Log opened at Mon, Feb 06 2023 01:28:20 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-02-06 01:28:21.1: Periodic AF schedule reset. Interval is now 1.0 hours 2023-02-06 01:28:21.1: Last AutoFocus was completed at 03-Feb-2023 12:27:58 UTC 2023-02-06 01:28:21.1: Autofocus will be done ASAP. 2023-02-06 01:28:21.1: ++ Observatory Startup ++ 2023-02-06 01:28:21.1: Weather safety is now disabled 2023-02-06 01:28:21.1: Start ACP Sequencer's StartupObs script 2023-02-06 01:29:07.6: Weather safety is re-enabled 2023-02-06 01:29:07.6: Weather safety is now disabled 2023-02-06 01:29:07.6: Open the observatory dome/roof 2023-02-06 01:30:08.4: Weather safety is re-enabled 2023-02-06 01:30:08.4: Observatory startup succeeded, and dome opened successfully 2023-02-06 01:30:08.4: Periodic AF schedule reset. Interval is now 1.0 hours 2023-02-06 01:30:08.4: Last AutoFocus was completed at 03-Feb-2023 12:27:58 UTC 2023-02-06 01:30:08.4: Autofocus will be done ASAP. 2023-02-06 01:39:15.3: ++ Auto Focus ++ 2023-02-06 01:39:15.3: Doing periodic autofocus. 2023-02-06 01:39:15.3: Start special ACP AutoFocus script for scheduler 2023-02-06 01:45:07.3: Next periodic autofocus ASAP after 3600sec. 06-Feb-2023 02:44:47 UTC 2023-02-06 01:45:09.0: Plan V1674_Her has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan GZ_Cnc has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan PKS_1222+216 has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan HS1340+1524 has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan OJ287 has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan U_Leo has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan BX_Pup has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan NSV-6690 has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Plan V504_Per has Monitor Mode. Time to resubmit it. 2023-02-06 01:45:09.0: Rising plan delay enabled for Plan AO_Aur: 2023-02-06 01:45:09.0: 414 min. remaining to meet strict constraints. 2023-02-06 01:45:09.0: 669 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.0: but only 121 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.0: deferred (rising) for 120 min, until 06-Feb-2023 03:45:56 UTC 2023-02-06 01:45:09.0: Rising plan delay enabled for Plan AO_Aur: 2023-02-06 01:45:09.0: 414 min. remaining to meet strict constraints. 2023-02-06 01:45:09.0: 670 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.0: but only 121 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.0: deferred (rising) for 120 min, until 06-Feb-2023 03:46:03 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-02-06 01:45:09.1: 338 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 659 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 137 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 135 min, until 06-Feb-2023 04:01:02 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-02-06 01:45:09.1: 338 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 654 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 135 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 133 min, until 06-Feb-2023 03:58:29 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan CW_Mon: 2023-02-06 01:45:09.1: 389 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 671 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 171 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 170 min, until 06-Feb-2023 04:35:50 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan CW_Mon: 2023-02-06 01:45:09.1: 389 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 669 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 170 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 169 min, until 06-Feb-2023 04:35:03 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan ER_Aur: 2023-02-06 01:45:09.1: 398 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 85 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 84 min, until 06-Feb-2023 03:09:12 UTC 2023-02-06 01:45:09.1: Rising plan delay enabled for Plan ER_Aur: 2023-02-06 01:45:09.1: 398 min. remaining to meet strict constraints. 