Log opened at Fri, Feb 03 2023 04:40:30 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-02-03 04:40:30.5: REAL TIME internal clock initialized at 03-Feb-2023 04:40:30 UTC 2023-02-03 04:40:30.5: Dispatcher started at 03-Feb-2023 04:40:30 UTC 2023-02-03 04:40:30.8: Loaded Constraint plugin AirMass 2023-02-03 04:40:30.8: Loaded Constraint plugin AirmassRange 2023-02-03 04:40:30.8: Loaded Constraint plugin Horizon 2023-02-03 04:40:30.8: Loaded Constraint plugin HourAngle 2023-02-03 04:40:30.8: Loaded Constraint plugin MoonAvoid 2023-02-03 04:40:30.9: Loaded Constraint plugin MoonDown 2023-02-03 04:40:30.9: Loaded Constraint plugin SkyCondition 2023-02-03 04:40:30.9: Loaded Constraint plugin TimeRange 2023-02-03 04:40:31.7: 215 plans are now pending. 2023-02-03 04:40:31.8: Attach ACP sequencer 2023-02-03 04:40:38.3: ++ Weather Safe ++ 2023-02-03 04:40:38.5: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2023-02-03 04:40:38.5: Sequencer does sky flats 2023-02-03 04:41:35.7: ++ Observatory Startup ++ 2023-02-03 04:41:35.7: Weather safety is now disabled 2023-02-03 04:41:35.7: Start ACP Sequencer's StartupObs script 2023-02-03 04:42:24.7: Weather safety is re-enabled 2023-02-03 04:42:24.7: Observatory startup succeeded 2023-02-03 04:42:24.7: Periodic AF schedule reset. Interval is now 1.0 hours 2023-02-03 04:42:24.7: Last AutoFocus was completed at 03-Feb-2023 04:22:59 UTC 2023-02-03 04:42:24.7: Next AutoFocus in 40.6 minutes or ASAP after that. 2023-02-03 04:42:26.5: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-02-03 04:42:26.5: 235 min. remaining to meet strict constraints. 2023-02-03 04:42:26.5: 485 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.5: but only 33 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.5: deferred (rising) for 31 min, until 03-Feb-2023 05:13:48 UTC 2023-02-03 04:42:26.6: Rising plan delay enabled for Plan CW_Mon: 2023-02-03 04:42:26.6: 224 min. remaining to meet strict constraints. 2023-02-03 04:42:26.6: 495 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.6: but only 5 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.6: deferred (rising) for 5 min, until 03-Feb-2023 04:47:37 UTC 2023-02-03 04:42:26.6: Rising plan delay enabled for Plan CW_Mon: 2023-02-03 04:42:26.6: 224 min. remaining to meet strict constraints. 2023-02-03 04:42:26.6: 494 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.6: but only 5 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.6: deferred (rising) for 4 min, until 03-Feb-2023 04:46:51 UTC 2023-02-03 04:42:26.7: Rising plan delay enabled for Plan GZ_Cnc: 2023-02-03 04:42:26.7: 407 min. remaining to meet strict constraints. 2023-02-03 04:42:26.7: 482 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.7: but only 157 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.7: deferred (rising) for 155 min, until 03-Feb-2023 07:18:19 UTC 2023-02-03 04:42:26.7: Rising plan delay enabled for Plan GZ_Cnc: 2023-02-03 04:42:26.7: 407 min. remaining to meet strict constraints. 2023-02-03 04:42:26.7: 482 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.7: but only 157 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.7: deferred (rising) for 155 min, until 03-Feb-2023 07:18:19 UTC 2023-02-03 04:42:26.7: Rising plan delay enabled for Plan HQ_Mon: 2023-02-03 04:42:26.7: 261 min. remaining to meet strict constraints. 2023-02-03 04:42:26.7: 493 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.7: but only 39 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.7: deferred (rising) for 38 min, until 03-Feb-2023 05:20:42 UTC 2023-02-03 04:42:26.7: Rising plan delay enabled for Plan HQ_Mon: 2023-02-03 04:42:26.7: 261 min. remaining to meet strict constraints. 2023-02-03 04:42:26.7: 491 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.7: but only 38 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.7: deferred (rising) for 37 min, until 03-Feb-2023 05:19:36 UTC 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan J072816: 2023-02-03 04:42:26.8: 438 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 475 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 46 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 44 min, until 03-Feb-2023 05:26:39 UTC 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan J072816: 2023-02-03 04:42:26.8: 438 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 475 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 46 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 44 min, until 03-Feb-2023 05:26:39 UTC 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan KN_Lyn: 2023-02-03 04:42:26.8: 466 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 469 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 91 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 88 min, until 03-Feb-2023 06:11:00 UTC 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan L1022_IRS: 2023-02-03 04:42:26.8: 215 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 492 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 24 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 23 min, until 03-Feb-2023 05:05:50 UTC 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan L1022_IRS: 2023-02-03 04:42:26.8: 215 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 492 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 24 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 23 min, until 03-Feb-2023 05:05:50 UTC 2023-02-03 04:42:26.8: Plan M67 deferred, too early 2023-02-03 04:42:26.8: Plan M67 couldn't be run before latest time, failed. 2023-02-03 04:42:26.8: Plan Melotte_111 deferred, too early 2023-02-03 04:42:26.8: Rising plan delay enabled for Plan Mrk_180: 2023-02-03 04:42:26.8: 670 min. remaining to meet strict constraints. 2023-02-03 04:42:26.8: 498 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:26.8: but only 305 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:26.8: deferred (rising) for 305 min, until 03-Feb-2023 09:47:39 UTC 2023-02-03 04:42:27.0: Plan NGC_7790 deferred, too early 2023-02-03 04:42:27.0: Rising plan delay enabled for Plan OJ287: 2023-02-03 04:42:27.0: 412 min. remaining to meet strict constraints. 