Log opened at Sun, Jan 22 2023 04:34:48 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-01-22 04:34:48.9: REAL TIME internal clock initialized at 22-Jan-2023 04:34:48 UTC 2023-01-22 04:34:48.9: Dispatcher started at 22-Jan-2023 04:34:48 UTC 2023-01-22 04:34:49.1: Loaded Constraint plugin AirMass 2023-01-22 04:34:49.2: Loaded Constraint plugin AirmassRange 2023-01-22 04:34:49.2: Loaded Constraint plugin Horizon 2023-01-22 04:34:49.2: Loaded Constraint plugin HourAngle 2023-01-22 04:34:49.2: Loaded Constraint plugin MoonAvoid 2023-01-22 04:34:49.2: Loaded Constraint plugin MoonDown 2023-01-22 04:34:49.2: Loaded Constraint plugin SkyCondition 2023-01-22 04:34:49.2: Loaded Constraint plugin TimeRange 2023-01-22 04:34:50.0: 215 plans are now pending. 2023-01-22 04:34:50.0: Attach ACP sequencer 2023-01-22 04:34:56.2: ++ Weather Safe ++ 2023-01-22 04:34:56.8: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2023-01-22 04:34:56.8: Sequencer does sky flats 2023-01-22 04:35:07.5: ++ Observatory Startup ++ 2023-01-22 04:35:07.5: Weather safety is now disabled 2023-01-22 04:35:07.5: Start ACP Sequencer's StartupObs script 2023-01-22 04:35:54.1: Weather safety is re-enabled 2023-01-22 04:35:54.1: Observatory startup succeeded 2023-01-22 04:35:54.1: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-22 04:35:54.1: Last AutoFocus was completed at 20-Jan-2023 04:11:54 UTC 2023-01-22 04:35:54.1: Autofocus will be done ASAP. 2023-01-22 04:35:54.1: ++ Auto Focus ++ 2023-01-22 04:35:54.1: Doing periodic autofocus. 2023-01-22 04:35:54.1: Start special ACP AutoFocus script for scheduler 2023-01-22 05:04:52.6: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 2023-01-22 05:05:01.6: ** ACP script "AutoFocusScheduler" failed: 2023-01-22 05:05:01.6: **Script Error** Source: ACP Message: The script was aborted. Location: line 80 column 9. 2023-01-22 05:05:01.6: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-22 05:06:12.9: ++ Observatory Startup ++ 2023-01-22 05:06:12.9: Weather safety is now disabled 2023-01-22 05:06:12.9: Start ACP Sequencer's StartupObs script 2023-01-22 05:06:58.7: Weather safety is re-enabled 2023-01-22 05:06:58.7: Observatory startup succeeded 2023-01-22 05:06:58.7: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-22 05:06:58.7: Last AutoFocus was completed at 20-Jan-2023 04:11:54 UTC 2023-01-22 05:06:58.7: Autofocus will be done ASAP. 2023-01-22 05:06:58.7: ++ Auto Focus ++ 2023-01-22 05:06:58.7: Doing periodic autofocus. 2023-01-22 05:06:58.7: Start special ACP AutoFocus script for scheduler 2023-01-22 05:13:12.6: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-22 05:13:14.6: Plan AE_And has Monitor Mode. Time to resubmit it. 2023-01-22 05:13:14.6: Plan V504_Per has Monitor Mode. Time to resubmit it. 2023-01-22 05:13:14.6: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-22 05:13:14.6: 251 min. remaining to meet strict constraints. 2023-01-22 05:13:14.6: 460 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.6: but only 49 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.6: deferred (rising) for 47 min, until 22-Jan-2023 06:00:59 UTC 2023-01-22 05:13:14.7: Rising plan delay enabled for Plan CW_Mon: 2023-01-22 05:13:14.7: 240 min. remaining to meet strict constraints. 2023-01-22 05:13:14.7: 469 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.7: but only 21 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.7: deferred (rising) for 20 min, until 22-Jan-2023 05:34:02 UTC 2023-01-22 05:13:14.7: Rising plan delay enabled for Plan CW_Mon: 2023-01-22 05:13:14.7: 240 min. remaining to meet strict constraints. 2023-01-22 05:13:14.7: 469 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.7: but only 21 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.7: deferred (rising) for 20 min, until 22-Jan-2023 05:34:02 UTC 2023-01-22 05:13:14.8: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-22 05:13:14.8: 424 min. remaining to meet strict constraints. 2023-01-22 05:13:14.8: 457 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.8: but only 174 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.8: deferred (rising) for 172 min, until 22-Jan-2023 08:05:30 UTC 2023-01-22 05:13:14.8: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-22 05:13:14.8: 424 min. remaining to meet strict constraints. 2023-01-22 05:13:14.8: 457 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.8: but only 174 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.8: deferred (rising) for 172 min, until 22-Jan-2023 08:05:30 UTC 2023-01-22 05:13:14.8: Rising plan delay enabled for Plan HQ_Mon: 2023-01-22 05:13:14.8: 277 min. remaining to meet strict constraints. 2023-01-22 05:13:14.8: 466 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.8: but only 54 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.8: deferred (rising) for 53 min, until 22-Jan-2023 06:06:47 UTC 2023-01-22 05:13:14.8: Rising plan delay enabled for Plan HQ_Mon: 2023-01-22 05:13:14.8: 277 min. remaining to meet strict constraints. 2023-01-22 05:13:14.8: 466 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.8: but only 54 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.8: deferred (rising) for 53 min, until 22-Jan-2023 06:06:47 UTC 2023-01-22 05:13:14.9: Rising plan delay enabled for Plan J072816: 2023-01-22 05:13:14.9: 455 min. remaining to meet strict constraints. 2023-01-22 05:13:14.9: 450 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.9: but only 63 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.9: deferred (rising) for 60 min, until 22-Jan-2023 06:13:50 UTC 2023-01-22 05:13:14.9: Rising plan delay enabled for Plan J072816: 2023-01-22 05:13:14.9: 455 min. remaining to meet strict constraints. 