Important dates
11/18/2025 : Enclosure box installed, requiring ferrule to be reseated.
10/2/2025 : First light on sky!
5/29/25 : new Shelyak FIGU installed. Calibration channel mirrors adjusted.
5/8/25 : initial spectrograph (re)assembly complete at APO
4/30/25 : optical table and vibration isolation supports installed in spectrograph room