2023-02-06 01:45:09.1: 665 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.1: but only 85 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.1: deferred (rising) for 83 min, until 06-Feb-2023 03:09:01 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan FS_Aur: 2023-02-06 01:45:09.2: 408 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 120 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 119 min, until 06-Feb-2023 03:44:17 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan FS_Aur: 2023-02-06 01:45:09.2: 408 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 120 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 119 min, until 06-Feb-2023 03:44:17 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan GR_Ori: 2023-02-06 01:45:09.2: 317 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 670 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 95 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 95 min, until 06-Feb-2023 03:20:17 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan GR_Ori: 2023-02-06 01:45:09.2: 317 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 670 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 95 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 95 min, until 06-Feb-2023 03:20:17 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan HQ_Mon: 2023-02-06 01:45:09.2: 426 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 668 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 204 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 203 min, until 06-Feb-2023 05:08:54 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan HQ_Mon: 2023-02-06 01:45:09.2: 426 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 668 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 204 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 203 min, until 06-Feb-2023 05:08:58 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan HQ_Per: 2023-02-06 01:45:09.2: 367 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 667 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 56 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 55 min, until 06-Feb-2023 02:40:48 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan HQ_Per: 2023-02-06 01:45:09.2: 367 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 663 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 54 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 53 min, until 06-Feb-2023 02:38:34 UTC 2023-02-06 01:45:09.2: Rising plan delay enabled for Plan J072816: 2023-02-06 01:45:09.2: 604 min. remaining to meet strict constraints. 2023-02-06 01:45:09.2: 650 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.2: but only 212 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.2: deferred (rising) for 209 min, until 06-Feb-2023 05:14:51 UTC 2023-02-06 01:45:09.3: Rising plan delay enabled for Plan J072816: 2023-02-06 01:45:09.3: 604 min. remaining to meet strict constraints. 2023-02-06 01:45:09.3: 650 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.3: but only 212 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.3: deferred (rising) for 209 min, until 06-Feb-2023 05:14:51 UTC 2023-02-06 01:45:09.3: Rising plan delay enabled for Plan KN_Lyn: 2023-02-06 01:45:09.3: 632 min. remaining to meet strict constraints. 2023-02-06 01:45:09.3: 647 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.3: but only 258 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.3: deferred (rising) for 255 min, until 06-Feb-2023 06:00:57 UTC 2023-02-06 01:45:09.3: Plan M67 deferred, too early 2023-02-06 01:45:09.3: Plan Melotte_111 deferred, too early 2023-02-06 01:45:09.4: Rising plan delay enabled for Plan MP_Gem: 2023-02-06 01:45:09.4: 451 min. remaining to meet strict constraints. 2023-02-06 01:45:09.4: 620 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.4: but only 157 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.4: deferred (rising) for 151 min, until 06-Feb-2023 04:17:01 UTC 2023-02-06 01:45:09.4: Rising plan delay enabled for Plan MP_Gem: 2023-02-06 01:45:09.4: 451 min. remaining to meet strict constraints. 2023-02-06 01:45:09.4: 645 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.4: but only 169 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.4: deferred (rising) for 166 min, until 06-Feb-2023 04:31:45 UTC 2023-02-06 01:45:09.5: Plan NGC_7790 deferred, too early 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan NQ_Gem: 2023-02-06 01:45:09.5: 504 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 668 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 224 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 223 min, until 06-Feb-2023 05:29:00 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 01:45:09.5: 297 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 660 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 