2023-01-22 05:13:14.9: 450 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.9: but only 63 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.9: deferred (rising) for 60 min, until 22-Jan-2023 06:13:50 UTC 2023-01-22 05:13:14.9: Rising plan delay enabled for Plan KN_Lyn: 2023-01-22 05:13:14.9: 483 min. remaining to meet strict constraints. 2023-01-22 05:13:14.9: 441 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.9: but only 107 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.9: deferred (rising) for 103 min, until 22-Jan-2023 06:56:43 UTC 2023-01-22 05:13:14.9: Rising plan delay enabled for Plan L1022_IRS: 2023-01-22 05:13:14.9: 231 min. remaining to meet strict constraints. 2023-01-22 05:13:14.9: 467 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.9: but only 40 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.9: deferred (rising) for 39 min, until 22-Jan-2023 05:53:01 UTC 2023-01-22 05:13:14.9: Rising plan delay enabled for Plan L1022_IRS: 2023-01-22 05:13:14.9: 231 min. remaining to meet strict constraints. 2023-01-22 05:13:14.9: 467 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:14.9: but only 40 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:14.9: deferred (rising) for 39 min, until 22-Jan-2023 05:53:01 UTC 2023-01-22 05:13:15.0: Plan M67 deferred, too early 2023-01-22 05:13:15.0: Rising plan delay enabled for Plan M67: 2023-01-22 05:13:15.0: 406 min. remaining to meet strict constraints. 2023-01-22 05:13:15.0: 453 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.0: 13126 min. remaining for the plan to fit before "must run before" time. 2023-01-22 05:13:15.0: but only 147 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.0: deferred (rising) for 145 min, until 22-Jan-2023 07:38:21 UTC 2023-01-22 05:13:15.0: Plan Melotte_111 deferred, too early 2023-01-22 05:13:15.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:13:15.0: 301 min. remaining to meet strict constraints. 2023-01-22 05:13:15.0: 444 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.0: but only 20 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.0: deferred (rising) for 17 min, until 22-Jan-2023 05:30:44 UTC 2023-01-22 05:13:15.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:13:15.0: 301 min. remaining to meet strict constraints. 2023-01-22 05:13:15.0: 419 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.0: but only 8 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.0: deferred (rising) for 2 min, until 22-Jan-2023 05:15:59 UTC 2023-01-22 05:13:15.0: Rising plan delay enabled for Plan Mrk_180: 2023-01-22 05:13:15.0: 582 min. remaining to meet strict constraints. 2023-01-22 05:13:15.0: 472 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.0: but only 322 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.0: deferred (rising) for 321 min, until 22-Jan-2023 10:34:50 UTC 2023-01-22 05:13:15.1: Plan NGC_7790 deferred, too early 2023-01-22 05:13:15.1: Rising plan delay enabled for Plan NQ_Gem: 2023-01-22 05:13:15.1: 355 min. remaining to meet strict constraints. 2023-01-22 05:13:15.1: 469 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.1: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.1: deferred (rising) for 75 min, until 22-Jan-2023 06:29:07 UTC 2023-01-22 05:13:15.1: Rising plan delay enabled for Plan OI_158: 2023-01-22 05:13:15.1: 347 min. remaining to meet strict constraints. 2023-01-22 05:13:15.1: 463 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.1: but only 79 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.1: deferred (rising) for 78 min, until 22-Jan-2023 06:31:28 UTC 2023-01-22 05:13:15.1: Rising plan delay enabled for Plan OI_158: 2023-01-22 05:13:15.1: 347 min. remaining to meet strict constraints. 2023-01-22 05:13:15.1: 463 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.1: but only 79 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.1: deferred (rising) for 78 min, until 22-Jan-2023 06:31:28 UTC 2023-01-22 05:13:15.1: Rising plan delay enabled for Plan OJ287: 2023-01-22 05:13:15.1: 428 min. remaining to meet strict constraints. 2023-01-22 05:13:15.1: 459 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.1: but only 153 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.1: deferred (rising) for 152 min, until 22-Jan-2023 07:45:21 UTC 2023-01-22 05:13:15.1: Rising plan delay enabled for Plan OJ287: 2023-01-22 05:13:15.1: 428 min. remaining to meet strict constraints. 2023-01-22 05:13:15.1: 459 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.1: but only 153 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.1: deferred (rising) for 152 min, until 22-Jan-2023 07:45:21 UTC 2023-01-22 05:13:15.2: Rising plan delay enabled for Plan QX_Pup: 2023-01-22 05:13:15.2: 245 min. remaining to meet strict constraints. 2023-01-22 05:13:15.2: 465 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.2: but only 84 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.2: deferred (rising) for 82 min, until 22-Jan-2023 06:36:09 UTC 2023-01-22 05:13:15.2: Rising plan delay enabled for Plan SU_Lyn: 2023-01-22 05:13:15.2: 362 min. remaining to meet strict constraints. 2023-01-22 05:13:15.2: 472 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.2: but only 29 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.2: deferred (rising) for 28 min, until 22-Jan-2023 05:42:01 UTC 2023-01-22 05:13:15.2: Rising plan delay enabled for Plan SU_Lyn: 2023-01-22 05:13:15.2: 362 min. remaining to meet strict constraints. 