| Line 16: | Line 16: | ||
| *1.1.8 Reporting Documentation | *1.1.8 Reporting Documentation | ||
| *1.2 Facilities | *1.2 Facilities | ||
| - | *1.2.1 1-m dome | + | *1.2.1 |
| *1.2.1.1 Preparation work | *1.2.1.1 Preparation work | ||
| *1.2.1.2 Telescope removal | *1.2.1.2 Telescope removal | ||
| Line 22: | Line 22: | ||
| *1.2.2 NMSU lab facility | *1.2.2 NMSU lab facility | ||
| *1.2.3 APO lab facility | *1.2.3 APO lab facility | ||
| - | *1.2.4 Fiber run | + | *1.2.4 |
| *1.2.4.1 Design | *1.2.4.1 Design | ||
| *1.2.4.2 Fabrication, | *1.2.4.2 Fabrication, | ||
| *1.3 Telescope Systems | *1.3 Telescope Systems | ||
| - | *1.3.1 | + | *1.3.1 [[planewave_1000# |
| *1.3.2 Monitors | *1.3.2 Monitors | ||
| *1.3.3 Remote communication system | *1.3.3 Remote communication system | ||
| *1.3.3.1 Hardware | *1.3.3.1 Hardware | ||
| *1.3.3.2 Observatory control system (OCS) | *1.3.3.2 Observatory control system (OCS) | ||
| - | *1.3.3.3 Telescope control system (TCS) | + | *1.3.3.3 |
| *1.4 Instrument Systems | *1.4 Instrument Systems | ||
| *1.4.1 [[song_spectrograph|SONG spectrograph]] | *1.4.1 [[song_spectrograph|SONG spectrograph]] | ||
| Line 46: | Line 46: | ||
| *1.4.1.11 Reassembly and integration | *1.4.1.11 Reassembly and integration | ||
| *1.4.1.12 Site testing and acceptance | *1.4.1.12 Site testing and acceptance | ||
| - | *1.4.2 Guider unit | + | *1.4.2 |
| *1.4.2.1 Design and assembly | *1.4.2.1 Design and assembly | ||
| *1.4.2.2 Lab testing and acceptance | *1.4.2.2 Lab testing and acceptance | ||
| Line 81: | Line 81: | ||
| {{: | {{: | ||
| + | |||
| + | ===== Update / item tracking | ||
| + | |||
| + | Tasks identified February 2025: | ||
| + | |||
| + | Spectrograph | ||
| + | - < | ||
| + | - < | ||
| + | - < | ||
| + | - < | ||
| + | - < | ||
| + | |||
| + | Calibration channel | ||
| + | - < | ||
| + | - < | ||
| + | |||
| + | Fiber | ||
| + | - getting long fiber run + ferrule. All circular fiber? match 125 micron cladding or not? Fusing 50/75/125 micron cladding onto other 50 micron fiber at focal plane side? Fusing hexagonal fiber onto circular 50 micron fiber at ferrule side? | ||
| + | - running fiber through conduit | ||
| + | |||
| + | Spectrograph room | ||
| + | - < | ||
| + | - insulating box for spectrograph | ||
| + | - < | ||
| + | - < | ||
| + | - relay/ | ||
| + | - < | ||
| + | - < | ||
| + | |||
| + | FPU box | ||
| + | - cover | ||
| + | - cabling | ||
| + | |||
| + | Dome | ||
| + | - lower slit control | ||
| + | - packaging of dome control | ||
| + | - spare computer and Raspberry Pi? | ||
| + | |||
| + | Software | ||
| + | - interfacing Aarhus with APO | ||