dates
This is an old revision of the document!
Important dates
5/29/25 : new Shelyak FIGU installed. Calibration channel mirrors adjusted.
5/8/25 : initial spectrograph (re)assembly complete at APO
4/30/25 : optical table and vibration isolation supports installed in spectrograph room
dates.1748626647.txt.gz · Last modified: by 172.59.0.80 · Currently locked by: 216.73.216.40