Log opened at Mon, Jan 09 2023 01:37:00 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-01-09 01:37:01.0: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-09 01:37:01.0: Last AutoFocus was completed at 08-Jan-2023 12:35:10 UTC 2023-01-09 01:37:01.0: Autofocus will be done ASAP. 2023-01-09 01:37:01.0: ++ Observatory Startup ++ 2023-01-09 01:37:01.0: Weather safety is now disabled 2023-01-09 01:37:01.0: Start ACP Sequencer's StartupObs script 2023-01-09 01:37:58.4: Weather safety is re-enabled 2023-01-09 01:37:58.4: Weather safety is now disabled 2023-01-09 01:37:58.4: Open the observatory dome/roof 2023-01-09 01:38:59.1: Weather safety is re-enabled 2023-01-09 01:38:59.1: Observatory startup succeeded, and dome opened successfully 2023-01-09 01:38:59.1: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-09 01:38:59.1: Last AutoFocus was completed at 08-Jan-2023 12:35:10 UTC 2023-01-09 01:38:59.1: Autofocus will be done ASAP. 2023-01-09 01:38:59.1: ++ Auto Focus ++ 2023-01-09 01:38:59.1: Doing periodic autofocus. 2023-01-09 01:38:59.1: Start special ACP AutoFocus script for scheduler 2023-01-09 01:43:40.5: Next periodic autofocus ASAP after 3600sec. 09-Jan-2023 02:43:22 UTC 2023-01-09 01:43:42.3: Plan NSVS_0421121 has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan EE_Cep has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan MP_Gem has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V838_Mon has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan AO_Aur has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan AZ_Cas has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan CGCS_5926 has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V1112_Per has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V838_Mon has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V479_And has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan CW_Mon has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan BO_Cep has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan RY_Lep has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan EE_Cep has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan TU_Cas has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V838_Mon has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan TV_Cam has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan KN_Lyn has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan ER_Aur has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan FS_Aur has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan IR_Com has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan J072816 has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan MP_Gem has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan QZ_Aur has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan SU_Lyn has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan U_Leo has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V1687_Cyg has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V407_Cas has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V504_Per has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan V630_Cas has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.3: Plan X_Boo has Monitor Mode. Time to resubmit it. 2023-01-09 01:43:42.4: Rising plan delay enabled for Plan AO_Aur: 2023-01-09 01:43:42.4: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.4: 679 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.4: deferred (rising) for 0 min, until 09-Jan-2023 01:44:12 UTC 2023-01-09 01:43:42.4: Rising plan delay enabled for Plan AO_Aur: 2023-01-09 01:43:42.4: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.4: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.4: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan ER_Aur: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan ER_Aur: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 674 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan FS_Aur: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 677 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: deferred (rising) for 0 min, until 09-Jan-2023 01:43:59 UTC 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan FS_Aur: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan GR_Ori: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 681 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: deferred (rising) for 0 min, until 09-Jan-2023 01:44:21 UTC 2023-01-09 01:43:42.5: Rising plan delay enabled for Plan GR_Ori: 2023-01-09 01:43:42.5: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.5: 681 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.5: deferred (rising) for 0 min, until 09-Jan-2023 01:44:21 UTC 2023-01-09 01:43:42.6: Rising plan delay enabled for Plan HQ_Per: 2023-01-09 01:43:42.6: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.6: 674 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.6: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.6: Rising plan delay enabled for Plan HQ_Per: 2023-01-09 01:43:42.6: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.6: 674 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.6: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.6: Rising plan delay enabled for Plan J072816: 2023-01-09 01:43:42.6: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.6: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.6: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.6: Rising plan delay enabled for Plan J072816: 2023-01-09 01:43:42.6: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.6: 661 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.6: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.8: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-09 01:43:42.8: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.8: 671 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.8: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.8: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-09 01:43:42.8: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.8: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.8: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.8: Rising plan delay enabled for Plan QZ_Aur: 2023-01-09 01:43:42.8: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.8: 657 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.8: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.8: Rising plan delay enabled for Plan QZ_Aur: 2023-01-09 01:43:42.8: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.8: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.8: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan SU_Lyn: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan SU_Lyn: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 681 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: deferred (rising) for 0 min, until 09-Jan-2023 01:44:21 UTC 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan TT_Ari: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 672 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan TT_Ari: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 666 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 675 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: deferred (rising) for 0 min, until 09-Jan-2023 01:43:48 UTC 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 674 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: ending rising plan delay. Plan is now eligible. 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:42.9: Rising plan delay enabled for Plan V1112_Per: 2023-01-09 01:43:42.9: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:42.9: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:42.9: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:43.0: Rising plan delay enabled for Plan V370_And: 2023-01-09 01:43:43.0: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.0: 685 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.0: deferred (rising) for 1 min, until 09-Jan-2023 01:44:50 UTC 2023-01-09 01:43:43.0: Rising plan delay enabled for Plan V370_And: 2023-01-09 01:43:43.0: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.0: 685 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.0: deferred (rising) for 1 min, until 09-Jan-2023 01:44:50 UTC 2023-01-09 01:43:43.0: Rising plan delay enabled for Plan V479_And: 2023-01-09 01:43:43.0: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.0: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.0: 31546 min. remaining for the plan to fit before "must run before" time. 2023-01-09 01:43:43.0: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan V504_Per: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 680 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 0 min, until 09-Jan-2023 01:44:17 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan V504_Per: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 688 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 1 min, until 09-Jan-2023 01:45:05 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan V582_Aur: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 0 min, until 09-Jan-2023 01:44:03 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan V582_Aur: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 0 min, until 09-Jan-2023 01:44:03 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan YZ_Aur: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 680 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 0 min, until 09-Jan-2023 01:44:20 UTC 2023-01-09 01:43:43.1: Rising plan delay enabled for Plan YZ_Aur: 2023-01-09 01:43:43.1: 1 min. remaining to meet strict constraints. 2023-01-09 01:43:43.1: 680 min. remaining for the plan to fit before dawn. 2023-01-09 01:43:43.1: deferred (rising) for 0 min, until 09-Jan-2023 01:44:17 UTC 2023-01-09 01:43:43.4: Dispatcher cycle time: 2.8 sec. 2023-01-09 01:43:43.4: Acquire data for Observation AZ_Cas... 2023-01-09 01:43:43.4: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan AZ_Cas) 2023-01-09 01:43:43.4: Send Observation AZ_Cas to ACP Sequencer 2023-01-09 01:46:03.1: Acquisition time: 139.7152394 sec. 2023-01-09 01:46:03.1: Data for Observation AZ_Cas of Plan AZ_Cas acquired successfully. 2023-01-09 01:46:03.1: Plan AZ_Cas completed successfully. 