30 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 29 min, until 06-Feb-2023 02:14:18 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 01:45:09.5: 297 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 660 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 30 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 29 min, until 06-Feb-2023 02:14:18 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan OI_158: 2023-02-06 01:45:09.5: 496 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 663 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 228 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 227 min, until 06-Feb-2023 05:32:29 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan OI_158: 2023-02-06 01:45:09.5: 496 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 663 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 228 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 227 min, until 06-Feb-2023 05:32:29 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan QZ_Aur: 2023-02-06 01:45:09.5: 398 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 647 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 91 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 88 min, until 06-Feb-2023 03:13:20 UTC 2023-02-06 01:45:09.5: Rising plan delay enabled for Plan QZ_Aur: 2023-02-06 01:45:09.5: 398 min. remaining to meet strict constraints. 2023-02-06 01:45:09.5: 647 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.5: but only 91 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.5: deferred (rising) for 88 min, until 06-Feb-2023 03:13:20 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan S_Ori: 2023-02-06 01:45:09.6: 306 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 660 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 98 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 96 min, until 06-Feb-2023 03:21:53 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan S5_0716+714: 2023-02-06 01:45:09.6: 584 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 673 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 217 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 216 min, until 06-Feb-2023 05:22:00 UTC 2023-02-06 01:45:09.6: [AirmassRange] Target will never be below the maximum air mass 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan SU_Lyn: 2023-02-06 01:45:09.6: 511 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 674 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 178 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 178 min, until 06-Feb-2023 04:43:27 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan SU_Lyn: 2023-02-06 01:45:09.6: 511 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 672 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 177 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 177 min, until 06-Feb-2023 04:42:25 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan TV_Cam: 2023-02-06 01:45:09.6: 365 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 665 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 19 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 18 min, until 06-Feb-2023 02:03:39 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan TV_Cam: 2023-02-06 01:45:09.6: 365 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 20 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 18 min, until 06-Feb-2023 02:04:07 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan TV_Cam: 2023-02-06 01:45:09.6: 365 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 19 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 18 min, until 06-Feb-2023 02:03:59 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan V1112_Per: 2023-02-06 01:45:09.6: 358 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 661 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 39 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 37 min, until 06-Feb-2023 02:22:39 UTC 2023-02-06 01:45:09.6: Rising plan delay enabled for Plan V1261_Ori: 2023-02-06 01:45:09.6: 284 min. remaining to meet strict constraints. 2023-02-06 01:45:09.6: 674 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.6: but only 98 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.6: deferred (rising) for 97 min, until 06-Feb-2023 03:23:05 UTC 2023-02-06 01:45:09.7: Rising plan delay enabled for Plan V1647_Ori: 2023-02-06 01:45:09.7: 338 min. remaining to meet strict constraints. 