2023-01-22 05:13:15.2: 470 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.2: but only 28 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.2: deferred (rising) for 27 min, until 22-Jan-2023 05:40:56 UTC 2023-01-22 05:13:15.2: Rising plan delay enabled for Plan U_Leo: 2023-01-22 05:13:15.2: 504 min. remaining to meet strict constraints. 2023-01-22 05:13:15.2: 467 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.2: but only 247 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.2: deferred (rising) for 246 min, until 22-Jan-2023 09:19:36 UTC 2023-01-22 05:13:15.2: Rising plan delay enabled for Plan U_Leo: 2023-01-22 05:13:15.2: 504 min. remaining to meet strict constraints. 2023-01-22 05:13:15.2: 467 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.2: but only 247 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.2: deferred (rising) for 246 min, until 22-Jan-2023 09:19:36 UTC 2023-01-22 05:13:15.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:13:15.4: 288 min. remaining to meet strict constraints. 2023-01-22 05:13:15.4: 454 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.4: but only 41 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.4: deferred (rising) for 39 min, until 22-Jan-2023 05:52:22 UTC 2023-01-22 05:13:15.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:13:15.4: 254 min. remaining to meet strict constraints. 2023-01-22 05:13:15.4: 390 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.4: but only 9 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.4: deferred (rising) for 0 min, until 22-Jan-2023 05:14:04 UTC 2023-01-22 05:13:15.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:13:15.4: 254 min. remaining to meet strict constraints. 2023-01-22 05:13:15.4: 403 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.4: 96586 min. remaining for the plan to fit before "must run before" time. 2023-01-22 05:13:15.4: but only 15 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.4: deferred (rising) for 8 min, until 22-Jan-2023 05:21:22 UTC 2023-01-22 05:13:15.4: Rising plan delay enabled for Plan V900_Mon: 2023-01-22 05:13:15.4: 231 min. remaining to meet strict constraints. 2023-01-22 05:13:15.4: 452 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.4: but only 33 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.4: deferred (rising) for 31 min, until 22-Jan-2023 05:44:22 UTC 2023-01-22 05:13:15.4: Rising plan delay enabled for Plan V900_Mon: 2023-01-22 05:13:15.4: 231 min. remaining to meet strict constraints. 2023-01-22 05:13:15.4: 452 min. remaining for the plan to fit before dawn. 2023-01-22 05:13:15.4: but only 33 min till start so Plan transits mid-way in its time span. 2023-01-22 05:13:15.4: deferred (rising) for 31 min, until 22-Jan-2023 05:44:22 UTC 2023-01-22 05:13:15.6: Dispatcher cycle time: 3.0 sec. 2023-01-22 05:13:15.6: Acquire data for Observation V1261_Ori... 2023-01-22 05:13:15.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan V1261_Ori) 2023-01-22 05:13:15.6: ++ Auto Focus ++ 2023-01-22 05:13:15.6: Doing periodic autofocus. 2023-01-22 05:13:15.6: Start special ACP AutoFocus script for scheduler 2023-01-22 05:16:07.8: Next periodic autofocus ASAP after 3600sec. 22-Jan-2023 06:15:49 UTC 2023-01-22 05:16:07.8: Send Observation V1261_Ori to ACP Sequencer 2023-01-22 05:21:06.7: Acquisition time: 298.9142254 sec. 2023-01-22 05:21:06.7: Data for Observation V1261_Ori of Plan V1261_Ori acquired successfully. 2023-01-22 05:21:06.7: Plan V1261_Ori completed successfully. 2023-01-22 05:21:06.7: Image Efficiency: 46.4% 2023-01-22 05:21:06.7: Cycle Efficiency: 99.0% 2023-01-22 05:21:06.9: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:21:06.9: 294 min. remaining to meet strict constraints. 2023-01-22 05:21:06.9: 412 min. remaining for the plan to fit before dawn. 2023-01-22 05:21:06.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-22 05:21:06.9: ending rising plan delay. Plan is now eligible. 2023-01-22 05:21:07.0: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:21:07.0: 246 min. remaining to meet strict constraints. 2023-01-22 05:21:07.0: 383 min. remaining for the plan to fit before dawn. 2023-01-22 05:21:07.0: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-22 05:21:07.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:21:07.2: Dispatcher cycle time: 0.3 sec. 2023-01-22 05:21:07.2: Acquire data for Observation B0133+47... 2023-01-22 05:21:07.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan B0133+47) 2023-01-22 05:21:07.2: Send Observation B0133+47 to ACP Sequencer 2023-01-22 05:33:47.8: Acquisition time: 760.6502262 sec. 2023-01-22 05:33:47.8: Data for Observation B0133+47 of Plan B0133+47 acquired successfully. 2023-01-22 05:33:47.8: Plan B0133+47 completed successfully. 2023-01-22 05:33:47.8: Image Efficiency: 71.0% 2023-01-22 05:33:47.8: Cycle Efficiency: 100.0% 2023-01-22 05:33:48.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-22 05:33:48.0: 166 min. remaining to meet strict constraints. 2023-01-22 05:33:48.0: 445 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.0: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.0: deferred (rising) for 75 min, until 22-Jan-2023 06:49:22 UTC 2023-01-22 05:33:48.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-22 05:33:48.0: 166 min. remaining to meet strict constraints. 2023-01-22 05:33:48.0: 445 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.0: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.0: deferred (rising) for 75 min, until 22-Jan-2023 06:49:22 UTC 2023-01-22 05:33:48.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:33:48.1: 281 min. remaining to meet strict constraints. 