construction_phase
Table of Contents
Project Management in Construction Phase
Work Breakdown Structure
The work breakdown structure (WBS) describes all project deliverables.
1 SONG in NM Construction
- 1.1 Project Management
- 1.1.1 NSF start (M)
- 1.1.2 WBS development and approval
- 1.1.3 Project schedule development and approval
- 1.1.4 MOU documents
- 1.1.5 Postdoc
- 1.1.6 Budget
- 1.1.7 Contracting
- 1.1.8 Reporting Documentation
- 1.2 Facilities
- 1.3 Telescope Systems
- 1.3.2 Monitors
- 1.3.3 Remote communication system
- 1.3.3.1 Hardware
- 1.3.3.2 Observatory control system (OCS)
- 1.3.3.3 Telescope control system (TCS)
- 1.4 Instrument Systems
- 1.4.1 SONG spectrograph
- 1.4.1.1 Optical design
- 1.4.1.2 Standard item procurement
- 1.4.1.3 Specialty item procurement
- 1.4.1.4 Optical table
- 1.4.1.5 Lab assembly
- 1.4.1.6 Control computers and software
- 1.4.1.7 Thermal enclosure
- 1.4.1.8 Monitors
- 1.4.1.9 Lab testing and acceptance
- 1.4.1.10 Transport to APO
- 1.4.1.11 Reassembly and integration
- 1.4.1.12 Site testing and acceptance
- 1.4.2 Guider unit
- 1.4.2.1 Design and assembly
- 1.4.2.2 Lab testing and acceptance
- 1.4.2.3 Transport to APO
- 1.4.2.4 Reassembly and integration
- 1.4.2.5 Site testing and acceptance
- 1.4.3 Calibration unit
- 1.4.3.1 Design and assembly
- 1.4.3.2 Lab testing and acceptance
- 1.4.3.3 Transport to APO
- 1.4.3.4 Reassembly and integration
- 1.4.3.5 Site testing and acceptance
- 1.4.4 Solar telescope (tbd)
- 1.5 Network Software
- 1.5.1 Scheduler
- 1.5.2 Data handling system (DHS)
- 1.5.3 Monitors database and webpage
- 1.6 Integration, Test, and Commissioning
- 1.6.1 Software integration
- 1.6.2 First light through telescope
- 1.6.3 First light through spectrograph
- 1.6.4 Science verification
- 1.6.5 NSF end
- 1.7 Contingency
- 1.7.1 Cost contingency
- 1.7.2 Schedule contingency
- 1.7.3 Scope contingency
Schedule
Update / item tracking
Tasks identified February 2025:
Spectrograph
continued work on alignment, esp with “point” sourceinstallation of prisminstallation of camerainstallation of focuser + detectortesting with calibration source? solar source?
Calibration channel
assembly of relay optics / stage at focal planedevelopment of calibration source : Shelyak possibility? Selectable sources by stage? Integrating sphere?
Fiber
- getting long fiber run + ferrule. All circular fiber? match 125 micron cladding or not? Fusing 50/75/125 micron cladding onto other 50 micron fiber at focal plane side? Fusing hexagonal fiber onto circular 50 micron fiber at ferrule side?
- running fiber through conduit
Spectrograph room
legs for table- insulating box for spectrograph
making room in APO roomconfirming power (UPS) and Ethernet- relay/thermocouple control/computer packaging
location of pumpmore thermocouples for monitoring instrument
FPU box
- cover
- cabling
Dome
- lower slit control
- packaging of dome control
- spare computer and Raspberry Pi?
Software
- interfacing Aarhus with APO
construction_phase.txt · Last modified: 2025/05/12 17:50 by holtz