Log opened at Fri, Jan 13 2023 00:35:22 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-01-13 00:35:22.3: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-13 00:35:22.3: Last AutoFocus was completed at 10-Jan-2023 12:30:10 UTC 2023-01-13 00:35:22.3: Autofocus will be done ASAP. 2023-01-13 00:35:22.3: ++ Observatory Startup ++ 2023-01-13 00:35:22.3: Weather safety is now disabled 2023-01-13 00:35:22.3: Start ACP Sequencer's StartupObs script 2023-01-13 00:36:19.7: Weather safety is re-enabled 2023-01-13 00:36:19.7: Weather safety is now disabled 2023-01-13 00:36:19.7: Open the observatory dome/roof 2023-01-13 00:37:20.4: Weather safety is re-enabled 2023-01-13 00:37:20.4: Observatory startup succeeded, and dome opened successfully 2023-01-13 00:37:20.4: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-13 00:37:20.4: Last AutoFocus was completed at 10-Jan-2023 12:30:10 UTC 2023-01-13 00:37:20.4: Autofocus will be done ASAP. 2023-01-13 00:37:20.4: ++ Dusk Sky Flats ++ 2023-01-13 00:37:20.4: Start ACP AutoFlat script for Dusk flats 2023-01-13 01:19:20.2: ++ Auto Focus ++ 2023-01-13 01:19:20.2: Doing periodic autofocus. 2023-01-13 01:19:20.2: Start special ACP AutoFocus script for scheduler 2023-01-13 01:23:39.6: Next periodic autofocus ASAP after 3600sec. 13-Jan-2023 02:23:15 UTC 2023-01-13 01:23:41.7: Plan OI_158 has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V0704_And has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V0704_And has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V504_Per has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V630_Cas has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan J072816 has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan 2MASS_J07092139-1029344 has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V1112_Per has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan M5-V84 has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan AE_And has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan NSV-6690 has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan HQ_Mon has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.7: Plan V479_And has Monitor Mode. Time to resubmit it. 2023-01-13 01:23:41.8: Rising plan delay enabled for Plan AO_Aur: 2023-01-13 01:23:41.8: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.8: 699 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.8: but only 237 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.8: deferred (rising) for 236 min, until 13-Jan-2023 05:19:53 UTC 2023-01-13 01:23:41.8: Rising plan delay enabled for Plan AO_Aur: 2023-01-13 01:23:41.8: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.8: 699 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.8: but only 237 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.8: deferred (rising) for 236 min, until 13-Jan-2023 05:19:52 UTC 2023-01-13 01:23:41.9: Rising plan delay enabled for Plan ER_Aur: 2023-01-13 01:23:41.9: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.9: 696 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.9: but only 200 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.9: deferred (rising) for 199 min, until 13-Jan-2023 04:43:24 UTC 2023-01-13 01:23:41.9: Rising plan delay enabled for Plan ER_Aur: 2023-01-13 01:23:41.9: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.9: 695 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.9: but only 200 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.9: deferred (rising) for 199 min, until 13-Jan-2023 04:43:08 UTC 2023-01-13 01:23:41.9: Rising plan delay enabled for Plan FS_Aur: 2023-01-13 01:23:41.9: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.9: 697 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.9: but only 236 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.9: deferred (rising) for 234 min, until 13-Jan-2023 05:18:39 UTC 2023-01-13 01:23:41.9: Rising plan delay enabled for Plan FS_Aur: 2023-01-13 01:23:41.9: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.9: 697 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.9: but only 236 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.9: deferred (rising) for 234 min, until 13-Jan-2023 05:18:39 UTC 2023-01-13 01:23:41.9: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 01:23:41.9: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:41.9: 701 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:41.9: but only 211 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:41.9: deferred (rising) for 210 min, until 13-Jan-2023 04:54:39 UTC 2023-01-13 01:23:42.0: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 01:23:42.0: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.0: 701 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.0: but only 211 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.0: deferred (rising) for 210 min, until 13-Jan-2023 04:54:39 UTC 2023-01-13 01:23:42.0: Rising plan delay enabled for Plan HQ_Per: 2023-01-13 01:23:42.0: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.0: 696 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.0: but only 171 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.0: deferred (rising) for 170 min, until 13-Jan-2023 04:14:15 UTC 2023-01-13 01:23:42.0: Rising plan delay enabled for Plan HQ_Per: 2023-01-13 01:23:42.0: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.0: 694 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.0: but only 170 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.0: deferred (rising) for 169 min, until 13-Jan-2023 04:12:56 UTC 2023-01-13 01:23:42.1: Rising plan delay enabled for Plan J072816: 2023-01-13 01:23:42.1: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.1: 681 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.1: deferred (rising) for 245 min, until 13-Jan-2023 05:28:53 UTC 2023-01-13 01:23:42.1: Rising plan delay enabled for Plan J072816: 2023-01-13 01:23:42.1: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.1: 708 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.1: deferred (rising) for 247 min, until 13-Jan-2023 05:31:35 UTC 2023-01-13 01:23:42.3: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 01:23:42.3: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.3: 691 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.3: but only 146 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.3: deferred (rising) for 144 min, until 13-Jan-2023 03:48:41 UTC 2023-01-13 01:23:42.3: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 01:23:42.3: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.3: 691 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.3: but only 146 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.3: deferred (rising) for 144 min, until 13-Jan-2023 03:48:41 UTC 2023-01-13 01:23:42.3: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 01:23:42.3: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.3: 677 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.3: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.3: deferred (rising) for 204 min, until 13-Jan-2023 04:47:43 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 677 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 204 min, until 13-Jan-2023 04:47:43 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan S5_0716+714: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 704 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: deferred (rising) for 247 min, until 13-Jan-2023 05:31:09 UTC 2023-01-13 01:23:42.4: [AirmassRange] Target will never be below the maximum air mass 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 702 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: deferred (rising) for 247 min, until 13-Jan-2023 05:30:57 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 703 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: deferred (rising) for 247 min, until 13-Jan-2023 05:31:08 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 686 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 10 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 8 min, until 13-Jan-2023 01:31:53 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 692 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 13 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 11 min, until 13-Jan-2023 01:35:32 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 694 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 134 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 132 min, until 13-Jan-2023 03:36:36 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 697 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 135 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 134 min, until 13-Jan-2023 03:38:21 UTC 2023-01-13 01:23:42.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 01:23:42.4: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.4: 697 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.4: but only 135 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.4: deferred (rising) for 134 min, until 13-Jan-2023 03:38:29 UTC 2023-01-13 01:23:42.5: Rising plan delay enabled for Plan V1112_Per: 2023-01-13 01:23:42.5: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.5: 708 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.5: but only 163 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.5: deferred (rising) for 163 min, until 13-Jan-2023 04:06:57 UTC 2023-01-13 01:23:42.5: Rising plan delay enabled for Plan V370_And: 2023-01-13 01:23:42.5: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.5: 705 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.5: but only 11 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.5: deferred (rising) for 11 min, until 13-Jan-2023 01:35:15 UTC 2023-01-13 01:23:42.5: Rising plan delay enabled for Plan V370_And: 2023-01-13 01:23:42.5: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.5: 705 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.5: but only 11 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.5: deferred (rising) for 11 min, until 13-Jan-2023 01:35:15 UTC 2023-01-13 01:23:42.5: [AirmassRange] Target will never be below the maximum air mass 2023-01-13 01:23:42.5: [AirmassRange] Target will never be below the maximum air mass 2023-01-13 01:23:42.5: Rising plan delay enabled for Plan V479_And: 2023-01-13 01:23:42.5: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.5: 708 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.5: 25806 min. remaining for the plan to fit before "must run before" time. 2023-01-13 01:23:42.5: but only 178 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.5: deferred (rising) for 178 min, until 13-Jan-2023 04:21:49 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan V504_Per: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 700 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 31 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 30 min, until 13-Jan-2023 01:54:17 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan V504_Per: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 708 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 35 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 35 min, until 13-Jan-2023 01:59:17 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 698 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 214 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 213 min, until 13-Jan-2023 04:56:43 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 698 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 214 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 213 min, until 13-Jan-2023 04:56:43 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan YZ_Aur: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 700 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 205 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 204 min, until 13-Jan-2023 04:48:20 UTC 2023-01-13 01:23:42.6: Rising plan delay enabled for Plan YZ_Aur: 2023-01-13 01:23:42.6: 247 min. remaining to meet strict constraints. 2023-01-13 01:23:42.6: 700 min. remaining for the plan to fit before dawn. 2023-01-13 01:23:42.6: but only 204 min till start so Plan transits mid-way in its time span. 2023-01-13 01:23:42.6: deferred (rising) for 204 min, until 13-Jan-2023 04:47:49 UTC 2023-01-13 01:23:42.8: Dispatcher cycle time: 3.3 sec. 2023-01-13 01:23:42.8: Acquire data for Observation EE_Cep... 2023-01-13 01:23:42.8: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan EE_Cep) 2023-01-13 01:23:42.8: Send Observation EE_Cep to ACP Sequencer 2023-01-13 01:37:50.9: Acquisition time: 848.1231705 sec. 2023-01-13 01:37:50.9: Data for Observation EE_Cep of Plan EE_Cep acquired successfully. 2023-01-13 01:37:50.9: Plan EE_Cep completed successfully. 2023-01-13 01:37:51.0: Image Efficiency: 74.6% 2023-01-13 01:37:51.0: Cycle Efficiency: 99.6% 2023-01-13 01:37:51.3: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:37:51.3: 233 min. remaining to meet strict constraints. 2023-01-13 01:37:51.3: 672 min. remaining for the plan to fit before dawn. 2023-01-13 01:37:51.3: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 01:37:51.3: ending rising plan delay. Plan is now eligible. 2023-01-13 01:37:51.3: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:37:51.3: 233 min. remaining to meet strict constraints. 2023-01-13 01:37:51.3: 678 min. remaining for the plan to fit before dawn. 2023-01-13 01:37:51.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 01:37:51.3: ending rising plan delay. Plan is now eligible. 2023-01-13 01:37:51.5: Dispatcher cycle time: 0.4 sec. 2023-01-13 01:37:51.5: Acquire data for Observation AX_Per... 2023-01-13 01:37:51.5: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan AX_Per) 2023-01-13 01:37:51.5: Send Observation AX_Per to ACP Sequencer 2023-01-13 01:44:54.7: Acquisition time: 423.2335508 sec. 2023-01-13 01:44:54.7: Data for Observation AX_Per of Plan AX_Per acquired successfully. 2023-01-13 01:44:54.7: Plan AX_Per completed successfully. 2023-01-13 01:44:54.8: Image Efficiency: 35.4% 2023-01-13 01:44:54.8: Cycle Efficiency: 99.9% 2023-01-13 01:44:55.0: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:44:55.0: 226 min. remaining to meet strict constraints. 2023-01-13 01:44:55.0: 665 min. remaining for the plan to fit before dawn. 2023-01-13 01:44:55.0: but only -10 min till start so Plan transits mid-way in its time span. 2023-01-13 01:44:55.0: ending rising plan delay. Plan is now eligible. 2023-01-13 01:44:55.0: Rising plan delay enabled for Plan TT_Ari: 2023-01-13 01:44:55.0: 226 min. remaining to meet strict constraints. 2023-01-13 01:44:55.0: 671 min. remaining for the plan to fit before dawn. 2023-01-13 01:44:55.0: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-13 01:44:55.0: ending rising plan delay. Plan is now eligible. 2023-01-13 01:44:55.1: Dispatcher cycle time: 0.3 sec. 2023-01-13 01:44:55.1: Acquire data for Observation V630_Cas... 2023-01-13 01:44:55.1: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan V630_Cas) 2023-01-13 01:44:55.2: Send Observation V630_Cas to ACP Sequencer 2023-01-13 01:58:51.8: Acquisition time: 836.6779658 sec. 2023-01-13 01:58:51.8: Data for Observation V630_Cas of Plan V630_Cas acquired successfully. 2023-01-13 01:58:51.8: Plan V630_Cas completed successfully. 2023-01-13 01:58:51.8: Image Efficiency: 64.5% 2023-01-13 01:58:51.8: Cycle Efficiency: 100.0% 2023-01-13 01:58:52.0: Rising plan delay enabled for Plan KN_Lyn: 2023-01-13 01:58:52.0: 212 min. remaining to meet strict constraints. 2023-01-13 01:58:52.0: 637 min. remaining for the plan to fit before dawn. 2023-01-13 01:58:52.0: deferred (rising) for 209 min, until 13-Jan-2023 05:28:00 UTC 2023-01-13 01:58:52.0: Rising plan delay enabled for Plan S_Ori: 2023-01-13 01:58:52.0: 212 min. remaining to meet strict constraints. 2023-01-13 01:58:52.0: 656 min. remaining for the plan to fit before dawn. 2023-01-13 01:58:52.0: but only 179 min till start so Plan transits mid-way in its time span. 2023-01-13 01:58:52.0: deferred (rising) for 177 min, until 13-Jan-2023 04:56:16 UTC 2023-01-13 01:58:52.1: Rising plan delay enabled for Plan V1261_Ori: 2023-01-13 01:58:52.1: 212 min. remaining to meet strict constraints. 2023-01-13 01:58:52.1: 669 min. remaining for the plan to fit before dawn. 2023-01-13 01:58:52.1: but only 178 min till start so Plan transits mid-way in its time span. 2023-01-13 01:58:52.1: deferred (rising) for 178 min, until 13-Jan-2023 04:57:23 UTC 2023-01-13 01:58:52.1: Rising plan delay enabled for Plan V1647_Ori: 2023-01-13 01:58:52.1: 212 min. remaining to meet strict constraints. 2023-01-13 01:58:52.1: 658 min. remaining for the plan to fit before dawn. 2023-01-13 01:58:52.1: but only 197 min till start so Plan transits mid-way in its time span. 2023-01-13 01:58:52.1: deferred (rising) for 195 min, until 13-Jan-2023 05:14:28 UTC 2023-01-13 01:58:52.1: Rising plan delay enabled for Plan V504_Per: 2023-01-13 01:58:52.1: 212 min. remaining to meet strict constraints. 2023-01-13 01:58:52.1: 665 min. remaining for the plan to fit before dawn. 2023-01-13 01:58:52.1: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 01:58:52.1: ending rising plan delay. Plan is now eligible. 2023-01-13 01:58:52.2: Dispatcher cycle time: 0.3 sec. 2023-01-13 01:58:52.2: Acquire data for Observation V407_Cas... 2023-01-13 01:58:52.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V407_Cas) 2023-01-13 01:58:52.2: Send Observation V407_Cas to ACP Sequencer 2023-01-13 02:21:17.6: Acquisition time: 1345.3772533 sec. 2023-01-13 02:21:17.6: Data for Observation V407_Cas of Plan V407_Cas acquired successfully. 2023-01-13 02:21:17.6: Plan V407_Cas completed successfully. 2023-01-13 02:21:17.6: Image Efficiency: 32.0% 2023-01-13 02:21:17.6: Cycle Efficiency: 100.0% 2023-01-13 02:21:17.8: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 02:21:17.8: 190 min. remaining to meet strict constraints. 2023-01-13 02:21:17.8: 593 min. remaining for the plan to fit before dawn. 2023-01-13 02:21:17.8: deferred (rising) for 184 min, until 13-Jan-2023 05:25:51 UTC 2023-01-13 02:21:17.8: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 02:21:17.8: 190 min. remaining to meet strict constraints. 2023-01-13 02:21:17.8: 618 min. remaining for the plan to fit before dawn. 2023-01-13 02:21:17.8: deferred (rising) for 187 min, until 13-Jan-2023 05:28:19 UTC 2023-01-13 02:21:18.0: Dispatcher cycle time: 0.3 sec. 2023-01-13 02:21:18.0: Acquire data for Observation TT_Ari... 2023-01-13 02:21:18.0: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan TT_Ari) 2023-01-13 02:21:18.0: Send Observation TT_Ari to ACP Sequencer 2023-01-13 02:23:39.6: ACP data acquisition failed for Observation TT_Ari. 2023-01-13 02:23:39.6: (Observation TT_Ari interrupted by acquisition process failure.) 2023-01-13 02:23:39.7: ++ Auto Focus ++ 2023-01-13 02:23:39.8: Doing periodic autofocus. 2023-01-13 02:23:39.8: Start special ACP AutoFocus script for scheduler 2023-01-13 02:23:57.5: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 02:23:57.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 02:23:57.5: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-13 02:23:57.8: Dispatcher cycle time: 0.3 sec. 2023-01-13 02:23:57.8: Acquire data for Observation AZ_Cas... 2023-01-13 02:23:57.8: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan AZ_Cas) 2023-01-13 02:23:57.8: ++ Auto Focus ++ 2023-01-13 02:23:57.8: Doing periodic autofocus. 2023-01-13 02:23:57.8: Start special ACP AutoFocus script for scheduler 2023-01-13 02:24:25.2: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 02:24:25.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 02:24:25.2: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-13 02:24:25.2: Send Observation AZ_Cas to ACP Sequencer 2023-01-13 02:24:40.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:24:40.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:24:40.