2023-01-22 05:33:48.1: 399 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.1: but only -12 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.1: ending rising plan delay. Plan is now eligible. 2023-01-22 05:33:48.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:33:48.1: 281 min. remaining to meet strict constraints. 2023-01-22 05:33:48.1: 423 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.1: ending rising plan delay. Plan is now eligible. 2023-01-22 05:33:48.1: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:33:48.1: 234 min. remaining to meet strict constraints. 2023-01-22 05:33:48.1: 382 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.1: 96566 min. remaining for the plan to fit before "must run before" time. 2023-01-22 05:33:48.1: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.1: ending rising plan delay. Plan is now eligible. 2023-01-22 05:33:48.1: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:33:48.1: 234 min. remaining to meet strict constraints. 2023-01-22 05:33:48.1: 370 min. remaining for the plan to fit before dawn. 2023-01-22 05:33:48.1: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-22 05:33:48.1: ending rising plan delay. Plan is now eligible. 2023-01-22 05:33:48.4: Dispatcher cycle time: 0.4 sec. 2023-01-22 05:33:48.4: Acquire data for Observation YZ_Aur... 2023-01-22 05:33:48.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan YZ_Aur) 2023-01-22 05:33:48.4: Send Observation YZ_Aur to ACP Sequencer 2023-01-22 05:42:50.8: Acquisition time: 542.3887203 sec. 2023-01-22 05:42:50.8: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2023-01-22 05:42:50.8: Plan YZ_Aur completed successfully. 2023-01-22 05:42:50.8: Image Efficiency: 33.2% 2023-01-22 05:42:50.8: Cycle Efficiency: 99.9% 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:42:51.0: 272 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 414 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-22 05:42:51.0: 272 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 390 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: but only -21 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan SU_Lyn: 2023-01-22 05:42:51.0: 333 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 441 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan SU_Lyn: 2023-01-22 05:42:51.0: 333 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 443 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:42:51.0: 225 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 373 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: 96557 min. remaining for the plan to fit before "must run before" time. 2023-01-22 05:42:51.0: but only -14 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.0: Rising plan delay enabled for Plan V838_Mon: 2023-01-22 05:42:51.0: 225 min. remaining to meet strict constraints. 2023-01-22 05:42:51.0: 361 min. remaining for the plan to fit before dawn. 2023-01-22 05:42:51.0: but only -20 min till start so Plan transits mid-way in its time span. 2023-01-22 05:42:51.0: ending rising plan delay. Plan is now eligible. 2023-01-22 05:42:51.2: Dispatcher cycle time: 0.4 sec. 2023-01-22 05:42:51.2: Acquire data for Observation QZ_Aur... 2023-01-22 05:42:51.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan QZ_Aur) 2023-01-22 05:42:51.3: Send Observation QZ_Aur to ACP Sequencer 2023-01-22 06:13:33.1: Acquisition time: 1841.8088385 sec. 2023-01-22 06:13:33.1: Data for Observation QZ_Aur of Plan QZ_Aur acquired successfully. 2023-01-22 06:13:33.1: Plan QZ_Aur completed successfully. 2023-01-22 06:13:33.1: Image Efficiency: 76.0% 2023-01-22 06:13:33.1: Cycle Efficiency: 100.0% 2023-01-22 06:13:33.5: Dispatcher cycle time: 0.4 sec. 2023-01-22 06:13:33.5: Acquire data for Observation V582_Aur... 2023-01-22 06:13:33.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V582_Aur) 2023-01-22 06:13:33.5: Send Observation V582_Aur to ACP Sequencer 2023-01-22 06:23:13.3: Acquisition time: 579.7886318 sec. 2023-01-22 06:23:13.3: Data for Observation V582_Aur of Plan V582_Aur acquired successfully. 2023-01-22 06:23:13.3: Plan V582_Aur completed successfully. 2023-01-22 06:23:13.3: Image Efficiency: 72.4% 2023-01-22 06:23:13.3: Cycle Efficiency: 99.9% 2023-01-22 06:23:13.5: ++ Auto Focus ++ 2023-01-22 06:23:13.5: Doing periodic autofocus. 2023-01-22 06:23:13.5: Start special ACP AutoFocus script for scheduler 2023-01-22 06:26:32.3: Next periodic autofocus ASAP after 7200sec. 22-Jan-2023 08:26:13 UTC 2023-01-22 06:26:32.4: Rising plan delay enabled for Plan J072816: 2023-01-22 06:26:32.4: 381 min. remaining to meet strict constraints. 2023-01-22 06:26:32.4: 376 min. remaining for the plan to fit before dawn. 2023-01-22 06:26:32.4: but only -9 min till start so Plan transits mid-way in its time span. 2023-01-22 06:26:32.4: ending rising plan delay. Plan is now eligible. 2023-01-22 06:26:32.4: Rising plan delay enabled for Plan J072816: 2023-01-22 06:26:32.4: 381 min. remaining to meet strict constraints. 2023-01-22 06:26:32.4: 376 min. remaining for the plan to fit before dawn. 2023-01-22 06:26:32.4: but only -9 min till start so Plan transits mid-way in its time span. 2023-01-22 06:26:32.4: ending rising plan delay. Plan is now eligible. 2023-01-22 06:26:32.7: Dispatcher cycle time: 0.3 sec. 2023-01-22 06:26:32.7: Acquire data for Observation CW_Mon... 2023-01-22 06:26:32.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan CW_Mon) 2023-01-22 06:26:32.7: Send Observation CW_Mon to ACP Sequencer 2023-01-22 06:35:38.2: Acquisition time: 545.5412826 sec. 2023-01-22 06:35:38.2: Data for Observation CW_Mon of Plan CW_Mon acquired successfully. 2023-01-22 06:35:38.2: Plan CW_Mon completed successfully. 