User Tools

Site Tools


construction_phase

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
construction_phase [2023/11/09 19:34] jasonjconstruction_phase [2025/05/12 17:50] (current) holtz
Line 16: Line 16:
     *1.1.8 Reporting Documentation     *1.1.8 Reporting Documentation
   *1.2 Facilities   *1.2 Facilities
-    *1.2.1 1-m dome+    *1.2.1 [[observatory_dome_and_pier|1-m dome]]
       *1.2.1.1 Preparation work       *1.2.1.1 Preparation work
       *1.2.1.2 Telescope removal       *1.2.1.2 Telescope removal
Line 22: Line 22:
     *1.2.2 NMSU lab facility     *1.2.2 NMSU lab facility
     *1.2.3 APO lab facility     *1.2.3 APO lab facility
-    *1.2.4 Fiber  run+    *1.2.4 [[fiber_run|Fiber  run]]
       *1.2.4.1 Design       *1.2.4.1 Design
       *1.2.4.2 Fabrication, procurement, installation       *1.2.4.2 Fabrication, procurement, installation
   *1.3 Telescope Systems   *1.3 Telescope Systems
-    *1.3.1 [[planewave_1000|PlaneWave 1000]]| 1-m telescope (vendor)]]+    *1.3.1 [[planewave_1000#Installation|PlaneWave 1000 1-m telescope (vendor)]]
     *1.3.2 Monitors     *1.3.2 Monitors
     *1.3.3 Remote communication system     *1.3.3 Remote communication system
       *1.3.3.1 Hardware       *1.3.3.1 Hardware
       *1.3.3.2 Observatory control system (OCS)       *1.3.3.2 Observatory control system (OCS)
-      *1.3.3.3 Telescope control system (TCS)+      *1.3.3.3 [[software|Telescope control system]] (TCS)
   *1.4 Instrument Systems   *1.4 Instrument Systems
     *1.4.1 [[song_spectrograph|SONG spectrograph]]     *1.4.1 [[song_spectrograph|SONG spectrograph]]
Line 46: Line 46:
       *1.4.1.11 Reassembly and integration       *1.4.1.11 Reassembly and integration
       *1.4.1.12 Site testing and acceptance       *1.4.1.12 Site testing and acceptance
-    *1.4.2 Guider unit+    *1.4.2 [[focal_plane_unit|Guider unit]]
       *1.4.2.1 Design and assembly       *1.4.2.1 Design and assembly
       *1.4.2.2 Lab testing and acceptance       *1.4.2.2 Lab testing and acceptance
Line 81: Line 81:
 {{:manage:project_schedule.png?direct&500 |}} {{:manage:project_schedule.png?direct&500 |}}
  
 +
 +===== Update / item tracking  =====
 +
 +Tasks identified February 2025:
 +
 +Spectrograph
 +  - <del>continued work on alignment, esp with "point" source</del>
 +  - <del>installation of prism</del>
 +  - <del>installation of camera</del>
 +  - <del>installation of focuser + detector</del> 
 +  - <del>testing with calibration source? solar source?</del>
 +
 +Calibration channel
 +  - <del>assembly of relay optics / stage at focal plane</del>
 +  - <del>development of calibration source : Shelyak possibility? Selectable sources by stage? Integrating sphere?</del>
 +
 +Fiber
 +  - getting long fiber run + ferrule. All circular fiber? match 125 micron cladding or not?  Fusing 50/75/125 micron cladding onto other 50 micron fiber at focal plane side?  Fusing hexagonal fiber onto circular 50 micron fiber at ferrule side?
 +  - running fiber through conduit
 +
 +Spectrograph room
 +  - <del>legs for table</del>
 +  - insulating box for spectrograph
 +  - <del>making room in APO room</del> 
 +  - <del>confirming power (UPS) and Ethernet</del>
 +  - relay/thermocouple control/computer packaging
 +  - <del>location of pump</del>
 +  - <del>more thermocouples for monitoring instrument</del>
 +
 +FPU box
 +  - cover
 +  - cabling
 +
 +Dome
 +  - lower slit control
 +  - packaging of dome control
 +  - spare computer and Raspberry Pi?
 +
 +Software
 +  - interfacing Aarhus with APO