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:24:40.3: ACP data acquisition failed for Observation AZ_Cas. 2023-01-13 02:24:40.3: (Observation AZ_Cas interrupted by acquisition process failure.) 2023-01-13 02:24:40.7: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:24:40.7: Acquire data for Observation EE_Cep... 2023-01-13 02:24:40.7: (belongs to Project AAVSO_P124_Staels_AUTO_ver3395, Plan EE_Cep) 2023-01-13 02:24:40.7: Send Observation EE_Cep to ACP Sequencer 2023-01-13 02:25:12.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:25:12.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:25:12.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:25:12.7: ACP data acquisition failed for Observation EE_Cep. 2023-01-13 02:25:12.7: (Observation EE_Cep interrupted by acquisition process failure.) 2023-01-13 02:25:13.0: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:25:13.0: Acquire data for Observation CGCS_5926... 2023-01-13 02:25:13.0: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan CGCS_5926) 2023-01-13 02:25:13.0: Send Observation CGCS_5926 to ACP Sequencer 2023-01-13 02:25:29.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:25:29.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:25:29.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:25:29.9: ACP data acquisition failed for Observation CGCS_5926. 2023-01-13 02:25:29.9: (Observation CGCS_5926 interrupted by acquisition process failure.) 2023-01-13 02:25:30.2: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:25:30.2: Acquire data for Observation B0133+47... 2023-01-13 02:25:30.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan B0133+47) 2023-01-13 02:25:30.2: Send Observation B0133+47 to ACP Sequencer 2023-01-13 02:25:45.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:25:45.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:25:45.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:25:45.3: ACP data acquisition failed for Observation B0133+47. 2023-01-13 02:25:45.3: (Observation B0133+47 interrupted by acquisition process failure.) 2023-01-13 02:25:45.6: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:25:45.6: Acquire data for Observation V370_And... 2023-01-13 02:25:45.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V370_And) 2023-01-13 02:25:45.6: Send Observation V370_And to ACP Sequencer 2023-01-13 02:26:00.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:26:00.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:26:00.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:26:00.7: ACP data acquisition failed for Observation V370_And. 2023-01-13 02:26:00.7: (Observation V370_And interrupted by acquisition process failure.) 2023-01-13 02:26:01.0: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:26:01.0: Acquire data for Observation V407_Cas... 2023-01-13 02:26:01.0: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan V407_Cas) 2023-01-13 02:26:01.0: Send Observation V407_Cas to ACP Sequencer 2023-01-13 02:26:16.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:26:16.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:26:16.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:26:16.1: ACP data acquisition failed for Observation V407_Cas. 2023-01-13 02:26:16.1: (Observation V407_Cas interrupted by acquisition process failure.) 2023-01-13 02:26:16.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:26:16.4: Acquire data for Observation DW_Cas... 2023-01-13 02:26:16.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan DW_Cas) 2023-01-13 02:26:16.4: Send Observation DW_Cas to ACP Sequencer 2023-01-13 02:26:31.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:26:31.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:26:31.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:26:31.6: ACP data acquisition failed for Observation DW_Cas. 2023-01-13 02:26:31.6: (Observation DW_Cas interrupted by acquisition process failure.) 2023-01-13 02:26:31.9: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:26:31.9: Acquire data for Observation AE_And... 2023-01-13 02:26:31.9: (belongs to Project AAVSO_P251_MSD_AUTO_ver2819, Plan AE_And) 2023-01-13 02:26:31.9: Send Observation AE_And to ACP Sequencer 2023-01-13 02:26:47.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:26:47.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:26:47.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:26:47.4: ACP data acquisition failed for Observation AE_And. 2023-01-13 02:26:47.4: (Observation AE_And interrupted by acquisition process failure.) 2023-01-13 02:26:47.6: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:26:47.6: Acquire data for Observation V504_Per... 2023-01-13 02:26:47.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V504_Per) 2023-01-13 02:26:47.6: Send Observation V504_Per to ACP Sequencer 2023-01-13 02:27:04.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:27:04.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:27:04.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:27:04.9: ACP data acquisition failed for Observation V504_Per. 2023-01-13 02:27:04.9: (Observation V504_Per interrupted by acquisition process failure.) 2023-01-13 02:27:05.2: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:27:05.2: Acquire data for Observation TT_Ari... 2023-01-13 02:27:05.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan TT_Ari) 2023-01-13 02:27:05.2: Send Observation TT_Ari to ACP Sequencer 2023-01-13 02:27:22.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:27:22.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:27:22.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:27:22.1: ACP data acquisition failed for Observation TT_Ari. 2023-01-13 02:27:22.1: (Observation TT_Ari interrupted by acquisition process failure.) 2023-01-13 02:27:22.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:27:22.4: Acquire data for Observation KK_Cas... 2023-01-13 02:27:22.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan KK_Cas) 2023-01-13 02:27:22.4: Send Observation KK_Cas to ACP Sequencer 2023-01-13 02:28:06.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:28:06.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:28:06.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:28:06.2: ACP data acquisition failed for Observation KK_Cas. 2023-01-13 02:28:06.2: (Observation KK_Cas interrupted by acquisition process failure.) 2023-01-13 02:28:06.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 02:28:06.4: Acquire data for Observation V0704_And... 2023-01-13 02:28:06.4: (belongs to Project AAVSO_P253_CDAG_AUTO_ver3388, Plan V0704_And) 2023-01-13 02:28:06.5: Send Observation V0704_And to ACP Sequencer 2023-01-13 02:28:55.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:28:55.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:28:55.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:28:55.6: ACP data acquisition failed for Observation V0704_And. 2023-01-13 02:28:55.6: (Observation V0704_And interrupted by acquisition process failure.) 2023-01-13 02:28:55.9: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:28:55.9: Acquire data for Observation CGCS_5926... 2023-01-13 02:28:55.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan CGCS_5926) 2023-01-13 02:28:55.9: Send Observation CGCS_5926 to ACP Sequencer 2023-01-13 02:29:11.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:29:11.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:29:11.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:29:11.0: ACP data acquisition failed for Observation CGCS_5926. 2023-01-13 02:29:11.0: (Observation CGCS_5926 interrupted by acquisition process failure.) 2023-01-13 02:29:11.2: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:29:11.2: Acquire data for Observation GZ_Cet... 2023-01-13 02:29:11.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan GZ_Cet) 2023-01-13 02:29:11.2: Send Observation GZ_Cet to ACP Sequencer 2023-01-13 02:29:26.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:29:26.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:29:26.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:29:26.4: ACP data acquisition failed for Observation GZ_Cet. 2023-01-13 02:29:26.4: (Observation GZ_Cet interrupted by acquisition process failure.) 2023-01-13 02:29:26.5: ++ Auto Focus ++ 2023-01-13 02:29:26.5: Doing periodic autofocus. 2023-01-13 02:29:26.5: Start special ACP AutoFocus script for scheduler 2023-01-13 02:30:04.1: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 02:30:04.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 02:30:04.1: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2023-01-13 02:30:04.2: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:30:04.2: Acquire data for Observation BO_Cep... 2023-01-13 02:30:04.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan BO_Cep) 2023-01-13 02:30:04.2: Send Observation BO_Cep to ACP Sequencer 2023-01-13 02:30:26.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:30:26.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:30:26.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:30:26.5: ACP data acquisition failed for Observation BO_Cep. 2023-01-13 02:30:26.5: (Observation BO_Cep interrupted by acquisition process failure.) 2023-01-13 02:30:26.7: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:30:26.7: Acquire data for Observation V0704_And... 2023-01-13 02:30:26.7: (belongs to Project AAVSO_P253_CDAG_AUTO_ver3388, Plan V0704_And) 2023-01-13 02:30:26.7: Send Observation V0704_And to ACP Sequencer 2023-01-13 02:30:54.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:30:54.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:30:54.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:30:54.3: ACP data acquisition failed for Observation V0704_And. 2023-01-13 02:30:54.3: (Observation V0704_And interrupted by acquisition process failure.) 2023-01-13 02:30:54.5: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:30:54.5: Acquire data for Observation TU_Cas... 2023-01-13 02:30:54.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan TU_Cas) 2023-01-13 02:30:54.5: Send Observation TU_Cas to ACP Sequencer 2023-01-13 02:31:11.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:31:11.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:31:11.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:31:11.4: ACP data acquisition failed for Observation TU_Cas. 2023-01-13 02:31:11.4: (Observation TU_Cas interrupted by acquisition process failure.) 2023-01-13 02:31:11.6: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:31:11.6: Acquire data for Observation EG_And... 2023-01-13 02:31:11.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan EG_And) 2023-01-13 02:31:11.6: Send Observation EG_And to ACP Sequencer 2023-01-13 02:31:26.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:31:26.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:31:26.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:31:26.7: ACP data acquisition failed for Observation EG_And. 2023-01-13 02:31:26.7: (Observation EG_And interrupted by acquisition process failure.) 2023-01-13 02:31:26.9: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:31:26.9: Acquire data for Observation GZ_Cet... 2023-01-13 02:31:26.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan GZ_Cet) 2023-01-13 02:31:26.9: Send Observation GZ_Cet to ACP Sequencer 2023-01-13 02:31:42.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:31:42.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:31:42.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:31:42.0: ACP data acquisition failed for Observation GZ_Cet. 2023-01-13 02:31:42.0: (Observation GZ_Cet interrupted by acquisition process failure.) 2023-01-13 02:31:42.2: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:31:42.2: Acquire data for Observation V630_Cas... 2023-01-13 02:31:42.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V630_Cas) 2023-01-13 02:31:42.2: Send Observation V630_Cas to ACP Sequencer 2023-01-13 02:32:08.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:32:08.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:32:08.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:32:08.7: ACP data acquisition failed for Observation V630_Cas. 2023-01-13 02:32:08.7: (Observation V630_Cas interrupted by acquisition process failure.) 2023-01-13 02:32:08.9: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:32:08.9: Acquire data for Observation AZ_Cas... 2023-01-13 02:32:08.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan AZ_Cas) 2023-01-13 02:32:08.9: Send Observation AZ_Cas to ACP Sequencer 2023-01-13 02:32:47.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:32:47.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:32:47.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:32:47.5: ACP data acquisition failed for Observation AZ_Cas. 2023-01-13 02:32:47.5: (Observation AZ_Cas interrupted by acquisition process failure.) 2023-01-13 02:32:47.7: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:32:47.7: Acquire data for Observation AF_And... 2023-01-13 02:32:47.7: (belongs to Project AAVSO_P251_MSD_AUTO_ver2819, Plan AF_And) 2023-01-13 02:32:47.7: Send Observation AF_And to ACP Sequencer 2023-01-13 02:33:04.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:33:04.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:33:04.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:33:04.7: ACP data acquisition failed for Observation AF_And. 2023-01-13 02:33:04.7: (Observation AF_And interrupted by acquisition process failure.) 2023-01-13 02:33:04.8: Dispatcher cycle time: 0.1 sec. 2023-01-13 02:33:04.8: Acquire data for Observation B0133+47... 2023-01-13 02:33:04.8: (belongs to Project AAVSO_MISC_RMU_AUTO_ver2706, Plan B0133+47) 2023-01-13 02:33:04.9: Send Observation B0133+47 to ACP Sequencer 2023-01-13 02:33:27.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:33:27.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:33:27.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:33:27.2: ACP data acquisition failed for Observation B0133+47. 2023-01-13 02:33:27.2: (Observation B0133+47 interrupted by acquisition process failure.) 2023-01-13 02:33:27.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 02:33:27.4: Acquire data for Observation DW_Cas... 2023-01-13 02:33:27.4: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan DW_Cas) 2023-01-13 02:33:27.4: Send Observation DW_Cas to ACP Sequencer 2023-01-13 02:33:55.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:33:55.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:33:55.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:33:55.5: ACP data acquisition failed for Observation DW_Cas. 2023-01-13 02:33:55.5: (Observation DW_Cas interrupted by acquisition process failure.) 2023-01-13 02:33:55.7: Dispatcher cycle time: 0.0 sec. 2023-01-13 02:33:55.7: Acquire data for Observation KK_Cas... 2023-01-13 02:33:55.7: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan KK_Cas) 2023-01-13 02:33:55.7: Send Observation KK_Cas to ACP Sequencer 2023-01-13 02:34:11.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:34:11.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:34:11.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:34:11.3: ACP data acquisition failed for Observation KK_Cas. 2023-01-13 02:34:11.3: (Observation KK_Cas interrupted by acquisition process failure.) 2023-01-13 02:34:11.5: Dispatcher cycle time: 0.0 sec. 2023-01-13 02:34:11.5: Acquire data for Observation V370_And... 2023-01-13 02:34:11.5: (belongs to Project AAVSO_MISC_FGU_AUTO_ver2706, Plan V370_And) 2023-01-13 02:34:11.5: Send Observation V370_And to ACP Sequencer 2023-01-13 02:34:26.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:34:26.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:34:26.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:34:26.5: ACP data acquisition failed for Observation V370_And. 2023-01-13 02:34:26.5: (Observation V370_And interrupted by acquisition process failure.) 2023-01-13 02:34:26.7: Rising plan delay enabled for Plan NQ_Gem: 2023-01-13 02:34:26.7: 177 min. remaining to meet strict constraints. 2023-01-13 02:34:26.7: 630 min. remaining for the plan to fit before dawn. 2023-01-13 02:34:26.7: deferred (rising) for 176 min, until 13-Jan-2023 05:30:50 UTC 2023-01-13 02:34:26.7: Dispatcher cycle time: 0.0 sec. 2023-01-13 02:34:26.7: Acquire data for Observation V504_Per... 2023-01-13 02:34:26.7: (belongs to Project AAVSO_MISC_RNO_AUTO_ver3394, Plan V504_Per) 2023-01-13 02:34:26.7: Send Observation V504_Per to ACP Sequencer 2023-01-13 02:34:42.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 02:34:42.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 02:34:42.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 02:34:42.0: ACP data acquisition failed for Observation V504_Per. 2023-01-13 02:34:42.0: (Observation V504_Per interrupted by acquisition process failure.) 2023-01-13 02:35:12.6: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 02:35:12.6: 176 min. remaining to meet strict constraints. 2023-01-13 02:35:12.6: 613 min. remaining for the plan to fit before dawn. 2023-01-13 02:35:12.6: deferred (rising) for 174 min, until 13-Jan-2023 05:29:17 UTC 2023-01-13 02:35:12.6: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 02:35:12.6: 176 min. remaining to meet strict constraints. 2023-01-13 02:35:12.6: 613 min. remaining for the plan to fit before dawn. 2023-01-13 02:35:12.6: deferred (rising) for 174 min, until 13-Jan-2023 05:29:17 UTC 2023-01-13 02:39:16.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 02:39:16.3: 172 min. remaining to meet strict constraints. 2023-01-13 02:39:16.3: 624 min. remaining for the plan to fit before dawn. 2023-01-13 02:39:16.3: deferred (rising) for 171 min, until 13-Jan-2023 05:30:48 UTC 2023-01-13 02:39:16.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 02:39:16.3: 172 min. remaining to meet strict constraints. 2023-01-13 02:39:16.3: 624 min. remaining for the plan to fit before dawn. 2023-01-13 02:39:16.3: deferred (rising) for 171 min, until 13-Jan-2023 05:30:48 UTC 2023-01-13 02:40:17.2: ++ Auto Focus ++ 2023-01-13 02:40:17.2: Doing periodic autofocus. 2023-01-13 02:40:17.2: Start special ACP AutoFocus script for scheduler 2023-01-13 02:40:32.3: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 02:40:32.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 02:40:32.3: ** Autofocus failed (n=4), will retry ASAP after 15 min. 2023-01-13 02:46:06.9: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 02:46:06.9: 165 min. remaining to meet strict constraints. 2023-01-13 02:46:06.9: 603 min. remaining for the plan to fit before dawn. 2023-01-13 02:46:06.9: deferred (rising) for 163 min, until 13-Jan-2023 05:29:20 UTC 2023-01-13 02:54:44.3: Rising plan delay enabled for Plan OI_158: 2023-01-13 02:54:44.3: 156 min. remaining to meet strict constraints. 2023-01-13 02:54:44.3: 603 min. remaining for the plan to fit before dawn. 2023-01-13 02:54:44.3: deferred (rising) for 155 min, until 13-Jan-2023 05:30:12 UTC 2023-01-13 02:54:44.3: Rising plan delay enabled for Plan OI_158: 2023-01-13 02:54:44.3: 156 min. remaining to meet strict constraints. 2023-01-13 02:54:44.3: 617 min. remaining for the plan to fit before dawn. 2023-01-13 02:54:44.3: deferred (rising) for 156 min, until 13-Jan-2023 05:31:35 UTC 2023-01-13 02:55:45.2: ++ Auto Focus ++ 2023-01-13 02:55:45.2: Doing periodic autofocus. 2023-01-13 02:55:45.2: Start special ACP AutoFocus script for scheduler 2023-01-13 02:56:00.3: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 02:56:00.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 02:56:00.3: ** Autofocus failed (n=5), will retry ASAP after 20 min. 2023-01-13 03:11:43.7: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 03:11:43.7: 139 min. remaining to meet strict constraints. 