2023-01-22 06:35:38.2: Image Efficiency: 65.9% 2023-01-22 06:35:38.2: Cycle Efficiency: 99.9% 2023-01-22 06:35:38.5: Rising plan delay enabled for Plan OI_158: 2023-01-22 06:35:38.5: 264 min. remaining to meet strict constraints. 2023-01-22 06:35:38.5: 380 min. remaining for the plan to fit before dawn. 2023-01-22 06:35:38.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-22 06:35:38.5: ending rising plan delay. Plan is now eligible. 2023-01-22 06:35:38.5: Rising plan delay enabled for Plan OI_158: 2023-01-22 06:35:38.5: 264 min. remaining to meet strict constraints. 2023-01-22 06:35:38.5: 380 min. remaining for the plan to fit before dawn. 2023-01-22 06:35:38.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-22 06:35:38.5: ending rising plan delay. Plan is now eligible. 2023-01-22 06:35:38.7: Dispatcher cycle time: 0.4 sec. 2023-01-22 06:35:38.7: Acquire data for Observation V900_Mon... 2023-01-22 06:35:38.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V900_Mon) 2023-01-22 06:35:38.8: Send Observation V900_Mon to ACP Sequencer 2023-01-22 07:00:26.2: Acquisition time: 1487.4437986 sec. 2023-01-22 07:00:26.2: Data for Observation V900_Mon of Plan V900_Mon acquired successfully. 2023-01-22 07:00:26.2: Plan V900_Mon completed successfully. 2023-01-22 07:00:26.2: Image Efficiency: 72.6% 2023-01-22 07:00:26.2: Cycle Efficiency: 100.0% 2023-01-22 07:00:26.4: Rising plan delay enabled for Plan KN_Lyn: 2023-01-22 07:00:26.4: 376 min. remaining to meet strict constraints. 2023-01-22 07:00:26.4: 334 min. remaining for the plan to fit before dawn. 2023-01-22 07:00:26.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-22 07:00:26.4: ending rising plan delay. Plan is now eligible. 2023-01-22 07:00:26.4: Rising plan delay enabled for Plan RZ_Leo: 2023-01-22 07:00:26.4: 438 min. remaining to meet strict constraints. 2023-01-22 07:00:26.4: 356 min. remaining for the plan to fit before dawn. 2023-01-22 07:00:26.4: but only 211 min till start so Plan transits mid-way in its time span. 2023-01-22 07:00:26.4: deferred (rising) for 209 min, until 22-Jan-2023 10:30:04 UTC 2023-01-22 07:00:26.7: Dispatcher cycle time: 0.4 sec. 2023-01-22 07:00:26.7: Acquire data for Observation HQ_Per... 2023-01-22 07:00:26.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan HQ_Per) 2023-01-22 07:00:26.7: Send Observation HQ_Per to ACP Sequencer 2023-01-22 07:15:08.2: Acquisition time: 881.5214438 sec. 2023-01-22 07:15:08.2: Data for Observation HQ_Per of Plan HQ_Per acquired successfully. 2023-01-22 07:15:08.2: Plan HQ_Per completed successfully. 2023-01-22 07:15:08.2: Image Efficiency: 63.5% 2023-01-22 07:15:08.2: Cycle Efficiency: 100.0% 2023-01-22 07:15:08.4: Rising plan delay enabled for Plan IR_Com: 2023-01-22 07:15:08.4: 461 min. remaining to meet strict constraints. 2023-01-22 07:15:08.4: 341 min. remaining for the plan to fit before dawn. 2023-01-22 07:15:08.4: but only 258 min till start so Plan transits mid-way in its time span. 2023-01-22 07:15:08.4: deferred (rising) for 256 min, until 22-Jan-2023 11:32:04 UTC 2023-01-22 07:15:08.4: Rising plan delay enabled for Plan IR_Com: 2023-01-22 07:15:08.4: 461 min. remaining to meet strict constraints. 2023-01-22 07:15:08.4: 341 min. remaining for the plan to fit before dawn. 2023-01-22 07:15:08.4: but only 258 min till start so Plan transits mid-way in its time span. 2023-01-22 07:15:08.4: deferred (rising) for 256 min, until 22-Jan-2023 11:32:04 UTC 2023-01-22 07:15:08.5: Rising plan delay enabled for Plan KN_Lyn: 2023-01-22 07:15:08.5: 361 min. remaining to meet strict constraints. 2023-01-22 07:15:08.5: 319 min. remaining for the plan to fit before dawn. 2023-01-22 07:15:08.5: but only -14 min till start so Plan transits mid-way in its time span. 2023-01-22 07:15:08.5: ending rising plan delay. Plan is now eligible. 2023-01-22 07:15:08.8: Dispatcher cycle time: 0.4 sec. 2023-01-22 07:15:08.8: Acquire data for Observation FS_Aur... 2023-01-22 07:15:08.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan FS_Aur) 2023-01-22 07:15:08.8: Send Observation FS_Aur to ACP Sequencer 2023-01-22 07:26:49.8: Acquisition time: 700.9604133 sec. 2023-01-22 07:26:49.8: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2023-01-22 07:26:49.8: Plan FS_Aur completed successfully. 2023-01-22 07:26:49.8: Image Efficiency: 77.0% 2023-01-22 07:26:49.8: Cycle Efficiency: 99.9% 2023-01-22 07:26:50.3: Dispatcher cycle time: 0.4 sec. 2023-01-22 07:26:50.3: Acquire data for Observation TV_Cam... 2023-01-22 07:26:50.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan TV_Cam) 2023-01-22 07:26:50.3: Send Observation TV_Cam to ACP Sequencer 2023-01-22 07:41:47.3: Acquisition time: 896.9973725 sec. 2023-01-22 07:41:47.3: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2023-01-22 07:41:47.3: Plan TV_Cam completed successfully. 2023-01-22 07:41:47.3: Image Efficiency: 62.4% 2023-01-22 07:41:47.3: Cycle Efficiency: 100.0% 2023-01-22 07:41:47.5: Rising plan delay enabled for Plan M67: 2023-01-22 07:41:47.5: 258 min. remaining to meet strict constraints. 2023-01-22 07:41:47.5: 304 min. remaining for the plan to fit before dawn. 2023-01-22 07:41:47.5: 12978 min. remaining for the plan to fit before "must run before" time. 2023-01-22 07:41:47.5: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-22 07:41:47.5: ending rising plan delay. Plan is now eligible. 2023-01-22 07:41:47.7: Dispatcher cycle time: 0.3 sec. 2023-01-22 07:41:47.7: Acquire data for Observation OI_158... 2023-01-22 07:41:47.7: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan OI_158) 2023-01-22 07:41:47.7: Send Observation OI_158 to ACP Sequencer 2023-01-22 07:57:14.3: Acquisition time: 926.5157968 sec. 2023-01-22 07:57:14.3: Data for Observation OI_158 of Plan OI_158 acquired successfully. 