2023-02-03 04:42:27.0: 484 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.0: but only 137 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.0: deferred (rising) for 135 min, until 03-Feb-2023 06:58:10 UTC 2023-02-03 04:42:27.0: Rising plan delay enabled for Plan OJ287: 2023-02-03 04:42:27.0: 412 min. remaining to meet strict constraints. 2023-02-03 04:42:27.0: 484 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.0: but only 137 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.0: deferred (rising) for 135 min, until 03-Feb-2023 06:58:10 UTC 2023-02-03 04:42:27.0: Rising plan delay enabled for Plan QX_Pup: 2023-02-03 04:42:27.0: 229 min. remaining to meet strict constraints. 2023-02-03 04:42:27.0: 490 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.0: but only 67 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.0: deferred (rising) for 66 min, until 03-Feb-2023 05:48:58 UTC 2023-02-03 04:42:27.0: Rising plan delay enabled for Plan R_Leo: 2023-02-03 04:42:27.0: 445 min. remaining to meet strict constraints. 2023-02-03 04:42:27.0: 490 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.0: but only 193 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.0: deferred (rising) for 192 min, until 03-Feb-2023 07:54:27 UTC 2023-02-03 04:42:27.1: Rising plan delay enabled for Plan S5_0716+714: 2023-02-03 04:42:27.1: 419 min. remaining to meet strict constraints. 2023-02-03 04:42:27.1: 498 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.1: but only 51 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.1: deferred (rising) for 51 min, until 03-Feb-2023 05:33:48 UTC 2023-02-03 04:42:27.1: [AirmassRange] Target will never be below the maximum air mass 2023-02-03 04:42:27.1: Rising plan delay enabled for Plan SU_Lyn: 2023-02-03 04:42:27.1: 346 min. remaining to meet strict constraints. 2023-02-03 04:42:27.1: 498 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.1: but only 13 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.1: deferred (rising) for 12 min, until 03-Feb-2023 04:55:04 UTC 2023-02-03 04:42:27.1: Rising plan delay enabled for Plan SU_Lyn: 2023-02-03 04:42:27.1: 346 min. remaining to meet strict constraints. 2023-02-03 04:42:27.1: 496 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.1: but only 12 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.1: deferred (rising) for 11 min, until 03-Feb-2023 04:54:13 UTC 2023-02-03 04:42:27.1: Rising plan delay enabled for Plan U_Leo: 2023-02-03 04:42:27.1: 487 min. remaining to meet strict constraints. 2023-02-03 04:42:27.1: 493 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.1: but only 230 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.1: deferred (rising) for 229 min, until 03-Feb-2023 08:32:25 UTC 2023-02-03 04:42:27.1: Rising plan delay enabled for Plan U_Leo: 2023-02-03 04:42:27.1: 487 min. remaining to meet strict constraints. 2023-02-03 04:42:27.1: 493 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.1: but only 230 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.1: deferred (rising) for 229 min, until 03-Feb-2023 08:32:25 UTC 2023-02-03 04:42:27.2: [AirmassRange] Target will never be below the maximum air mass 2023-02-03 04:42:27.2: [AirmassRange] Target will never be below the maximum air mass 2023-02-03 04:42:27.2: Plan V479_And couldn't be run before latest time, failed. 2023-02-03 04:42:27.2: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 04:42:27.2: 271 min. remaining to meet strict constraints. 2023-02-03 04:42:27.2: 480 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.2: but only 25 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.2: deferred (rising) for 22 min, until 03-Feb-2023 05:05:11 UTC 2023-02-03 04:42:27.2: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 04:42:27.2: 238 min. remaining to meet strict constraints. 2023-02-03 04:42:27.2: 416 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.2: but only -6 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.2: ending rising plan delay. Plan is now eligible. 2023-02-03 04:42:27.2: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 04:42:27.2: 238 min. remaining to meet strict constraints. 2023-02-03 04:42:27.2: 433 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.2: 79337 min. remaining for the plan to fit before "must run before" time. 2023-02-03 04:42:27.2: but only 1 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.2: ending rising plan delay. Plan is now eligible. 2023-02-03 04:42:27.3: Rising plan delay enabled for Plan V900_Mon: 2023-02-03 04:42:27.3: 214 min. remaining to meet strict constraints. 2023-02-03 04:42:27.3: 477 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.3: but only 17 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.3: deferred (rising) for 14 min, until 03-Feb-2023 04:57:11 UTC 2023-02-03 04:42:27.3: Rising plan delay enabled for Plan V900_Mon: 2023-02-03 04:42:27.3: 214 min. remaining to meet strict constraints. 2023-02-03 04:42:27.3: 477 min. remaining for the plan to fit before dawn. 2023-02-03 04:42:27.3: but only 17 min till start so Plan transits mid-way in its time span. 2023-02-03 04:42:27.3: deferred (rising) for 14 min, until 03-Feb-2023 04:57:11 UTC 2023-02-03 04:42:27.5: Dispatcher cycle time: 2.8 sec. 2023-02-03 04:42:27.5: Acquire data for Observation V504_Per... 2023-02-03 04:42:27.5: (belongs to Project AAVSO_MISC_RNO_AUTO_ver3443, Plan V504_Per) 2023-02-03 04:42:27.5: Send Observation V504_Per to ACP Sequencer 2023-02-03 04:49:58.0: Acquisition time: 450.4976414 sec. 2023-02-03 04:49:58.0: Data for Observation V504_Per of Plan V504_Per acquired successfully. 2023-02-03 04:49:58.0: Plan V504_Per completed successfully. 2023-02-03 04:49:58.0: Image Efficiency: 28.5% 2023-02-03 04:49:58.0: Cycle Efficiency: 99.4% 2023-02-03 04:49:58.2: Rising plan delay enabled for Plan BX_Pup: 2023-02-03 04:49:58.2: 162 min. remaining to meet strict constraints. 