2023-01-13 03:11:43.7: 589 min. remaining for the plan to fit before dawn. 2023-01-13 03:11:43.7: deferred (rising) for 138 min, until 13-Jan-2023 05:30:30 UTC 2023-01-13 03:11:43.7: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 03:11:43.7: 139 min. remaining to meet strict constraints. 2023-01-13 03:11:43.7: 600 min. remaining for the plan to fit before dawn. 2023-01-13 03:11:43.7: deferred (rising) for 139 min, until 13-Jan-2023 05:31:35 UTC 2023-01-13 03:16:17.6: ++ Auto Focus ++ 2023-01-13 03:16:17.6: Doing periodic autofocus. 2023-01-13 03:16:17.6: Start special ACP AutoFocus script for scheduler 2023-01-13 03:16:32.7: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 03:16:32.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 03:16:32.7: ** Autofocus failed (n=6), will retry ASAP after 20 min. 2023-01-13 03:19:35.2: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 03:19:35.2: 132 min. remaining to meet strict constraints. 2023-01-13 03:19:35.2: 506 min. remaining for the plan to fit before dawn. 2023-01-13 03:19:35.2: deferred (rising) for 123 min, until 13-Jan-2023 05:22:57 UTC 2023-01-13 03:19:35.2: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 03:19:35.2: 132 min. remaining to meet strict constraints. 2023-01-13 03:19:35.2: 518 min. remaining for the plan to fit before dawn. 2023-01-13 03:19:35.2: 109660 min. remaining for the plan to fit before "must run before" time. 2023-01-13 03:19:35.2: deferred (rising) for 124 min, until 13-Jan-2023 05:24:10 UTC 2023-01-13 03:22:37.8: Rising plan delay enabled for Plan RY_Lep: 2023-01-13 03:22:37.8: 128 min. remaining to meet strict constraints. 2023-01-13 03:22:37.8: 560 min. remaining for the plan to fit before dawn. 2023-01-13 03:22:37.8: but only 108 min till start so Plan transits mid-way in its time span. 2023-01-13 03:22:37.8: deferred (rising) for 105 min, until 13-Jan-2023 05:08:14 UTC 2023-01-13 03:23:12.2: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 2023-01-13 03:24:54.8: ++ Observatory Startup ++ 2023-01-13 03:24:54.8: Weather safety is now disabled 2023-01-13 03:24:54.8: Start ACP Sequencer's StartupObs script 2023-01-13 03:25:41.6: Weather safety is re-enabled 2023-01-13 03:25:41.6: Observatory startup succeeded 2023-01-13 03:25:41.6: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-13 03:25:41.6: Last AutoFocus was completed at 13-Jan-2023 01:23:15 UTC 2023-01-13 03:25:41.6: Autofocus will be done ASAP. 2023-01-13 03:25:41.6: ++ Auto Focus ++ 2023-01-13 03:25:41.6: Doing periodic autofocus. 2023-01-13 03:25:41.6: Start special ACP AutoFocus script for scheduler 2023-01-13 03:31:52.4: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-13 03:31:53.7: Rising plan delay enabled for Plan AO_Aur: 2023-01-13 03:31:53.7: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.7: 571 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.7: but only 108 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.7: deferred (rising) for 107 min, until 13-Jan-2023 05:19:52 UTC 2023-01-13 03:31:53.7: Rising plan delay enabled for Plan AO_Aur: 2023-01-13 03:31:53.7: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.7: 571 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.7: but only 108 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.7: deferred (rising) for 108 min, until 13-Jan-2023 05:19:53 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 557 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 117 min, until 13-Jan-2023 05:29:17 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 557 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 117 min, until 13-Jan-2023 05:29:17 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 118 min, until 13-Jan-2023 05:30:47 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 118 min, until 13-Jan-2023 05:30:47 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan ER_Aur: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 567 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 72 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 71 min, until 13-Jan-2023 04:43:08 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan ER_Aur: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 568 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 72 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 71 min, until 13-Jan-2023 04:43:24 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan FS_Aur: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 107 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 106 min, until 13-Jan-2023 05:18:39 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan FS_Aur: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 107 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 106 min, until 13-Jan-2023 05:18:39 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 83 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 82 min, until 13-Jan-2023 04:54:39 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: but only 83 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.8: deferred (rising) for 82 min, until 13-Jan-2023 04:54:39 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 118 min, until 13-Jan-2023 05:30:29 UTC 2023-01-13 03:31:53.8: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 03:31:53.8: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.8: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.8: deferred (rising) for 118 min, until 13-Jan-2023 05:30:29 UTC 2023-01-13 03:31:53.9: Rising plan delay enabled for Plan HQ_Per: 2023-01-13 03:31:53.9: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.9: 568 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.9: but only 43 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.9: deferred (rising) for 42 min, until 13-Jan-2023 04:14:15 UTC 2023-01-13 03:31:53.9: Rising plan delay enabled for Plan HQ_Per: 2023-01-13 03:31:53.9: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.9: 565 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.9: but only 42 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:53.9: deferred (rising) for 41 min, until 13-Jan-2023 04:12:56 UTC 2023-01-13 03:31:53.9: Rising plan delay enabled for Plan J072816: 2023-01-13 03:31:53.9: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.9: 553 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.9: deferred (rising) for 116 min, until 13-Jan-2023 05:28:53 UTC 2023-01-13 03:31:53.9: Rising plan delay enabled for Plan J072816: 2023-01-13 03:31:53.9: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.9: 553 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.9: deferred (rising) for 116 min, until 13-Jan-2023 05:28:53 UTC 2023-01-13 03:31:53.9: Rising plan delay enabled for Plan KN_Lyn: 2023-01-13 03:31:53.9: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:53.9: 544 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:53.9: deferred (rising) for 116 min, until 13-Jan-2023 05:28:00 UTC 2023-01-13 03:31:54.0: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 03:31:54.0: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.0: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.0: deferred (rising) for 118 min, until 13-Jan-2023 05:30:33 UTC 2023-01-13 03:31:54.0: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 03:31:54.0: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.0: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.0: deferred (rising) for 118 min, until 13-Jan-2023 05:30:33 UTC 2023-01-13 03:31:54.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 03:31:54.0: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.0: 547 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.0: deferred (rising) for 116 min, until 13-Jan-2023 05:28:18 UTC 2023-01-13 03:31:54.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 03:31:54.0: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.0: 522 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.0: deferred (rising) for 113 min, until 13-Jan-2023 05:25:51 UTC 2023-01-13 03:31:54.1: Rising plan delay enabled for Plan NQ_Gem: 2023-01-13 03:31:54.1: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.1: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.1: deferred (rising) for 118 min, until 13-Jan-2023 05:30:50 UTC 2023-01-13 03:31:54.1: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 03:31:54.1: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.1: 563 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.1: but only 18 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.1: deferred (rising) for 16 min, until 13-Jan-2023 03:48:41 UTC 2023-01-13 03:31:54.1: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 03:31:54.1: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.1: 563 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.1: but only 18 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.1: deferred (rising) for 16 min, until 13-Jan-2023 03:48:41 UTC 2023-01-13 03:31:54.1: Rising plan delay enabled for Plan OI_158: 2023-01-13 03:31:54.1: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.1: 566 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.1: deferred (rising) for 118 min, until 13-Jan-2023 05:30:11 UTC 2023-01-13 03:31:54.1: Rising plan delay enabled for Plan OI_158: 2023-01-13 03:31:54.1: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.1: 566 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: deferred (rising) for 118 min, until 13-Jan-2023 05:30:11 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 549 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 78 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 75 min, until 13-Jan-2023 04:47:43 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 549 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 78 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 75 min, until 13-Jan-2023 04:47:43 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan RY_Lep: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 551 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 99 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 96 min, until 13-Jan-2023 05:08:13 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan S_Ori: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 563 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 86 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 84 min, until 13-Jan-2023 04:56:16 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan S5_0716+714: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 575 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: deferred (rising) for 119 min, until 13-Jan-2023 05:31:08 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 575 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: deferred (rising) for 119 min, until 13-Jan-2023 05:31:07 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 573 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: deferred (rising) for 119 min, until 13-Jan-2023 05:30:57 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 7 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 6 min, until 13-Jan-2023 03:38:29 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 568 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 7 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 6 min, until 13-Jan-2023 03:38:22 UTC 2023-01-13 03:31:54.2: Rising plan delay enabled for Plan TV_Cam: 2023-01-13 03:31:54.2: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.2: 565 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.2: but only 6 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.2: deferred (rising) for 4 min, until 13-Jan-2023 03:36:37 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V1112_Per: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 563 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: but only 26 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: deferred (rising) for 25 min, until 13-Jan-2023 03:57:01 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V1261_Ori: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 576 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: but only 85 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: deferred (rising) for 85 min, until 13-Jan-2023 04:57:23 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V1647_Ori: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 564 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: but only 104 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: deferred (rising) for 102 min, until 13-Jan-2023 05:14:28 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V479_And: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 328 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: 25678 min. remaining for the plan to fit before "must run before" time. 2023-01-13 03:31:54.3: but only -75 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: ending rising plan delay. Plan is now eligible. 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: but only 85 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: deferred (rising) for 84 min, until 13-Jan-2023 04:56:43 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 569 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: but only 85 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.3: deferred (rising) for 84 min, until 13-Jan-2023 04:56:43 UTC 2023-01-13 03:31:54.3: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 03:31:54.3: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.3: 557 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.3: deferred (rising) for 117 min, until 13-Jan-2023 05:29:20 UTC 2023-01-13 03:31:54.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 03:31:54.4: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.4: 493 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.4: deferred (rising) for 111 min, until 13-Jan-2023 05:22:57 UTC 2023-01-13 03:31:54.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 03:31:54.4: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.4: 506 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.4: 109648 min. remaining for the plan to fit before "must run before" time. 2023-01-13 03:31:54.4: deferred (rising) for 112 min, until 13-Jan-2023 05:24:10 UTC 2023-01-13 03:31:54.4: Rising plan delay enabled for Plan V900_Mon: 2023-01-13 03:31:54.4: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.4: 555 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.4: deferred (rising) for 117 min, until 13-Jan-2023 05:29:07 UTC 2023-01-13 03:31:54.4: Rising plan delay enabled for Plan YZ_Aur: 2023-01-13 03:31:54.4: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.4: 571 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.4: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.4: deferred (rising) for 75 min, until 13-Jan-2023 04:47:49 UTC 2023-01-13 03:31:54.4: Rising plan delay enabled for Plan YZ_Aur: 2023-01-13 03:31:54.4: 119 min. remaining to meet strict constraints. 2023-01-13 03:31:54.4: 572 min. remaining for the plan to fit before dawn. 2023-01-13 03:31:54.4: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-13 03:31:54.4: deferred (rising) for 76 min, until 13-Jan-2023 04:48:21 UTC 2023-01-13 03:31:54.4: Dispatcher cycle time: 2.0 sec. 2023-01-13 03:31:54.4: Acquire data for Observation V479_And... 2023-01-13 03:31:54.4: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-13 03:31:54.8: ++ Auto Focus ++ 2023-01-13 03:31:54.8: Doing periodic autofocus. 2023-01-13 03:31:54.8: Start special ACP AutoFocus script for scheduler 2023-01-13 03:35:52.5: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-13 03:35:52.5: Send Observation V479_And to ACP Sequencer 2023-01-13 03:51:25.0: Acquisition time: 932.4736522 sec. 2023-01-13 03:51:25.0: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-13 03:51:25.0: Image Efficiency: 64.2% 2023-01-13 03:51:25.0: Cycle Efficiency: 99.8% 2023-01-13 03:51:25.1: ++ Auto Focus ++ 2023-01-13 03:51:25.1: Doing periodic autofocus. 2023-01-13 03:51:25.1: Start special ACP AutoFocus script for scheduler 2023-01-13 03:57:12.5: Next periodic autofocus ASAP after 3600sec. 13-Jan-2023 04:56:58 UTC 2023-01-13 03:57:12.6: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 03:57:12.6: 94 min. remaining to meet strict constraints. 2023-01-13 03:57:12.6: 538 min. remaining for the plan to fit before dawn. 2023-01-13 03:57:12.6: deferred (rising) for 92 min, until 13-Jan-2023 05:29:53 UTC 2023-01-13 03:57:12.6: Rising plan delay enabled for Plan NGC_1904: 2023-01-13 03:57:12.6: 94 min. remaining to meet strict constraints. 2023-01-13 03:57:12.6: 535 min. remaining for the plan to fit before dawn. 2023-01-13 03:57:12.6: but only 54 min till start so Plan transits mid-way in its time span. 2023-01-13 03:57:12.6: deferred (rising) for 52 min, until 13-Jan-2023 04:50:00 UTC 2023-01-13 03:57:12.6: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 03:57:12.6: 94 min. remaining to meet strict constraints. 2023-01-13 03:57:12.6: 538 min. remaining for the plan to fit before dawn. 2023-01-13 03:57:12.6: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-13 03:57:12.6: ending rising plan delay. Plan is now eligible. 2023-01-13 03:57:12.6: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-13 03:57:12.6: 94 min. remaining to meet strict constraints. 2023-01-13 03:57:12.6: 538 min. remaining for the plan to fit before dawn. 2023-01-13 03:57:12.6: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-13 03:57:12.6: ending rising plan delay. Plan is now eligible. 2023-01-13 03:57:12.6: Rising plan delay enabled for Plan V1112_Per: 2023-01-13 03:57:12.6: 94 min. remaining to meet strict constraints. 2023-01-13 03:57:12.6: 538 min. remaining for the plan to fit before dawn. 2023-01-13 03:57:12.6: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 03:57:12.6: ending rising plan delay. Plan is now eligible. 2023-01-13 03:57:12.7: Dispatcher cycle time: 0.1 sec. 2023-01-13 03:57:12.7: Acquire data for Observation V1112_Per... 2023-01-13 03:57:12.7: (belongs to Project AAVSO_P167_HGUA_AUTO_ver2706, Plan V1112_Per) 2023-01-13 03:57:12.7: Send Observation V1112_Per to ACP Sequencer 2023-01-13 04:13:52.7: Acquisition time: 1000.0234324 sec. 2023-01-13 04:13:52.7: Data for Observation V1112_Per of Plan V1112_Per acquired successfully. 2023-01-13 04:13:52.7: Plan V1112_Per completed successfully. 2023-01-13 04:13:52.7: Image Efficiency: 72.0% 2023-01-13 04:13:52.7: Cycle Efficiency: 100.0% 2023-01-13 04:13:53.2: Rising plan delay enabled for Plan HQ_Per: 2023-01-13 04:13:53.2: 77 min. remaining to meet strict constraints. 2023-01-13 04:13:53.2: 523 min. remaining for the plan to fit before dawn. 2023-01-13 04:13:53.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 04:13:53.2: ending rising plan delay. Plan is now eligible. 2023-01-13 04:13:53.2: Rising plan delay enabled for Plan OJ287: 2023-01-13 04:13:53.2: 77 min. remaining to meet strict constraints. 2023-01-13 04:13:53.2: 519 min. remaining for the plan to fit before dawn. 2023-01-13 04:13:53.2: deferred (rising) for 75 min, until 13-Jan-2023 05:29:45 UTC 2023-01-13 04:13:53.2: Rising plan delay enabled for Plan OJ287: 2023-01-13 04:13:53.2: 77 min. remaining to meet strict constraints. 2023-01-13 04:13:53.2: 519 min. remaining for the plan to fit before dawn. 2023-01-13 04:13:53.2: deferred (rising) for 75 min, until 13-Jan-2023 05:29:45 UTC 2023-01-13 04:13:53.2: Dispatcher cycle time: 0.1 sec. 2023-01-13 04:13:53.2: Acquire data for Observation TV_Cam... 2023-01-13 04:13:53.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan TV_Cam) 2023-01-13 04:13:53.2: Send Observation TV_Cam to ACP Sequencer 2023-01-13 04:25:41.8: Acquisition time: 708.5475426 sec. 2023-01-13 04:25:41.8: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2023-01-13 04:25:41.8: Plan TV_Cam completed successfully. 