2023-01-09 01:46:03.1: Image Efficiency: 21.0% 2023-01-09 01:46:03.1: Cycle Efficiency: 98.0% 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan AO_Aur: 2023-01-09 01:46:03.3: 524 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 234 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 234 min, until 09-Jan-2023 05:40:55 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan AO_Aur: 2023-01-09 01:46:03.3: 524 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 677 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 230 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 229 min, until 09-Jan-2023 05:35:37 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan ER_Aur: 2023-01-09 01:46:03.3: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 200 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 200 min, until 09-Jan-2023 05:06:25 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan ER_Aur: 2023-01-09 01:46:03.3: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 672 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 193 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 191 min, until 09-Jan-2023 04:57:58 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan FS_Aur: 2023-01-09 01:46:03.3: 517 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 675 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 229 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 228 min, until 09-Jan-2023 05:34:23 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan FS_Aur: 2023-01-09 01:46:03.3: 517 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 234 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 234 min, until 09-Jan-2023 05:40:58 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan GR_Ori: 2023-01-09 01:46:03.3: 427 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 205 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 204 min, until 09-Jan-2023 05:10:23 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan GR_Ori: 2023-01-09 01:46:03.3: 427 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 205 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 204 min, until 09-Jan-2023 05:10:23 UTC 2023-01-09 01:46:03.3: Rising plan delay enabled for Plan HQ_Per: 2023-01-09 01:46:03.3: 476 min. remaining to meet strict constraints. 2023-01-09 01:46:03.3: 671 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.3: but only 164 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.3: deferred (rising) for 162 min, until 09-Jan-2023 04:28:40 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan HQ_Per: 2023-01-09 01:46:03.4: 476 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 672 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 164 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 162 min, until 09-Jan-2023 04:28:51 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan J072816: 2023-01-09 01:46:03.4: 713 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 335 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 335 min, until 09-Jan-2023 07:21:11 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan J072816: 2023-01-09 01:46:03.4: 713 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 659 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 321 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 318 min, until 09-Jan-2023 07:04:57 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-09 01:46:03.4: 406 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 148 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 148 min, until 09-Jan-2023 04:14:36 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-09 01:46:03.4: 406 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 669 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 140 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 138 min, until 09-Jan-2023 04:04:25 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan QZ_Aur: 2023-01-09 01:46:03.4: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 215 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 215 min, until 09-Jan-2023 05:21:47 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan QZ_Aur: 2023-01-09 01:46:03.4: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 655 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 200 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 197 min, until 09-Jan-2023 05:03:27 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-09 01:46:03.4: 620 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 289 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 289 min, until 09-Jan-2023 06:35:55 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan SU_Lyn: 2023-01-09 01:46:03.4: 620 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 286 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 285 min, until 09-Jan-2023 06:31:30 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan TT_Ari: 2023-01-09 01:46:03.4: 269 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 664 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 3 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 1 min, until 09-Jan-2023 01:47:37 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan TT_Ari: 2023-01-09 01:46:03.4: 269 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 670 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 6 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 5 min, until 09-Jan-2023 01:51:16 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:46:03.4: 475 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 671 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 127 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 126 min, until 09-Jan-2023 03:52:21 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:46:03.4: 475 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 134 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 134 min, until 09-Jan-2023 04:00:59 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan TV_Cam: 2023-01-09 01:46:03.4: 475 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 673 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 128 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 127 min, until 09-Jan-2023 03:53:17 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan V1112_Per: 2023-01-09 01:46:03.4: 467 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 156 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 156 min, until 09-Jan-2023 04:22:41 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan V370_And: 2023-01-09 01:46:03.4: 319 min. remaining to meet strict constraints. 2023-01-09 01:46:03.4: 683 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.4: but only 5 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.4: deferred (rising) for 4 min, until 09-Jan-2023 01:50:59 UTC 2023-01-09 01:46:03.4: Rising plan delay enabled for Plan V370_And: 2023-01-09 01:46:03.5: 319 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 683 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 5 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 4 min, until 09-Jan-2023 01:50:59 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan V479_And: 2023-01-09 01:46:03.5: 466 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: 31543 min. remaining for the plan to fit before "must run before" time. 2023-01-09 01:46:03.5: but only 171 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 171 min, until 09-Jan-2023 04:37:34 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan V504_Per: 2023-01-09 01:46:03.5: 363 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 686 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 28 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 28 min, until 09-Jan-2023 02:15:01 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan V504_Per: 2023-01-09 01:46:03.5: 363 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 24 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 24 min, until 09-Jan-2023 02:10:12 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan V582_Aur: 2023-01-09 01:46:03.5: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 675 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 206 min, until 09-Jan-2023 05:12:27 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan V582_Aur: 2023-01-09 01:46:03.5: 507 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 675 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 206 min, until 09-Jan-2023 05:12:27 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan YZ_Aur: 2023-01-09 01:46:03.5: 506 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 198 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 198 min, until 09-Jan-2023 05:04:05 UTC 2023-01-09 01:46:03.5: Rising plan delay enabled for Plan YZ_Aur: 2023-01-09 01:46:03.5: 506 min. remaining to meet strict constraints. 2023-01-09 01:46:03.5: 678 min. remaining for the plan to fit before dawn. 2023-01-09 01:46:03.5: but only 198 min till start so Plan transits mid-way in its time span. 2023-01-09 01:46:03.5: deferred (rising) for 197 min, until 09-Jan-2023 05:03:48 UTC 2023-01-09 01:46:03.7: Dispatcher cycle time: 0.5 sec. 2023-01-09 01:46:03.7: Acquire data for Observation AF_And... 2023-01-09 01:46:03.7: (belongs to Project AAVSO_P251_MSD_AUTO_ver2819, Plan AF_And) 2023-01-09 01:46:03.7: Send Observation AF_And to ACP Sequencer 2023-01-09 02:12:31.0: Acquisition time: 1587.3079444 sec. 2023-01-09 02:12:31.0: Data for Observation AF_And of Plan AF_And acquired successfully. 2023-01-09 02:12:31.0: Plan AF_And completed successfully. 2023-01-09 02:12:31.0: Image Efficiency: 83.1% 2023-01-09 02:12:31.0: Cycle Efficiency: 100.0% 2023-01-09 02:12:31.2: Rising plan delay enabled for Plan KN_Lyn: 2023-01-09 02:12:31.2: 715 min. remaining to meet strict constraints. 2023-01-09 02:12:31.2: 659 min. remaining for the plan to fit before dawn. 2023-01-09 02:12:31.2: but only 356 min till start so Plan transits mid-way in its time span. 2023-01-09 02:12:31.2: deferred (rising) for 356 min, until 09-Jan-2023 08:09:21 UTC 2023-01-09 02:12:31.2: Rising plan delay enabled for Plan S_Ori: 2023-01-09 02:12:31.2: 388 min. remaining to meet strict constraints. 2023-01-09 02:12:31.2: 639 min. remaining for the plan to fit before dawn. 2023-01-09 02:12:31.2: but only 179 min till start so Plan transits mid-way in its time span. 2023-01-09 02:12:31.2: deferred (rising) for 177 min, until 09-Jan-2023 05:10:09 UTC 2023-01-09 02:12:31.2: Rising plan delay enabled for Plan V1647_Ori: 2023-01-09 02:12:31.2: 421 min. remaining to meet strict constraints. 2023-01-09 02:12:31.2: 644 min. remaining for the plan to fit before dawn. 2023-01-09 02:12:31.2: but only 199 min till start so Plan transits mid-way in its time span. 2023-01-09 02:12:31.2: deferred (rising) for 197 min, until 09-Jan-2023 05:30:12 UTC 2023-01-09 02:12:31.2: Rising plan delay enabled for Plan V504_Per: 2023-01-09 02:12:31.2: 336 min. remaining to meet strict constraints. 2023-01-09 02:12:31.2: 651 min. remaining for the plan to fit before dawn. 2023-01-09 02:12:31.2: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-09 02:12:31.2: ending rising plan delay. Plan is now eligible. 