2023-02-03 04:49:58.2: 484 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.2: but only 73 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.2: deferred (rising) for 72 min, until 03-Feb-2023 06:02:11 UTC 2023-02-03 04:49:58.2: Rising plan delay enabled for Plan BX_Pup: 2023-02-03 04:49:58.2: 162 min. remaining to meet strict constraints. 2023-02-03 04:49:58.2: 484 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.2: but only 73 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.2: deferred (rising) for 72 min, until 03-Feb-2023 06:02:11 UTC 2023-02-03 04:49:58.2: Rising plan delay enabled for Plan CW_Mon: 2023-02-03 04:49:58.2: 216 min. remaining to meet strict constraints. 2023-02-03 04:49:58.2: 487 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.2: but only -2 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.2: ending rising plan delay. Plan is now eligible. 2023-02-03 04:49:58.2: Rising plan delay enabled for Plan CW_Mon: 2023-02-03 04:49:58.2: 216 min. remaining to meet strict constraints. 2023-02-03 04:49:58.2: 488 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.2: but only -1 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.2: ending rising plan delay. Plan is now eligible. 2023-02-03 04:49:58.3: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 04:49:58.3: 230 min. remaining to meet strict constraints. 2023-02-03 04:49:58.3: 426 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.3: 79330 min. remaining for the plan to fit before "must run before" time. 2023-02-03 04:49:58.3: but only -5 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.3: ending rising plan delay. Plan is now eligible. 2023-02-03 04:49:58.3: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 04:49:58.3: 230 min. remaining to meet strict constraints. 2023-02-03 04:49:58.3: 408 min. remaining for the plan to fit before dawn. 2023-02-03 04:49:58.3: but only -14 min till start so Plan transits mid-way in its time span. 2023-02-03 04:49:58.3: ending rising plan delay. Plan is now eligible. 2023-02-03 04:49:58.5: Dispatcher cycle time: 0.3 sec. 2023-02-03 04:49:58.5: Acquire data for Observation CSS091110:060919-064155... 2023-02-03 04:49:58.5: (belongs to Project AAVSO_MISC_WLP_AUTO_ver3443, Plan CSS091110:060919-064155) 2023-02-03 04:49:58.5: Send Observation CSS091110:060919-064155 to ACP Sequencer 2023-02-03 05:11:23.5: Acquisition time: 1284.9761459 sec. 2023-02-03 05:11:23.5: Data for Observation CSS091110:060919-064155 of Plan CSS091110:060919-064155 acquired successfully. 2023-02-03 05:11:23.5: Plan CSS091110:060919-064155 completed successfully. 2023-02-03 05:11:23.5: Image Efficiency: 69.8% 2023-02-03 05:11:23.5: Cycle Efficiency: 100.0% 2023-02-03 05:11:23.7: Rising plan delay enabled for Plan IU_Leo: 2023-02-03 05:11:23.7: 481 min. remaining to meet strict constraints. 2023-02-03 05:11:23.7: 459 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.7: but only 233 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.7: deferred (rising) for 232 min, until 03-Feb-2023 09:03:34 UTC 2023-02-03 05:11:23.7: Rising plan delay enabled for Plan IU_Leo: 2023-02-03 05:11:23.7: 481 min. remaining to meet strict constraints. 2023-02-03 05:11:23.7: 459 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.7: but only 233 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.7: deferred (rising) for 232 min, until 03-Feb-2023 09:03:34 UTC 2023-02-03 05:11:23.7: Rising plan delay enabled for Plan L1022_IRS: 2023-02-03 05:11:23.7: 186 min. remaining to meet strict constraints. 2023-02-03 05:11:23.7: 463 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.7: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.7: Rising plan delay enabled for Plan L1022_IRS: 2023-02-03 05:11:23.7: 186 min. remaining to meet strict constraints. 2023-02-03 05:11:23.7: 463 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.7: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 05:11:23.8: 209 min. remaining to meet strict constraints. 2023-02-03 05:11:23.8: 387 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.8: but only -35 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.8: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 05:11:23.8: 242 min. remaining to meet strict constraints. 2023-02-03 05:11:23.8: 451 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.8: but only -3 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.8: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.8: Rising plan delay enabled for Plan V838_Mon: 2023-02-03 05:11:23.8: 209 min. remaining to meet strict constraints. 2023-02-03 05:11:23.8: 404 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.8: 79308 min. remaining for the plan to fit before "must run before" time. 2023-02-03 05:11:23.8: but only -27 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.8: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.8: Rising plan delay enabled for Plan V900_Mon: 2023-02-03 05:11:23.8: 185 min. remaining to meet strict constraints. 2023-02-03 05:11:23.8: 448 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.8: but only -11 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.8: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:23.8: Rising plan delay enabled for Plan V900_Mon: 2023-02-03 05:11:23.8: 185 min. remaining to meet strict constraints. 2023-02-03 05:11:23.8: 448 min. remaining for the plan to fit before dawn. 2023-02-03 05:11:23.8: but only -11 min till start so Plan transits mid-way in its time span. 2023-02-03 05:11:23.8: ending rising plan delay. Plan is now eligible. 2023-02-03 05:11:24.0: Dispatcher cycle time: 0.4 sec. 2023-02-03 05:11:24.0: Acquire data for Observation V838_Mon... 2023-02-03 05:11:24.0: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3443, Plan V838_Mon) 2023-02-03 05:11:24.0: Doing 2 sets 2023-02-03 05:11:24.0: Send Observation V838_Mon to ACP Sequencer 2023-02-03 05:53:47.2: Send Observation V838_Mon to ACP Sequencer 2023-02-03 06:35:11.8: Acquisition time: 5027.7793821 sec. 2023-02-03 06:35:11.8: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-02-03 06:35:11.8: Plan V838_Mon completed successfully. 