2023-01-13 04:25:41.8: Image Efficiency: 55.0% 2023-01-13 04:25:41.8: Cycle Efficiency: 100.0% 2023-01-13 04:25:41.9: Dispatcher cycle time: 0.0 sec. 2023-01-13 04:25:41.9: Acquire data for Observation V479_And... 2023-01-13 04:25:41.9: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-13 04:25:41.9: Send Observation V479_And to ACP Sequencer 2023-01-13 04:38:40.8: Acquisition time: 778.8369036 sec. 2023-01-13 04:38:40.8: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-13 04:38:40.8: Image Efficiency: 77.0% 2023-01-13 04:38:40.8: Cycle Efficiency: 100.0% 2023-01-13 04:38:41.0: Dispatcher cycle time: 0.1 sec. 2023-01-13 04:38:41.0: Acquire data for Observation NSVS_0421121... 2023-01-13 04:38:41.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan NSVS_0421121) 2023-01-13 04:38:41.0: Send Observation NSVS_0421121 to ACP Sequencer 2023-01-13 04:56:49.1: Acquisition time: 1088.1577385 sec. 2023-01-13 04:56:49.1: Data for Observation NSVS_0421121 of Plan NSVS_0421121 acquired successfully. 2023-01-13 04:56:49.1: Plan NSVS_0421121 completed successfully. 2023-01-13 04:56:49.2: Image Efficiency: 82.7% 2023-01-13 04:56:49.2: Cycle Efficiency: 100.0% 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 487 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan GR_Ori: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 487 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 475 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: deferred (rising) for 32 min, until 13-Jan-2023 05:29:37 UTC 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 475 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: deferred (rising) for 32 min, until 13-Jan-2023 05:29:37 UTC 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan NGC_1904: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 475 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan QX_Pup: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 483 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: deferred (rising) for 33 min, until 13-Jan-2023 05:30:22 UTC 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 464 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan QZ_Aur: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 464 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan S_Ori: 2023-01-13 04:56:49.3: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.3: 478 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.3: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.3: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.3: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 04:56:49.4: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.4: 485 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.4: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.4: Rising plan delay enabled for Plan V582_Aur: 2023-01-13 04:56:49.4: 34 min. remaining to meet strict constraints. 2023-01-13 04:56:49.4: 485 min. remaining for the plan to fit before dawn. 2023-01-13 04:56:49.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 04:56:49.4: ending rising plan delay. Plan is now eligible. 2023-01-13 04:56:49.5: Dispatcher cycle time: 0.2 sec. 2023-01-13 04:56:49.5: Acquire data for Observation ER_Aur... 2023-01-13 04:56:49.5: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan ER_Aur) 2023-01-13 04:56:49.5: Send Observation ER_Aur to ACP Sequencer 2023-01-13 05:09:42.0: Acquisition time: 772.5627363 sec. 2023-01-13 05:09:42.0: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-01-13 05:09:42.0: Plan ER_Aur completed successfully. 2023-01-13 05:09:42.0: Image Efficiency: 55.6% 2023-01-13 05:09:42.0: Cycle Efficiency: 100.0% 2023-01-13 05:09:42.2: ++ Auto Focus ++ 2023-01-13 05:09:42.2: Doing periodic autofocus. 2023-01-13 05:09:42.2: Start special ACP AutoFocus script for scheduler 2023-01-13 05:13:48.2: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-13 05:13:48.2: Dispatcher cycle time: 0.0 sec. 2023-01-13 05:13:48.2: Acquire data for Observation V479_And... 2023-01-13 05:13:48.2: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-13 05:13:48.2: ++ Auto Focus ++ 2023-01-13 05:13:48.2: Doing periodic autofocus. 2023-01-13 05:13:48.2: Start special ACP AutoFocus script for scheduler 2023-01-13 05:17:14.0: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-13 05:17:14.1: Send Observation V479_And to ACP Sequencer 2023-01-13 05:30:42.7: Acquisition time: 808.64416 sec. 2023-01-13 05:30:42.7: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-13 05:30:42.7: Plan V479_And completed successfully. 2023-01-13 05:30:42.7: Image Efficiency: 74.2% 2023-01-13 05:30:42.7: Cycle Efficiency: 100.0% 2023-01-13 05:30:42.9: ++ Auto Focus ++ 2023-01-13 05:30:42.9: Doing periodic autofocus. 2023-01-13 05:30:42.9: Start special ACP AutoFocus script for scheduler 2023-01-13 05:34:11.2: Next periodic autofocus ASAP after 7200sec. 13-Jan-2023 07:33:51 UTC 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 05:34:11.2: 266 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 441 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 63 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: deferred (rising) for 62 min, until 13-Jan-2023 06:36:23 UTC 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 05:34:11.2: 204 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 434 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: ending rising plan delay. Plan is now eligible. 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 05:34:11.2: 204 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 434 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: ending rising plan delay. Plan is now eligible. 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 05:34:11.2: 254 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 450 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: deferred (rising) for 35 min, until 13-Jan-2023 06:09:25 UTC 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan CW_Mon: 2023-01-13 05:34:11.2: 254 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 450 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: deferred (rising) for 35 min, until 13-Jan-2023 06:09:25 UTC 2023-01-13 05:34:11.2: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 05:34:11.2: 438 min. remaining to meet strict constraints. 2023-01-13 05:34:11.2: 438 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.2: but only 188 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.2: deferred (rising) for 186 min, until 13-Jan-2023 08:40:53 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 05:34:11.3: 438 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 438 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 188 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 186 min, until 13-Jan-2023 08:40:53 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 05:34:11.3: 292 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 447 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 69 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 68 min, until 13-Jan-2023 06:42:11 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 05:34:11.3: 292 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 447 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 69 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 68 min, until 13-Jan-2023 06:42:11 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan J072816: 2023-01-13 05:34:11.3: 469 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 430 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 75 min, until 13-Jan-2023 06:49:14 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan J072816: 2023-01-13 05:34:11.3: 469 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 430 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 75 min, until 13-Jan-2023 06:49:14 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan KN_Lyn: 2023-01-13 05:34:11.3: 497 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 422 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 121 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 117 min, until 13-Jan-2023 07:32:06 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 05:34:11.3: 245 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 447 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 55 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 54 min, until 13-Jan-2023 06:28:25 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 05:34:11.3: 245 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 447 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 55 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 54 min, until 13-Jan-2023 06:28:25 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 05:34:11.3: 316 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 425 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 35 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 31 min, until 13-Jan-2023 06:06:08 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 05:34:11.3: 316 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 400 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 22 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 17 min, until 13-Jan-2023 05:51:23 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan Mrk_180: 2023-01-13 05:34:11.3: 700 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 453 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 336 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 336 min, until 13-Jan-2023 11:10:14 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan NQ_Gem: 2023-01-13 05:34:11.3: 369 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 450 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 91 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 90 min, until 13-Jan-2023 07:04:31 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan OI_158: 2023-01-13 05:34:11.3: 361 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 444 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 94 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 92 min, until 13-Jan-2023 07:06:52 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan OI_158: 2023-01-13 05:34:11.3: 361 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 444 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 94 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 92 min, until 13-Jan-2023 07:06:52 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan OJ287: 2023-01-13 05:34:11.3: 443 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 439 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 168 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 166 min, until 13-Jan-2023 08:20:45 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan OJ287: 2023-01-13 05:34:11.3: 443 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 439 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 168 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 166 min, until 13-Jan-2023 08:20:45 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan QX_Pup: 2023-01-13 05:34:11.3: 260 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 445 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 98 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 97 min, until 13-Jan-2023 07:11:33 UTC 2023-01-13 05:34:11.3: Rising plan delay enabled for Plan R_Leo: 2023-01-13 05:34:11.3: 476 min. remaining to meet strict constraints. 2023-01-13 05:34:11.3: 445 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.3: but only 224 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.3: deferred (rising) for 222 min, until 13-Jan-2023 09:17:02 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan S5_0716+714: 2023-01-13 05:34:11.4: 450 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 453 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 82 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 82 min, until 13-Jan-2023 06:56:23 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 05:34:11.4: 377 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 451 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 42 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 42 min, until 13-Jan-2023 06:16:20 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-13 05:34:11.4: 377 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 453 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 43 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 43 min, until 13-Jan-2023 06:17:25 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 05:34:11.4: 302 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 435 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 55 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 53 min, until 13-Jan-2023 06:27:46 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 05:34:11.4: 269 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 383 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: 109525 min. remaining for the plan to fit before "must run before" time. 2023-01-13 05:34:11.4: but only 30 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 22 min, until 13-Jan-2023 05:56:46 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 05:34:11.4: 269 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 371 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 23 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 15 min, until 13-Jan-2023 05:49:28 UTC 2023-01-13 05:34:11.4: Rising plan delay enabled for Plan V900_Mon: 2023-01-13 05:34:11.4: 245 min. remaining to meet strict constraints. 2023-01-13 05:34:11.4: 433 min. remaining for the plan to fit before dawn. 2023-01-13 05:34:11.4: but only 48 min till start so Plan transits mid-way in its time span. 2023-01-13 05:34:11.4: deferred (rising) for 45 min, until 13-Jan-2023 06:19:47 UTC 2023-01-13 05:34:11.5: Dispatcher cycle time: 0.4 sec. 2023-01-13 05:34:11.5: Acquire data for Observation V582_Aur... 2023-01-13 05:34:11.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan V582_Aur) 2023-01-13 05:34:11.5: Send Observation V582_Aur to ACP Sequencer 2023-01-13 05:44:35.9: Acquisition time: 624.3427462 sec. 2023-01-13 05:44:35.9: Data for Observation V582_Aur of Plan V582_Aur acquired successfully. 2023-01-13 05:44:35.9: Plan V582_Aur completed successfully. 2023-01-13 05:44:35.9: Image Efficiency: 67.2% 2023-01-13 05:44:35.9: Cycle Efficiency: 99.9% 2023-01-13 05:44:36.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 05:44:36.3: 193 min. remaining to meet strict constraints. 2023-01-13 05:44:36.3: 424 min. remaining for the plan to fit before dawn. 2023-01-13 05:44:36.3: but only -9 min till start so Plan transits mid-way in its time span. 2023-01-13 05:44:36.3: ending rising plan delay. Plan is now eligible. 2023-01-13 05:44:36.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-13 05:44:36.3: 193 min. remaining to meet strict constraints. 2023-01-13 05:44:36.3: 424 min. remaining for the plan to fit before dawn. 2023-01-13 05:44:36.3: but only -9 min till start so Plan transits mid-way in its time span. 2023-01-13 05:44:36.3: ending rising plan delay. Plan is now eligible. 2023-01-13 05:44:36.5: Dispatcher cycle time: 0.2 sec. 2023-01-13 05:44:36.5: Acquire data for Observation TV_Cam... 2023-01-13 05:44:36.5: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan TV_Cam) 2023-01-13 05:44:36.5: Send Observation TV_Cam to ACP Sequencer 2023-01-13 05:56:17.7: Acquisition time: 701.1976903 sec. 2023-01-13 05:56:17.7: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2023-01-13 05:56:17.7: Plan TV_Cam completed successfully. 2023-01-13 05:56:17.7: Image Efficiency: 53.2% 2023-01-13 05:56:17.7: Cycle Efficiency: 100.0% 2023-01-13 05:56:17.9: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 05:56:17.9: 294 min. remaining to meet strict constraints. 2023-01-13 05:56:17.9: 378 min. remaining for the plan to fit before dawn. 2023-01-13 05:56:17.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 05:56:17.9: ending rising plan delay. Plan is now eligible. 2023-01-13 05:56:17.9: Rising plan delay enabled for Plan U_Leo: 2023-01-13 05:56:17.9: 496 min. remaining to meet strict constraints. 2023-01-13 05:56:17.9: 426 min. remaining for the plan to fit before dawn. 2023-01-13 05:56:17.9: but only 239 min till start so Plan transits mid-way in its time span. 2023-01-13 05:56:17.9: deferred (rising) for 238 min, until 13-Jan-2023 09:55:00 UTC 2023-01-13 05:56:17.9: Rising plan delay enabled for Plan U_Leo: 2023-01-13 05:56:17.9: 496 min. remaining to meet strict constraints. 2023-01-13 05:56:17.9: 426 min. remaining for the plan to fit before dawn. 2023-01-13 05:56:17.9: but only 239 min till start so Plan transits mid-way in its time span. 2023-01-13 05:56:17.9: deferred (rising) for 238 min, until 13-Jan-2023 09:55:00 UTC 2023-01-13 05:56:17.9: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 05:56:17.9: 247 min. remaining to meet strict constraints. 2023-01-13 05:56:17.9: 349 min. remaining for the plan to fit before dawn. 2023-01-13 05:56:17.9: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 05:56:17.9: ending rising plan delay. Plan is now eligible. 2023-01-13 05:56:18.1: Dispatcher cycle time: 0.2 sec. 2023-01-13 05:56:18.1: Acquire data for Observation HQ_Per... 2023-01-13 05:56:18.1: (belongs to Project AAVSO_MISC_WEL_AUTO_ver3411, Plan HQ_Per) 2023-01-13 05:56:18.1: Send Observation HQ_Per to ACP Sequencer 2023-01-13 06:08:49.8: Acquisition time: 751.7662591 sec. 2023-01-13 06:08:49.8: Data for Observation HQ_Per of Plan HQ_Per acquired successfully. 2023-01-13 06:08:49.9: Plan HQ_Per completed successfully. 2023-01-13 06:08:49.9: Image Efficiency: 57.3% 2023-01-13 06:08:49.9: Cycle Efficiency: 100.0% 2023-01-13 06:08:50.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-13 06:08:50.0: 166 min. remaining to meet strict constraints. 2023-01-13 06:08:50.0: 412 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.0: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.0: deferred (rising) for 75 min, until 13-Jan-2023 07:24:46 UTC 2023-01-13 06:08:50.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-13 06:08:50.0: 166 min. remaining to meet strict constraints. 2023-01-13 06:08:50.0: 412 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.0: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.0: deferred (rising) for 75 min, until 13-Jan-2023 07:24:46 UTC 2023-01-13 06:08:50.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 06:08:50.0: 281 min. remaining to meet strict constraints. 2023-01-13 06:08:50.0: 365 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.0: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:08:50.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 06:08:50.0: 281 min. remaining to meet strict constraints. 2023-01-13 06:08:50.0: 390 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:08:50.1: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:08:50.1: 234 min. remaining to meet strict constraints. 2023-01-13 06:08:50.1: 349 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.1: 109491 min. remaining for the plan to fit before "must run before" time. 2023-01-13 06:08:50.1: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.1: ending rising plan delay. Plan is now eligible. 2023-01-13 06:08:50.1: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:08:50.1: 234 min. remaining to meet strict constraints. 2023-01-13 06:08:50.1: 336 min. remaining for the plan to fit before dawn. 2023-01-13 06:08:50.1: but only -10 min till start so Plan transits mid-way in its time span. 2023-01-13 06:08:50.1: ending rising plan delay. Plan is now eligible. 2023-01-13 06:08:50.2: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:08:50.2: Acquire data for Observation FS_Aur... 2023-01-13 06:08:50.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan FS_Aur) 2023-01-13 06:08:50.2: Send Observation FS_Aur to ACP Sequencer 2023-01-13 06:20:56.8: Acquisition time: 726.5899374 sec. 2023-01-13 06:20:56.8: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2023-01-13 06:20:56.8: Plan FS_Aur completed successfully. 2023-01-13 06:20:56.8: Image Efficiency: 74.3% 2023-01-13 06:20:56.8: Cycle Efficiency: 100.0% 2023-01-13 06:20:57.3: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 06:20:57.3: 269 min. remaining to meet strict constraints. 