2023-02-06 01:45:09.7: 662 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.7: but only 116 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.7: deferred (rising) for 114 min, until 06-Feb-2023 03:40:05 UTC 2023-02-06 01:45:09.7: [AirmassRange] Target will never be below the maximum air mass 2023-02-06 01:45:09.7: [AirmassRange] Target will never be below the maximum air mass 2023-02-06 01:45:09.7: Rising plan delay enabled for Plan V582_Aur: 2023-02-06 01:45:09.7: 397 min. remaining to meet strict constraints. 2023-02-06 01:45:09.7: 667 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.7: but only 98 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.7: deferred (rising) for 97 min, until 06-Feb-2023 03:22:20 UTC 2023-02-06 01:45:09.7: Rising plan delay enabled for Plan V582_Aur: 2023-02-06 01:45:09.7: 397 min. remaining to meet strict constraints. 2023-02-06 01:45:09.7: 667 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.7: but only 98 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.7: deferred (rising) for 97 min, until 06-Feb-2023 03:22:20 UTC 2023-02-06 01:45:09.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-06 01:45:09.8: 403 min. remaining to meet strict constraints. 2023-02-06 01:45:09.8: 606 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.8: but only 165 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.8: deferred (rising) for 158 min, until 06-Feb-2023 04:23:55 UTC 2023-02-06 01:45:09.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-06 01:45:09.8: 403 min. remaining to meet strict constraints. 2023-02-06 01:45:09.8: 609 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.8: 75194 min. remaining for the plan to fit before "must run before" time. 2023-02-06 01:45:09.8: but only 167 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.8: deferred (rising) for 160 min, until 06-Feb-2023 04:25:40 UTC 2023-02-06 01:45:09.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-06 01:45:09.8: 437 min. remaining to meet strict constraints. 2023-02-06 01:45:09.8: 655 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.8: but only 190 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.8: deferred (rising) for 188 min, until 06-Feb-2023 04:53:23 UTC 2023-02-06 01:45:09.8: Rising plan delay enabled for Plan YZ_Aur: 2023-02-06 01:45:09.8: 397 min. remaining to meet strict constraints. 2023-02-06 01:45:09.8: 670 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.8: but only 89 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.8: deferred (rising) for 88 min, until 06-Feb-2023 03:13:55 UTC 2023-02-06 01:45:09.8: Rising plan delay enabled for Plan YZ_Aur: 2023-02-06 01:45:09.8: 397 min. remaining to meet strict constraints. 2023-02-06 01:45:09.8: 666 min. remaining for the plan to fit before dawn. 2023-02-06 01:45:09.8: but only 87 min till start so Plan transits mid-way in its time span. 2023-02-06 01:45:09.8: deferred (rising) for 86 min, until 06-Feb-2023 03:11:40 UTC 2023-02-06 01:45:09.9: Dispatcher cycle time: 2.6 sec. 2023-02-06 01:45:09.9: Acquire data for Observation V630_Cas... 2023-02-06 01:45:09.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3464, Plan V630_Cas) 2023-02-06 01:45:10.0: Send Observation V630_Cas to ACP Sequencer 2023-02-06 01:57:04.6: Acquisition time: 714.6804326 sec. 2023-02-06 01:57:04.6: Data for Observation V630_Cas of Plan V630_Cas acquired successfully. 2023-02-06 01:57:04.6: Plan V630_Cas completed successfully. 2023-02-06 01:57:04.6: Image Efficiency: 75.3% 2023-02-06 01:57:04.6: Cycle Efficiency: 99.6% 2023-02-06 01:57:04.8: Rising plan delay enabled for Plan L1022_IRS: 2023-02-06 01:57:04.8: 368 min. remaining to meet strict constraints. 2023-02-06 01:57:04.8: 655 min. remaining for the plan to fit before dawn. 2023-02-06 01:57:04.8: but only 178 min till start so Plan transits mid-way in its time span. 2023-02-06 01:57:04.8: deferred (rising) for 176 min, until 06-Feb-2023 04:54:03 UTC 2023-02-06 01:57:04.8: Rising plan delay enabled for Plan L1022_IRS: 2023-02-06 01:57:04.8: 368 min. remaining to meet strict constraints. 2023-02-06 01:57:04.8: 655 min. remaining for the plan to fit before dawn. 2023-02-06 01:57:04.8: but only 178 min till start so Plan transits mid-way in its time span. 2023-02-06 01:57:04.8: deferred (rising) for 176 min, until 06-Feb-2023 04:54:03 UTC 2023-02-06 01:57:04.8: Rising plan delay enabled for Plan RY_Lep: 2023-02-06 01:57:04.8: 237 min. remaining to meet strict constraints. 