2023-02-03 06:35:11.8: Image Efficiency: 83.5% 2023-02-03 06:35:11.8: Cycle Efficiency: 100.0% 2023-02-03 06:35:11.9: ++ Auto Focus ++ 2023-02-03 06:35:11.9: Doing periodic autofocus. 2023-02-03 06:35:11.9: Start special ACP AutoFocus script for scheduler 2023-02-03 06:39:45.4: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-02-03 06:39:45.5: Rising plan delay enabled for Plan IR_Com: 2023-02-03 06:39:45.5: 521 min. remaining to meet strict constraints. 2023-02-03 06:39:45.5: 371 min. remaining for the plan to fit before dawn. 2023-02-03 06:39:45.5: but only 246 min till start so Plan transits mid-way in its time span. 2023-02-03 06:39:45.5: deferred (rising) for 245 min, until 03-Feb-2023 10:44:53 UTC 2023-02-03 06:39:45.5: Rising plan delay enabled for Plan IR_Com: 2023-02-03 06:39:45.5: 521 min. remaining to meet strict constraints. 2023-02-03 06:39:45.5: 371 min. remaining for the plan to fit before dawn. 2023-02-03 06:39:45.5: but only 246 min till start so Plan transits mid-way in its time span. 2023-02-03 06:39:45.5: deferred (rising) for 245 min, until 03-Feb-2023 10:44:53 UTC 2023-02-03 06:39:45.5: Rising plan delay enabled for Plan PKS_1222+216: 2023-02-03 06:39:45.5: 507 min. remaining to meet strict constraints. 2023-02-03 06:39:45.5: 378 min. remaining for the plan to fit before dawn. 2023-02-03 06:39:45.5: but only 235 min till start so Plan transits mid-way in its time span. 2023-02-03 06:39:45.5: deferred (rising) for 234 min, until 03-Feb-2023 10:34:29 UTC 2023-02-03 06:39:45.5: Rising plan delay enabled for Plan RZ_Leo: 2023-02-03 06:39:45.5: 411 min. remaining to meet strict constraints. 2023-02-03 06:39:45.5: 371 min. remaining for the plan to fit before dawn. 2023-02-03 06:39:45.5: but only 184 min till start so Plan transits mid-way in its time span. 2023-02-03 06:39:45.5: deferred (rising) for 183 min, until 03-Feb-2023 09:42:53 UTC 2023-02-03 06:39:45.8: Dispatcher cycle time: 0.4 sec. 2023-02-03 06:39:45.8: Acquire data for Observation HQ_Mon... 2023-02-03 06:39:45.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan HQ_Mon) 2023-02-03 06:39:45.8: ++ Auto Focus ++ 2023-02-03 06:39:45.8: Doing periodic autofocus. 2023-02-03 06:39:45.8: Start special ACP AutoFocus script for scheduler 2023-02-03 06:43:36.3: Next periodic autofocus ASAP after 3600sec. 03-Feb-2023 07:43:16 UTC 2023-02-03 06:43:36.3: Send Observation HQ_Mon to ACP Sequencer 2023-02-03 06:55:14.1: Acquisition time: 697.7396296 sec. 2023-02-03 06:55:14.1: Data for Observation HQ_Mon of Plan HQ_Mon acquired successfully. 2023-02-03 06:55:14.1: Plan HQ_Mon completed successfully. 2023-02-03 06:55:14.1: Image Efficiency: 77.3% 2023-02-03 06:55:14.1: Cycle Efficiency: 99.9% 2023-02-03 06:55:14.5: Dispatcher cycle time: 0.3 sec. 2023-02-03 06:55:14.5: Acquire data for Observation QX_Pup... 2023-02-03 06:55:14.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3443, Plan QX_Pup) 2023-02-03 06:55:14.5: Send Observation QX_Pup to ACP Sequencer 2023-02-03 07:08:08.3: Acquisition time: 773.7907353 sec. 2023-02-03 07:08:08.3: Data for Observation QX_Pup of Plan QX_Pup acquired successfully. 2023-02-03 07:08:08.3: Plan QX_Pup completed successfully. 2023-02-03 07:08:08.3: Image Efficiency: 57.4% 2023-02-03 07:08:08.3: Cycle Efficiency: 100.0% 2023-02-03 07:08:08.5: Rising plan delay enabled for Plan OJ287: 2023-02-03 07:08:08.5: 266 min. remaining to meet strict constraints. 2023-02-03 07:08:08.5: 338 min. remaining for the plan to fit before dawn. 2023-02-03 07:08:08.5: but only -8 min till start so Plan transits mid-way in its time span. 2023-02-03 07:08:08.5: ending rising plan delay. Plan is now eligible. 2023-02-03 07:08:08.5: Rising plan delay enabled for Plan OJ287: 2023-02-03 07:08:08.5: 266 min. remaining to meet strict constraints. 2023-02-03 07:08:08.5: 338 min. remaining for the plan to fit before dawn. 2023-02-03 07:08:08.5: but only -8 min till start so Plan transits mid-way in its time span. 2023-02-03 07:08:08.5: ending rising plan delay. Plan is now eligible. 2023-02-03 07:08:08.7: Dispatcher cycle time: 0.3 sec. 2023-02-03 07:08:08.7: Acquire data for Observation YZ_Aur... 2023-02-03 07:08:08.7: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3443, Plan YZ_Aur) 2023-02-03 07:08:08.7: Send Observation YZ_Aur to ACP Sequencer 2023-02-03 07:18:05.8: Acquisition time: 597.0864076 sec. 2023-02-03 07:18:05.8: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2023-02-03 07:18:05.8: Plan YZ_Aur completed successfully. 2023-02-03 07:18:05.8: Image Efficiency: 22.8% 2023-02-03 07:18:05.8: Cycle Efficiency: 99.9% 2023-02-03 07:18:06.0: Rising plan delay enabled for Plan M3-V154: 2023-02-03 07:18:06.0: 560 min. remaining to meet strict constraints. 2023-02-03 07:18:06.0: 342 min. remaining for the plan to fit before dawn. 2023-02-03 07:18:06.0: but only 275 min till start so Plan transits mid-way in its time span. 2023-02-03 07:18:06.0: deferred (rising) for 275 min, until 03-Feb-2023 11:53:13 UTC 2023-02-03 07:18:06.3: Dispatcher cycle time: 0.3 sec. 2023-02-03 07:18:06.3: Acquire data for Observation BX_Pup... 2023-02-03 07:18:06.3: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver3443, Plan BX_Pup) 2023-02-03 07:18:06.3: Send Observation BX_Pup to ACP Sequencer 2023-02-03 07:30:17.9: Acquisition time: 731.6283302 sec. 2023-02-03 07:30:17.9: Data for Observation BX_Pup of Plan BX_Pup acquired successfully. 2023-02-03 07:30:17.9: Plan BX_Pup completed successfully. 2023-02-03 07:30:17.9: Image Efficiency: 73.8% 2023-02-03 07:30:17.9: Cycle Efficiency: 100.0% 2023-02-03 07:30:18.3: Dispatcher cycle time: 0.3 sec. 2023-02-03 07:30:18.3: Acquire data for Observation CW_Mon... 2023-02-03 07:30:18.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan CW_Mon) 2023-02-03 07:30:18.4: Send Observation CW_Mon to ACP Sequencer 2023-02-03 07:37:59.5: Acquisition time: 461.1008588 sec. 2023-02-03 07:37:59.5: Data for Observation CW_Mon of Plan CW_Mon acquired successfully. 