2023-01-22 07:57:14.3: Plan OI_158 completed successfully. 2023-01-22 07:57:14.3: Image Efficiency: 77.7% 2023-01-22 07:57:14.3: Cycle Efficiency: 100.0% 2023-01-22 07:57:14.7: Dispatcher cycle time: 0.3 sec. 2023-01-22 07:57:14.7: Acquire data for Observation J072816... 2023-01-22 07:57:14.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan J072816) 2023-01-22 07:57:14.7: Send Observation J072816 to ACP Sequencer 2023-01-22 08:22:42.8: Acquisition time: 1528.1216611 sec. 2023-01-22 08:22:42.8: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-22 08:22:42.8: Plan J072816 completed successfully. 2023-01-22 08:22:42.8: Image Efficiency: 74.6% 2023-01-22 08:22:42.8: Cycle Efficiency: 100.0% 2023-01-22 08:22:43.0: Rising plan delay enabled for Plan M3-V154: 2023-01-22 08:22:43.0: 393 min. remaining to meet strict constraints. 2023-01-22 08:22:43.0: 283 min. remaining for the plan to fit before dawn. 2023-01-22 08:22:43.0: but only 258 min till start so Plan transits mid-way in its time span. 2023-01-22 08:22:43.0: deferred (rising) for 257 min, until 22-Jan-2023 12:40:24 UTC 2023-01-22 08:22:43.3: Dispatcher cycle time: 0.3 sec. 2023-01-22 08:22:43.3: Acquire data for Observation AO_Aur... 2023-01-22 08:22:43.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan AO_Aur) 2023-01-22 08:22:43.3: Send Observation AO_Aur to ACP Sequencer 2023-01-22 08:32:28.7: Acquisition time: 585.4127116 sec. 2023-01-22 08:32:28.7: Data for Observation AO_Aur of Plan AO_Aur acquired successfully. 2023-01-22 08:32:28.7: Plan AO_Aur completed successfully. 2023-01-22 08:32:28.7: Image Efficiency: 35.9% 2023-01-22 08:32:28.7: Cycle Efficiency: 99.9% 2023-01-22 08:32:28.8: ++ Auto Focus ++ 2023-01-22 08:32:28.8: Doing periodic autofocus. 2023-01-22 08:32:28.8: Start special ACP AutoFocus script for scheduler 2023-01-22 08:36:04.2: Next periodic autofocus ASAP after 7200sec. 22-Jan-2023 10:35:50 UTC 2023-01-22 08:36:04.3: Rising plan delay enabled for Plan HS1340+1524: 2023-01-22 08:36:04.3: 380 min. remaining to meet strict constraints. 2023-01-22 08:36:04.3: 266 min. remaining for the plan to fit before dawn. 2023-01-22 08:36:04.3: but only 244 min till start so Plan transits mid-way in its time span. 2023-01-22 08:36:04.3: deferred (rising) for 243 min, until 22-Jan-2023 12:39:21 UTC 2023-01-22 08:36:04.3: Rising plan delay enabled for Plan HS1340+1524: 2023-01-22 08:36:04.3: 380 min. remaining to meet strict constraints. 2023-01-22 08:36:04.3: 266 min. remaining for the plan to fit before dawn. 2023-01-22 08:36:04.3: but only 244 min till start so Plan transits mid-way in its time span. 2023-01-22 08:36:04.3: deferred (rising) for 243 min, until 22-Jan-2023 12:39:21 UTC 2023-01-22 08:36:04.5: Dispatcher cycle time: 0.3 sec. 2023-01-22 08:36:04.5: Acquire data for Observation HQ_Per... 2023-01-22 08:36:04.5: (belongs to Project AAVSO_MISC_WEL_AUTO_ver3411, Plan HQ_Per) 2023-01-22 08:36:04.5: Send Observation HQ_Per to ACP Sequencer 2023-01-22 08:48:53.3: ACP data acquisition failed for Observation HQ_Per. 2023-01-22 08:48:53.3: (Observation HQ_Per interrupted by acquisition process failure.) 2023-01-22 08:48:53.4: Rising plan delay enabled for Plan 3C_279: 2023-01-22 08:48:53.4: 367 min. remaining to meet strict constraints. 2023-01-22 08:48:53.4: 254 min. remaining for the plan to fit before dawn. 2023-01-22 08:48:53.4: but only 184 min till start so Plan transits mid-way in its time span. 2023-01-22 08:48:53.4: deferred (rising) for 183 min, until 22-Jan-2023 11:52:52 UTC 2023-01-22 08:48:53.7: Dispatcher cycle time: 0.3 sec. 2023-01-22 08:48:53.7: Acquire data for Observation OI_158... 2023-01-22 08:48:53.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan OI_158) 2023-01-22 08:48:53.7: Send Observation OI_158 to ACP Sequencer 2023-01-22 09:04:42.4: Acquisition time: 948.6623873 sec. 2023-01-22 09:04:42.4: Data for Observation OI_158 of Plan OI_158 acquired successfully. 2023-01-22 09:04:42.4: Plan OI_158 completed successfully. 2023-01-22 09:04:42.4: Image Efficiency: 75.9% 2023-01-22 09:04:42.4: Cycle Efficiency: 100.0% 2023-01-22 09:04:42.6: Rising plan delay enabled for Plan NSV-6690: 2023-01-22 09:04:42.6: 351 min. remaining to meet strict constraints. 2023-01-22 09:04:42.6: 211 min. remaining for the plan to fit before dawn. 2023-01-22 09:04:42.6: deferred (rising) for 207 min, until 22-Jan-2023 12:32:34 UTC 2023-01-22 09:04:42.6: Rising plan delay enabled for Plan PG_1424+240: 2023-01-22 09:04:42.6: 351 min. remaining to meet strict constraints. 2023-01-22 09:04:42.6: 241 min. remaining for the plan to fit before dawn. 2023-01-22 09:04:42.6: deferred (rising) for 240 min, until 22-Jan-2023 13:05:40 UTC 2023-01-22 09:04:42.8: Dispatcher cycle time: 0.3 sec. 2023-01-22 09:04:42.8: Acquire data for Observation AO_Aur... 2023-01-22 09:04:42.8: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3420, Plan AO_Aur) 2023-01-22 09:04:42.8: Send Observation AO_Aur to ACP Sequencer 2023-01-22 09:14:35.8: Acquisition time: 593.028001 sec. 2023-01-22 09:14:35.8: Data for Observation AO_Aur of Plan AO_Aur acquired successfully. 2023-01-22 09:14:35.8: Plan AO_Aur completed successfully. 2023-01-22 09:14:35.8: Image Efficiency: 43.8% 2023-01-22 09:14:35.8: Cycle Efficiency: 99.9% 2023-01-22 09:14:36.2: Rising plan delay enabled for Plan AG_Dra: 2023-01-22 09:14:36.2: 341 min. remaining to meet strict constraints. 2023-01-22 09:14:36.2: 230 min. remaining for the plan to fit before dawn. 2023-01-22 09:14:36.2: deferred (rising) for 230 min, until 22-Jan-2023 13:04:50 UTC 2023-01-22 09:14:36.2: Rising plan delay enabled for Plan AG_Dra: 2023-01-22 09:14:36.2: 341 min. remaining to meet strict constraints. 