construction_phase
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
construction_phase [2023/08/03 18:55] – jasonj | construction_phase [2025/05/12 17:50] (current) – holtz | ||
---|---|---|---|
Line 16: | Line 16: | ||
*1.1.8 Reporting Documentation | *1.1.8 Reporting Documentation | ||
*1.2 Facilities | *1.2 Facilities | ||
- | *1.2.1 1-m dome | + | *1.2.1 |
*1.2.1.1 Preparation work | *1.2.1.1 Preparation work | ||
*1.2.1.2 Telescope removal | *1.2.1.2 Telescope removal | ||
Line 22: | Line 22: | ||
*1.2.2 NMSU lab facility | *1.2.2 NMSU lab facility | ||
*1.2.3 APO lab facility | *1.2.3 APO lab facility | ||
- | *1.2.4 Fiber run | + | *1.2.4 |
*1.2.4.1 Design | *1.2.4.1 Design | ||
*1.2.4.2 Fabrication, | *1.2.4.2 Fabrication, | ||
*1.3 Telescope Systems | *1.3 Telescope Systems | ||
- | *1.3.1 1-m telescope (vendor) | + | *1.3.1 |
*1.3.2 Monitors | *1.3.2 Monitors | ||
*1.3.3 Remote communication system | *1.3.3 Remote communication system | ||
*1.3.3.1 Hardware | *1.3.3.1 Hardware | ||
*1.3.3.2 Observatory control system (OCS) | *1.3.3.2 Observatory control system (OCS) | ||
- | *1.3.3.3 Telescope control system (TCS) | + | *1.3.3.3 |
*1.4 Instrument Systems | *1.4 Instrument Systems | ||
- | *1.4.1 SONG spectrograph | + | *1.4.1 |
*1.4.1.1 Optical design | *1.4.1.1 Optical design | ||
*1.4.1.2 Standard item procurement | *1.4.1.2 Standard item procurement | ||
Line 46: | Line 46: | ||
*1.4.1.11 Reassembly and integration | *1.4.1.11 Reassembly and integration | ||
*1.4.1.12 Site testing and acceptance | *1.4.1.12 Site testing and acceptance | ||
- | *1.4.2 Guider unit | + | *1.4.2 |
*1.4.2.1 Design and assembly | *1.4.2.1 Design and assembly | ||
*1.4.2.2 Lab testing and acceptance | *1.4.2.2 Lab testing and acceptance | ||
Line 77: | Line 77: | ||
===== Schedule ===== | ===== Schedule ===== | ||
+ | A high-level picture of the construction project schedule as of August, 2023 is shown here. | ||
+ | {{: | ||
+ | |||
+ | |||
+ | ===== Update / item tracking | ||
+ | |||
+ | Tasks identified February 2025: | ||
+ | |||
+ | Spectrograph | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
+ | |||
+ | Calibration channel | ||
+ | - < | ||
+ | - < | ||
+ | |||
+ | Fiber | ||
+ | - getting long fiber run + ferrule. All circular fiber? match 125 micron cladding or not? Fusing 50/75/125 micron cladding onto other 50 micron fiber at focal plane side? Fusing hexagonal fiber onto circular 50 micron fiber at ferrule side? | ||
+ | - running fiber through conduit | ||
+ | |||
+ | Spectrograph room | ||
+ | - < | ||
+ | - insulating box for spectrograph | ||
+ | - < | ||
+ | - < | ||
+ | - relay/ | ||
+ | - < | ||
+ | - < | ||
+ | |||
+ | FPU box | ||
+ | - cover | ||
+ | - cabling | ||
+ | |||
+ | Dome | ||
+ | - lower slit control | ||
+ | - packaging of dome control | ||
+ | - spare computer and Raspberry Pi? | ||
+ | |||
+ | Software | ||
+ | - interfacing Aarhus with APO |
construction_phase.1691088915.txt.gz · Last modified: 2023/08/03 18:55 by jasonj