 +====October 31 2026====
 +
 +- QHY camera apparently recovered! although lots of ups and downs along the way, with it seeming to fail, but eventually got it working (not that software would keep turning it off until chiller fault was commented out). Replaced chiller with Coolance pump, at pump speed 8, seem to be able to achieve -20 C at cooler power ~68%.
 +
 +- investigated watchdog system and recognized that perhaps relay trigger needs to be on for more than one second to trigger watchdog reset.Changed to 5 seconds and testing...seems to be holding.
 +
 +- cal fiber shutter not working due to apparent relay failure. Replaced LCUS relay with Noyito relay
 +
 +- swapped channel 1 purple wire thermocouple for failed black wire thermocouple. Note that the half of the cell that wasn't being heated was not achieving temperature; both channels apparently need to be enabled (I had previously disabled channel 1 because of the erratic sensor readings).
 +
 +- checked lower dome, wouldn't open at first, but did after pushing on latch. On first two closes, didn't trigger stop switch, but after that, it did
 +
 +====October 20 2026====
 +
 +Catastrophic (?) failure of chiller. CCD held temperature about 10 minutes as thermocouples rose, then CCD power hit 100% and CCD temperature rose over 10 minutes, then perhaps power set to zero, then no response from CCD. Couldn't get CCD  to respond despite power cycles. Had Tracey unplug CCD after about 2 days.
 +
 ====August 2026==== ====August 2026====
  