2023-01-22 09:14:36.2: 230 min. remaining for the plan to fit before dawn. 2023-01-22 09:14:36.2: deferred (rising) for 230 min, until 22-Jan-2023 13:04:50 UTC 2023-01-22 09:14:36.3: Rising plan delay enabled for Plan X_Boo: 2023-01-22 09:14:36.3: 341 min. remaining to meet strict constraints. 2023-01-22 09:14:36.3: 230 min. remaining for the plan to fit before dawn. 2023-01-22 09:14:36.3: deferred (rising) for 230 min, until 22-Jan-2023 13:04:44 UTC 2023-01-22 09:14:36.3: Rising plan delay enabled for Plan X_Boo: 2023-01-22 09:14:36.3: 341 min. remaining to meet strict constraints. 2023-01-22 09:14:36.3: 230 min. remaining for the plan to fit before dawn. 2023-01-22 09:14:36.3: deferred (rising) for 230 min, until 22-Jan-2023 13:04:44 UTC 2023-01-22 09:14:36.4: Dispatcher cycle time: 0.2 sec. 2023-01-22 09:14:36.4: Acquire data for Observation KN_Lyn... 2023-01-22 09:14:36.4: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan KN_Lyn) 2023-01-22 09:14:36.4: Send Observation KN_Lyn to ACP Sequencer 2023-01-22 09:51:23.5: Acquisition time: 2207.1015464 sec. 2023-01-22 09:51:23.5: Data for Observation KN_Lyn of Plan KN_Lyn acquired successfully. 2023-01-22 09:51:23.5: Plan KN_Lyn completed successfully. 2023-01-22 09:51:23.5: Image Efficiency: 76.6% 2023-01-22 09:51:23.5: Cycle Efficiency: 100.0% 2023-01-22 09:51:23.8: Dispatcher cycle time: 0.1 sec. 2023-01-22 09:51:23.8: Acquire data for Observation U_Leo... 2023-01-22 09:51:23.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan U_Leo) 2023-01-22 09:51:23.8: Send Observation U_Leo to ACP Sequencer 2023-01-22 10:04:15.6: Acquisition time: 771.7763841 sec. 2023-01-22 10:04:15.6: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-01-22 10:04:15.6: Plan U_Leo completed successfully. 2023-01-22 10:04:15.6: Image Efficiency: 62.2% 2023-01-22 10:04:15.6: Cycle Efficiency: 100.0% 2023-01-22 10:04:15.8: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:04:15.8: Acquire data for Observation OJ287... 2023-01-22 10:04:15.8: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan OJ287) 2023-01-22 10:04:15.8: Send Observation OJ287 to ACP Sequencer 2023-01-22 10:24:30.3: Acquisition time: 1214.5716074 sec. 2023-01-22 10:24:30.3: Data for Observation OJ287 of Plan OJ287 acquired successfully. 2023-01-22 10:24:30.4: Plan OJ287 completed successfully. 2023-01-22 10:24:30.4: Image Efficiency: 64.2% 2023-01-22 10:24:30.4: Cycle Efficiency: 100.0% 2023-01-22 10:24:30.5: Rising plan delay enabled for Plan NGC_5634: 2023-01-22 10:24:30.5: 271 min. remaining to meet strict constraints. 2023-01-22 10:24:30.5: 134 min. remaining for the plan to fit before dawn. 2023-01-22 10:24:30.5: deferred (rising) for 130 min, until 22-Jan-2023 12:35:25 UTC 2023-01-22 10:24:30.6: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:24:30.6: Acquire data for Observation GZ_Cnc... 2023-01-22 10:24:30.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan GZ_Cnc) 2023-01-22 10:24:30.6: Send Observation GZ_Cnc to ACP Sequencer 2023-01-22 10:26:11.1: ACP data acquisition failed for Observation GZ_Cnc. 2023-01-22 10:26:11.1: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-01-22 10:26:11.3: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:26:11.3: Acquire data for Observation OJ287... 2023-01-22 10:26:11.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan OJ287) 2023-01-22 10:26:11.3: Send Observation OJ287 to ACP Sequencer 2023-01-22 10:45:34.5: Acquisition time: 1163.2352982 sec. 2023-01-22 10:45:34.5: Data for Observation OJ287 of Plan OJ287 acquired successfully. 2023-01-22 10:45:34.5: Plan OJ287 completed successfully. 2023-01-22 10:45:34.5: Image Efficiency: 67.0% 2023-01-22 10:45:34.5: Cycle Efficiency: 100.0% 2023-01-22 10:45:34.6: ++ Auto Focus ++ 2023-01-22 10:45:34.7: Doing periodic autofocus. 2023-01-22 10:45:34.7: Start special ACP AutoFocus script for scheduler 2023-01-22 10:48:57.5: Next periodic autofocus ASAP after 7200sec. 22-Jan-2023 12:48:44 UTC 2023-01-22 10:48:57.5: Rising plan delay enabled for Plan M5-V42: 2023-01-22 10:48:57.5: 247 min. remaining to meet strict constraints. 2023-01-22 10:48:57.5: 136 min. remaining for the plan to fit before dawn. 2023-01-22 10:48:57.5: deferred (rising) for 135 min, until 22-Jan-2023 13:04:56 UTC 2023-01-22 10:48:57.5: Rising plan delay enabled for Plan M5-V84: 2023-01-22 10:48:57.5: 247 min. remaining to meet strict constraints. 2023-01-22 10:48:57.5: 136 min. remaining for the plan to fit before dawn. 2023-01-22 10:48:57.5: deferred (rising) for 135 min, until 22-Jan-2023 13:04:56 UTC 2023-01-22 10:48:57.5: Rising plan delay enabled for Plan Pal_5: 2023-01-22 10:48:57.5: 247 min. remaining to meet strict constraints. 2023-01-22 10:48:57.5: 117 min. remaining for the plan to fit before dawn. 2023-01-22 10:48:57.5: deferred (rising) for 115 min, until 22-Jan-2023 12:44:35 UTC 2023-01-22 10:48:57.6: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:48:57.6: Acquire data for Observation NQ_Gem... 2023-01-22 10:48:57.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan NQ_Gem) 2023-01-22 10:48:57.6: Send Observation NQ_Gem to ACP Sequencer 2023-01-22 10:56:13.4: Acquisition time: 435.8422548 sec. 2023-01-22 10:56:13.4: Data for Observation NQ_Gem of Plan NQ_Gem acquired successfully. 2023-01-22 10:56:13.5: Plan NQ_Gem completed successfully. 2023-01-22 10:56:13.5: Image Efficiency: 32.6% 2023-01-22 10:56:13.5: Cycle Efficiency: 100.0% 2023-01-22 10:56:13.6: Rising plan delay enabled for Plan PG_1553+113: 2023-01-22 10:56:13.6: 240 min. remaining to meet strict constraints. 