2023-01-09 02:12:31.4: Dispatcher cycle time: 0.3 sec. 2023-01-09 02:12:31.4: Acquire data for Observation V630_Cas... 2023-01-09 02:12:31.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V630_Cas) 2023-01-09 02:12:31.4: Send Observation V630_Cas to ACP Sequencer 2023-01-09 02:24:11.8: Acquisition time: 700.4145541 sec. 2023-01-09 02:24:11.8: Data for Observation V630_Cas of Plan V630_Cas acquired successfully. 2023-01-09 02:24:11.8: Plan V630_Cas completed successfully. 2023-01-09 02:24:11.8: Image Efficiency: 77.1% 2023-01-09 02:24:11.8: Cycle Efficiency: 100.0% 2023-01-09 02:24:12.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-09 02:24:12.0: 522 min. remaining to meet strict constraints. 2023-01-09 02:24:12.0: 647 min. remaining for the plan to fit before dawn. 2023-01-09 02:24:12.0: but only 257 min till start so Plan transits mid-way in its time span. 2023-01-09 02:24:12.0: deferred (rising) for 257 min, until 09-Jan-2023 06:41:33 UTC 2023-01-09 02:24:12.0: Rising plan delay enabled for Plan MP_Gem: 2023-01-09 02:24:12.0: 522 min. remaining to meet strict constraints. 2023-01-09 02:24:12.0: 647 min. remaining for the plan to fit before dawn. 2023-01-09 02:24:12.0: but only 257 min till start so Plan transits mid-way in its time span. 2023-01-09 02:24:12.0: deferred (rising) for 257 min, until 09-Jan-2023 06:41:33 UTC 2023-01-09 02:24:12.2: Dispatcher cycle time: 0.3 sec. 2023-01-09 02:24:12.2: Acquire data for Observation GZ_Cet... 2023-01-09 02:24:12.2: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan GZ_Cet) 2023-01-09 02:24:12.2: Send Observation GZ_Cet to ACP Sequencer 2023-01-09 02:39:29.5: Acquisition time: 917.2970828 sec. 2023-01-09 02:39:29.5: Data for Observation GZ_Cet of Plan GZ_Cet acquired successfully. 2023-01-09 02:39:29.5: Plan GZ_Cet completed successfully. 2023-01-09 02:39:29.5: Image Efficiency: 78.5% 2023-01-09 02:39:29.5: Cycle Efficiency: 100.0% 2023-01-09 02:39:29.9: Dispatcher cycle time: 0.2 sec. 2023-01-09 02:39:29.9: Acquire data for Observation KK_Cas... 2023-01-09 02:39:29.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan KK_Cas) 2023-01-09 02:39:29.9: Send Observation KK_Cas to ACP Sequencer 2023-01-09 02:52:03.2: Acquisition time: 753.3460029 sec. 2023-01-09 02:52:03.2: Data for Observation KK_Cas of Plan KK_Cas acquired successfully. 2023-01-09 02:52:03.2: Plan KK_Cas completed successfully. 2023-01-09 02:52:03.2: Image Efficiency: 54.8% 2023-01-09 02:52:03.2: Cycle Efficiency: 100.0% 2023-01-09 02:52:03.3: ++ Auto Focus ++ 2023-01-09 02:52:03.3: Doing periodic autofocus. 2023-01-09 02:52:03.3: Start special ACP AutoFocus script for scheduler 2023-01-09 02:55:29.2: Next periodic autofocus ASAP after 7200sec. 09-Jan-2023 04:55:11 UTC 2023-01-09 02:55:29.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 02:55:29.3: 378 min. remaining to meet strict constraints. 2023-01-09 02:55:29.3: 593 min. remaining for the plan to fit before dawn. 2023-01-09 02:55:29.3: but only 175 min till start so Plan transits mid-way in its time span. 2023-01-09 02:55:29.3: deferred (rising) for 173 min, until 09-Jan-2023 05:48:35 UTC 2023-01-09 02:55:29.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 02:55:29.3: 378 min. remaining to meet strict constraints. 2023-01-09 02:55:29.3: 593 min. remaining for the plan to fit before dawn. 2023-01-09 02:55:29.3: but only 175 min till start so Plan transits mid-way in its time span. 2023-01-09 02:55:29.3: deferred (rising) for 173 min, until 09-Jan-2023 05:48:35 UTC 2023-01-09 02:55:29.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-09 02:55:29.3: 429 min. remaining to meet strict constraints. 2023-01-09 02:55:29.3: 616 min. remaining for the plan to fit before dawn. 2023-01-09 02:55:29.3: but only 214 min till start so Plan transits mid-way in its time span. 2023-01-09 02:55:29.3: deferred (rising) for 214 min, until 09-Jan-2023 06:29:56 UTC 2023-01-09 02:55:29.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-09 02:55:29.3: 429 min. remaining to meet strict constraints. 2023-01-09 02:55:29.3: 608 min. remaining for the plan to fit before dawn. 2023-01-09 02:55:29.3: but only 210 min till start so Plan transits mid-way in its time span. 2023-01-09 02:55:29.3: deferred (rising) for 209 min, until 09-Jan-2023 06:25:09 UTC 2023-01-09 02:55:29.3: Rising plan delay enabled for Plan NQ_Gem: 2023-01-09 02:55:29.3: 544 min. remaining to meet strict constraints. 2023-01-09 02:55:29.3: 609 min. remaining for the plan to fit before dawn. 2023-01-09 02:55:29.3: but only 265 min till start so Plan transits mid-way in its time span. 2023-01-09 02:55:29.3: deferred (rising) for 264 min, until 09-Jan-2023 07:20:24 UTC 2023-01-09 02:55:29.5: Dispatcher cycle time: 0.2 sec. 2023-01-09 02:55:29.5: Acquire data for Observation TT_Ari... 2023-01-09 02:55:29.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan TT_Ari) 2023-01-09 02:55:29.5: Send Observation TT_Ari to ACP Sequencer 2023-01-09 03:16:33.6: Acquisition time: 1264.1598635 sec. 2023-01-09 03:16:33.6: Data for Observation TT_Ari of Plan TT_Ari acquired successfully. 2023-01-09 03:16:33.6: Plan TT_Ari completed successfully. 2023-01-09 03:16:33.6: Image Efficiency: 85.4% 2023-01-09 03:16:33.6: Cycle Efficiency: 100.0% 2023-01-09 03:16:33.8: Rising plan delay enabled for Plan OI_158: 2023-01-09 03:16:33.8: 515 min. remaining to meet strict constraints. 2023-01-09 03:16:33.8: 581 min. remaining for the plan to fit before dawn. 2023-01-09 03:16:33.8: but only 247 min till start so Plan transits mid-way in its time span. 2023-01-09 03:16:33.8: deferred (rising) for 246 min, until 09-Jan-2023 07:22:36 UTC 2023-01-09 03:16:33.8: Rising plan delay enabled for Plan OI_158: 2023-01-09 03:16:33.8: 515 min. remaining to meet strict constraints. 2023-01-09 03:16:33.8: 581 min. remaining for the plan to fit before dawn. 2023-01-09 03:16:33.8: but only 247 min till start so Plan transits mid-way in its time span. 2023-01-09 03:16:33.8: deferred (rising) for 246 min, until 09-Jan-2023 07:22:36 UTC 2023-01-09 03:16:33.9: Rising plan delay enabled for Plan V838_Mon: 2023-01-09 03:16:33.9: 455 min. remaining to meet strict constraints. 2023-01-09 03:16:33.9: 595 min. remaining for the plan to fit before dawn. 2023-01-09 03:16:33.9: but only 220 min till start so Plan transits mid-way in its time span. 2023-01-09 03:16:33.9: deferred (rising) for 220 min, until 09-Jan-2023 06:57:02 UTC 2023-01-09 03:16:34.0: Dispatcher cycle time: 0.2 sec. 2023-01-09 03:16:34.0: Acquire data for Observation V0704_And... 2023-01-09 03:16:34.0: (belongs to Project AAVSO_P253_CDAG_AUTO_ver3388, Plan V0704_And) 2023-01-09 03:16:34.0: Send Observation V0704_And to ACP Sequencer 2023-01-09 03:51:08.3: Acquisition time: 2074.2731036 sec. 2023-01-09 03:51:08.3: Data for Observation V0704_And of Plan V0704_And acquired successfully. 2023-01-09 03:51:08.3: Plan V0704_And completed successfully. 2023-01-09 03:51:08.3: Image Efficiency: 86.8% 2023-01-09 03:51:08.3: Cycle Efficiency: 100.0% 2023-01-09 03:51:08.5: Rising plan delay enabled for Plan HQ_Mon: 2023-01-09 03:51:08.5: 410 min. remaining to meet strict constraints. 2023-01-09 03:51:08.5: 550 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.5: but only 187 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.5: deferred (rising) for 186 min, until 09-Jan-2023 06:57:55 UTC 2023-01-09 03:51:08.5: Rising plan delay enabled for Plan HQ_Mon: 2023-01-09 03:51:08.5: 410 min. remaining to meet strict constraints. 2023-01-09 03:51:08.5: 550 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.5: but only 187 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.5: deferred (rising) for 186 min, until 09-Jan-2023 06:57:55 UTC 2023-01-09 03:51:08.5: Rising plan delay enabled for Plan L1022_IRS: 2023-01-09 03:51:08.5: 364 min. remaining to meet strict constraints. 2023-01-09 03:51:08.5: 550 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.5: but only 174 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.5: deferred (rising) for 173 min, until 09-Jan-2023 06:44:09 UTC 2023-01-09 03:51:08.5: Rising plan delay enabled for Plan L1022_IRS: 2023-01-09 03:51:08.5: 364 min. remaining to meet strict constraints. 2023-01-09 03:51:08.5: 550 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.5: but only 174 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.5: deferred (rising) for 173 min, until 09-Jan-2023 06:44:09 UTC 2023-01-09 03:51:08.5: Rising plan delay enabled for Plan RY_Lep: 2023-01-09 03:51:08.5: 233 min. remaining to meet strict constraints. 2023-01-09 03:51:08.5: 561 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.5: but only 110 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.5: deferred (rising) for 110 min, until 09-Jan-2023 05:41:20 UTC 2023-01-09 03:51:08.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-09 03:51:08.6: 388 min. remaining to meet strict constraints. 2023-01-09 03:51:08.6: 561 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.6: but only 185 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.6: deferred (rising) for 185 min, until 09-Jan-2023 06:57:02 UTC 2023-01-09 03:51:08.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-09 03:51:08.6: 388 min. remaining to meet strict constraints. 2023-01-09 03:51:08.6: 561 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.6: 115388 min. remaining for the plan to fit before "must run before" time. 2023-01-09 03:51:08.6: but only 185 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.6: deferred (rising) for 185 min, until 09-Jan-2023 06:57:02 UTC 2023-01-09 03:51:08.6: Rising plan delay enabled for Plan V900_Mon: 2023-01-09 03:51:08.6: 364 min. remaining to meet strict constraints. 2023-01-09 03:51:08.6: 536 min. remaining for the plan to fit before dawn. 2023-01-09 03:51:08.6: but only 166 min till start so Plan transits mid-way in its time span. 2023-01-09 03:51:08.6: deferred (rising) for 164 min, until 09-Jan-2023 06:35:30 UTC 2023-01-09 03:51:08.7: Dispatcher cycle time: 0.3 sec. 2023-01-09 03:51:08.7: Acquire data for Observation GZ_Cet... 2023-01-09 03:51:08.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan GZ_Cet) 2023-01-09 03:51:08.7: Send Observation GZ_Cet to ACP Sequencer 2023-01-09 04:13:35.9: Acquisition time: 1347.1625591 sec. 2023-01-09 04:13:35.9: Data for Observation GZ_Cet of Plan GZ_Cet acquired successfully. 2023-01-09 04:13:35.9: Plan GZ_Cet completed successfully. 2023-01-09 04:13:35.9: Image Efficiency: 80.2% 2023-01-09 04:13:35.9: Cycle Efficiency: 100.0% 2023-01-09 04:13:36.1: Rising plan delay enabled for Plan NGC_1904: 2023-01-09 04:13:36.1: 145 min. remaining to meet strict constraints. 