2023-02-03 07:37:59.5: Plan CW_Mon completed successfully. 2023-02-03 07:37:59.5: Image Efficiency: 61.3% 2023-02-03 07:37:59.5: Cycle Efficiency: 99.9% 2023-02-03 07:37:59.9: Dispatcher cycle time: 0.3 sec. 2023-02-03 07:37:59.9: Acquire data for Observation FS_Aur... 2023-02-03 07:37:59.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan FS_Aur) 2023-02-03 07:37:59.9: Send Observation FS_Aur to ACP Sequencer 2023-02-03 07:50:35.8: Acquisition time: 755.9706746 sec. 2023-02-03 07:50:35.8: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2023-02-03 07:50:35.8: Plan FS_Aur completed successfully. 2023-02-03 07:50:35.9: Image Efficiency: 71.4% 2023-02-03 07:50:35.9: Cycle Efficiency: 100.0% 2023-02-03 07:50:36.0: ++ Auto Focus ++ 2023-02-03 07:50:36.0: Doing periodic autofocus. 2023-02-03 07:50:36.0: Start special ACP AutoFocus script for scheduler 2023-02-03 07:54:46.3: Next periodic autofocus ASAP after 7200sec. 03-Feb-2023 09:54:28 UTC 2023-02-03 07:54:46.3: Rising plan delay enabled for Plan 3C_279: 2023-02-03 07:54:46.3: 390 min. remaining to meet strict constraints. 2023-02-03 07:54:46.3: 303 min. remaining for the plan to fit before dawn. 2023-02-03 07:54:46.3: but only 191 min till start so Plan transits mid-way in its time span. 2023-02-03 07:54:46.3: deferred (rising) for 190 min, until 03-Feb-2023 11:05:41 UTC 2023-02-03 07:54:46.4: Rising plan delay enabled for Plan HS1340+1524: 2023-02-03 07:54:46.4: 497 min. remaining to meet strict constraints. 2023-02-03 07:54:46.4: 302 min. remaining for the plan to fit before dawn. 2023-02-03 07:54:46.4: but only 238 min till start so Plan transits mid-way in its time span. 2023-02-03 07:54:46.4: deferred (rising) for 237 min, until 03-Feb-2023 11:52:10 UTC 2023-02-03 07:54:46.4: Rising plan delay enabled for Plan HS1340+1524: 2023-02-03 07:54:46.4: 497 min. remaining to meet strict constraints. 2023-02-03 07:54:46.4: 302 min. remaining for the plan to fit before dawn. 2023-02-03 07:54:46.4: but only 238 min till start so Plan transits mid-way in its time span. 2023-02-03 07:54:46.4: deferred (rising) for 237 min, until 03-Feb-2023 11:52:10 UTC 2023-02-03 07:54:46.4: Rising plan delay enabled for Plan R_Leo: 2023-02-03 07:54:46.4: 253 min. remaining to meet strict constraints. 2023-02-03 07:54:46.4: 298 min. remaining for the plan to fit before dawn. 2023-02-03 07:54:46.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-02-03 07:54:46.4: ending rising plan delay. Plan is now eligible. 2023-02-03 07:54:46.6: Dispatcher cycle time: 0.3 sec. 2023-02-03 07:54:46.6: Acquire data for Observation ER_Aur... 2023-02-03 07:54:46.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan ER_Aur) 2023-02-03 07:54:46.6: Send Observation ER_Aur to ACP Sequencer 2023-02-03 08:08:57.9: Acquisition time: 851.2752979 sec. 2023-02-03 08:08:57.9: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-02-03 08:08:57.9: Plan ER_Aur completed successfully. 2023-02-03 08:08:57.9: Image Efficiency: 53.7% 2023-02-03 08:08:57.9: Cycle Efficiency: 100.0% 2023-02-03 08:08:58.0: Rising plan delay enabled for Plan PG_1424+240: 2023-02-03 08:08:58.0: 544 min. remaining to meet strict constraints. 2023-02-03 08:08:58.0: 291 min. remaining for the plan to fit before dawn. 2023-02-03 08:08:58.0: but only 269 min till start so Plan transits mid-way in its time span. 2023-02-03 08:08:58.0: deferred (rising) for 268 min, until 03-Feb-2023 12:37:45 UTC 2023-02-03 08:08:58.2: Dispatcher cycle time: 0.2 sec. 2023-02-03 08:08:58.2: Acquire data for Observation J072816... 2023-02-03 08:08:58.2: (belongs to Project AAVSO_MISC_WLP_AUTO_ver3443, Plan J072816) 2023-02-03 08:08:58.2: Send Observation J072816 to ACP Sequencer 2023-02-03 08:34:14.0: Acquisition time: 1515.8434514 sec. 2023-02-03 08:34:14.0: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-02-03 08:34:14.1: Plan J072816 completed successfully. 2023-02-03 08:34:14.1: Image Efficiency: 75.2% 2023-02-03 08:34:14.1: Cycle Efficiency: 100.0% 2023-02-03 08:34:14.2: Rising plan delay enabled for Plan AG_Dra: 2023-02-03 08:34:14.2: 694 min. remaining to meet strict constraints. 2023-02-03 08:34:14.2: 265 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.2: deferred (rising) for 265 min, until 03-Feb-2023 12:59:19 UTC 2023-02-03 08:34:14.2: Rising plan delay enabled for Plan AG_Dra: 2023-02-03 08:34:14.2: 694 min. remaining to meet strict constraints. 2023-02-03 08:34:14.2: 265 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.2: deferred (rising) for 265 min, until 03-Feb-2023 12:59:19 UTC 2023-02-03 08:34:14.2: Rising plan delay enabled for Plan NSV-6690: 2023-02-03 08:34:14.2: 521 min. remaining to meet strict constraints. 2023-02-03 08:34:14.2: 236 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.2: but only 232 min till start so Plan transits mid-way in its time span. 2023-02-03 08:34:14.2: deferred (rising) for 228 min, until 03-Feb-2023 12:22:58 UTC 2023-02-03 08:34:14.2: Rising plan delay enabled for Plan U_Leo: 2023-02-03 08:34:14.2: 256 min. remaining to meet strict constraints. 2023-02-03 08:34:14.2: 261 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-02-03 08:34:14.2: ending rising plan delay. Plan is now eligible. 2023-02-03 08:34:14.2: Rising plan delay enabled for Plan U_Leo: 2023-02-03 08:34:14.2: 256 min. remaining to meet strict constraints. 2023-02-03 08:34:14.2: 261 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-02-03 08:34:14.2: ending rising plan delay. Plan is now eligible. 2023-02-03 08:34:14.3: Rising plan delay enabled for Plan X_Boo: 2023-02-03 08:34:14.3: 500 min. remaining to meet strict constraints. 2023-02-03 08:34:14.3: 265 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.3: but only 240 min till start so Plan transits mid-way in its time span. 2023-02-03 08:34:14.3: deferred (rising) for 240 min, until 03-Feb-2023 12:34:25 UTC 2023-02-03 08:34:14.3: Rising plan delay enabled for Plan X_Boo: 2023-02-03 08:34:14.3: 500 min. remaining to meet strict constraints. 