:manage
Upload a file to the current namespace here. To create subnamespaces, prepend them to your filename separated by colons after you selected the files. Files can also be selected by drag and drop.
Upload max. 2 MB per file. List of allowed file extensions jpg, jpeg, gif, png, webp, ico, mp3, ogg, wav, webm, ogv, mp4, vtt, tgz, tar, gz, bz2, zip, rar, 7z, pdf, ps, rpm, deb, doc, xls, ppt, rtf, docx, xlsx, pptx, sxw, sxc, sxi, sxd, odc, odf, odg, odi, odp, ods, odt, svg
project_schedule.png (911×725 2023/08/03 19:28 27.6 KB)


Use the following syntax to reference this file:
{{:manage:project_schedule.png}}