2023-01-09 04:13:36.1: 519 min. remaining for the plan to fit before dawn. 2023-01-09 04:13:36.1: but only 54 min till start so Plan transits mid-way in its time span. 2023-01-09 04:13:36.1: deferred (rising) for 52 min, until 09-Jan-2023 05:05:44 UTC 2023-01-09 04:13:36.1: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-09 04:13:36.1: 258 min. remaining to meet strict constraints. 2023-01-09 04:13:36.1: 521 min. remaining for the plan to fit before dawn. 2023-01-09 04:13:36.1: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-09 04:13:36.1: ending rising plan delay. Plan is now eligible. 2023-01-09 04:13:36.2: Dispatcher cycle time: 0.2 sec. 2023-01-09 04:13:36.2: Acquire data for Observation EG_And... 2023-01-09 04:13:36.2: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan EG_And) 2023-01-09 04:13:36.2: Send Observation EG_And to ACP Sequencer 2023-01-09 04:18:53.0: Acquisition time: 316.7553622 sec. 2023-01-09 04:18:53.0: Data for Observation EG_And of Plan EG_And acquired successfully. 2023-01-09 04:18:53.0: Plan EG_And completed successfully. 2023-01-09 04:18:53.0: Image Efficiency: 47.3% 2023-01-09 04:18:53.0: Cycle Efficiency: 99.9% 2023-01-09 04:18:53.3: Dispatcher cycle time: 0.2 sec. 2023-01-09 04:18:53.3: Acquire data for Observation CGCS_5926... 2023-01-09 04:18:53.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan CGCS_5926) 2023-01-09 04:18:53.3: Send Observation CGCS_5926 to ACP Sequencer 2023-01-09 04:43:32.6: Acquisition time: 1479.2435227 sec. 2023-01-09 04:43:32.6: Data for Observation CGCS_5926 of Plan CGCS_5926 acquired successfully. 2023-01-09 04:43:32.6: Plan CGCS_5926 completed successfully. 2023-01-09 04:43:32.6: Image Efficiency: 78.4% 2023-01-09 04:43:32.6: Cycle Efficiency: 100.0% 2023-01-09 04:43:32.9: Dispatcher cycle time: 0.3 sec. 2023-01-09 04:43:32.9: Acquire data for Observation DW_Cas... 2023-01-09 04:43:32.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan DW_Cas) 2023-01-09 04:43:33.0: Send Observation DW_Cas to ACP Sequencer 2023-01-09 04:54:13.5: Acquisition time: 640.5496702 sec. 2023-01-09 04:54:13.5: Data for Observation DW_Cas of Plan DW_Cas acquired successfully. 2023-01-09 04:54:13.5: Plan DW_Cas completed successfully. 2023-01-09 04:54:13.5: Image Efficiency: 59.3% 2023-01-09 04:54:13.5: Cycle Efficiency: 100.0% 2023-01-09 04:54:13.9: Dispatcher cycle time: 0.3 sec. 2023-01-09 04:54:13.9: Acquire data for Observation DW_Cas... 2023-01-09 04:54:13.9: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3394, Plan DW_Cas) 2023-01-09 04:54:13.9: Send Observation DW_Cas to ACP Sequencer 2023-01-09 05:04:38.8: Acquisition time: 624.8865866 sec. 2023-01-09 05:04:38.8: Data for Observation DW_Cas of Plan DW_Cas acquired successfully. 2023-01-09 05:04:38.8: Plan DW_Cas completed successfully. 2023-01-09 05:04:38.8: Image Efficiency: 60.8% 2023-01-09 05:04:38.8: Cycle Efficiency: 100.0% 2023-01-09 05:04:38.9: ++ Auto Focus ++ 2023-01-09 05:04:38.9: Doing periodic autofocus. 2023-01-09 05:04:38.9: Start special ACP AutoFocus script for scheduler 2023-01-09 05:08:51.4: Next periodic autofocus ASAP after 7200sec. 09-Jan-2023 07:08:33 UTC 2023-01-09 05:08:51.5: Rising plan delay enabled for Plan NGC_1904: 2023-01-09 05:08:51.5: 90 min. remaining to meet strict constraints. 2023-01-09 05:08:51.5: 463 min. remaining for the plan to fit before dawn. 2023-01-09 05:08:51.5: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-09 05:08:51.5: ending rising plan delay. Plan is now eligible. 2023-01-09 05:08:51.5: Rising plan delay enabled for Plan QX_Pup: 2023-01-09 05:08:51.5: 301 min. remaining to meet strict constraints. 2023-01-09 05:08:51.5: 471 min. remaining for the plan to fit before dawn. 2023-01-09 05:08:51.5: but only 139 min till start so Plan transits mid-way in its time span. 2023-01-09 05:08:51.5: deferred (rising) for 138 min, until 09-Jan-2023 07:27:17 UTC 2023-01-09 05:08:51.5: Rising plan delay enabled for Plan QZ_Aur: 2023-01-09 05:08:51.5: 304 min. remaining to meet strict constraints. 2023-01-09 05:08:51.5: 452 min. remaining for the plan to fit before dawn. 2023-01-09 05:08:51.5: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-09 05:08:51.5: ending rising plan delay. Plan is now eligible. 2023-01-09 05:08:51.7: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:08:51.7: Acquire data for Observation ER_Aur... 2023-01-09 05:08:51.7: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3394, Plan ER_Aur) 2023-01-09 05:08:51.8: Send Observation ER_Aur to ACP Sequencer 2023-01-09 05:23:32.8: Acquisition time: 881.0283241 sec. 2023-01-09 05:23:32.8: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-01-09 05:23:32.8: Plan ER_Aur completed successfully. 2023-01-09 05:23:32.8: Image Efficiency: 61.7% 2023-01-09 05:23:32.8: Cycle Efficiency: 100.0% 2023-01-09 05:23:33.2: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:23:33.2: Acquire data for Observation GR_Ori... 2023-01-09 05:23:33.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan GR_Ori) 2023-01-09 05:23:33.2: Send Observation GR_Ori to ACP Sequencer 2023-01-09 05:31:53.4: Acquisition time: 500.2323812 sec. 2023-01-09 05:31:53.4: Data for Observation GR_Ori of Plan GR_Ori acquired successfully. 2023-01-09 05:31:53.4: Plan GR_Ori completed successfully. 2023-01-09 05:31:53.4: Image Efficiency: 53.9% 2023-01-09 05:31:53.4: Cycle Efficiency: 99.9% 2023-01-09 05:31:53.6: Rising plan delay enabled for Plan V1647_Ori: 2023-01-09 05:31:53.6: 222 min. remaining to meet strict constraints. 2023-01-09 05:31:53.6: 444 min. remaining for the plan to fit before dawn. 2023-01-09 05:31:53.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 05:31:53.6: ending rising plan delay. Plan is now eligible. 2023-01-09 05:31:53.8: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:31:53.8: Acquire data for Observation V1112_Per... 2023-01-09 05:31:53.8: (belongs to Project AAVSO_P167_HGUA_AUTO_ver2706, Plan V1112_Per) 2023-01-09 05:31:53.8: Send Observation V1112_Per to ACP Sequencer 2023-01-09 05:48:35.8: Acquisition time: 1001.958918 sec. 2023-01-09 05:48:35.8: Data for Observation V1112_Per of Plan V1112_Per acquired successfully. 2023-01-09 05:48:35.8: Plan V1112_Per completed successfully. 2023-01-09 05:48:35.8: Image Efficiency: 71.8% 2023-01-09 05:48:35.8: Cycle Efficiency: 100.0% 2023-01-09 05:48:35.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:48:35.9: 205 min. remaining to meet strict constraints. 2023-01-09 05:48:35.9: 420 min. remaining for the plan to fit before dawn. 2023-01-09 05:48:35.9: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-09 05:48:35.9: ending rising plan delay. Plan is now eligible. 2023-01-09 05:48:35.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:48:35.9: 205 min. remaining to meet strict constraints. 2023-01-09 05:48:35.9: 420 min. remaining for the plan to fit before dawn. 2023-01-09 05:48:35.9: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-09 05:48:35.9: ending rising plan delay. Plan is now eligible. 2023-01-09 05:48:36.2: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:48:36.2: Acquire data for Observation YZ_Aur... 2023-01-09 05:48:36.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan YZ_Aur) 2023-01-09 05:48:36.2: Send Observation YZ_Aur to ACP Sequencer 2023-01-09 05:56:06.3: Acquisition time: 450.0580252 sec. 2023-01-09 05:56:06.3: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2023-01-09 05:56:06.3: Plan YZ_Aur completed successfully. 2023-01-09 05:56:06.3: Image Efficiency: 40.0% 2023-01-09 05:56:06.3: Cycle Efficiency: 99.9% 2023-01-09 05:56:06.5: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:56:06.5: 198 min. remaining to meet strict constraints. 2023-01-09 05:56:06.5: 413 min. remaining for the plan to fit before dawn. 2023-01-09 05:56:06.5: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-09 05:56:06.5: ending rising plan delay. Plan is now eligible. 2023-01-09 05:56:06.5: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:56:06.5: 198 min. remaining to meet strict constraints. 2023-01-09 05:56:06.5: 413 min. remaining for the plan to fit before dawn. 2023-01-09 05:56:06.5: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-09 05:56:06.5: ending rising plan delay. Plan is now eligible. 2023-01-09 05:56:06.7: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:56:06.7: Acquire data for Observation V370_And... 2023-01-09 05:56:06.7: (belongs to Project AAVSO_MISC_FGU_AUTO_ver2706, Plan V370_And) 2023-01-09 05:56:06.8: Send Observation V370_And to ACP Sequencer 2023-01-09 05:59:13.9: Acquisition time: 187.1928362 sec. 2023-01-09 05:59:13.9: Data for Observation V370_And of Plan V370_And acquired successfully. 2023-01-09 05:59:13.9: Plan V370_And completed successfully. 2023-01-09 05:59:14.0: Image Efficiency: 10.7% 2023-01-09 05:59:14.0: Cycle Efficiency: 99.8% 2023-01-09 05:59:14.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:59:14.1: 194 min. remaining to meet strict constraints. 2023-01-09 05:59:14.1: 409 min. remaining for the plan to fit before dawn. 2023-01-09 05:59:14.1: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-09 05:59:14.1: ending rising plan delay. Plan is now eligible. 2023-01-09 05:59:14.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-09 05:59:14.1: 194 min. remaining to meet strict constraints. 2023-01-09 05:59:14.1: 409 min. remaining for the plan to fit before dawn. 2023-01-09 05:59:14.1: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-09 05:59:14.1: ending rising plan delay. Plan is now eligible. 2023-01-09 05:59:14.4: Dispatcher cycle time: 0.3 sec. 2023-01-09 05:59:14.4: Acquire data for Observation S_Ori... 2023-01-09 05:59:14.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan S_Ori) 2023-01-09 05:59:14.4: Send Observation S_Ori to ACP Sequencer 2023-01-09 06:20:02.4: Acquisition time: 1247.9927222 sec. 2023-01-09 06:20:02.4: Data for Observation S_Ori of Plan S_Ori acquired successfully. 2023-01-09 06:20:02.4: Plan S_Ori completed successfully. 2023-01-09 06:20:02.4: Image Efficiency: 72.1% 2023-01-09 06:20:02.4: Cycle Efficiency: 100.0% 2023-01-09 06:20:02.6: Rising plan delay enabled for Plan U_Leo: 2023-01-09 06:20:02.6: 488 min. remaining to meet strict constraints. 2023-01-09 06:20:02.6: 402 min. remaining for the plan to fit before dawn. 2023-01-09 06:20:02.6: but only 231 min till start so Plan transits mid-way in its time span. 2023-01-09 06:20:02.6: deferred (rising) for 230 min, until 09-Jan-2023 10:10:44 UTC 2023-01-09 06:20:02.6: Rising plan delay enabled for Plan U_Leo: 2023-01-09 06:20:02.6: 488 min. remaining to meet strict constraints. 