2023-02-03 08:34:14.3: 265 min. remaining for the plan to fit before dawn. 2023-02-03 08:34:14.3: but only 240 min till start so Plan transits mid-way in its time span. 2023-02-03 08:34:14.3: deferred (rising) for 240 min, until 03-Feb-2023 12:34:25 UTC 2023-02-03 08:34:14.4: Dispatcher cycle time: 0.2 sec. 2023-02-03 08:34:14.4: Acquire data for Observation S5_0716+714... 2023-02-03 08:34:14.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan S5_0716+714) 2023-02-03 08:34:14.4: Send Observation S5_0716+714 to ACP Sequencer 2023-02-03 08:39:43.1: Acquisition time: 328.7749043 sec. 2023-02-03 08:39:43.1: Data for Observation S5_0716+714 of Plan S5_0716+714 acquired successfully. 2023-02-03 08:39:43.1: Plan S5_0716+714 completed successfully. 2023-02-03 08:39:43.1: Image Efficiency: 54.7% 2023-02-03 08:39:43.1: Cycle Efficiency: 99.9% 2023-02-03 08:39:43.4: Dispatcher cycle time: 0.1 sec. 2023-02-03 08:39:43.4: Acquire data for Observation SU_Lyn... 2023-02-03 08:39:43.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan SU_Lyn) 2023-02-03 08:39:43.4: Send Observation SU_Lyn to ACP Sequencer 2023-02-03 08:45:39.1: Acquisition time: 355.6857112 sec. 2023-02-03 08:45:39.1: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2023-02-03 08:45:39.1: Plan SU_Lyn completed successfully. 2023-02-03 08:45:39.1: Image Efficiency: 23.3% 2023-02-03 08:45:39.1: Cycle Efficiency: 100.0% 2023-02-03 08:45:39.3: Dispatcher cycle time: 0.1 sec. 2023-02-03 08:45:39.3: Acquire data for Observation GZ_Cnc... 2023-02-03 08:45:39.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan GZ_Cnc) 2023-02-03 08:45:39.3: Send Observation GZ_Cnc to ACP Sequencer 2023-02-03 08:47:42.3: ACP data acquisition failed for Observation GZ_Cnc. 2023-02-03 08:47:42.3: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-02-03 08:47:42.5: Dispatcher cycle time: 0.1 sec. 2023-02-03 08:47:42.5: Acquire data for Observation U_Leo... 2023-02-03 08:47:42.5: (belongs to Project AAVSO_MISC_SFY_AUTO_ver2706, Plan U_Leo) 2023-02-03 08:47:42.5: Send Observation U_Leo to ACP Sequencer 2023-02-03 09:00:26.1: Acquisition time: 763.5442289 sec. 2023-02-03 09:00:26.1: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-02-03 09:00:26.1: Plan U_Leo completed successfully. 2023-02-03 09:00:26.1: Image Efficiency: 62.9% 2023-02-03 09:00:26.1: Cycle Efficiency: 100.0% 2023-02-03 09:00:26.3: Dispatcher cycle time: 0.1 sec. 2023-02-03 09:00:26.3: Acquire data for Observation OJ287... 2023-02-03 09:00:26.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan OJ287) 2023-02-03 09:00:26.3: Send Observation OJ287 to ACP Sequencer 2023-02-03 09:19:28.0: Acquisition time: 1141.7043972 sec. 2023-02-03 09:19:28.0: Data for Observation OJ287 of Plan OJ287 acquired successfully. 2023-02-03 09:19:28.0: Plan OJ287 completed successfully. 2023-02-03 09:19:28.0: Image Efficiency: 68.3% 2023-02-03 09:19:28.0: Cycle Efficiency: 100.0% 2023-02-03 09:19:28.2: Dispatcher cycle time: 0.1 sec. 2023-02-03 09:19:28.2: Acquire data for Observation U_Leo... 2023-02-03 09:19:28.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan U_Leo) 2023-02-03 09:19:28.2: Send Observation U_Leo to ACP Sequencer 2023-02-03 09:31:36.1: Acquisition time: 727.9355573 sec. 2023-02-03 09:31:36.1: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-02-03 09:31:36.2: Plan U_Leo completed successfully. 2023-02-03 09:31:36.2: Image Efficiency: 65.9% 2023-02-03 09:31:36.2: Cycle Efficiency: 100.0% 2023-02-03 09:31:36.3: Rising plan delay enabled for Plan NGC_5634: 2023-02-03 09:31:36.3: 385 min. remaining to meet strict constraints. 2023-02-03 09:31:36.3: 181 min. remaining for the plan to fit before dawn. 2023-02-03 09:31:36.3: but only 175 min till start so Plan transits mid-way in its time span. 2023-02-03 09:31:36.3: deferred (rising) for 172 min, until 03-Feb-2023 12:23:52 UTC 2023-02-03 09:31:36.4: Dispatcher cycle time: 0.1 sec. 2023-02-03 09:31:36.4: Acquire data for Observation GZ_Cnc... 2023-02-03 09:31:36.4: (belongs to Project AAVSO_MISC_MZK_AUTO_ver2706, Plan GZ_Cnc) 2023-02-03 09:31:36.4: Send Observation GZ_Cnc to ACP Sequencer 2023-02-03 09:53:15.9: Acquisition time: 1299.5532383 sec. 2023-02-03 09:53:15.9: Data for Observation GZ_Cnc of Plan GZ_Cnc acquired successfully. 2023-02-03 09:53:15.9: Plan GZ_Cnc completed successfully. 2023-02-03 09:53:15.9: Image Efficiency: 73.9% 2023-02-03 09:53:15.9: Cycle Efficiency: 100.0% 2023-02-03 09:53:16.1: Rising plan delay enabled for Plan M5-V42: 2023-02-03 09:53:16.1: 439 min. remaining to meet strict constraints. 2023-02-03 09:53:16.1: 186 min. remaining for the plan to fit before dawn. 2023-02-03 09:53:16.1: deferred (rising) for 186 min, until 03-Feb-2023 12:59:45 UTC 2023-02-03 09:53:16.1: Rising plan delay enabled for Plan M5-V84: 2023-02-03 09:53:16.1: 439 min. remaining to meet strict constraints. 2023-02-03 09:53:16.1: 186 min. remaining for the plan to fit before dawn. 2023-02-03 09:53:16.1: deferred (rising) for 186 min, until 03-Feb-2023 12:59:24 UTC 2023-02-03 09:53:16.1: Dispatcher cycle time: 0.1 sec. 2023-02-03 09:53:16.1: Acquire data for Observation IU_Leo... 2023-02-03 09:53:16.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan IU_Leo) 2023-02-03 09:53:16.1: Send Observation IU_Leo to ACP Sequencer 2023-02-03 10:12:23.5: Acquisition time: 1147.3514517 sec. 2023-02-03 10:12:23.5: Data for Observation IU_Leo of Plan IU_Leo acquired successfully. 2023-02-03 10:12:23.5: Plan IU_Leo completed successfully. 2023-02-03 10:12:23.5: Image Efficiency: 62.7% 2023-02-03 10:12:23.5: Cycle Efficiency: 100.0% 2023-02-03 10:12:23.6: ++ Auto Focus ++ 2023-02-03 10:12:23.6: Doing periodic autofocus. 2023-02-03 10:12:23.6: Start special ACP AutoFocus script for scheduler 2023-02-03 10:15:42.9: Next periodic autofocus ASAP after 7200sec. 03-Feb-2023 12:15:29 UTC 2023-02-03 10:15:43.0: Rising plan delay enabled for Plan Pal_5: 2023-02-03 10:15:43.0: 408 min. remaining to meet strict constraints. 2023-02-03 10:15:43.0: 145 min. remaining for the plan to fit before dawn. 2023-02-03 10:15:43.0: deferred (rising) for 143 min, until 03-Feb-2023 12:39:03 UTC 2023-02-03 10:15:43.0: Rising plan delay enabled for Plan PG_1553+113: 2023-02-03 10:15:43.0: 478 min. remaining to meet strict constraints. 