2023-02-06 01:57:04.8: 625 min. remaining for the plan to fit before dawn. 2023-02-06 01:57:04.8: but only 94 min till start so Plan transits mid-way in its time span. 2023-02-06 01:57:04.8: deferred (rising) for 90 min, until 06-Feb-2023 03:27:12 UTC 2023-02-06 01:57:04.9: Rising plan delay enabled for Plan V900_Mon: 2023-02-06 01:57:04.9: 368 min. remaining to meet strict constraints. 2023-02-06 01:57:04.9: 641 min. remaining for the plan to fit before dawn. 2023-02-06 01:57:04.9: but only 170 min till start so Plan transits mid-way in its time span. 2023-02-06 01:57:04.9: deferred (rising) for 168 min, until 06-Feb-2023 04:45:24 UTC 2023-02-06 01:57:04.9: Rising plan delay enabled for Plan V900_Mon: 2023-02-06 01:57:04.9: 368 min. remaining to meet strict constraints. 2023-02-06 01:57:04.9: 641 min. remaining for the plan to fit before dawn. 2023-02-06 01:57:04.9: but only 170 min till start so Plan transits mid-way in its time span. 2023-02-06 01:57:04.9: deferred (rising) for 168 min, until 06-Feb-2023 04:45:24 UTC 2023-02-06 01:57:05.0: Dispatcher cycle time: 0.3 sec. 2023-02-06 01:57:05.0: Acquire data for Observation TT_Ari... 2023-02-06 01:57:05.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3464, Plan TT_Ari) 2023-02-06 01:57:05.0: Send Observation TT_Ari to ACP Sequencer 2023-02-06 02:18:36.3: Acquisition time: 1291.305883 sec. 2023-02-06 02:18:36.3: Data for Observation TT_Ari of Plan TT_Ari acquired successfully. 2023-02-06 02:18:36.3: Plan TT_Ari completed successfully. 2023-02-06 02:18:36.3: Image Efficiency: 83.6% 2023-02-06 02:18:36.3: Cycle Efficiency: 100.0% 2023-02-06 02:18:36.5: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-02-06 02:18:36.5: 367 min. remaining to meet strict constraints. 2023-02-06 02:18:36.5: 627 min. remaining for the plan to fit before dawn. 2023-02-06 02:18:36.5: but only 165 min till start so Plan transits mid-way in its time span. 2023-02-06 02:18:36.5: deferred (rising) for 163 min, until 06-Feb-2023 05:02:00 UTC 2023-02-06 02:18:36.5: Rising plan delay enabled for Plan NGC_1904: 2023-02-06 02:18:36.5: 150 min. remaining to meet strict constraints. 2023-02-06 02:18:36.5: 625 min. remaining for the plan to fit before dawn. 2023-02-06 02:18:36.5: but only 58 min till start so Plan transits mid-way in its time span. 2023-02-06 02:18:36.5: deferred (rising) for 57 min, until 06-Feb-2023 03:15:37 UTC 2023-02-06 02:18:36.5: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 02:18:36.5: 263 min. remaining to meet strict constraints. 2023-02-06 02:18:36.5: 627 min. remaining for the plan to fit before dawn. 2023-02-06 02:18:36.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-02-06 02:18:36.5: ending rising plan delay. Plan is now eligible. 2023-02-06 02:18:36.5: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 02:18:36.5: 263 min. remaining to meet strict constraints. 2023-02-06 02:18:36.5: 627 min. remaining for the plan to fit before dawn. 2023-02-06 02:18:36.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-02-06 02:18:36.5: ending rising plan delay. Plan is now eligible. 2023-02-06 02:18:36.7: Dispatcher cycle time: 0.3 sec. 2023-02-06 02:18:36.7: Acquire data for Observation AZ_Cas... 2023-02-06 02:18:36.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3464, Plan AZ_Cas) 2023-02-06 02:18:36.7: Send Observation AZ_Cas to ACP Sequencer 2023-02-06 02:21:44.7: Acquisition time: 187.989552 sec. 2023-02-06 02:21:44.7: Data for Observation AZ_Cas of Plan AZ_Cas acquired successfully. 2023-02-06 02:21:44.7: Plan AZ_Cas completed successfully. 2023-02-06 02:21:44.7: Image Efficiency: 13.3% 2023-02-06 02:21:44.7: Cycle Efficiency: 99.8% 2023-02-06 02:21:44.9: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 02:21:44.9: 260 min. remaining to meet strict constraints. 2023-02-06 02:21:44.9: 624 min. remaining for the plan to fit before dawn. 2023-02-06 02:21:44.9: but only -5 min till start so Plan transits mid-way in its time span. 2023-02-06 02:21:44.9: ending rising plan delay. Plan is now eligible. 2023-02-06 02:21:44.9: Rising plan delay enabled for Plan NSVS_0421121: 2023-02-06 02:21:44.9: 260 min. remaining to meet strict constraints. 2023-02-06 02:21:44.9: 624 min. remaining for the plan to fit before dawn. 2023-02-06 02:21:44.9: but only -5 min till start so Plan transits mid-way in its time span. 2023-02-06 02:21:44.9: ending rising plan delay. Plan is now eligible. 2023-02-06 02:21:45.1: Dispatcher cycle time: 0.3 sec. 2023-02-06 02:21:45.1: Acquire data for Observation B0133+47... 