2023-01-09 06:20:02.6: 412 min. remaining for the plan to fit before dawn. 2023-01-09 06:20:02.6: but only 236 min till start so Plan transits mid-way in its time span. 2023-01-09 06:20:02.6: deferred (rising) for 236 min, until 09-Jan-2023 10:16:28 UTC 2023-01-09 06:20:02.8: Dispatcher cycle time: 0.3 sec. 2023-01-09 06:20:02.8: Acquire data for Observation V1647_Ori... 2023-01-09 06:20:02.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V1647_Ori) 2023-01-09 06:20:02.8: Send Observation V1647_Ori to ACP Sequencer 2023-01-09 06:20:44.1: ACP data acquisition failed for Observation V1647_Ori. 2023-01-09 06:20:44.1: (Observation V1647_Ori interrupted by acquisition process failure.) 2023-01-09 06:20:44.5: Dispatcher cycle time: 0.2 sec. 2023-01-09 06:20:44.5: Acquire data for Observation TV_Cam... 2023-01-09 06:20:44.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan TV_Cam) 2023-01-09 06:20:44.5: Send Observation TV_Cam to ACP Sequencer 2023-01-09 06:35:47.9: Acquisition time: 903.4080869 sec. 2023-01-09 06:35:47.9: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2023-01-09 06:35:47.9: Plan TV_Cam completed successfully. 2023-01-09 06:35:47.9: Image Efficiency: 62.0% 2023-01-09 06:35:47.9: Cycle Efficiency: 100.0% 2023-01-09 06:35:48.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-09 06:35:48.0: 155 min. remaining to meet strict constraints. 2023-01-09 06:35:48.0: 385 min. remaining for the plan to fit before dawn. 2023-01-09 06:35:48.0: but only 65 min till start so Plan transits mid-way in its time span. 2023-01-09 06:35:48.0: deferred (rising) for 64 min, until 09-Jan-2023 07:40:30 UTC 2023-01-09 06:35:48.0: Rising plan delay enabled for Plan BX_Pup: 2023-01-09 06:35:48.0: 155 min. remaining to meet strict constraints. 2023-01-09 06:35:48.0: 385 min. remaining for the plan to fit before dawn. 2023-01-09 06:35:48.0: but only 65 min till start so Plan transits mid-way in its time span. 2023-01-09 06:35:48.0: deferred (rising) for 64 min, until 09-Jan-2023 07:40:30 UTC 2023-01-09 06:35:48.1: Rising plan delay enabled for Plan SU_Lyn: 2023-01-09 06:35:48.1: 331 min. remaining to meet strict constraints. 2023-01-09 06:35:48.1: 388 min. remaining for the plan to fit before dawn. 2023-01-09 06:35:48.1: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-09 06:35:48.1: ending rising plan delay. Plan is now eligible. 2023-01-09 06:35:48.1: Rising plan delay enabled for Plan V900_Mon: 2023-01-09 06:35:48.1: 199 min. remaining to meet strict constraints. 2023-01-09 06:35:48.1: 371 min. remaining for the plan to fit before dawn. 2023-01-09 06:35:48.1: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-09 06:35:48.1: ending rising plan delay. Plan is now eligible. 2023-01-09 06:35:48.3: Dispatcher cycle time: 0.3 sec. 2023-01-09 06:35:48.3: Acquire data for Observation ER_Aur... 2023-01-09 06:35:48.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan ER_Aur) 2023-01-09 06:35:48.3: Send Observation ER_Aur to ACP Sequencer 2023-01-09 06:50:01.5: Acquisition time: 853.1692769 sec. 2023-01-09 06:50:01.5: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-01-09 06:50:01.5: Plan ER_Aur completed successfully. 2023-01-09 06:50:01.5: Image Efficiency: 63.6% 2023-01-09 06:50:01.5: Cycle Efficiency: 100.0% 2023-01-09 06:50:01.6: Rising plan delay enabled for Plan IU_Leo: 2023-01-09 06:50:01.6: 481 min. remaining to meet strict constraints. 2023-01-09 06:50:01.6: 368 min. remaining for the plan to fit before dawn. 2023-01-09 06:50:01.6: but only 233 min till start so Plan transits mid-way in its time span. 2023-01-09 06:50:01.6: deferred (rising) for 231 min, until 09-Jan-2023 10:41:52 UTC 2023-01-09 06:50:01.7: Rising plan delay enabled for Plan L1022_IRS: 2023-01-09 06:50:01.7: 185 min. remaining to meet strict constraints. 2023-01-09 06:50:01.7: 371 min. remaining for the plan to fit before dawn. 2023-01-09 06:50:01.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-09 06:50:01.7: ending rising plan delay. Plan is now eligible. 2023-01-09 06:50:01.7: Rising plan delay enabled for Plan L1022_IRS: 2023-01-09 06:50:01.7: 185 min. remaining to meet strict constraints. 2023-01-09 06:50:01.7: 371 min. remaining for the plan to fit before dawn. 2023-01-09 06:50:01.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-09 06:50:01.7: ending rising plan delay. Plan is now eligible. 2023-01-09 06:50:01.7: Rising plan delay enabled for Plan V900_Mon: 2023-01-09 06:50:01.7: 185 min. remaining to meet strict constraints. 2023-01-09 06:50:01.7: 357 min. remaining for the plan to fit before dawn. 2023-01-09 06:50:01.7: but only -12 min till start so Plan transits mid-way in its time span. 2023-01-09 06:50:01.7: ending rising plan delay. Plan is now eligible. 2023-01-09 06:50:01.9: Dispatcher cycle time: 0.3 sec. 2023-01-09 06:50:01.9: Acquire data for Observation V504_Per... 2023-01-09 06:50:01.9: (belongs to Project AAVSO_MISC_RNO_AUTO_ver3394, Plan V504_Per) 2023-01-09 06:50:01.9: Send Observation V504_Per to ACP Sequencer 2023-01-09 06:58:58.4: Acquisition time: 536.5171649 sec. 2023-01-09 06:58:58.4: Data for Observation V504_Per of Plan V504_Per acquired successfully. 2023-01-09 06:58:58.4: Plan V504_Per completed successfully. 2023-01-09 06:58:58.4: Image Efficiency: 30.7% 2023-01-09 06:58:58.4: Cycle Efficiency: 99.9% 2023-01-09 06:58:58.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-09 06:58:58.6: 223 min. remaining to meet strict constraints. 2023-01-09 06:58:58.6: 362 min. remaining for the plan to fit before dawn. 2023-01-09 06:58:58.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 06:58:58.6: ending rising plan delay. Plan is now eligible. 2023-01-09 06:58:58.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-09 06:58:58.6: 223 min. remaining to meet strict constraints. 2023-01-09 06:58:58.6: 362 min. remaining for the plan to fit before dawn. 2023-01-09 06:58:58.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 06:58:58.6: ending rising plan delay. Plan is now eligible. 2023-01-09 06:58:58.9: Dispatcher cycle time: 0.4 sec. 2023-01-09 06:58:58.9: Acquire data for Observation HQ_Mon... 2023-01-09 06:58:58.9: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan HQ_Mon) 2023-01-09 06:58:58.9: Send Observation HQ_Mon to ACP Sequencer 2023-01-09 07:12:39.7: Acquisition time: 820.8131332 sec. 2023-01-09 07:12:39.7: Data for Observation HQ_Mon of Plan HQ_Mon acquired successfully. 2023-01-09 07:12:39.7: Plan HQ_Mon completed successfully. 2023-01-09 07:12:39.7: Image Efficiency: 65.8% 2023-01-09 07:12:39.7: Cycle Efficiency: 100.0% 2023-01-09 07:12:39.8: ++ Auto Focus ++ 2023-01-09 07:12:39.9: Doing periodic autofocus. 2023-01-09 07:12:39.9: Start special ACP AutoFocus script for scheduler 2023-01-09 07:16:18.2: Next periodic autofocus ASAP after 7200sec. 09-Jan-2023 09:16:00 UTC 2023-01-09 07:16:18.3: Rising plan delay enabled for Plan J072816: 2023-01-09 07:16:18.3: 383 min. remaining to meet strict constraints. 2023-01-09 07:16:18.3: 328 min. remaining for the plan to fit before dawn. 2023-01-09 07:16:18.3: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-09 07:16:18.3: ending rising plan delay. Plan is now eligible. 2023-01-09 07:16:18.5: Dispatcher cycle time: 0.3 sec. 2023-01-09 07:16:18.5: Acquire data for Observation QZ_Aur... 2023-01-09 07:16:18.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan QZ_Aur) 2023-01-09 07:16:18.5: Send Observation QZ_Aur to ACP Sequencer 2023-01-09 07:46:40.5: Acquisition time: 1821.9675532 sec. 2023-01-09 07:46:40.5: Data for Observation QZ_Aur of Plan QZ_Aur acquired successfully. 2023-01-09 07:46:40.5: Plan QZ_Aur completed successfully. 2023-01-09 07:46:40.5: Image Efficiency: 76.8% 2023-01-09 07:46:40.5: Cycle Efficiency: 100.0% 2023-01-09 07:46:40.6: Rising plan delay enabled for Plan BX_Pup: 2023-01-09 07:46:40.6: 84 min. remaining to meet strict constraints. 2023-01-09 07:46:40.6: 314 min. remaining for the plan to fit before dawn. 2023-01-09 07:46:40.6: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-09 07:46:40.6: ending rising plan delay. Plan is now eligible. 2023-01-09 07:46:40.6: Rising plan delay enabled for Plan BX_Pup: 2023-01-09 07:46:40.6: 84 min. remaining to meet strict constraints. 2023-01-09 07:46:40.6: 314 min. remaining for the plan to fit before dawn. 2023-01-09 07:46:40.6: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-09 07:46:40.6: ending rising plan delay. Plan is now eligible. 2023-01-09 07:46:40.9: Dispatcher cycle time: 0.3 sec. 2023-01-09 07:46:40.9: Acquire data for Observation J072816... 2023-01-09 07:46:40.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan J072816) 2023-01-09 07:46:40.9: Send Observation J072816 to ACP Sequencer 2023-01-09 08:11:36.6: Acquisition time: 1495.6284261 sec. 2023-01-09 08:11:36.6: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-09 08:11:36.6: Plan J072816 completed successfully. 2023-01-09 08:11:36.6: Image Efficiency: 76.2% 2023-01-09 08:11:36.6: Cycle Efficiency: 100.0% 2023-01-09 08:11:36.8: Rising plan delay enabled for Plan IR_Com: 2023-01-09 08:11:36.8: 527 min. remaining to meet strict constraints. 2023-01-09 08:11:36.8: 300 min. remaining for the plan to fit before dawn. 2023-01-09 08:11:36.8: but only 259 min till start so Plan transits mid-way in its time span. 2023-01-09 08:11:36.8: deferred (rising) for 259 min, until 09-Jan-2023 12:31:34 UTC 2023-01-09 08:11:36.8: Rising plan delay enabled for Plan IR_Com: 2023-01-09 08:11:36.8: 527 min. remaining to meet strict constraints. 2023-01-09 08:11:36.8: 286 min. remaining for the plan to fit before dawn. 2023-01-09 08:11:36.8: but only 252 min till start so Plan transits mid-way in its time span. 2023-01-09 08:11:36.8: deferred (rising) for 251 min, until 09-Jan-2023 12:23:11 UTC 2023-01-09 08:11:36.8: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-09 08:11:36.8: 513 min. remaining to meet strict constraints. 2023-01-09 08:11:36.8: 293 min. remaining for the plan to fit before dawn. 2023-01-09 08:11:36.8: but only 241 min till start so Plan transits mid-way in its time span. 2023-01-09 08:11:36.8: deferred (rising) for 241 min, until 09-Jan-2023 12:12:48 UTC 2023-01-09 08:11:37.0: Dispatcher cycle time: 0.3 sec. 2023-01-09 08:11:37.0: Acquire data for Observation FS_Aur... 2023-01-09 08:11:37.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan FS_Aur) 2023-01-09 08:11:37.0: Send Observation FS_Aur to ACP Sequencer 2023-01-09 08:23:34.0: Acquisition time: 716.9950919 sec. 2023-01-09 08:23:34.0: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2023-01-09 08:23:34.0: Plan FS_Aur completed successfully. 