2023-02-03 10:15:43.0: 165 min. remaining for the plan to fit before dawn. 2023-02-03 10:15:43.0: deferred (rising) for 165 min, until 03-Feb-2023 13:01:14 UTC 2023-02-03 10:15:43.0: Dispatcher cycle time: 0.1 sec. 2023-02-03 10:15:43.0: Acquire data for Observation RZ_Leo... 2023-02-03 10:15:43.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan RZ_Leo) 2023-02-03 10:15:43.0: Send Observation RZ_Leo to ACP Sequencer 2023-02-03 10:30:55.4: Acquisition time: 912.395323 sec. 2023-02-03 10:30:55.4: Data for Observation RZ_Leo of Plan RZ_Leo acquired successfully. 2023-02-03 10:30:55.4: Plan RZ_Leo completed successfully. 2023-02-03 10:30:55.4: Image Efficiency: 78.9% 2023-02-03 10:30:55.4: Cycle Efficiency: 100.0% 2023-02-03 10:30:55.6: Rising plan delay enabled for Plan IX_Dra: 2023-02-03 10:30:55.6: 708 min. remaining to meet strict constraints. 2023-02-03 10:30:55.6: 131 min. remaining for the plan to fit before dawn. 2023-02-03 10:30:55.6: deferred (rising) for 129 min, until 03-Feb-2023 12:40:26 UTC 2023-02-03 10:30:55.6: Rising plan delay enabled for Plan PKS_1510-089: 2023-02-03 10:30:55.6: 357 min. remaining to meet strict constraints. 2023-02-03 10:30:55.6: 144 min. remaining for the plan to fit before dawn. 2023-02-03 10:30:55.6: deferred (rising) for 143 min, until 03-Feb-2023 12:54:38 UTC 2023-02-03 10:30:55.6: Rising plan delay enabled for Plan PKS_1510-089: 2023-02-03 10:30:55.6: 357 min. remaining to meet strict constraints. 2023-02-03 10:30:55.6: 144 min. remaining for the plan to fit before dawn. 2023-02-03 10:30:55.6: deferred (rising) for 143 min, until 03-Feb-2023 12:54:38 UTC 2023-02-03 10:30:55.6: Dispatcher cycle time: 0.1 sec. 2023-02-03 10:30:55.6: Acquire data for Observation J072816... 2023-02-03 10:30:55.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan J072816) 2023-02-03 10:30:55.6: Send Observation J072816 to ACP Sequencer 2023-02-03 10:56:24.0: Acquisition time: 1528.3665567 sec. 2023-02-03 10:56:24.0: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-02-03 10:56:24.0: Plan J072816 completed successfully. 2023-02-03 10:56:24.0: Image Efficiency: 74.6% 2023-02-03 10:56:24.0: Cycle Efficiency: 100.0% 2023-02-03 10:56:24.2: Dispatcher cycle time: 0.1 sec. 2023-02-03 10:56:24.2: Acquire data for Observation PKS_1222+216... 2023-02-03 10:56:24.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan PKS_1222+216) 2023-02-03 10:56:24.2: Send Observation PKS_1222+216 to ACP Sequencer 2023-02-03 11:04:50.8: Acquisition time: 506.561799 sec. 2023-02-03 11:04:50.8: Data for Observation PKS_1222+216 of Plan PKS_1222+216 acquired successfully. 2023-02-03 11:04:50.8: Plan PKS_1222+216 completed successfully. 2023-02-03 11:04:50.8: Image Efficiency: 59.2% 2023-02-03 11:04:50.8: Cycle Efficiency: 100.0% 2023-02-03 11:04:51.0: Dispatcher cycle time: 0.1 sec. 2023-02-03 11:04:51.0: Acquire data for Observation OJ287... 2023-02-03 11:04:51.0: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan OJ287) 2023-02-03 11:04:51.0: Send Observation OJ287 to ACP Sequencer 2023-02-03 11:24:36.3: Acquisition time: 1185.2548112 sec. 2023-02-03 11:24:36.3: Data for Observation OJ287 of Plan OJ287 acquired successfully. 2023-02-03 11:24:36.3: Plan OJ287 completed successfully. 2023-02-03 11:24:36.3: Image Efficiency: 65.8% 2023-02-03 11:24:36.3: Cycle Efficiency: 100.0% 2023-02-03 11:24:36.4: Rising plan delay enabled for Plan X_Ser: 2023-02-03 11:24:36.4: 394 min. remaining to meet strict constraints. 2023-02-03 11:24:36.4: 92 min. remaining for the plan to fit before dawn. 2023-02-03 11:24:36.4: deferred (rising) for 91 min, until 03-Feb-2023 12:56:17 UTC 2023-02-03 11:24:36.4: Rising plan delay enabled for Plan X_Ser: 2023-02-03 11:24:36.4: 394 min. remaining to meet strict constraints. 2023-02-03 11:24:36.4: 78 min. remaining for the plan to fit before dawn. 2023-02-03 11:24:36.4: deferred (rising) for 76 min, until 03-Feb-2023 12:40:59 UTC 2023-02-03 11:24:36.5: Dispatcher cycle time: 0.1 sec. 2023-02-03 11:24:36.5: Acquire data for Observation KN_Lyn... 2023-02-03 11:24:36.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3443, Plan KN_Lyn) 2023-02-03 11:24:36.5: Send Observation KN_Lyn to ACP Sequencer 2023-02-03 11:57:11.1: Acquisition time: 1954.6339611 sec. 2023-02-03 11:57:11.1: Data for Observation KN_Lyn of Plan KN_Lyn acquired successfully. 2023-02-03 11:57:11.1: Plan KN_Lyn completed successfully. 2023-02-03 11:57:11.1: Image Efficiency: 78.9% 2023-02-03 11:57:11.1: Cycle Efficiency: 100.0% 2023-02-03 11:57:11.2: Rising plan delay enabled for Plan ASAS_185038: 2023-02-03 11:57:11.2: 615 min. remaining to meet strict constraints. 2023-02-03 11:57:11.2: 48 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.2: deferred (rising) for 46 min, until 03-Feb-2023 12:43:22 UTC 2023-02-03 11:57:11.2: Rising plan delay enabled for Plan CG_Dra: 2023-02-03 11:57:11.2: 649 min. remaining to meet strict constraints. 2023-02-03 11:57:11.2: 53 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.2: deferred (rising) for 52 min, until 03-Feb-2023 12:49:14 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan J184706: 2023-02-03 11:57:11.3: 612 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 50 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 48 min, until 03-Feb-2023 12:45:56 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan MV_Lyr: 2023-02-03 11:57:11.3: 671 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 33 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 29 min, until 03-Feb-2023 12:27:03 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan NGC_5897: 2023-02-03 11:57:11.3: 209 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 44 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 41 min, until 03-Feb-2023 12:39:03 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan NGC_6254: 2023-02-03 11:57:11.3: 394 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 53 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 