2023-01-22 10:56:13.6: 130 min. remaining for the plan to fit before dawn. 2023-01-22 10:56:13.6: deferred (rising) for 130 min, until 22-Jan-2023 13:06:46 UTC 2023-01-22 10:56:13.7: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:56:13.7: Acquire data for Observation GZ_Cnc... 2023-01-22 10:56:13.7: (belongs to Project AAVSO_MISC_MZK_AUTO_ver2706, Plan GZ_Cnc) 2023-01-22 10:56:13.7: Send Observation GZ_Cnc to ACP Sequencer 2023-01-22 10:58:02.0: ACP data acquisition failed for Observation GZ_Cnc. 2023-01-22 10:58:02.0: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-01-22 10:58:02.2: Dispatcher cycle time: 0.1 sec. 2023-01-22 10:58:02.2: Acquire data for Observation J072816... 2023-01-22 10:58:02.2: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan J072816) 2023-01-22 10:58:02.2: Send Observation J072816 to ACP Sequencer 2023-01-22 11:23:27.4: Acquisition time: 1525.1769489 sec. 2023-01-22 11:23:27.4: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-22 11:23:27.4: Plan J072816 completed successfully. 2023-01-22 11:23:27.4: Image Efficiency: 74.7% 2023-01-22 11:23:27.4: Cycle Efficiency: 100.0% 2023-01-22 11:23:27.5: Rising plan delay enabled for Plan IX_Dra: 2023-01-22 11:23:27.5: 212 min. remaining to meet strict constraints. 2023-01-22 11:23:27.5: 84 min. remaining for the plan to fit before dawn. 2023-01-22 11:23:27.5: deferred (rising) for 82 min, until 22-Jan-2023 12:45:57 UTC 2023-01-22 11:23:27.5: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-22 11:23:27.5: 212 min. remaining to meet strict constraints. 2023-01-22 11:23:27.5: 97 min. remaining for the plan to fit before dawn. 2023-01-22 11:23:27.5: deferred (rising) for 96 min, until 22-Jan-2023 13:00:10 UTC 2023-01-22 11:23:27.5: Dispatcher cycle time: 0.1 sec. 2023-01-22 11:23:27.5: Acquire data for Observation M67... 2023-01-22 11:23:27.5: (belongs to Project AAVSO_Transform_Std_Fields_AUTO_ver3422, Plan M67) 2023-01-22 11:23:27.5: Send Observation M67 to ACP Sequencer 2023-01-22 11:49:26.1: Acquisition time: 1558.5690009 sec. 2023-01-22 11:49:26.1: Data for Observation M67 of Plan M67 acquired successfully. 2023-01-22 11:49:26.1: Plan M67 completed successfully. 2023-01-22 11:49:26.1: Image Efficiency: 59.0% 2023-01-22 11:49:26.1: Cycle Efficiency: 100.0% 2023-01-22 11:49:26.3: Dispatcher cycle time: 0.1 sec. 2023-01-22 11:49:26.3: Acquire data for Observation Mrk_180... 2023-01-22 11:49:26.3: (belongs to Project AAVSO_MISC_OAR_AUTO_ver2706, Plan Mrk_180) 2023-01-22 11:49:26.4: Send Observation Mrk_180 to ACP Sequencer 2023-01-22 11:55:40.4: Acquisition time: 374.0453664 sec. 2023-01-22 11:55:40.4: Data for Observation Mrk_180 of Plan Mrk_180 acquired successfully. 2023-01-22 11:55:40.4: Plan Mrk_180 completed successfully. 2023-01-22 11:55:40.4: Image Efficiency: 48.1% 2023-01-22 11:55:40.4: Cycle Efficiency: 100.0% 2023-01-22 11:55:40.5: Rising plan delay enabled for Plan 3C_279: 2023-01-22 11:55:40.5: 180 min. remaining to meet strict constraints. 2023-01-22 11:55:40.5: 67 min. remaining for the plan to fit before dawn. 2023-01-22 11:55:40.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-22 11:55:40.5: ending rising plan delay. Plan is now eligible. 2023-01-22 11:55:40.5: Rising plan delay enabled for Plan X_Ser: 2023-01-22 11:55:40.5: 180 min. remaining to meet strict constraints. 2023-01-22 11:55:40.5: 66 min. remaining for the plan to fit before dawn. 2023-01-22 11:55:40.5: deferred (rising) for 66 min, until 22-Jan-2023 13:01:49 UTC 2023-01-22 11:55:40.6: Rising plan delay enabled for Plan X_Ser: 2023-01-22 11:55:40.6: 180 min. remaining to meet strict constraints. 2023-01-22 11:55:40.6: 53 min. remaining for the plan to fit before dawn. 2023-01-22 11:55:40.6: deferred (rising) for 50 min, until 22-Jan-2023 12:46:30 UTC 2023-01-22 11:55:40.6: Dispatcher cycle time: 0.1 sec. 2023-01-22 11:55:40.6: Acquire data for Observation U_Leo... 2023-01-22 11:55:40.6: (belongs to Project AAVSO_MISC_SFY_AUTO_ver2706, Plan U_Leo) 2023-01-22 11:55:40.6: Send Observation U_Leo to ACP Sequencer 2023-01-22 12:06:48.4: Acquisition time: 667.7717849 sec. 2023-01-22 12:06:48.4: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-01-22 12:06:48.4: Plan U_Leo completed successfully. 2023-01-22 12:06:48.4: Image Efficiency: 71.9% 2023-01-22 12:06:48.4: Cycle Efficiency: 100.0% 2023-01-22 12:06:48.5: Dispatcher cycle time: 0.1 sec. 2023-01-22 12:06:48.5: Acquire data for Observation 3C_279... 2023-01-22 12:06:48.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan 3C_279) 2023-01-22 12:06:48.5: Send Observation 3C_279 to ACP Sequencer 2023-01-22 12:08:41.9: ACP data acquisition failed for Observation 3C_279. 2023-01-22 12:08:41.9: (Observation 3C_279 interrupted by acquisition process failure.) 2023-01-22 12:08:42.1: Dispatcher cycle time: 0.0 sec. 2023-01-22 12:08:42.1: Acquire data for Observation RZ_Leo... 2023-01-22 12:08:42.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan RZ_Leo) 2023-01-22 12:08:42.1: Send Observation RZ_Leo to ACP Sequencer 2023-01-22 12:23:22.3: Acquisition time: 880.2383648 sec. 2023-01-22 12:23:22.3: Data for Observation RZ_Leo of Plan RZ_Leo acquired successfully. 2023-01-22 12:23:22.3: Plan RZ_Leo completed successfully. 2023-01-22 12:23:22.3: Image Efficiency: 81.8% 2023-01-22 12:23:22.3: Cycle Efficiency: 100.0% 2023-01-22 12:23:22.6: Run statistics: 2023-01-22 12:23:22.6: Observations: 273 2023-01-22 12:23:22.6: Considered: 62 2023-01-22 12:23:22.6: Completed: 1 2023-01-22 12:23:22.6: Skipped: 45 2023-01-22 12:23:22.6: Never Eligible: 211 2023-01-22 12:23:22.6: Failed: 16 Log closed at Sun, Jan 22 2023 12:23:22 UTC (actual time)