2023-01-13 06:20:57.3: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:20:57.3: but only -23 min till start so Plan transits mid-way in its time span. 2023-01-13 06:20:57.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:20:57.3: Rising plan delay enabled for Plan MP_Gem: 2023-01-13 06:20:57.3: 269 min. remaining to meet strict constraints. 2023-01-13 06:20:57.3: 378 min. remaining for the plan to fit before dawn. 2023-01-13 06:20:57.3: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-13 06:20:57.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:20:57.3: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:20:57.3: 222 min. remaining to meet strict constraints. 2023-01-13 06:20:57.3: 337 min. remaining for the plan to fit before dawn. 2023-01-13 06:20:57.3: 109479 min. remaining for the plan to fit before "must run before" time. 2023-01-13 06:20:57.3: but only -16 min till start so Plan transits mid-way in its time span. 2023-01-13 06:20:57.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:20:57.3: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:20:57.3: 222 min. remaining to meet strict constraints. 2023-01-13 06:20:57.3: 324 min. remaining for the plan to fit before dawn. 2023-01-13 06:20:57.3: but only -22 min till start so Plan transits mid-way in its time span. 2023-01-13 06:20:57.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:20:57.3: Rising plan delay enabled for Plan V900_Mon: 2023-01-13 06:20:57.3: 198 min. remaining to meet strict constraints. 2023-01-13 06:20:57.3: 386 min. remaining for the plan to fit before dawn. 2023-01-13 06:20:57.3: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:20:57.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:20:57.5: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:20:57.5: Acquire data for Observation GR_Ori... 2023-01-13 06:20:57.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan GR_Ori) 2023-01-13 06:20:57.5: Send Observation GR_Ori to ACP Sequencer 2023-01-13 06:29:15.3: Acquisition time: 497.8601555 sec. 2023-01-13 06:29:15.3: Data for Observation GR_Ori of Plan GR_Ori acquired successfully. 2023-01-13 06:29:15.3: Plan GR_Ori completed successfully. 2023-01-13 06:29:15.3: Image Efficiency: 54.2% 2023-01-13 06:29:15.3: Cycle Efficiency: 99.9% 2023-01-13 06:29:15.5: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 06:29:15.5: 190 min. remaining to meet strict constraints. 2023-01-13 06:29:15.5: 392 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.5: Rising plan delay enabled for Plan L1022_IRS: 2023-01-13 06:29:15.5: 190 min. remaining to meet strict constraints. 2023-01-13 06:29:15.5: 392 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:29:15.6: 214 min. remaining to meet strict constraints. 2023-01-13 06:29:15.6: 328 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.6: 109470 min. remaining for the plan to fit before "must run before" time. 2023-01-13 06:29:15.6: but only -25 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:29:15.6: 214 min. remaining to meet strict constraints. 2023-01-13 06:29:15.6: 316 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.6: but only -31 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-13 06:29:15.6: 247 min. remaining to meet strict constraints. 2023-01-13 06:29:15.6: 380 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.6: Rising plan delay enabled for Plan V900_Mon: 2023-01-13 06:29:15.6: 190 min. remaining to meet strict constraints. 2023-01-13 06:29:15.6: 378 min. remaining for the plan to fit before dawn. 2023-01-13 06:29:15.6: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-13 06:29:15.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:29:15.8: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:29:15.8: Acquire data for Observation ER_Aur... 2023-01-13 06:29:15.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan ER_Aur) 2023-01-13 06:29:15.8: Send Observation ER_Aur to ACP Sequencer 2023-01-13 06:42:30.2: Acquisition time: 794.3867426 sec. 2023-01-13 06:42:30.2: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-01-13 06:42:30.2: Plan ER_Aur completed successfully. 2023-01-13 06:42:30.2: Image Efficiency: 57.5% 2023-01-13 06:42:30.2: Cycle Efficiency: 100.0% 2023-01-13 06:42:30.3: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:42:30.3: 197 min. remaining to meet strict constraints. 2023-01-13 06:42:30.3: 372 min. remaining for the plan to fit before dawn. 2023-01-13 06:42:30.3: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:42:30.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:42:30.3: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:42:30.3: 223 min. remaining to meet strict constraints. 2023-01-13 06:42:30.3: 378 min. remaining for the plan to fit before dawn. 2023-01-13 06:42:30.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:42:30.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:42:30.3: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:42:30.3: 223 min. remaining to meet strict constraints. 2023-01-13 06:42:30.3: 378 min. remaining for the plan to fit before dawn. 2023-01-13 06:42:30.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:42:30.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:42:30.3: Rising plan delay enabled for Plan IU_Leo: 2023-01-13 06:42:30.3: 473 min. remaining to meet strict constraints. 2023-01-13 06:42:30.3: 375 min. remaining for the plan to fit before dawn. 2023-01-13 06:42:30.3: but only 225 min till start so Plan transits mid-way in its time span. 2023-01-13 06:42:30.3: deferred (rising) for 223 min, until 13-Jan-2023 10:26:08 UTC 2023-01-13 06:42:30.4: Rising plan delay enabled for Plan IU_Leo: 2023-01-13 06:42:30.4: 473 min. remaining to meet strict constraints. 2023-01-13 06:42:30.4: 375 min. remaining for the plan to fit before dawn. 2023-01-13 06:42:30.4: but only 225 min till start so Plan transits mid-way in its time span. 2023-01-13 06:42:30.4: deferred (rising) for 223 min, until 13-Jan-2023 10:26:08 UTC 2023-01-13 06:42:30.6: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:42:30.6: Acquire data for Observation HQ_Mon... 2023-01-13 06:42:30.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan HQ_Mon) 2023-01-13 06:42:30.6: Send Observation HQ_Mon to ACP Sequencer 2023-01-13 06:44:47.3: ACP data acquisition failed for Observation HQ_Mon. 2023-01-13 06:44:47.3: (Observation HQ_Mon interrupted by acquisition process failure.) 2023-01-13 06:44:47.5: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:44:47.5: 195 min. remaining to meet strict constraints. 2023-01-13 06:44:47.5: 370 min. remaining for the plan to fit before dawn. 2023-01-13 06:44:47.5: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-13 06:44:47.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:44:47.5: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:44:47.5: 221 min. remaining to meet strict constraints. 2023-01-13 06:44:47.5: 376 min. remaining for the plan to fit before dawn. 2023-01-13 06:44:47.5: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:44:47.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:44:47.7: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:44:47.7: Acquire data for Observation V1647_Ori... 2023-01-13 06:44:47.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V1647_Ori) 2023-01-13 06:44:47.7: Send Observation V1647_Ori to ACP Sequencer 2023-01-13 06:45:10.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:45:10.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:45:10.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:45:10.7: ACP data acquisition failed for Observation V1647_Ori. 2023-01-13 06:45:10.7: (Observation V1647_Ori interrupted by acquisition process failure.) 2023-01-13 06:45:10.8: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:45:10.8: 195 min. remaining to meet strict constraints. 2023-01-13 06:45:10.8: 370 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:10.8: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:10.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:10.8: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:45:10.8: 221 min. remaining to meet strict constraints. 2023-01-13 06:45:10.8: 376 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:10.8: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:10.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:11.1: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:45:11.1: Acquire data for Observation CW_Mon... 2023-01-13 06:45:11.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan CW_Mon) 2023-01-13 06:45:11.1: Send Observation CW_Mon to ACP Sequencer 2023-01-13 06:45:26.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:45:26.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:45:26.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:45:26.4: ACP data acquisition failed for Observation CW_Mon. 2023-01-13 06:45:26.4: (Observation CW_Mon interrupted by acquisition process failure.) 2023-01-13 06:45:26.5: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:45:26.5: 194 min. remaining to meet strict constraints. 2023-01-13 06:45:26.5: 369 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:26.5: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:26.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:26.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:45:26.6: 220 min. remaining to meet strict constraints. 2023-01-13 06:45:26.6: 375 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:26.6: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:26.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:26.8: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:45:26.8: Acquire data for Observation QZ_Aur... 2023-01-13 06:45:26.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan QZ_Aur) 2023-01-13 06:45:26.8: Send Observation QZ_Aur to ACP Sequencer 2023-01-13 06:45:41.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:45:41.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:45:41.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:45:41.9: ACP data acquisition failed for Observation QZ_Aur. 2023-01-13 06:45:41.9: (Observation QZ_Aur interrupted by acquisition process failure.) 2023-01-13 06:45:42.0: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:45:42.0: 194 min. remaining to meet strict constraints. 2023-01-13 06:45:42.0: 369 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:42.0: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:42.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:42.0: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:45:42.0: 220 min. remaining to meet strict constraints. 2023-01-13 06:45:42.0: 375 min. remaining for the plan to fit before dawn. 2023-01-13 06:45:42.0: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:45:42.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:45:42.2: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:45:42.2: Acquire data for Observation V900_Mon... 2023-01-13 06:45:42.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V900_Mon) 2023-01-13 06:45:42.2: Send Observation V900_Mon to ACP Sequencer 2023-01-13 06:46:08.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:46:08.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:46:08.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:46:08.8: ACP data acquisition failed for Observation V900_Mon. 2023-01-13 06:46:08.8: (Observation V900_Mon interrupted by acquisition process failure.) 2023-01-13 06:46:08.9: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-13 06:46:08.9: 194 min. remaining to meet strict constraints. 2023-01-13 06:46:08.9: 369 min. remaining for the plan to fit before dawn. 2023-01-13 06:46:08.9: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-13 06:46:08.9: ending rising plan delay. Plan is now eligible. 2023-01-13 06:46:08.9: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:46:08.9: 220 min. remaining to meet strict constraints. 2023-01-13 06:46:08.9: 375 min. remaining for the plan to fit before dawn. 2023-01-13 06:46:08.9: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:46:08.9: ending rising plan delay. Plan is now eligible. 2023-01-13 06:46:09.2: Dispatcher cycle time: 0.3 sec. 2023-01-13 06:46:09.2: Acquire data for Observation V838_Mon... 2023-01-13 06:46:09.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan V838_Mon) 2023-01-13 06:46:09.2: Doing 2 sets 2023-01-13 06:46:09.2: Send Observation V838_Mon to ACP Sequencer 2023-01-13 06:46:42.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:46:42.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:46:42.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:46:42.1: ACP data acquisition failed for Observation V838_Mon. 2023-01-13 06:46:42.1: (Observation V838_Mon interrupted by acquisition process failure.) 2023-01-13 06:46:42.2: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:46:42.2: 219 min. remaining to meet strict constraints. 2023-01-13 06:46:42.2: 374 min. remaining for the plan to fit before dawn. 2023-01-13 06:46:42.2: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 06:46:42.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:46:42.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:46:42.4: Acquire data for Observation NSVS_0421121... 2023-01-13 06:46:42.4: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan NSVS_0421121) 2023-01-13 06:46:42.4: Send Observation NSVS_0421121 to ACP Sequencer 2023-01-13 06:46:57.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:46:57.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:46:57.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:46:57.6: ACP data acquisition failed for Observation NSVS_0421121. 2023-01-13 06:46:57.6: (Observation NSVS_0421121 interrupted by acquisition process failure.) 2023-01-13 06:46:57.7: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:46:57.7: 219 min. remaining to meet strict constraints. 2023-01-13 06:46:57.7: 374 min. remaining for the plan to fit before dawn. 2023-01-13 06:46:57.7: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 06:46:57.7: ending rising plan delay. Plan is now eligible. 2023-01-13 06:46:57.9: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:46:57.9: Acquire data for Observation SU_Lyn... 2023-01-13 06:46:57.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan SU_Lyn) 2023-01-13 06:46:57.9: Send Observation SU_Lyn to ACP Sequencer 2023-01-13 06:47:19.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:47:19.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:47:19.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:47:19.0: ACP data acquisition failed for Observation SU_Lyn. 2023-01-13 06:47:19.0: (Observation SU_Lyn interrupted by acquisition process failure.) 2023-01-13 06:47:19.2: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:47:19.2: 218 min. remaining to meet strict constraints. 2023-01-13 06:47:19.2: 373 min. remaining for the plan to fit before dawn. 2023-01-13 06:47:19.2: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:47:19.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:47:19.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:47:19.4: Acquire data for Observation S_Ori... 2023-01-13 06:47:19.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan S_Ori) 2023-01-13 06:47:19.4: Send Observation S_Ori to ACP Sequencer 2023-01-13 06:47:57.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:47:57.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:47:57.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:47:57.7: ACP data acquisition failed for Observation S_Ori. 2023-01-13 06:47:57.7: (Observation S_Ori interrupted by acquisition process failure.) 2023-01-13 06:47:57.9: Rising plan delay enabled for Plan HQ_Mon: 2023-01-13 06:47:57.9: 218 min. remaining to meet strict constraints. 2023-01-13 06:47:57.9: 373 min. remaining for the plan to fit before dawn. 2023-01-13 06:47:57.9: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:47:57.9: ending rising plan delay. Plan is now eligible. 2023-01-13 06:47:58.1: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:47:58.1: Acquire data for Observation TV_Cam... 2023-01-13 06:47:58.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan TV_Cam) 2023-01-13 06:47:58.1: Send Observation TV_Cam to ACP Sequencer 2023-01-13 06:48:47.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:48:47.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:48:47.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:48:47.0: ACP data acquisition failed for Observation TV_Cam. 2023-01-13 06:48:47.0: (Observation TV_Cam interrupted by acquisition process failure.) 2023-01-13 06:48:47.3: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:48:47.3: Acquire data for Observation GR_Ori... 2023-01-13 06:48:47.3: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan GR_Ori) 2023-01-13 06:48:47.3: Send Observation GR_Ori to ACP Sequencer 2023-01-13 06:49:25.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:49:25.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:49:25.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:49:25.6: ACP data acquisition failed for Observation GR_Ori. 2023-01-13 06:49:25.6: (Observation GR_Ori interrupted by acquisition process failure.) 2023-01-13 06:49:25.7: Rising plan delay enabled for Plan J072816: 2023-01-13 06:49:25.7: 394 min. remaining to meet strict constraints. 2023-01-13 06:49:25.7: 355 min. remaining for the plan to fit before dawn. 2023-01-13 06:49:25.7: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:49:25.7: ending rising plan delay. Plan is now eligible. 2023-01-13 06:49:25.7: Rising plan delay enabled for Plan J072816: 2023-01-13 06:49:25.7: 394 min. remaining to meet strict constraints. 2023-01-13 06:49:25.7: 355 min. remaining for the plan to fit before dawn. 2023-01-13 06:49:25.7: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:49:25.7: ending rising plan delay. Plan is now eligible. 2023-01-13 06:49:25.9: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:49:25.9: Acquire data for Observation MP_Gem... 2023-01-13 06:49:25.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan MP_Gem) 2023-01-13 06:49:25.9: Send Observation MP_Gem to ACP Sequencer 2023-01-13 06:50:04.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:50:04.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:50:04.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:50:04.3: ACP data acquisition failed for Observation MP_Gem. 2023-01-13 06:50:04.3: (Observation MP_Gem interrupted by acquisition process failure.) 2023-01-13 06:50:04.4: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:04.4: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:04.4: 355 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:04.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:04.4: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:04.4: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:04.4: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:04.4: 355 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:04.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:04.4: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:04.5: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:50:04.5: Acquire data for Observation RY_Lep... 2023-01-13 06:50:04.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan RY_Lep) 2023-01-13 06:50:04.6: Send Observation RY_Lep to ACP Sequencer 2023-01-13 06:50:21.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:50:21.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:50:21.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:50:21.4: ACP data acquisition failed for Observation RY_Lep. 2023-01-13 06:50:21.4: (Observation RY_Lep interrupted by acquisition process failure.) 2023-01-13 06:50:21.6: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:21.6: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:21.6: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:21.6: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:21.