-===== SONG in New Mexico Status ===== +====== SONG in New Mexico Status ====== 
-(updated 5/30/2025)+(updated 3/2026)
  
-Major upcoming milestones:+The SONG spectrograph is assembled and carrying out science observations at Apache Point Observatory.
  
-  * <del>Mount focal plane unit on port 2, test guiding with/without iodine cell (9/4/2024)</del> +Major milestones: 
-  * <del>Visit by F. Grundahl (Aug. 4-17/2024)</del> + 
-  * <del>Initial alignment and collimation of spectrograph</del> +  * Integration with SONG network, January 2026 
-  * <del>Manufacture aluminum focal plane platform</del+  * Commissioning has begun, October 2025 ---
-  * <del>Finalize focal plane unit design</del> +  * FIRST LIGHT! October 22025 
-  * Test image quality and dome seeing +  * Fiber installed in conduit. September 2025 
-  * <del> PW1000 installJanuary 17/18, 2024</del> +  * Received optical fibers. July 2025
-  * <del> Receive iodine cell </del> +
-  * <del> Receive echelle grating </del>+
          
  
Line 27: Line 25:
  
  
-[[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]]+/* [[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]] */ 
 + 
 +===== SONG Newsletters ===== 
 +  * March 2026, Vol. 1: {{ :docs:song-newsletter-vol-1.pdf |}} 
 +  * March 2025, Vol. 0: {{ :docs:song-newsletter-vol-0.pdf |}}
  