2023-01-09 08:23:34.0: Image Efficiency: 75.3% 2023-01-09 08:23:34.0: Cycle Efficiency: 100.0% 2023-01-09 08:23:34.4: Dispatcher cycle time: 0.3 sec. 2023-01-09 08:23:34.4: Acquire data for Observation BX_Pup... 2023-01-09 08:23:34.4: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan BX_Pup) 2023-01-09 08:23:34.5: Send Observation BX_Pup to ACP Sequencer 2023-01-09 08:35:44.2: Acquisition time: 729.752729 sec. 2023-01-09 08:35:44.2: Data for Observation BX_Pup of Plan BX_Pup acquired successfully. 2023-01-09 08:35:44.2: Plan BX_Pup completed successfully. 2023-01-09 08:35:44.2: Image Efficiency: 74.0% 2023-01-09 08:35:44.2: Cycle Efficiency: 100.0% 2023-01-09 08:35:44.6: Dispatcher cycle time: 0.3 sec. 2023-01-09 08:35:44.6: Acquire data for Observation AO_Aur... 2023-01-09 08:35:44.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan AO_Aur) 2023-01-09 08:35:44.6: Send Observation AO_Aur to ACP Sequencer 2023-01-09 08:45:46.1: Acquisition time: 601.492428 sec. 2023-01-09 08:45:46.1: Data for Observation AO_Aur of Plan AO_Aur acquired successfully. 2023-01-09 08:45:46.1: Plan AO_Aur completed successfully. 2023-01-09 08:45:46.1: Image Efficiency: 43.2% 2023-01-09 08:45:46.1: Cycle Efficiency: 100.0% 2023-01-09 08:45:46.5: Dispatcher cycle time: 0.3 sec. 2023-01-09 08:45:46.5: Acquire data for Observation V900_Mon... 2023-01-09 08:45:46.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V900_Mon) 2023-01-09 08:45:46.5: Send Observation V900_Mon to ACP Sequencer 2023-01-09 09:12:19.5: Acquisition time: 1593.0027636 sec. 2023-01-09 09:12:19.5: Data for Observation V900_Mon of Plan V900_Mon acquired successfully. 2023-01-09 09:12:19.5: Plan V900_Mon completed successfully. 2023-01-09 09:12:19.5: Image Efficiency: 67.8% 2023-01-09 09:12:19.5: Cycle Efficiency: 100.0% 2023-01-09 09:12:19.7: Rising plan delay enabled for Plan M3-V154: 2023-01-09 09:12:19.7: 544 min. remaining to meet strict constraints. 2023-01-09 09:12:19.7: 235 min. remaining for the plan to fit before dawn. 2023-01-09 09:12:19.7: deferred (rising) for 235 min, until 09-Jan-2023 13:07:32 UTC 2023-01-09 09:12:19.9: Dispatcher cycle time: 0.2 sec. 2023-01-09 09:12:19.9: Acquire data for Observation J072816... 2023-01-09 09:12:19.9: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan J072816) 2023-01-09 09:12:19.9: Send Observation J072816 to ACP Sequencer 2023-01-09 09:37:37.7: Acquisition time: 1517.8284618 sec. 2023-01-09 09:37:37.7: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-09 09:37:37.8: Plan J072816 completed successfully. 2023-01-09 09:37:37.8: Image Efficiency: 75.1% 2023-01-09 09:37:37.8: Cycle Efficiency: 100.0% 2023-01-09 09:37:37.9: ++ Auto Focus ++ 2023-01-09 09:37:37.9: Doing periodic autofocus. 2023-01-09 09:37:37.9: Start special ACP AutoFocus script for scheduler 2023-01-09 09:42:09.8: Next periodic autofocus ASAP after 7200sec. 09-Jan-2023 11:41:51 UTC 2023-01-09 09:42:09.8: Rising plan delay enabled for Plan 3C_279: 2023-01-09 09:42:09.8: 381 min. remaining to meet strict constraints. 2023-01-09 09:42:09.8: 203 min. remaining for the plan to fit before dawn. 2023-01-09 09:42:09.8: but only 182 min till start so Plan transits mid-way in its time span. 2023-01-09 09:42:09.8: deferred (rising) for 181 min, until 09-Jan-2023 12:44:00 UTC 2023-01-09 09:42:09.8: Rising plan delay enabled for Plan 3C_279: 2023-01-09 09:42:09.8: 381 min. remaining to meet strict constraints. 2023-01-09 09:42:09.8: 203 min. remaining for the plan to fit before dawn. 2023-01-09 09:42:09.8: but only 182 min till start so Plan transits mid-way in its time span. 2023-01-09 09:42:09.8: deferred (rising) for 181 min, until 09-Jan-2023 12:44:00 UTC 2023-01-09 09:42:09.8: Rising plan delay enabled for Plan HS1340+1524: 2023-01-09 09:42:09.8: 487 min. remaining to meet strict constraints. 2023-01-09 09:42:09.8: 202 min. remaining for the plan to fit before dawn. 2023-01-09 09:42:09.8: deferred (rising) for 201 min, until 09-Jan-2023 13:03:25 UTC 2023-01-09 09:42:09.8: Rising plan delay enabled for Plan HS1340+1524: 2023-01-09 09:42:09.8: 487 min. remaining to meet strict constraints. 2023-01-09 09:42:09.8: 202 min. remaining for the plan to fit before dawn. 2023-01-09 09:42:09.8: deferred (rising) for 201 min, until 09-Jan-2023 13:03:25 UTC 2023-01-09 09:42:10.0: Dispatcher cycle time: 0.2 sec. 2023-01-09 09:42:10.0: Acquire data for Observation QX_Pup... 2023-01-09 09:42:10.0: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan QX_Pup) 2023-01-09 09:42:10.0: Send Observation QX_Pup to ACP Sequencer 2023-01-09 09:56:19.6: Acquisition time: 849.5997834 sec. 2023-01-09 09:56:19.6: Data for Observation QX_Pup of Plan QX_Pup acquired successfully. 2023-01-09 09:56:19.6: Plan QX_Pup completed successfully. 2023-01-09 09:56:19.6: Image Efficiency: 52.2% 2023-01-09 09:56:19.6: Cycle Efficiency: 100.0% 2023-01-09 09:56:19.8: Rising plan delay enabled for Plan NSV-6690: 2023-01-09 09:56:19.8: 537 min. remaining to meet strict constraints. 2023-01-09 09:56:19.8: 161 min. remaining for the plan to fit before dawn. 2023-01-09 09:56:19.8: deferred (rising) for 157 min, until 09-Jan-2023 12:34:10 UTC 2023-01-09 09:56:19.8: Rising plan delay enabled for Plan PG_1424+240: 2023-01-09 09:56:19.8: 535 min. remaining to meet strict constraints. 2023-01-09 09:56:19.8: 191 min. remaining for the plan to fit before dawn. 2023-01-09 09:56:19.8: deferred (rising) for 190 min, until 09-Jan-2023 13:07:16 UTC 2023-01-09 09:56:19.8: Rising plan delay enabled for Plan PG_1424+240: 2023-01-09 09:56:19.8: 535 min. remaining to meet strict constraints. 2023-01-09 09:56:19.8: 191 min. remaining for the plan to fit before dawn. 2023-01-09 09:56:19.8: deferred (rising) for 190 min, until 09-Jan-2023 13:07:16 UTC 2023-01-09 09:56:19.9: Dispatcher cycle time: 0.2 sec. 2023-01-09 09:56:19.9: Acquire data for Observation V838_Mon... 2023-01-09 09:56:19.9: (belongs to Project AAVSO_P304_SPP_AUTO_ver3394, Plan V838_Mon) 2023-01-09 09:56:19.9: Doing 4 sets 2023-01-09 09:56:19.9: Send Observation V838_Mon to ACP Sequencer 2023-01-09 10:07:39.9: Send Observation V838_Mon to ACP Sequencer 2023-01-09 10:16:50.5: ***Running Plan V838_Mon (best efforts) completed early: 2023-01-09 10:16:50.5: Obs V838_Mon would not meet strict constraints 2023-01-09 10:16:50.5: Acquisition time: 1230.6180665 sec. 2023-01-09 10:16:50.5: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-01-09 10:16:50.5: Plan V838_Mon completed successfully. 2023-01-09 10:16:50.5: Image Efficiency: 56.5% 2023-01-09 10:16:50.5: Cycle Efficiency: 100.0% 2023-01-09 10:16:50.7: Rising plan delay enabled for Plan AG_Dra: 2023-01-09 10:16:50.7: 690 min. remaining to meet strict constraints. 2023-01-09 10:16:50.7: 170 min. remaining for the plan to fit before dawn. 2023-01-09 10:16:50.7: deferred (rising) for 169 min, until 09-Jan-2023 13:06:26 UTC 2023-01-09 10:16:50.7: Rising plan delay enabled for Plan AG_Dra: 2023-01-09 10:16:50.7: 690 min. remaining to meet strict constraints. 2023-01-09 10:16:50.7: 170 min. remaining for the plan to fit before dawn. 2023-01-09 10:16:50.7: deferred (rising) for 169 min, until 09-Jan-2023 13:06:26 UTC 2023-01-09 10:16:50.7: Rising plan delay enabled for Plan X_Boo: 2023-01-09 10:16:50.7: 496 min. remaining to meet strict constraints. 2023-01-09 10:16:50.7: 175 min. remaining for the plan to fit before dawn. 2023-01-09 10:16:50.7: deferred (rising) for 175 min, until 09-Jan-2023 13:12:10 UTC 2023-01-09 10:16:50.7: Rising plan delay enabled for Plan X_Boo: 2023-01-09 10:16:50.7: 496 min. remaining to meet strict constraints. 2023-01-09 10:16:50.7: 170 min. remaining for the plan to fit before dawn. 2023-01-09 10:16:50.7: deferred (rising) for 169 min, until 09-Jan-2023 13:06:19 UTC 2023-01-09 10:16:50.8: Dispatcher cycle time: 0.1 sec. 2023-01-09 10:16:50.8: Acquire data for Observation HQ_Mon... 2023-01-09 10:16:50.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan HQ_Mon) 2023-01-09 10:16:50.8: Send Observation HQ_Mon to ACP Sequencer 2023-01-09 10:27:47.3: Acquisition time: 656.50568 sec. 2023-01-09 10:27:47.3: Data for Observation HQ_Mon of Plan HQ_Mon acquired successfully. 2023-01-09 10:27:47.3: Plan HQ_Mon completed successfully. 2023-01-09 10:27:47.3: Image Efficiency: 82.2% 2023-01-09 10:27:47.3: Cycle Efficiency: 100.0% 2023-01-09 10:27:47.5: Dispatcher cycle time: 0.1 sec. 2023-01-09 10:27:47.5: Acquire data for Observation V838_Mon... 2023-01-09 10:27:47.5: (belongs to Project AAVSO_P237_CWT_AUTO_ver2685, Plan V838_Mon) 2023-01-09 10:27:47.5: Send Observation V838_Mon to ACP Sequencer 2023-01-09 10:49:05.2: Acquisition time: 1277.63402 sec. 2023-01-09 10:49:05.2: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-01-09 10:49:05.2: Plan V838_Mon completed successfully. 2023-01-09 10:49:05.2: Image Efficiency: 84.5% 2023-01-09 10:49:05.2: Cycle Efficiency: 100.0% 2023-01-09 10:49:05.3: Rising plan delay enabled for Plan IU_Leo: 2023-01-09 10:49:05.3: 242 min. remaining to meet strict constraints. 2023-01-09 10:49:05.3: 129 min. remaining for the plan to fit before dawn. 2023-01-09 10:49:05.3: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-09 10:49:05.3: ending rising plan delay. Plan is now eligible. 2023-01-09 10:49:05.3: Dispatcher cycle time: 0.1 sec. 2023-01-09 10:49:05.3: Acquire data for Observation SU_Lyn... 2023-01-09 10:49:05.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan SU_Lyn) 2023-01-09 10:49:05.4: Send Observation SU_Lyn to ACP Sequencer 2023-01-09 10:56:09.7: Acquisition time: 424.341437 sec. 2023-01-09 10:56:09.7: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2023-01-09 10:56:09.7: Plan SU_Lyn completed successfully. 2023-01-09 10:56:09.7: Image Efficiency: 40.5% 2023-01-09 10:56:09.7: Cycle Efficiency: 100.0% 2023-01-09 10:56:09.9: Dispatcher cycle time: 0.1 sec. 2023-01-09 10:56:09.9: Acquire data for Observation OI_158... 2023-01-09 10:56:09.9: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan OI_158) 2023-01-09 10:56:09.9: Send Observation OI_158 to ACP Sequencer 2023-01-09 11:12:12.6: Acquisition time: 962.6472158 sec. 2023-01-09 11:12:12.6: Data for Observation OI_158 of Plan OI_158 acquired successfully. 2023-01-09 11:12:12.6: Plan OI_158 completed successfully. 2023-01-09 11:12:12.6: Image Efficiency: 74.8% 2023-01-09 11:12:12.6: Cycle Efficiency: 100.0% 2023-01-09 11:12:12.7: Rising plan delay enabled for Plan NGC_5634: 2023-01-09 11:12:12.7: 383 min. remaining to meet strict constraints. 2023-01-09 11:12:12.7: 88 min. remaining for the plan to fit before dawn. 2023-01-09 11:12:12.7: deferred (rising) for 84 min, until 09-Jan-2023 12:37:01 UTC 2023-01-09 11:12:12.7: Dispatcher cycle time: 0.1 sec. 2023-01-09 11:12:12.7: Acquire data for Observation NQ_Gem... 2023-01-09 11:12:12.7: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan NQ_Gem) 2023-01-09 11:12:12.8: Send Observation NQ_Gem to ACP Sequencer 2023-01-09 11:18:22.2: Acquisition time: 369.4430933 sec. 2023-01-09 11:18:22.2: Data for Observation NQ_Gem of Plan NQ_Gem acquired successfully. 