 +===== Update / item tracking  =====
 +
 +Tasks identified February 2025:
 +
 +Spectrograph
 +  - <del>continued work on alignment, esp with "point" source</del>
 +  - <del>installation of prism</del>
 +  - <del>installation of camera</del>
 +  - <del>installation of focuser + detector</del> 
 +  - <del>testing with calibration source? solar source?</del>
 +
 +Calibration channel
 +  - <del>assembly of relay optics / stage at focal plane</del>
 +  - <del>development of calibration source : Shelyak possibility? Selectable sources by stage? Integrating sphere?</del>
 +
 +Fiber
 +  - getting long fiber run + ferrule. All circular fiber? match 125 micron cladding or not?  Fusing 50/75/125 micron cladding onto other 50 micron fiber at focal plane side?  Fusing hexagonal fiber onto circular 50 micron fiber at ferrule side?
 +  - running fiber through conduit
 +
 +Spectrograph room
 +  - <del>legs for table</del>
 +  - insulating box for spectrograph
 +  - <del>making room in APO room</del> 
 +  - <del>confirming power (UPS) and Ethernet</del>
 +  - relay/thermocouple control/computer packaging
 +  - <del>location of pump</del>
 +  - <del>more thermocouples for monitoring instrument</del>
 +
 +FPU box
 +  - cover
 +  - cabling
 +
 +Dome
 +  - lower slit control
 +  - packaging of dome control
 +  - spare computer and Raspberry Pi?
 +
 +Software
 +  - interfacing Aarhus with APO