2023-02-06 02:21:45.1: (belongs to Project AAVSO_MISC_RMU_AUTO_ver2706, Plan B0133+47) 2023-02-06 02:21:45.1: Send Observation B0133+47 to ACP Sequencer 2023-02-06 02:33:33.8: Acquisition time: 708.6798369 sec. 2023-02-06 02:33:33.8: Data for Observation B0133+47 of Plan B0133+47 acquired successfully. 2023-02-06 02:33:33.8: Plan B0133+47 completed successfully. 2023-02-06 02:33:33.8: Image Efficiency: 76.2% 2023-02-06 02:33:33.8: Cycle Efficiency: 100.0% 2023-02-06 02:33:34.2: Dispatcher cycle time: 0.2 sec. 2023-02-06 02:33:34.2: Acquire data for Observation AZ_Cas... 2023-02-06 02:33:34.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3464, Plan AZ_Cas) 2023-02-06 02:33:34.2: Send Observation AZ_Cas to ACP Sequencer 2023-02-06 02:35:56.1: Acquisition time: 141.9608036 sec. 2023-02-06 02:35:56.1: Data for Observation AZ_Cas of Plan AZ_Cas acquired successfully. 2023-02-06 02:35:56.1: Plan AZ_Cas completed successfully. 2023-02-06 02:35:56.1: Image Efficiency: 21.1% 2023-02-06 02:35:56.1: Cycle Efficiency: 99.8% 2023-02-06 02:35:56.5: Dispatcher cycle time: 0.2 sec. 2023-02-06 02:35:56.5: Acquire data for Observation V504_Per... 2023-02-06 02:35:56.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3464, Plan V504_Per) 2023-02-06 02:35:56.5: Send Observation V504_Per to ACP Sequencer 2023-02-06 02:44:29.7: Acquisition time: 513.1638292 sec. 2023-02-06 02:44:29.7: Data for Observation V504_Per of Plan V504_Per acquired successfully. 2023-02-06 02:44:29.7: Plan V504_Per completed successfully. 2023-02-06 02:44:29.7: Image Efficiency: 34.9% 2023-02-06 02:44:29.7: Cycle Efficiency: 100.0% 2023-02-06 02:44:29.8: Rising plan delay enabled for Plan HQ_Per: 2023-02-06 02:44:29.8: 307 min. remaining to meet strict constraints. 2023-02-06 02:44:29.8: 607 min. remaining for the plan to fit before dawn. 2023-02-06 02:44:29.8: but only -2 min till start so Plan transits mid-way in its time span. 2023-02-06 02:44:29.8: ending rising plan delay. Plan is now eligible. 2023-02-06 02:44:29.8: Rising plan delay enabled for Plan HQ_Per: 2023-02-06 02:44:29.8: 307 min. remaining to meet strict constraints. 2023-02-06 02:44:29.8: 604 min. remaining for the plan to fit before dawn. 2023-02-06 02:44:29.8: but only -4 min till start so Plan transits mid-way in its time span. 2023-02-06 02:44:29.8: ending rising plan delay. Plan is now eligible. 2023-02-06 02:44:30.0: Dispatcher cycle time: 0.2 sec. 2023-02-06 02:44:30.0: Acquire data for Observation DW_Cas... 2023-02-06 02:44:30.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3464, Plan DW_Cas) 2023-02-06 02:44:30.0: Send Observation DW_Cas to ACP Sequencer 2023-02-06 02:55:08.0: Acquisition time: 637.9577112 sec. 2023-02-06 02:55:08.0: Data for Observation DW_Cas of Plan DW_Cas acquired successfully. 2023-02-06 02:55:08.0: Plan DW_Cas completed successfully. 2023-02-06 02:55:08.0: Image Efficiency: 47.0% 2023-02-06 02:55:08.0: Cycle Efficiency: 100.0% 2023-02-06 02:55:08.1: ++ Auto Focus ++ 2023-02-06 02:55:08.1: Doing periodic autofocus. 2023-02-06 02:55:08.1: Start special ACP AutoFocus script for scheduler 2023-02-06 02:57:01.4: ACPSequencer: Failed to get ACP's DispatcherEnabled property. ACP is compromised. 2023-02-06 02:57:01.4: The callee (server [not server application]) is not available and disappeared; all connections are invalid. The call may have executed. (Exception from HRESULT: 0x80010007 (RPC_E_SERVER_DIED)) 2023-02-06 02:57:05.9: **ACP HAS BECOME COMPROMISED: 2023-02-06 02:57:05.9: Scheduler depends on ACP and yet ACP is frozen, dead, or otherwise compromised. 2023-02-06 02:57:05.9: If this happens again, please look at ACP. Is it running? Is a fatal error box visible? Is it frozen? 2023-02-06 02:57:05.9: Usually this is a result of a device or USB failure or lock-up. 2023-02-06 02:57:05.9: Running C:\windows\syswow64\cscript.exe 2023-02-06 02:57:05.9: Arguments: '//NoLogo "C:\Users\Public\Documents\ACP Config\Scheduler\ShutdownObs.js"' 2023-02-06 02:57:06.0: Results look OK, the tool returned this text: 2023-02-06 02:57:06.0: '' 2023-02-06 02:57:06.1: Run statistics: 2023-02-06 02:57:06.1: Observations: 291 2023-02-06 02:57:06.1: Considered: 4 2023-02-06 02:57:06.1: Completed: 0 2023-02-06 02:57:06.1: Skipped: 0 2023-02-06 02:57:06.1: Never Eligible: 287 2023-02-06 02:57:06.1: Failed: 4 2023-02-06 02:57:06.1: Shutter-Open efficiency: 68.98% 2023-02-06 02:57:06.1: Overall Efficiency: 99.90%