2023-01-09 11:18:22.2: Plan NQ_Gem completed successfully. 2023-01-09 11:18:22.2: Image Efficiency: 40.9% 2023-01-09 11:18:22.2: Cycle Efficiency: 100.0% 2023-01-09 11:18:22.4: Dispatcher cycle time: 0.1 sec. 2023-01-09 11:18:22.4: Acquire data for Observation OI_158... 2023-01-09 11:18:22.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan OI_158) 2023-01-09 11:18:22.4: Send Observation OI_158 to ACP Sequencer 2023-01-09 11:32:37.4: Acquisition time: 854.9968131 sec. 2023-01-09 11:32:37.4: Data for Observation OI_158 of Plan OI_158 acquired successfully. 2023-01-09 11:32:37.4: Plan OI_158 completed successfully. 2023-01-09 11:32:37.4: Image Efficiency: 84.2% 2023-01-09 11:32:37.4: Cycle Efficiency: 100.0% 2023-01-09 11:32:37.5: Rising plan delay enabled for Plan M5-V42: 2023-01-09 11:32:37.5: 438 min. remaining to meet strict constraints. 2023-01-09 11:32:37.5: 94 min. remaining for the plan to fit before dawn. 2023-01-09 11:32:37.5: deferred (rising) for 93 min, until 09-Jan-2023 13:06:32 UTC 2023-01-09 11:32:37.5: Rising plan delay enabled for Plan M5-V84: 2023-01-09 11:32:37.5: 438 min. remaining to meet strict constraints. 2023-01-09 11:32:37.5: 94 min. remaining for the plan to fit before dawn. 2023-01-09 11:32:37.5: deferred (rising) for 93 min, until 09-Jan-2023 13:06:32 UTC 2023-01-09 11:32:37.5: Dispatcher cycle time: 0.1 sec. 2023-01-09 11:32:37.5: Acquire data for Observation KN_Lyn... 2023-01-09 11:32:37.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan KN_Lyn) 2023-01-09 11:32:37.6: Send Observation KN_Lyn to ACP Sequencer 2023-01-09 11:34:09.8: ACP data acquisition failed for Observation KN_Lyn. 2023-01-09 11:34:09.8: (Observation KN_Lyn interrupted by acquisition process failure.) 2023-01-09 11:34:09.9: Rising plan delay enabled for Plan Pal_5: 2023-01-09 11:34:09.9: 428 min. remaining to meet strict constraints. 2023-01-09 11:34:09.9: 74 min. remaining for the plan to fit before dawn. 2023-01-09 11:34:09.9: deferred (rising) for 72 min, until 09-Jan-2023 12:46:11 UTC 2023-01-09 11:34:09.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 11:34:09.9: Acquire data for Observation IU_Leo... 2023-01-09 11:34:09.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan IU_Leo) 2023-01-09 11:34:09.9: Send Observation IU_Leo to ACP Sequencer 2023-01-09 11:34:27.7: ** ACP script "AcquireScheduler" failed: 2023-01-09 11:34:27.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 11:34:27.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 11:34:27.7: ACP data acquisition failed for Observation IU_Leo. 2023-01-09 11:34:27.7: (Observation IU_Leo interrupted by acquisition process failure.) 2023-01-09 11:34:27.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 11:34:27.9: Acquire data for Observation SU_Lyn... 2023-01-09 11:34:27.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan SU_Lyn) 2023-01-09 11:34:27.9: Send Observation SU_Lyn to ACP Sequencer 2023-01-09 11:34:55.5: ** ACP script "AcquireScheduler" failed: 2023-01-09 11:34:55.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 11:34:55.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 11:34:55.5: ACP data acquisition failed for Observation SU_Lyn. 2023-01-09 11:34:55.5: (Observation SU_Lyn interrupted by acquisition process failure.) 2023-01-09 11:42:02.0: ++ Auto Focus ++ 2023-01-09 11:42:02.0: Doing periodic autofocus. 2023-01-09 11:42:02.0: Start special ACP AutoFocus script for scheduler 2023-01-09 11:42:17.1: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 11:42:17.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 11:42:17.1: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-09 11:42:17.1: Rising plan delay enabled for Plan PG_1553+113: 2023-01-09 11:42:17.1: 490 min. remaining to meet strict constraints. 2023-01-09 11:42:17.1: 86 min. remaining for the plan to fit before dawn. 2023-01-09 11:42:17.1: deferred (rising) for 86 min, until 09-Jan-2023 13:08:22 UTC 2023-01-09 11:42:17.1: Rising plan delay enabled for Plan PG_1553+113: 2023-01-09 11:42:17.1: 490 min. remaining to meet strict constraints. 2023-01-09 11:42:17.1: 86 min. remaining for the plan to fit before dawn. 2023-01-09 11:42:17.1: deferred (rising) for 86 min, until 09-Jan-2023 13:08:22 UTC 2023-01-09 11:42:47.5: ++ Auto Focus ++ 2023-01-09 11:42:47.5: Doing periodic autofocus. 2023-01-09 11:42:47.5: Start special ACP AutoFocus script for scheduler 2023-01-09 11:43:02.6: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 11:43:02.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 11:43:02.6: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-09 11:48:06.6: ++ Auto Focus ++ 2023-01-09 11:48:06.6: Doing periodic autofocus. 2023-01-09 11:48:06.6: Start special ACP AutoFocus script for scheduler 2023-01-09 11:48:21.7: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 11:48:21.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 11:48:21.7: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2023-01-09 11:58:29.8: ++ Auto Focus ++ 2023-01-09 11:58:29.8: Doing periodic autofocus. 2023-01-09 11:58:29.8: Start special ACP AutoFocus script for scheduler 2023-01-09 11:58:45.3: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 11:58:45.3: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 11:58:45.3: ** Autofocus failed (n=4), will retry ASAP after 15 min. 2023-01-09 12:02:18.2: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-09 12:02:18.2: 364 min. remaining to meet strict constraints. 2023-01-09 12:02:18.2: 60 min. remaining for the plan to fit before dawn. 2023-01-09 12:02:18.2: deferred (rising) for 59 min, until 09-Jan-2023 13:01:46 UTC 2023-01-09 12:09:24.0: Rising plan delay enabled for Plan IX_Dra: 2023-01-09 12:09:24.0: 708 min. remaining to meet strict constraints. 2023-01-09 12:09:24.0: 40 min. remaining for the plan to fit before dawn. 2023-01-09 12:09:24.0: deferred (rising) for 38 min, until 09-Jan-2023 12:47:33 UTC 2023-01-09 12:12:56.7: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-09 12:12:56.7: 272 min. remaining to meet strict constraints. 2023-01-09 12:12:56.7: 52 min. remaining for the plan to fit before dawn. 2023-01-09 12:12:56.7: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 12:12:56.7: ending rising plan delay. Plan is now eligible. 2023-01-09 12:12:56.8: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:12:56.8: Acquire data for Observation PKS_1222+216... 2023-01-09 12:12:56.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan PKS_1222+216) 2023-01-09 12:12:56.8: Send Observation PKS_1222+216 to ACP Sequencer 2023-01-09 12:13:11.8: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:13:11.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:13:11.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:13:11.8: ACP data acquisition failed for Observation PKS_1222+216. 2023-01-09 12:13:11.8: (Observation PKS_1222+216 interrupted by acquisition process failure.) 2023-01-09 12:14:12.8: ++ Auto Focus ++ 2023-01-09 12:14:12.8: Doing periodic autofocus. 2023-01-09 12:14:12.8: Start special ACP AutoFocus script for scheduler 2023-01-09 12:14:33.2: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 12:14:33.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 12:14:33.2: ** Autofocus failed (n=5), will retry ASAP after 20 min. 2023-01-09 12:23:40.9: Rising plan delay enabled for Plan IR_Com: 2023-01-09 12:23:40.9: 275 min. remaining to meet strict constraints. 2023-01-09 12:23:40.9: 34 min. remaining for the plan to fit before dawn. 2023-01-09 12:23:40.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 12:23:40.9: ending rising plan delay. Plan is now eligible. 2023-01-09 12:23:40.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:23:40.9: Acquire data for Observation IR_Com... 2023-01-09 12:23:40.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan IR_Com) 2023-01-09 12:23:40.9: Send Observation IR_Com to ACP Sequencer 2023-01-09 12:23:56.0: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:23:56.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:23:56.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:23:56.0: ACP data acquisition failed for Observation IR_Com. 2023-01-09 12:23:56.0: (Observation IR_Com interrupted by acquisition process failure.) 2023-01-09 12:32:02.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:32:02.9: Acquire data for Observation IR_Com... 2023-01-09 12:32:02.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan IR_Com) 2023-01-09 12:32:02.9: Send Observation IR_Com to ACP Sequencer 2023-01-09 12:32:17.9: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:32:17.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:32:17.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:32:18.0: ACP data acquisition failed for Observation IR_Com. 2023-01-09 12:32:18.0: (Observation IR_Com interrupted by acquisition process failure.) 2023-01-09 12:34:19.7: Rising plan delay enabled for Plan NSV-6690: 2023-01-09 12:34:19.7: 379 min. remaining to meet strict constraints. 2023-01-09 12:34:19.7: 3 min. remaining for the plan to fit before dawn. 2023-01-09 12:34:19.7: ending rising plan delay. Plan is now eligible. 2023-01-09 12:34:19.8: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:34:19.8: Acquire data for Observation NSV-6690... 2023-01-09 12:34:19.8: (belongs to Project AAVSO_P255_BPEC_AUTO_ver2890, Plan NSV-6690) 2023-01-09 12:34:19.8: Send Observation NSV-6690 to ACP Sequencer 2023-01-09 12:34:34.9: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:34:34.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:34:34.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:34:34.9: ACP data acquisition failed for Observation NSV-6690. 2023-01-09 12:34:34.9: (Observation NSV-6690 interrupted by acquisition process failure.) 2023-01-09 12:34:35.0: ++ Auto Focus ++ 2023-01-09 12:34:35.1: Doing periodic autofocus. 2023-01-09 12:34:35.1: Start special ACP AutoFocus script for scheduler 2023-01-09 12:35:18.0: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 12:35:18.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 12:35:18.0: ** Autofocus failed (n=6), will retry ASAP after 20 min. 2023-01-09 12:37:19.6: Rising plan delay enabled for Plan NGC_5634: 2023-01-09 12:37:19.6: 298 min. remaining to meet strict constraints. 2023-01-09 12:37:19.6: 2 min. remaining for the plan to fit before dawn. 2023-01-09 12:37:19.6: ending rising plan delay. Plan is now eligible. 2023-01-09 12:37:19.7: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:37:19.7: Acquire data for Observation NGC_5634... 