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:21.6: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:21.6: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:21.6: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:21.6: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:21.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:21.8: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:50:21.8: Acquire data for Observation V1261_Ori... 2023-01-13 06:50:21.8: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan V1261_Ori) 2023-01-13 06:50:21.8: Send Observation V1261_Ori to ACP Sequencer 2023-01-13 06:50:39.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:50:39.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:50:39.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:50:39.2: ACP data acquisition failed for Observation V1261_Ori. 2023-01-13 06:50:39.2: (Observation V1261_Ori interrupted by acquisition process failure.) 2023-01-13 06:50:39.4: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:39.4: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:39.4: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:39.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:39.4: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:39.4: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:39.4: 393 min. remaining to meet strict constraints. 2023-01-13 06:50:39.4: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:39.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:39.4: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:39.5: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:50:39.5: Acquire data for Observation HQ_Mon... 2023-01-13 06:50:39.5: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan HQ_Mon) 2023-01-13 06:50:39.5: Send Observation HQ_Mon to ACP Sequencer 2023-01-13 06:50:54.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:50:54.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:50:54.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:50:54.6: ACP data acquisition failed for Observation HQ_Mon. 2023-01-13 06:50:54.6: (Observation HQ_Mon interrupted by acquisition process failure.) 2023-01-13 06:50:54.8: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:54.8: 392 min. remaining to meet strict constraints. 2023-01-13 06:50:54.8: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:54.8: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:54.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:54.8: Rising plan delay enabled for Plan J072816: 2023-01-13 06:50:54.8: 392 min. remaining to meet strict constraints. 2023-01-13 06:50:54.8: 354 min. remaining for the plan to fit before dawn. 2023-01-13 06:50:54.8: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:50:54.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:50:54.9: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:50:54.9: Acquire data for Observation CW_Mon... 2023-01-13 06:50:54.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan CW_Mon) 2023-01-13 06:50:54.9: Send Observation CW_Mon to ACP Sequencer 2023-01-13 06:51:10.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:51:10.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:51:10.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:51:10.0: ACP data acquisition failed for Observation CW_Mon. 2023-01-13 06:51:10.0: (Observation CW_Mon interrupted by acquisition process failure.) 2023-01-13 06:51:10.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:10.2: 392 min. remaining to meet strict constraints. 2023-01-13 06:51:10.2: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:10.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:10.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:10.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:10.2: 392 min. remaining to meet strict constraints. 2023-01-13 06:51:10.2: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:10.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:10.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:11.0: Dispatcher cycle time: 0.9 sec. 2023-01-13 06:51:11.0: Acquire data for Observation CSS091110:060919-064155... 2023-01-13 06:51:11.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan CSS091110:060919-064155) 2023-01-13 06:51:11.0: Send Observation CSS091110:060919-064155 to ACP Sequencer 2023-01-13 06:51:29.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:51:29.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:51:29.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:51:29.0: ACP data acquisition failed for Observation CSS091110:060919-064155. 2023-01-13 06:51:29.0: (Observation CSS091110:060919-064155 interrupted by acquisition process failure.) 2023-01-13 06:51:29.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:29.2: 392 min. remaining to meet strict constraints. 2023-01-13 06:51:29.2: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:29.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:29.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:29.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:29.2: 392 min. remaining to meet strict constraints. 2023-01-13 06:51:29.2: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:29.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:29.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:29.3: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:51:29.3: Acquire data for Observation YZ_Aur... 2023-01-13 06:51:29.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan YZ_Aur) 2023-01-13 06:51:29.3: Send Observation YZ_Aur to ACP Sequencer 2023-01-13 06:51:44.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:51:44.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:51:44.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:51:44.4: ACP data acquisition failed for Observation YZ_Aur. 2023-01-13 06:51:44.4: (Observation YZ_Aur interrupted by acquisition process failure.) 2023-01-13 06:51:44.5: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:44.5: 391 min. remaining to meet strict constraints. 2023-01-13 06:51:44.5: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:44.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:44.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:44.5: Rising plan delay enabled for Plan J072816: 2023-01-13 06:51:44.5: 391 min. remaining to meet strict constraints. 2023-01-13 06:51:44.5: 353 min. remaining for the plan to fit before dawn. 2023-01-13 06:51:44.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:51:44.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:51:44.7: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:51:44.7: Acquire data for Observation V838_Mon... 2023-01-13 06:51:44.7: (belongs to Project AAVSO_P304_SPP_AUTO_ver3413, Plan V838_Mon) 2023-01-13 06:51:44.7: Doing 4 sets 2023-01-13 06:51:44.7: Send Observation V838_Mon to ACP Sequencer 2023-01-13 06:52:14.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:52:14.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:52:14.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:52:14.9: ACP data acquisition failed for Observation V838_Mon. 2023-01-13 06:52:14.9: (Observation V838_Mon interrupted by acquisition process failure.) 2023-01-13 06:52:15.0: Rising plan delay enabled for Plan J072816: 2023-01-13 06:52:15.0: 391 min. remaining to meet strict constraints. 2023-01-13 06:52:15.0: 352 min. remaining for the plan to fit before dawn. 2023-01-13 06:52:15.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:52:15.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:52:15.0: Rising plan delay enabled for Plan J072816: 2023-01-13 06:52:15.0: 391 min. remaining to meet strict constraints. 2023-01-13 06:52:15.0: 352 min. remaining for the plan to fit before dawn. 2023-01-13 06:52:15.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:52:15.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:52:15.1: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:52:15.1: Acquire data for Observation HQ_Per... 2023-01-13 06:52:15.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan HQ_Per) 2023-01-13 06:52:15.2: Send Observation HQ_Per to ACP Sequencer 2023-01-13 06:52:59.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:52:59.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:52:59.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:52:59.1: ACP data acquisition failed for Observation HQ_Per. 2023-01-13 06:52:59.1: (Observation HQ_Per interrupted by acquisition process failure.) 2023-01-13 06:52:59.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:52:59.2: 390 min. remaining to meet strict constraints. 2023-01-13 06:52:59.2: 352 min. remaining for the plan to fit before dawn. 2023-01-13 06:52:59.2: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:52:59.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:52:59.2: Rising plan delay enabled for Plan J072816: 2023-01-13 06:52:59.2: 390 min. remaining to meet strict constraints. 2023-01-13 06:52:59.2: 352 min. remaining for the plan to fit before dawn. 2023-01-13 06:52:59.2: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:52:59.2: ending rising plan delay. Plan is now eligible. 2023-01-13 06:52:59.4: Dispatcher cycle time: 0.2 sec. 2023-01-13 06:52:59.4: Acquire data for Observation L1022_IRS... 2023-01-13 06:52:59.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan L1022_IRS) 2023-01-13 06:52:59.4: Send Observation L1022_IRS to ACP Sequencer 2023-01-13 06:53:37.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:53:37.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:53:37.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:53:37.8: ACP data acquisition failed for Observation L1022_IRS. 2023-01-13 06:53:37.8: (Observation L1022_IRS interrupted by acquisition process failure.) 2023-01-13 06:53:37.9: Rising plan delay enabled for Plan J072816: 2023-01-13 06:53:37.9: 390 min. remaining to meet strict constraints. 2023-01-13 06:53:37.9: 351 min. remaining for the plan to fit before dawn. 2023-01-13 06:53:37.9: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:53:37.9: ending rising plan delay. Plan is now eligible. 2023-01-13 06:53:38.0: Rising plan delay enabled for Plan J072816: 2023-01-13 06:53:38.0: 390 min. remaining to meet strict constraints. 2023-01-13 06:53:38.0: 351 min. remaining for the plan to fit before dawn. 2023-01-13 06:53:38.0: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-13 06:53:38.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:53:38.1: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:53:38.1: Acquire data for Observation L1022_IRS... 2023-01-13 06:53:38.1: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan L1022_IRS) 2023-01-13 06:53:38.1: Send Observation L1022_IRS to ACP Sequencer 2023-01-13 06:54:16.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:54:16.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:54:16.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:54:16.4: ACP data acquisition failed for Observation L1022_IRS. 2023-01-13 06:54:16.4: (Observation L1022_IRS interrupted by acquisition process failure.) 2023-01-13 06:54:16.6: Rising plan delay enabled for Plan J072816: 2023-01-13 06:54:16.6: 389 min. remaining to meet strict constraints. 2023-01-13 06:54:16.6: 350 min. remaining for the plan to fit before dawn. 2023-01-13 06:54:16.6: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:54:16.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:54:16.6: Rising plan delay enabled for Plan J072816: 2023-01-13 06:54:16.6: 389 min. remaining to meet strict constraints. 2023-01-13 06:54:16.6: 350 min. remaining for the plan to fit before dawn. 2023-01-13 06:54:16.6: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:54:16.6: ending rising plan delay. Plan is now eligible. 2023-01-13 06:54:16.7: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:54:16.7: Acquire data for Observation J072816... 2023-01-13 06:54:16.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan J072816) 2023-01-13 06:54:16.7: Send Observation J072816 to ACP Sequencer 2023-01-13 06:54:31.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:54:31.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:54:31.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:54:31.8: ACP data acquisition failed for Observation J072816. 2023-01-13 06:54:31.8: (Observation J072816 interrupted by acquisition process failure.) 2023-01-13 06:54:31.9: Rising plan delay enabled for Plan J072816: 2023-01-13 06:54:31.9: 389 min. remaining to meet strict constraints. 2023-01-13 06:54:31.9: 350 min. remaining for the plan to fit before dawn. 2023-01-13 06:54:31.9: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-13 06:54:31.9: ending rising plan delay. Plan is now eligible. 2023-01-13 06:54:32.0: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:54:32.0: Acquire data for Observation AO_Aur... 2023-01-13 06:54:32.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan AO_Aur) 2023-01-13 06:54:32.0: Send Observation AO_Aur to ACP Sequencer 2023-01-13 06:55:09.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:55:09.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:55:09.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:55:09.2: ACP data acquisition failed for Observation AO_Aur. 2023-01-13 06:55:09.2: (Observation AO_Aur interrupted by acquisition process failure.) 2023-01-13 06:55:09.3: Rising plan delay enabled for Plan J072816: 2023-01-13 06:55:09.3: 388 min. remaining to meet strict constraints. 2023-01-13 06:55:09.3: 349 min. remaining for the plan to fit before dawn. 2023-01-13 06:55:09.3: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 06:55:09.3: ending rising plan delay. Plan is now eligible. 2023-01-13 06:55:09.4: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:55:09.4: Acquire data for Observation V582_Aur... 2023-01-13 06:55:09.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan V582_Aur) 2023-01-13 06:55:09.4: Send Observation V582_Aur to ACP Sequencer 2023-01-13 06:55:42.3: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:55:42.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:55:42.3: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:55:42.4: ACP data acquisition failed for Observation V582_Aur. 2023-01-13 06:55:42.4: (Observation V582_Aur interrupted by acquisition process failure.) 2023-01-13 06:55:42.5: Rising plan delay enabled for Plan J072816: 2023-01-13 06:55:42.5: 388 min. remaining to meet strict constraints. 2023-01-13 06:55:42.5: 349 min. remaining for the plan to fit before dawn. 2023-01-13 06:55:42.5: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-13 06:55:42.5: ending rising plan delay. Plan is now eligible. 2023-01-13 06:55:42.6: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:55:42.6: Acquire data for Observation MP_Gem... 2023-01-13 06:55:42.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan MP_Gem) 2023-01-13 06:55:42.6: Send Observation MP_Gem to ACP Sequencer 2023-01-13 06:55:57.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:55:57.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:55:57.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:55:57.7: ACP data acquisition failed for Observation MP_Gem. 2023-01-13 06:55:57.7: (Observation MP_Gem interrupted by acquisition process failure.) 2023-01-13 06:55:57.8: Rising plan delay enabled for Plan J072816: 2023-01-13 06:55:57.8: 387 min. remaining to meet strict constraints. 2023-01-13 06:55:57.8: 349 min. remaining for the plan to fit before dawn. 2023-01-13 06:55:57.8: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:55:57.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:55:57.9: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:55:57.9: Acquire data for Observation CSS091110:060919-064155... 2023-01-13 06:55:57.9: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan CSS091110:060919-064155) 2023-01-13 06:55:57.9: Send Observation CSS091110:060919-064155 to ACP Sequencer 2023-01-13 06:56:33.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:56:33.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:56:33.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:56:33.6: ACP data acquisition failed for Observation CSS091110:060919-064155. 2023-01-13 06:56:33.6: (Observation CSS091110:060919-064155 interrupted by acquisition process failure.) 2023-01-13 06:56:33.7: Rising plan delay enabled for Plan J072816: 2023-01-13 06:56:33.7: 387 min. remaining to meet strict constraints. 2023-01-13 06:56:33.7: 348 min. remaining for the plan to fit before dawn. 2023-01-13 06:56:33.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:56:33.7: ending rising plan delay. Plan is now eligible. 2023-01-13 06:56:33.7: Rising plan delay enabled for Plan S5_0716+714: 2023-01-13 06:56:33.7: 367 min. remaining to meet strict constraints. 2023-01-13 06:56:33.7: 371 min. remaining for the plan to fit before dawn. 2023-01-13 06:56:33.7: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 06:56:33.7: ending rising plan delay. Plan is now eligible. 2023-01-13 06:56:33.8: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:56:33.8: Acquire data for Observation S5_0716+714... 2023-01-13 06:56:33.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan S5_0716+714) 2023-01-13 06:56:33.8: Send Observation S5_0716+714 to ACP Sequencer 2023-01-13 06:56:48.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:56:48.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:56:48.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:56:48.8: ACP data acquisition failed for Observation S5_0716+714. 2023-01-13 06:56:48.8: (Observation S5_0716+714 interrupted by acquisition process failure.) 2023-01-13 06:56:49.0: Rising plan delay enabled for Plan J072816: 2023-01-13 06:56:49.0: 386 min. remaining to meet strict constraints. 2023-01-13 06:56:49.0: 348 min. remaining for the plan to fit before dawn. 2023-01-13 06:56:49.0: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-13 06:56:49.0: ending rising plan delay. Plan is now eligible. 2023-01-13 06:56:49.1: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:56:49.1: Acquire data for Observation V838_Mon... 2023-01-13 06:56:49.1: (belongs to Project AAVSO_P237_CWT_AUTO_ver2685, Plan V838_Mon) 2023-01-13 06:56:49.1: Send Observation V838_Mon to ACP Sequencer 2023-01-13 06:57:35.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:57:35.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:57:35.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:57:35.6: ACP data acquisition failed for Observation V838_Mon. 2023-01-13 06:57:35.6: (Observation V838_Mon interrupted by acquisition process failure.) 2023-01-13 06:57:35.8: Rising plan delay enabled for Plan J072816: 2023-01-13 06:57:35.8: 386 min. remaining to meet strict constraints. 2023-01-13 06:57:35.8: 347 min. remaining for the plan to fit before dawn. 2023-01-13 06:57:35.8: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-13 06:57:35.8: ending rising plan delay. Plan is now eligible. 2023-01-13 06:57:35.8: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:57:35.8: Acquire data for Observation J072816... 2023-01-13 06:57:35.8: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan J072816) 2023-01-13 06:57:35.8: Send Observation J072816 to ACP Sequencer 2023-01-13 06:58:19.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:58:19.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:58:19.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:58:19.8: ACP data acquisition failed for Observation J072816. 2023-01-13 06:58:19.8: (Observation J072816 interrupted by acquisition process failure.) 2023-01-13 06:58:20.0: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:58:20.0: Acquire data for Observation AO_Aur... 2023-01-13 06:58:20.0: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan AO_Aur) 2023-01-13 06:58:20.0: Send Observation AO_Aur to ACP Sequencer 2023-01-13 06:59:03.