52 min, until 03-Feb-2023 12:49:47 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan NGC_6254: 2023-02-03 11:57:11.3: 394 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 52 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 51 min, until 03-Feb-2023 12:48:13 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan NSV_11154: 2023-02-03 11:57:11.3: 610 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 40 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 38 min, until 03-Feb-2023 12:35:18 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan NSV_11154: 2023-02-03 11:57:11.3: 610 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 40 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 38 min, until 03-Feb-2023 12:35:18 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan V884_Her: 2023-02-03 11:57:11.3: 519 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 63 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 62 min, until 03-Feb-2023 13:00:08 UTC 2023-02-03 11:57:11.3: Rising plan delay enabled for Plan V884_Her: 2023-02-03 11:57:11.3: 519 min. remaining to meet strict constraints. 2023-02-03 11:57:11.3: 63 min. remaining for the plan to fit before dawn. 2023-02-03 11:57:11.3: deferred (rising) for 62 min, until 03-Feb-2023 13:00:08 UTC 2023-02-03 11:57:11.4: Dispatcher cycle time: 0.1 sec. 2023-02-03 11:57:11.4: Acquire data for Observation IR_Com... 2023-02-03 11:57:11.4: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3443, Plan IR_Com) 2023-02-03 11:57:11.4: Send Observation IR_Com to ACP Sequencer 2023-02-03 12:13:34.1: Acquisition time: 982.7519949 sec. 2023-02-03 12:13:34.1: Data for Observation IR_Com of Plan IR_Com acquired successfully. 2023-02-03 12:13:34.1: Plan IR_Com completed successfully. 2023-02-03 12:13:34.1: Image Efficiency: 73.3% 2023-02-03 12:13:34.1: Cycle Efficiency: 100.0% 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_185804: 2023-02-03 12:13:34.3: 601 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 34 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 32 min, until 03-Feb-2023 12:45:56 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_190343: 2023-02-03 12:13:34.3: 611 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 35 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 34 min, until 03-Feb-2023 12:47:46 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_190449: 2023-02-03 12:13:34.3: 616 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 30 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 28 min, until 03-Feb-2023 12:41:54 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_190522: 2023-02-03 12:13:34.3: 614 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 24 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 21 min, until 03-Feb-2023 12:35:18 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_190819: 2023-02-03 12:13:34.3: 623 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 30 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 28 min, until 03-Feb-2023 12:41:54 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan ASAS_191806: 2023-02-03 12:13:34.3: 638 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 42 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 41 min, until 03-Feb-2023 12:55:26 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan J190253: 2023-02-03 12:13:34.3: 608 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 24 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 21 min, until 03-Feb-2023 12:35:18 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan NGC_6171: 2023-02-03 12:13:34.3: 316 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: 32 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: deferred (rising) for 30 min, until 03-Feb-2023 12:43:38 UTC 2023-02-03 12:13:34.3: Rising plan delay enabled for Plan V1674_Her: 2023-02-03 12:13:34.3: 605 min. remaining to meet strict constraints. 2023-02-03 12:13:34.3: -532 min. remaining for the plan to fit before dawn. 2023-02-03 12:13:34.3: ending rising plan delay. Plan is now eligible. 2023-02-03 12:13:34.4: Dispatcher cycle time: 0.1 sec. 2023-02-03 12:13:34.4: Acquire data for Observation HS1340+1524... 2023-02-03 12:13:34.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3443, Plan HS1340+1524) 2023-02-03 12:13:34.4: Send Observation HS1340+1524 to ACP Sequencer 2023-02-03 12:15:16.6: ACP data acquisition failed for Observation HS1340+1524. 2023-02-03 12:15:16.6: (Observation HS1340+1524 interrupted by acquisition process failure.) 2023-02-03 12:15:16.8: Rising plan delay enabled for Plan ASAS_190148: 2023-02-03 12:15:16.8: 599 min. remaining to meet strict constraints. 2023-02-03 12:15:16.8: 15 min. remaining for the plan to fit before dawn. 2023-02-03 12:15:16.8: deferred (rising) for 12 min, until 03-Feb-2023 12:27:36 UTC 2023-02-03 12:15:16.8: Rising plan delay enabled for Plan V1674_Her: 2023-02-03 12:15:16.8: 603 min. remaining to meet strict constraints. 2023-02-03 12:15:16.8: -533 min. remaining for the plan to fit before dawn. 2023-02-03 12:15:16.8: ending rising plan delay. Plan is now eligible. 2023-02-03 12:15:16.9: Dispatcher cycle time: 0.1 sec. 2023-02-03 12:15:16.9: Acquire data for Observation HS1340+1524... 2023-02-03 12:15:16.9: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan HS1340+1524) 2023-02-03 12:15:16.9: Send Observation HS1340+1524 to ACP Sequencer 2023-02-03 12:24:20.2: Acquisition time: 543.3604771 sec. 2023-02-03 12:24:20.2: Data for Observation HS1340+1524 of Plan HS1340+1524 acquired successfully. 2023-02-03 12:24:20.2: Plan HS1340+1524 completed successfully. 2023-02-03 12:24:20.2: Image Efficiency: 66.2% 2023-02-03 12:24:20.2: Cycle Efficiency: 100.0% 2023-02-03 12:24:20.5: Run statistics: 2023-02-03 12:24:20.5: Observations: 273 2023-02-03 12:24:20.5: Considered: 57 2023-02-03 12:24:20.5: Completed: 1 2023-02-03 12:24:20.5: Skipped: 50 2023-02-03 12:24:20.5: Never Eligible: 216 2023-02-03 12:24:20.5: Failed: 6 Log closed at Fri, Feb 03 2023 12:24:20 UTC (actual time)