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:59:03.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:59:03.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:59:03.8: ACP data acquisition failed for Observation AO_Aur. 2023-01-13 06:59:03.8: (Observation AO_Aur interrupted by acquisition process failure.) 2023-01-13 06:59:04.0: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:59:04.0: Acquire data for Observation FS_Aur... 2023-01-13 06:59:04.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan FS_Aur) 2023-01-13 06:59:04.0: Send Observation FS_Aur to ACP Sequencer 2023-01-13 06:59:36.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:59:36.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:59:36.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:59:36.9: ACP data acquisition failed for Observation FS_Aur. 2023-01-13 06:59:36.9: (Observation FS_Aur interrupted by acquisition process failure.) 2023-01-13 06:59:37.1: Dispatcher cycle time: 0.1 sec. 2023-01-13 06:59:37.1: Acquire data for Observation 2MASS_J07092139-1029344... 2023-01-13 06:59:37.1: (belongs to Project AAVSO_P129_SGUA_AUTO_ver2823, Plan 2MASS_J07092139-1029344) 2023-01-13 06:59:37.1: Send Observation 2MASS_J07092139-1029344 to ACP Sequencer 2023-01-13 06:59:52.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 06:59:52.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 06:59:52.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 06:59:52.2: ACP data acquisition failed for Observation 2MASS_J07092139-1029344. 2023-01-13 06:59:52.2: (Observation 2MASS_J07092139-1029344 interrupted by acquisition process failure.) 2023-01-13 06:59:52.3: Dispatcher cycle time: 0.0 sec. 2023-01-13 06:59:52.3: Acquire data for Observation YZ_Aur... 2023-01-13 06:59:52.3: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3411, Plan YZ_Aur) 2023-01-13 06:59:52.3: Send Observation YZ_Aur to ACP Sequencer 2023-01-13 07:00:07.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:00:07.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:00:07.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:00:07.5: ACP data acquisition failed for Observation YZ_Aur. 2023-01-13 07:00:07.5: (Observation YZ_Aur interrupted by acquisition process failure.) 2023-01-13 07:00:07.6: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:00:07.6: Acquire data for Observation QZ_Aur... 2023-01-13 07:00:07.6: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan QZ_Aur) 2023-01-13 07:00:07.7: Send Observation QZ_Aur to ACP Sequencer 2023-01-13 07:00:46.7: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:00:46.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:00:46.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:00:46.7: ACP data acquisition failed for Observation QZ_Aur. 2023-01-13 07:00:46.7: (Observation QZ_Aur interrupted by acquisition process failure.) 2023-01-13 07:00:46.8: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:00:46.8: Acquire data for Observation SU_Lyn... 2023-01-13 07:00:46.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan SU_Lyn) 2023-01-13 07:00:46.8: Send Observation SU_Lyn to ACP Sequencer 2023-01-13 07:01:01.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:01:01.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:01:01.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:01:01.9: ACP data acquisition failed for Observation SU_Lyn. 2023-01-13 07:01:01.9: (Observation SU_Lyn interrupted by acquisition process failure.) 2023-01-13 07:04:34.6: Rising plan delay enabled for Plan NQ_Gem: 2023-01-13 07:04:34.6: 279 min. remaining to meet strict constraints. 2023-01-13 07:04:34.6: 360 min. remaining for the plan to fit before dawn. 2023-01-13 07:04:34.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:04:34.6: ending rising plan delay. Plan is now eligible. 2023-01-13 07:04:34.6: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:04:34.6: Acquire data for Observation NQ_Gem... 2023-01-13 07:04:34.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3411, Plan NQ_Gem) 2023-01-13 07:04:34.6: Send Observation NQ_Gem to ACP Sequencer 2023-01-13 07:04:49.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:04:49.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:04:49.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:04:49.8: ACP data acquisition failed for Observation NQ_Gem. 2023-01-13 07:04:49.8: (Observation NQ_Gem interrupted by acquisition process failure.) 2023-01-13 07:07:21.9: Rising plan delay enabled for Plan OI_158: 2023-01-13 07:07:21.9: 268 min. remaining to meet strict constraints. 2023-01-13 07:07:21.9: 350 min. remaining for the plan to fit before dawn. 2023-01-13 07:07:21.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:07:21.9: ending rising plan delay. Plan is now eligible. 2023-01-13 07:07:21.9: Rising plan delay enabled for Plan OI_158: 2023-01-13 07:07:21.9: 268 min. remaining to meet strict constraints. 2023-01-13 07:07:21.9: 350 min. remaining for the plan to fit before dawn. 2023-01-13 07:07:21.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:07:21.9: ending rising plan delay. Plan is now eligible. 2023-01-13 07:07:21.9: Dispatcher cycle time: 0.1 sec. 2023-01-13 07:07:21.9: Acquire data for Observation OI_158... 2023-01-13 07:07:21.9: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan OI_158) 2023-01-13 07:07:21.9: Send Observation OI_158 to ACP Sequencer 2023-01-13 07:07:37.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:07:37.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:07:37.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:07:37.1: ACP data acquisition failed for Observation OI_158. 2023-01-13 07:07:37.1: (Observation OI_158 interrupted by acquisition process failure.) 2023-01-13 07:07:37.3: Rising plan delay enabled for Plan OI_158: 2023-01-13 07:07:37.3: 268 min. remaining to meet strict constraints. 2023-01-13 07:07:37.3: 350 min. remaining for the plan to fit before dawn. 2023-01-13 07:07:37.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:07:37.3: ending rising plan delay. Plan is now eligible. 2023-01-13 07:07:37.3: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:07:37.3: Acquire data for Observation OI_158... 2023-01-13 07:07:37.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan OI_158) 2023-01-13 07:07:37.3: Send Observation OI_158 to ACP Sequencer 2023-01-13 07:07:52.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:07:52.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:07:52.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:07:52.4: ACP data acquisition failed for Observation OI_158. 2023-01-13 07:07:52.4: (Observation OI_158 interrupted by acquisition process failure.) 2023-01-13 07:11:55.5: Rising plan delay enabled for Plan QX_Pup: 2023-01-13 07:11:55.5: 162 min. remaining to meet strict constraints. 2023-01-13 07:11:55.5: 348 min. remaining for the plan to fit before dawn. 2023-01-13 07:11:55.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:11:55.5: ending rising plan delay. Plan is now eligible. 2023-01-13 07:11:55.5: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:11:55.5: Acquire data for Observation QX_Pup... 2023-01-13 07:11:55.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan QX_Pup) 2023-01-13 07:11:55.5: Send Observation QX_Pup to ACP Sequencer 2023-01-13 07:12:10.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:12:10.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:12:10.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:12:10.6: ACP data acquisition failed for Observation QX_Pup. 2023-01-13 07:12:10.6: (Observation QX_Pup interrupted by acquisition process failure.) 2023-01-13 07:24:51.3: Rising plan delay enabled for Plan BX_Pup: 2023-01-13 07:24:51.3: 90 min. remaining to meet strict constraints. 2023-01-13 07:24:51.3: 336 min. remaining for the plan to fit before dawn. 2023-01-13 07:24:51.3: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 07:24:51.3: ending rising plan delay. Plan is now eligible. 2023-01-13 07:24:51.3: Rising plan delay enabled for Plan BX_Pup: 2023-01-13 07:24:51.3: 90 min. remaining to meet strict constraints. 2023-01-13 07:24:51.3: 336 min. remaining for the plan to fit before dawn. 2023-01-13 07:24:51.3: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 07:24:51.3: ending rising plan delay. Plan is now eligible. 2023-01-13 07:24:51.3: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:24:51.3: Acquire data for Observation BX_Pup... 2023-01-13 07:24:51.3: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan BX_Pup) 2023-01-13 07:24:51.3: Send Observation BX_Pup to ACP Sequencer 2023-01-13 07:25:06.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:25:06.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:25:06.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:25:06.6: ACP data acquisition failed for Observation BX_Pup. 2023-01-13 07:25:06.6: (Observation BX_Pup interrupted by acquisition process failure.) 2023-01-13 07:25:06.7: Rising plan delay enabled for Plan BX_Pup: 2023-01-13 07:25:06.7: 90 min. remaining to meet strict constraints. 2023-01-13 07:25:06.7: 336 min. remaining for the plan to fit before dawn. 2023-01-13 07:25:06.7: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 07:25:06.7: ending rising plan delay. Plan is now eligible. 2023-01-13 07:25:06.8: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:25:06.8: Acquire data for Observation BX_Pup... 2023-01-13 07:25:06.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan BX_Pup) 2023-01-13 07:25:06.8: Send Observation BX_Pup to ACP Sequencer 2023-01-13 07:25:22.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:25:22.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:25:22.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:25:22.2: ACP data acquisition failed for Observation BX_Pup. 2023-01-13 07:25:22.2: (Observation BX_Pup interrupted by acquisition process failure.) 2023-01-13 07:32:28.1: Rising plan delay enabled for Plan KN_Lyn: 2023-01-13 07:32:28.1: 379 min. remaining to meet strict constraints. 2023-01-13 07:32:28.1: 303 min. remaining for the plan to fit before dawn. 2023-01-13 07:32:28.1: but only 3 min till start so Plan transits mid-way in its time span. 2023-01-13 07:32:28.1: ending rising plan delay. Plan is now eligible. 2023-01-13 07:32:28.2: Dispatcher cycle time: 0.0 sec. 2023-01-13 07:32:28.2: Acquire data for Observation KN_Lyn... 2023-01-13 07:32:28.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan KN_Lyn) 2023-01-13 07:32:28.2: Send Observation KN_Lyn to ACP Sequencer 2023-01-13 07:32:43.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 07:32:43.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 07:32:43.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 07:32:43.2: ACP data acquisition failed for Observation KN_Lyn. 2023-01-13 07:32:43.2: (Observation KN_Lyn interrupted by acquisition process failure.) 2023-01-13 07:33:13.9: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-13 07:33:13.9: 536 min. remaining to meet strict constraints. 2023-01-13 07:33:13.9: 331 min. remaining for the plan to fit before dawn. 2023-01-13 07:33:13.9: but only 264 min till start so Plan transits mid-way in its time span. 2023-01-13 07:33:13.9: deferred (rising) for 263 min, until 13-Jan-2023 11:57:04 UTC 2023-01-13 07:34:14.7: ++ Auto Focus ++ 2023-01-13 07:34:14.7: Doing periodic autofocus. 2023-01-13 07:34:14.7: Start special ACP AutoFocus script for scheduler 2023-01-13 07:34:29.7: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 07:34:29.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 07:34:29.7: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-13 07:35:00.1: ++ Auto Focus ++ 2023-01-13 07:35:00.1: Doing periodic autofocus. 2023-01-13 07:35:00.1: Start special ACP AutoFocus script for scheduler 2023-01-13 07:35:15.2: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 07:35:15.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 07:35:15.2: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-13 07:40:18.8: ++ Auto Focus ++ 2023-01-13 07:40:18.8: Doing periodic autofocus. 2023-01-13 07:40:18.8: Start special ACP AutoFocus script for scheduler 2023-01-13 07:40:33.9: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 07:40:33.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 07:40:33.9: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2023-01-13 07:48:10.3: Rising plan delay enabled for Plan IR_Com: 2023-01-13 07:48:10.3: 535 min. remaining to meet strict constraints. 2023-01-13 07:48:10.3: 310 min. remaining for the plan to fit before dawn. 2023-01-13 07:48:10.3: but only 260 min till start so Plan transits mid-way in its time span. 2023-01-13 07:48:10.3: deferred (rising) for 259 min, until 13-Jan-2023 12:07:28 UTC 2023-01-13 07:48:10.3: Rising plan delay enabled for Plan IR_Com: 2023-01-13 07:48:10.3: 535 min. remaining to meet strict constraints. 2023-01-13 07:48:10.3: 310 min. remaining for the plan to fit before dawn. 2023-01-13 07:48:10.3: but only 260 min till start so Plan transits mid-way in its time span. 2023-01-13 07:48:10.3: deferred (rising) for 259 min, until 13-Jan-2023 12:07:28 UTC 2023-01-13 07:50:42.5: ++ Auto Focus ++ 2023-01-13 07:50:42.5: Doing periodic autofocus. 2023-01-13 07:50:42.5: Start special ACP AutoFocus script for scheduler 2023-01-13 07:50:57.6: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 07:50:57.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 07:50:57.6: ** Autofocus failed (n=4), will retry ASAP after 15 min. 2023-01-13 08:06:09.3: ++ Auto Focus ++ 2023-01-13 08:06:09.3: Doing periodic autofocus. 2023-01-13 08:06:09.3: Start special ACP AutoFocus script for scheduler 2023-01-13 08:06:24.4: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 08:06:24.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 08:06:24.4: ** Autofocus failed (n=5), will retry ASAP after 20 min. 2023-01-13 08:21:06.6: Rising plan delay enabled for Plan OJ287: 2023-01-13 08:21:06.6: 276 min. remaining to meet strict constraints. 2023-01-13 08:21:06.6: 272 min. remaining for the plan to fit before dawn. 2023-01-13 08:21:06.6: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:21:06.6: ending rising plan delay. Plan is now eligible. 2023-01-13 08:21:06.6: Rising plan delay enabled for Plan OJ287: 2023-01-13 08:21:06.6: 276 min. remaining to meet strict constraints. 2023-01-13 08:21:06.6: 272 min. remaining for the plan to fit before dawn. 2023-01-13 08:21:06.6: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:21:06.6: ending rising plan delay. Plan is now eligible. 2023-01-13 08:21:06.6: Dispatcher cycle time: 0.1 sec. 2023-01-13 08:21:06.6: Acquire data for Observation OJ287... 2023-01-13 08:21:06.6: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan OJ287) 2023-01-13 08:21:06.6: Send Observation OJ287 to ACP Sequencer 2023-01-13 08:21:21.8: ** ACP script "AcquireScheduler" failed: 2023-01-13 08:21:21.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 08:21:21.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 08:21:21.8: ACP data acquisition failed for Observation OJ287. 2023-01-13 08:21:21.8: (Observation OJ287 interrupted by acquisition process failure.) 2023-01-13 08:21:21.9: Rising plan delay enabled for Plan OJ287: 2023-01-13 08:21:21.9: 276 min. remaining to meet strict constraints. 2023-01-13 08:21:21.9: 272 min. remaining for the plan to fit before dawn. 2023-01-13 08:21:21.9: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:21:21.9: ending rising plan delay. Plan is now eligible. 2023-01-13 08:21:21.9: Dispatcher cycle time: 0.0 sec. 2023-01-13 08:21:21.9: Acquire data for Observation OJ287... 2023-01-13 08:21:21.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan OJ287) 2023-01-13 08:21:21.9: Send Observation OJ287 to ACP Sequencer 2023-01-13 08:21:37.1: ** ACP script "AcquireScheduler" failed: 2023-01-13 08:21:37.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 08:21:37.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 08:21:37.1: ACP data acquisition failed for Observation OJ287. 2023-01-13 08:21:37.1: (Observation OJ287 interrupted by acquisition process failure.) 2023-01-13 08:26:41.1: ++ Auto Focus ++ 2023-01-13 08:26:41.1: Doing periodic autofocus. 2023-01-13 08:26:41.1: Start special ACP AutoFocus script for scheduler 2023-01-13 08:26:56.1: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 08:26:56.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 08:26:56.1: ** Autofocus failed (n=6), will retry ASAP after 20 min. 2023-01-13 08:36:03.7: Rising plan delay enabled for Plan M3-V154: 2023-01-13 08:36:03.7: 564 min. remaining to meet strict constraints. 2023-01-13 08:36:03.7: 271 min. remaining for the plan to fit before dawn. 2023-01-13 08:36:03.7: deferred (rising) for 271 min, until 13-Jan-2023 13:07:32 UTC 2023-01-13 08:41:08.2: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 08:41:08.2: 251 min. remaining to meet strict constraints. 2023-01-13 08:41:08.2: 251 min. remaining for the plan to fit before dawn. 2023-01-13 08:41:08.2: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:41:08.2: ending rising plan delay. Plan is now eligible. 2023-01-13 08:41:08.2: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 08:41:08.2: 251 min. remaining to meet strict constraints. 2023-01-13 08:41:08.2: 251 min. remaining for the plan to fit before dawn. 2023-01-13 08:41:08.2: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:41:08.2: ending rising plan delay. Plan is now eligible. 2023-01-13 08:41:08.2: Dispatcher cycle time: 0.0 sec. 2023-01-13 08:41:08.2: Acquire data for Observation GZ_Cnc... 2023-01-13 08:41:08.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan GZ_Cnc) 2023-01-13 08:41:08.2: Send Observation GZ_Cnc to ACP Sequencer 2023-01-13 08:41:23.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 08:41:23.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 08:41:23.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 08:41:23.3: ACP data acquisition failed for Observation GZ_Cnc. 2023-01-13 08:41:23.3: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-01-13 08:41:23.4: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-13 08:41:23.4: 251 min. remaining to meet strict constraints. 2023-01-13 08:41:23.4: 251 min. remaining for the plan to fit before dawn. 2023-01-13 08:41:23.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 08:41:23.4: ending rising plan delay. Plan is now eligible. 2023-01-13 08:41:23.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 08:41:23.4: Acquire data for Observation GZ_Cnc... 2023-01-13 08:41:23.4: (belongs to Project AAVSO_MISC_MZK_AUTO_ver2706, Plan GZ_Cnc) 2023-01-13 08:41:23.4: Send Observation GZ_Cnc to ACP Sequencer 2023-01-13 08:41:38.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 08:41:38.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 08:41:38.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 08:41:38.5: ACP data acquisition failed for Observation GZ_Cnc. 2023-01-13 08:41:38.5: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-01-13 08:47:12.8: ++ Auto Focus ++ 2023-01-13 08:47:12.8: Doing periodic autofocus. 2023-01-13 08:47:12.8: Start special ACP AutoFocus script for scheduler 2023-01-13 08:47:27.9: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 08:47:27.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 08:47:27.9: ** Autofocus failed (n=7), will retry ASAP after 20 min. 2023-01-13 09:04:42.1: Rising plan delay enabled for Plan HS1340+1524: 2023-01-13 09:04:42.1: 509 min. remaining to meet strict constraints. 2023-01-13 09:04:42.1: 239 min. remaining for the plan to fit before dawn. 2023-01-13 09:04:42.1: deferred (rising) for 238 min, until 13-Jan-2023 13:03:25 UTC 2023-01-13 09:04:42.1: Rising plan delay enabled for Plan HS1340+1524: 2023-01-13 09:04:42.1: 509 min. remaining to meet strict constraints. 2023-01-13 09:04:42.1: 239 min. remaining for the plan to fit before dawn. 2023-01-13 09:04:42.1: deferred (rising) for 238 min, until 13-Jan-2023 13:03:25 UTC 2023-01-13 09:07:44.7: ++ Auto Focus ++ 2023-01-13 09:07:44.7: Doing periodic autofocus. 2023-01-13 09:07:44.7: Start special ACP AutoFocus script for scheduler 2023-01-13 09:07:59.7: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 09:07:59.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 09:07:59.7: ** Autofocus failed (n=8), will retry ASAP after 20 min. 2023-01-13 09:17:07.4: Rising plan delay enabled for Plan R_Leo: 2023-01-13 09:17:07.4: 253 min. remaining to meet strict constraints. 2023-01-13 09:17:07.4: 222 min. remaining for the plan to fit before dawn. 2023-01-13 09:17:07.4: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 09:17:07.4: ending rising plan delay. Plan is now eligible. 2023-01-13 09:17:07.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 09:17:07.4: Acquire data for Observation R_Leo... 2023-01-13 09:17:07.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan R_Leo) 2023-01-13 09:17:07.4: Send Observation R_Leo to ACP Sequencer 2023-01-13 09:17:22.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 09:17:22.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 09:17:22.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 09:17:22.6: ACP data acquisition failed for Observation R_Leo. 2023-01-13 09:17:22.6: (Observation R_Leo interrupted by acquisition process failure.) 2023-01-13 09:17:22.7: Rising plan delay enabled for Plan 3C_279: 2023-01-13 09:17:22.7: 390 min. remaining to meet strict constraints. 2023-01-13 09:17:22.7: 227 min. remaining for the plan to fit before dawn. 2023-01-13 09:17:22.7: but only 191 min till start so Plan transits mid-way in its time span. 2023-01-13 09:17:22.7: deferred (rising) for 190 min, until 13-Jan-2023 12:28:16 UTC 2023-01-13 09:28:01.2: ++ Auto Focus ++ 2023-01-13 09:28:01.2: Doing periodic autofocus. 2023-01-13 09:28:01.2: Start special ACP AutoFocus script for scheduler 2023-01-13 09:28:16.3: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 09:28:16.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 09:28:16.3: ** Autofocus failed (n=9), will retry ASAP after 20 min. 2023-01-13 09:29:47.4: Rising plan delay enabled for Plan PG_1424+240: 2023-01-13 09:29:47.4: 546 min. remaining to meet strict constraints. 2023-01-13 09:29:47.4: 217 min. remaining for the plan to fit before dawn. 2023-01-13 09:29:47.4: deferred (rising) for 217 min, until 13-Jan-2023 13:07:16 UTC 2023-01-13 09:34:51.8: Rising plan delay enabled for Plan NSV-6690: 2023-01-13 09:34:51.8: 543 min. remaining to meet strict constraints. 2023-01-13 09:34:51.8: 182 min. remaining for the plan to fit before dawn. 2023-01-13 09:34:51.8: deferred (rising) for 179 min, until 13-Jan-2023 12:34:10 UTC 2023-01-13 09:42:58.9: Rising plan delay enabled for Plan X_Boo: 2023-01-13 09:42:58.9: 514 min. remaining to meet strict constraints. 2023-01-13 09:42:58.9: 203 min. remaining for the plan to fit before dawn. 2023-01-13 09:42:58.9: deferred (rising) for 203 min, until 13-Jan-2023 13:06:20 UTC 2023-01-13 09:42:58.9: Rising plan delay enabled for Plan X_Boo: 2023-01-13 09:42:58.9: 514 min. remaining to meet strict constraints. 2023-01-13 09:42:58.9: 203 min. remaining for the plan to fit before dawn. 2023-01-13 09:42:58.9: deferred (rising) for 203 min, until 13-Jan-2023 13:06:20 UTC 2023-01-13 09:43:59.9: Rising plan delay enabled for Plan AG_Dra: 2023-01-13 09:43:59.9: 707 min. remaining to meet strict constraints. 2023-01-13 09:43:59.9: 202 min. remaining for the plan to fit before dawn. 2023-01-13 09:43:59.9: deferred (rising) for 202 min, until 13-Jan-2023 13:06:26 UTC 2023-01-13 09:43:59.9: Rising plan delay enabled for Plan AG_Dra: 2023-01-13 09:43:59.9: 707 min. remaining to meet strict constraints. 2023-01-13 09:43:59.9: 202 min. remaining for the plan to fit before dawn. 2023-01-13 09:43:59.9: deferred (rising) for 202 min, until 13-Jan-2023 13:06:26 UTC 2023-01-13 09:48:34.0: ++ Auto Focus ++ 2023-01-13 09:48:34.0: Doing periodic autofocus. 2023-01-13 09:48:34.0: Start special ACP AutoFocus script for scheduler 2023-01-13 09:48:49.0: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 09:48:49.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 09:48:49.0: ** Autofocus failed (n=10), will retry ASAP after 20 min. 2023-01-13 09:55:24.9: Rising plan delay enabled for Plan U_Leo: 2023-01-13 09:55:24.9: 257 min. remaining to meet strict constraints. 2023-01-13 09:55:24.9: 187 min. remaining for the plan to fit before dawn. 2023-01-13 09:55:24.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 09:55:24.9: ending rising plan delay. Plan is now eligible. 2023-01-13 09:55:24.9: Rising plan delay enabled for Plan U_Leo: 2023-01-13 09:55:24.9: 257 min. remaining to meet strict constraints. 2023-01-13 09:55:24.9: 187 min. remaining for the plan to fit before dawn. 2023-01-13 09:55:24.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 09:55:24.9: ending rising plan delay. Plan is now eligible. 2023-01-13 09:55:24.9: Dispatcher cycle time: 0.0 sec. 2023-01-13 09:55:24.9: Acquire data for Observation U_Leo... 2023-01-13 09:55:24.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan U_Leo) 2023-01-13 09:55:25.0: Send Observation U_Leo to ACP Sequencer 2023-01-13 09:55:40.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 09:55:40.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 09:55:40.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 09:55:40.2: ACP data acquisition failed for Observation U_Leo. 2023-01-13 09:55:40.2: (Observation U_Leo interrupted by acquisition process failure.) 2023-01-13 09:55:40.4: Rising plan delay enabled for Plan U_Leo: 2023-01-13 09:55:40.4: 257 min. remaining to meet strict constraints. 2023-01-13 09:55:40.4: 186 min. remaining for the plan to fit before dawn. 2023-01-13 09:55:40.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 09:55:40.4: ending rising plan delay. Plan is now eligible. 2023-01-13 09:55:40.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 09:55:40.4: Acquire data for Observation U_Leo... 2023-01-13 09:55:40.4: (belongs to Project AAVSO_MISC_SFY_AUTO_ver2706, Plan U_Leo) 2023-01-13 09:55:40.4: Send Observation U_Leo to ACP Sequencer 2023-01-13 09:55:55.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 09:55:55.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 09:55:55.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 09:55:55.5: ACP data acquisition failed for Observation U_Leo. 2023-01-13 09:55:55.5: (Observation U_Leo interrupted by acquisition process failure.) 2023-01-13 10:09:07.5: ++ Auto Focus ++ 2023-01-13 10:09:07.5: Doing periodic autofocus. 2023-01-13 10:09:07.5: Start special ACP AutoFocus script for scheduler 2023-01-13 10:09:22.6: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 10:09:22.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 10:09:22.6: ** Autofocus failed (n=11), will retry ASAP after 20 min. 2023-01-13 10:26:37.3: Rising plan delay enabled for Plan IU_Leo: 2023-01-13 10:26:37.3: 248 min. remaining to meet strict constraints. 2023-01-13 10:26:37.3: 151 min. remaining for the plan to fit before dawn. 2023-01-13 10:26:37.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 10:26:37.3: ending rising plan delay. Plan is now eligible. 2023-01-13 10:26:37.3: Rising plan delay enabled for Plan IU_Leo: 2023-01-13 10:26:37.3: 248 min. remaining to meet strict constraints. 2023-01-13 10:26:37.3: 151 min. remaining for the plan to fit before dawn. 2023-01-13 10:26:37.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 10:26:37.3: ending rising plan delay. Plan is now eligible. 2023-01-13 10:26:37.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 10:26:37.4: Acquire data for Observation IU_Leo... 2023-01-13 10:26:37.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan IU_Leo) 2023-01-13 10:26:37.4: Send Observation IU_Leo to ACP Sequencer 2023-01-13 10:26:52.6: ** ACP script "AcquireScheduler" failed: 2023-01-13 10:26:52.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 10:26:52.6: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 10:26:52.6: ACP data acquisition failed for Observation IU_Leo. 2023-01-13 10:26:52.6: (Observation IU_Leo interrupted by acquisition process failure.) 2023-01-13 10:26:52.7: Rising plan delay enabled for Plan IU_Leo: 2023-01-13 10:26:52.7: 248 min. remaining to meet strict constraints. 2023-01-13 10:26:52.7: 151 min. remaining for the plan to fit before dawn. 2023-01-13 10:26:52.7: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 10:26:52.7: ending rising plan delay. Plan is now eligible. 2023-01-13 10:26:52.7: Dispatcher cycle time: 0.0 sec. 2023-01-13 10:26:52.7: Acquire data for Observation IU_Leo... 2023-01-13 10:26:52.7: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan IU_Leo) 2023-01-13 10:26:52.7: Send Observation IU_Leo to ACP Sequencer 2023-01-13 10:27:07.9: ** ACP script "AcquireScheduler" failed: 2023-01-13 10:27:07.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 10:27:07.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 10:27:07.9: ACP data acquisition failed for Observation IU_Leo. 2023-01-13 10:27:07.9: (Observation IU_Leo interrupted by acquisition process failure.) 2023-01-13 10:29:40.0: ++ Auto Focus ++ 2023-01-13 10:29:40.0: Doing periodic autofocus. 2023-01-13 10:29:40.0: Start special ACP AutoFocus script for scheduler 2023-01-13 10:29:55.0: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 10:29:55.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 10:29:55.0: ** Autofocus failed (n=12), will retry ASAP after 20 min. 2023-01-13 10:50:12.9: ++ Auto Focus ++ 2023-01-13 10:50:12.9: Doing periodic autofocus. 2023-01-13 10:50:12.9: Start special ACP AutoFocus script for scheduler 2023-01-13 10:50:27.9: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 10:50:27.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 10:50:27.9: ** Autofocus failed (n=13), will retry ASAP after 20 min. 2023-01-13 10:51:28.7: Rising plan delay enabled for Plan NGC_5634: 2023-01-13 10:51:28.7: 388 min. remaining to meet strict constraints. 2023-01-13 10:51:28.7: 108 min. remaining for the plan to fit before dawn. 2023-01-13 10:51:28.7: deferred (rising) for 105 min, until 13-Jan-2023 12:37:01 UTC 2023-01-13 11:10:15.3: Rising plan delay enabled for Plan Mrk_180: 2023-01-13 11:10:15.3: 364 min. remaining to meet strict constraints. 2023-01-13 11:10:15.3: 117 min. remaining for the plan to fit before dawn. 2023-01-13 11:10:15.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 11:10:15.3: ending rising plan delay. Plan is now eligible. 2023-01-13 11:10:15.3: Dispatcher cycle time: 0.0 sec. 2023-01-13 11:10:15.3: Acquire data for Observation Mrk_180... 2023-01-13 11:10:15.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan Mrk_180) 2023-01-13 11:10:15.3: Send Observation Mrk_180 to ACP Sequencer 2023-01-13 11:10:30.4: ** ACP script "AcquireScheduler" failed: 2023-01-13 11:10:30.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 11:10:30.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 11:10:30.4: ACP data acquisition failed for Observation Mrk_180. 2023-01-13 11:10:30.4: (Observation Mrk_180 interrupted by acquisition process failure.) 2023-01-13 11:10:30.5: ++ Auto Focus ++ 2023-01-13 11:10:30.5: Doing periodic autofocus. 2023-01-13 11:10:30.5: Start special ACP AutoFocus script for scheduler 2023-01-13 11:11:13.6: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 11:11:13.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 11:11:13.6: ** Autofocus failed (n=14), will retry ASAP after 20 min. 2023-01-13 11:13:15.2: Rising plan delay enabled for Plan M5-V42: 2023-01-13 11:13:15.2: 442 min. remaining to meet strict constraints. 2023-01-13 11:13:15.2: 113 min. remaining for the plan to fit before dawn. 2023-01-13 11:13:15.2: deferred (rising) for 113 min, until 13-Jan-2023 13:06:32 UTC 2023-01-13 11:13:45.7: Rising plan delay enabled for Plan M5-V84: 2023-01-13 11:13:45.7: 441 min. remaining to meet strict constraints. 2023-01-13 11:13:45.7: 113 min. remaining for the plan to fit before dawn. 2023-01-13 11:13:45.7: deferred (rising) for 112 min, until 13-Jan-2023 13:06:32 UTC 2023-01-13 11:17:49.1: Rising plan delay enabled for Plan Pal_5: 2023-01-13 11:17:49.1: 428 min. remaining to meet strict constraints. 2023-01-13 11:17:49.1: 90 min. remaining for the plan to fit before dawn. 2023-01-13 11:17:49.1: deferred (rising) for 88 min, until 13-Jan-2023 12:46:11 UTC 2023-01-13 11:25:56.3: Rising plan delay enabled for Plan PG_1553+113: 2023-01-13 11:25:56.3: 491 min. remaining to meet strict constraints. 2023-01-13 11:25:56.3: 102 min. remaining for the plan to fit before dawn. 2023-01-13 11:25:56.3: deferred (rising) for 102 min, until 13-Jan-2023 13:08:22 UTC 2023-01-13 11:31:31.1: ++ Auto Focus ++ 2023-01-13 11:31:31.2: Doing periodic autofocus. 2023-01-13 11:31:31.2: Start special ACP AutoFocus script for scheduler 2023-01-13 11:31:46.2: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 11:31:46.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 11:31:46.2: ** Autofocus failed (n=15), will retry ASAP after 20 min. 2023-01-13 11:46:59.2: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-13 11:46:59.2: 363 min. remaining to meet strict constraints. 2023-01-13 11:46:59.2: 75 min. remaining for the plan to fit before dawn. 2023-01-13 11:46:59.2: deferred (rising) for 74 min, until 13-Jan-2023 13:01:46 UTC 2023-01-13 11:52:03.7: ++ Auto Focus ++ 2023-01-13 11:52:03.8: Doing periodic autofocus. 2023-01-13 11:52:03.8: Start special ACP AutoFocus script for scheduler 2023-01-13 11:52:18.8: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 11:52:18.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 11:52:18.8: ** Autofocus failed (n=16), will retry ASAP after 20 min. 2023-01-13 11:53:50.1: Rising plan delay enabled for Plan IX_Dra: 2023-01-13 11:53:50.1: 708 min. remaining to meet strict constraints. 2023-01-13 11:53:50.1: 55 min. remaining for the plan to fit before dawn. 2023-01-13 11:53:50.1: deferred (rising) for 53 min, until 13-Jan-2023 12:47:33 UTC 2023-01-13 11:57:22.9: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-13 11:57:22.9: 272 min. remaining to meet strict constraints. 2023-01-13 11:57:22.9: 67 min. remaining for the plan to fit before dawn. 2023-01-13 11:57:22.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 11:57:22.9: ending rising plan delay. Plan is now eligible. 2023-01-13 11:57:23.0: Dispatcher cycle time: 0.0 sec. 2023-01-13 11:57:23.0: Acquire data for Observation PKS_1222+216... 2023-01-13 11:57:23.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan PKS_1222+216) 2023-01-13 11:57:23.0: Send Observation PKS_1222+216 to ACP Sequencer 2023-01-13 11:57:38.0: ** ACP script "AcquireScheduler" failed: 2023-01-13 11:57:38.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 11:57:38.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 11:57:38.0: ACP data acquisition failed for Observation PKS_1222+216. 2023-01-13 11:57:38.0: (Observation PKS_1222+216 interrupted by acquisition process failure.) 2023-01-13 12:07:47.0: Rising plan delay enabled for Plan IR_Com: 2023-01-13 12:07:47.0: 275 min. remaining to meet strict constraints. 2023-01-13 12:07:47.0: 50 min. remaining for the plan to fit before dawn. 2023-01-13 12:07:47.0: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 12:07:47.0: ending rising plan delay. Plan is now eligible. 2023-01-13 12:07:47.0: Rising plan delay enabled for Plan IR_Com: 2023-01-13 12:07:47.0: 275 min. remaining to meet strict constraints. 2023-01-13 12:07:47.0: 50 min. remaining for the plan to fit before dawn. 2023-01-13 12:07:47.0: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-13 12:07:47.0: ending rising plan delay. Plan is now eligible. 2023-01-13 12:07:47.0: Dispatcher cycle time: 0.0 sec. 2023-01-13 12:07:47.0: Acquire data for Observation IR_Com... 2023-01-13 12:07:47.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan IR_Com) 2023-01-13 12:07:47.0: Send Observation IR_Com to ACP Sequencer 2023-01-13 12:08:02.2: ** ACP script "AcquireScheduler" failed: 2023-01-13 12:08:02.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 12:08:02.2: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 12:08:02.2: ACP data acquisition failed for Observation IR_Com. 2023-01-13 12:08:02.2: (Observation IR_Com interrupted by acquisition process failure.) 2023-01-13 12:08:02.4: Rising plan delay enabled for Plan IR_Com: 2023-01-13 12:08:02.4: 275 min. remaining to meet strict constraints. 2023-01-13 12:08:02.4: 50 min. remaining for the plan to fit before dawn. 2023-01-13 12:08:02.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 12:08:02.4: ending rising plan delay. Plan is now eligible. 2023-01-13 12:08:02.4: Dispatcher cycle time: 0.0 sec. 2023-01-13 12:08:02.4: Acquire data for Observation IR_Com... 2023-01-13 12:08:02.4: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3411, Plan IR_Com) 2023-01-13 12:08:02.4: Send Observation IR_Com to ACP Sequencer 2023-01-13 12:08:23.5: ** ACP script "AcquireScheduler" failed: 2023-01-13 12:08:23.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-13 12:08:23.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-13 12:08:23.5: ACP data acquisition failed for Observation IR_Com. 2023-01-13 12:08:23.5: (Observation IR_Com interrupted by acquisition process failure.) 2023-01-13 12:12:26.9: ++ Auto Focus ++ 2023-01-13 12:12:26.9: Doing periodic autofocus. 2023-01-13 12:12:26.9: Start special ACP AutoFocus script for scheduler 2023-01-13 12:12:42.0: ** ACP script "AutoFocusScheduler" failed: 2023-01-13 12:12:42.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-13 12:12:42.0: ** Autofocus failed (n=17), will retry ASAP after 20 min. 2023-01-13 12:28:24.7: Rising plan delay enabled for Plan 3C_279: 2023-01-13 12:28:24.7: 199 min. remaining to meet strict constraints. 2023-01-13 12:28:24.7: 36 min. remaining for the plan to fit before dawn. 2023-01-13 12:28:24.7: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-13 12:28:24.7: ending rising plan delay. Plan is now eligible. 2023-01-13 12:28:24.7: Rising plan delay enabled for Plan X_Ser: 2023-01-13 12:28:24.7: 413 min. remaining to meet strict constraints. 2023-01-13 12:28:24.7: 35 min. remaining for the plan to fit before dawn. 2023-01-13 12:28:24.7: deferred (rising) for 35 min, until 13-Jan-2023 13:03:25 UTC 2023-01-13 12:28:24.7: Rising plan delay enabled for Plan X_Ser: 2023-01-13 12:28:24.7: 413 min. remaining to meet strict constraints. 2023-01-13 12:28:24.7: 21 min. remaining for the plan to fit before dawn. 2023-01-13 12:28:24.7: deferred (rising) for 19 min, until 13-Jan-2023 12:48:06 UTC 2023-01-13 12:28:24.7: Dispatcher cycle time: 0.0 sec. 2023-01-13 12:28:24.7: Acquire data for Observation 3C_279... 2023-01-13 12:28:24.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3411, Plan 3C_279) 2023-01-13 12:28:24.8: **EXCEPTION IN SCHEDULER: 2023-01-13 12:28:24.8: The telescope is not connected. 2023-01-13 12:28:24.9: Traceback: at ACP.TelescopeClass.get_SlewSettleTime() at DC3.Scheduler.ACPSequencer.AcquireData(Observation Obs) at DC3.Scheduler.Engine.DoSchedulePass() at DC3.Scheduler.Engine.Run() 2023-01-13 12:28:24.9: **Operator Intervention tool failed: 2023-01-13 12:28:24.9: 'Can't find operator intervention tool csript.exe' 2023-01-13 12:28:25.1: Run statistics: 2023-01-13 12:28:25.1: Observations: 278 2023-01-13 12:28:25.1: Considered: 90 2023-01-13 12:28:25.1: Completed: 1 2023-01-13 12:28:25.1: Skipped: 0 2023-01-13 12:28:25.1: Never Eligible: 188 2023-01-13 12:28:25.1: Failed: 89 2023-01-13 12:28:25.1: Shutter-Open efficiency: 36.24% 2023-01-13 12:28:25.1: Overall Efficiency: 63.51% 2023-01-13 12:28:25.1: Release ACP sequencer 2023-01-13 12:28:25.6: ACPSequencer: Failed to get ACP's DispatcherEnabled property. ACP is compromised. 2023-01-13 12:28:25.6: Object reference not set to an instance of an object. Log closed at Fri, Jan 13 2023 12:28:26 UTC (actual time)