2023-01-09 12:37:19.7: (belongs to Project AAVSO_Pgc_Welch_AUTO_ver2411, Plan NGC_5634) 2023-01-09 12:37:19.7: Send Observation NGC_5634 to ACP Sequencer 2023-01-09 12:37:34.8: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:37:34.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:37:34.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:37:34.8: ACP data acquisition failed for Observation NGC_5634. 2023-01-09 12:37:34.8: (Observation NGC_5634 interrupted by acquisition process failure.) 2023-01-09 12:44:10.5: Rising plan delay enabled for Plan 3C_279: 2023-01-09 12:44:10.5: 199 min. remaining to meet strict constraints. 2023-01-09 12:44:10.5: 21 min. remaining for the plan to fit before dawn. 2023-01-09 12:44:10.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 12:44:10.5: ending rising plan delay. Plan is now eligible. 2023-01-09 12:44:10.5: Rising plan delay enabled for Plan 3C_279: 2023-01-09 12:44:10.5: 199 min. remaining to meet strict constraints. 2023-01-09 12:44:10.5: 21 min. remaining for the plan to fit before dawn. 2023-01-09 12:44:10.5: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 12:44:10.5: ending rising plan delay. Plan is now eligible. 2023-01-09 12:44:10.5: Rising plan delay enabled for Plan X_Ser: 2023-01-09 12:44:10.5: 413 min. remaining to meet strict constraints. 2023-01-09 12:44:10.5: 20 min. remaining for the plan to fit before dawn. 2023-01-09 12:44:10.5: deferred (rising) for 19 min, until 09-Jan-2023 13:03:25 UTC 2023-01-09 12:44:10.5: Rising plan delay enabled for Plan X_Ser: 2023-01-09 12:44:10.5: 413 min. remaining to meet strict constraints. 2023-01-09 12:44:10.5: 6 min. remaining for the plan to fit before dawn. 2023-01-09 12:44:10.5: deferred (rising) for 3 min, until 09-Jan-2023 12:48:06 UTC 2023-01-09 12:44:10.5: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:44:10.5: Acquire data for Observation 3C_279... 2023-01-09 12:44:10.5: (belongs to Project AAVSO_MISC_OAR_AUTO_ver2706, Plan 3C_279) 2023-01-09 12:44:10.5: Send Observation 3C_279 to ACP Sequencer 2023-01-09 12:44:25.7: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:44:25.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:44:25.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:44:25.7: ACP data acquisition failed for Observation 3C_279. 2023-01-09 12:44:25.7: (Observation 3C_279 interrupted by acquisition process failure.) 2023-01-09 12:44:25.8: Rising plan delay enabled for Plan 3C_279: 2023-01-09 12:44:25.8: 198 min. remaining to meet strict constraints. 2023-01-09 12:44:25.8: 20 min. remaining for the plan to fit before dawn. 2023-01-09 12:44:25.8: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-09 12:44:25.8: ending rising plan delay. Plan is now eligible. 2023-01-09 12:44:25.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:44:25.9: Acquire data for Observation 3C_279... 2023-01-09 12:44:25.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan 3C_279) 2023-01-09 12:44:25.9: Send Observation 3C_279 to ACP Sequencer 2023-01-09 12:44:52.4: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:44:52.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:44:52.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:44:52.4: ACP data acquisition failed for Observation 3C_279. 2023-01-09 12:44:52.4: (Observation 3C_279 interrupted by acquisition process failure.) 2023-01-09 12:46:23.8: Rising plan delay enabled for Plan Pal_5: 2023-01-09 12:46:23.8: 355 min. remaining to meet strict constraints. 2023-01-09 12:46:23.8: 2 min. remaining for the plan to fit before dawn. 2023-01-09 12:46:23.8: ending rising plan delay. Plan is now eligible. 2023-01-09 12:46:23.8: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:46:23.8: Acquire data for Observation Pal_5... 2023-01-09 12:46:23.8: (belongs to Project AAVSO_Pgc_Welch_AUTO_ver2411, Plan Pal_5) 2023-01-09 12:46:23.8: Send Observation Pal_5 to ACP Sequencer 2023-01-09 12:46:38.9: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:46:38.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:46:38.9: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:46:38.9: ACP data acquisition failed for Observation Pal_5. 2023-01-09 12:46:38.9: (Observation Pal_5 interrupted by acquisition process failure.) 2023-01-09 12:47:39.9: Rising plan delay enabled for Plan IX_Dra: 2023-01-09 12:47:39.9: 670 min. remaining to meet strict constraints. 2023-01-09 12:47:39.9: 2 min. remaining for the plan to fit before dawn. 2023-01-09 12:47:39.9: ending rising plan delay. Plan is now eligible. 2023-01-09 12:47:39.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:47:39.9: Acquire data for Observation IX_Dra... 2023-01-09 12:47:39.9: (belongs to Project AAVSO_P153_SFY_AUTO_ver2706, Plan IX_Dra) 2023-01-09 12:47:39.9: Send Observation IX_Dra to ACP Sequencer 2023-01-09 12:48:07.5: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:48:07.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:48:07.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:48:07.5: ACP data acquisition failed for Observation IX_Dra. 2023-01-09 12:48:07.5: (Observation IX_Dra interrupted by acquisition process failure.) 2023-01-09 12:48:07.7: Rising plan delay enabled for Plan X_Ser: 2023-01-09 12:48:07.7: 409 min. remaining to meet strict constraints. 2023-01-09 12:48:07.7: 2 min. remaining for the plan to fit before dawn. 2023-01-09 12:48:07.7: ending rising plan delay. Plan is now eligible. 2023-01-09 12:48:07.7: Dispatcher cycle time: 0.0 sec. 2023-01-09 12:48:07.7: Acquire data for Observation X_Ser... 2023-01-09 12:48:07.7: (belongs to Project AAVSO_MISC_MRV_AUTO_ver3136, Plan X_Ser) 2023-01-09 12:48:07.7: Send Observation X_Ser to ACP Sequencer 2023-01-09 12:48:40.7: ** ACP script "AcquireScheduler" failed: 2023-01-09 12:48:40.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 12:48:40.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 12:48:40.7: ACP data acquisition failed for Observation X_Ser. 2023-01-09 12:48:40.7: (Observation X_Ser interrupted by acquisition process failure.) 2023-01-09 12:55:46.6: ++ Auto Focus ++ 2023-01-09 12:55:46.6: Doing periodic autofocus. 2023-01-09 12:55:46.6: Start special ACP AutoFocus script for scheduler 2023-01-09 12:56:01.7: ** ACP script "AutoFocusScheduler" failed: 2023-01-09 12:56:01.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 79 column 9. 2023-01-09 12:56:01.7: ** Autofocus failed (n=7), will retry ASAP after 20 min. 2023-01-09 13:02:06.9: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-09 13:02:06.9: 304 min. remaining to meet strict constraints. 2023-01-09 13:02:06.9: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:02:06.9: ending rising plan delay. Plan is now eligible. 2023-01-09 13:02:06.9: Dispatcher cycle time: 0.0 sec. 2023-01-09 13:02:06.9: Acquire data for Observation PKS_1510-089... 2023-01-09 13:02:06.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan PKS_1510-089) 2023-01-09 13:02:06.9: Send Observation PKS_1510-089 to ACP Sequencer 2023-01-09 13:02:22.0: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:02:22.0: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:02:22.0: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:02:22.0: ACP data acquisition failed for Observation PKS_1510-089. 2023-01-09 13:02:22.0: (Observation PKS_1510-089 interrupted by acquisition process failure.) 2023-01-09 13:03:53.3: Rising plan delay enabled for Plan HS1340+1524: 2023-01-09 13:03:53.3: 286 min. remaining to meet strict constraints. 2023-01-09 13:03:53.3: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:03:53.3: ending rising plan delay. Plan is now eligible. 2023-01-09 13:03:53.3: Rising plan delay enabled for Plan HS1340+1524: 2023-01-09 13:03:53.3: 286 min. remaining to meet strict constraints. 2023-01-09 13:03:53.3: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:03:53.3: ending rising plan delay. Plan is now eligible. 2023-01-09 13:03:53.3: Rising plan delay enabled for Plan X_Ser: 2023-01-09 13:03:53.3: 393 min. remaining to meet strict constraints. 2023-01-09 13:03:53.3: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:03:53.3: ending rising plan delay. Plan is now eligible. 2023-01-09 13:03:53.4: Dispatcher cycle time: 0.0 sec. 2023-01-09 13:03:53.4: Acquire data for Observation HS1340+1524... 2023-01-09 13:03:53.4: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan HS1340+1524) 2023-01-09 13:03:53.4: Send Observation HS1340+1524 to ACP Sequencer 2023-01-09 13:04:08.4: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:04:08.4: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:04:08.4: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:04:08.4: ACP data acquisition failed for Observation HS1340+1524. 2023-01-09 13:04:08.4: (Observation HS1340+1524 interrupted by acquisition process failure.) 2023-01-09 13:04:08.6: Rising plan delay enabled for Plan HS1340+1524: 2023-01-09 13:04:08.6: 286 min. remaining to meet strict constraints. 2023-01-09 13:04:08.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:04:08.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:04:08.6: Rising plan delay enabled for Plan X_Ser: 2023-01-09 13:04:08.6: 393 min. remaining to meet strict constraints. 2023-01-09 13:04:08.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:04:08.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:04:08.6: Dispatcher cycle time: 0.0 sec. 2023-01-09 13:04:08.6: Acquire data for Observation X_Ser... 2023-01-09 13:04:08.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan X_Ser) 2023-01-09 13:04:08.6: Send Observation X_Ser to ACP Sequencer 2023-01-09 13:04:45.8: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:04:45.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:04:45.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:04:45.8: ACP data acquisition failed for Observation X_Ser. 2023-01-09 13:04:45.8: (Observation X_Ser interrupted by acquisition process failure.) 2023-01-09 13:06:47.6: Rising plan delay enabled for Plan AG_Dra: 2023-01-09 13:06:47.6: 520 min. remaining to meet strict constraints. 2023-01-09 13:06:47.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:06:47.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:06:47.6: Rising plan delay enabled for Plan AG_Dra: 2023-01-09 13:06:47.6: 520 min. remaining to meet strict constraints. 2023-01-09 13:06:47.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:06:47.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:06:47.6: Rising plan delay enabled for Plan M5-V42: 2023-01-09 13:06:47.6: 344 min. remaining to meet strict constraints. 2023-01-09 13:06:47.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:06:47.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:06:47.6: Rising plan delay enabled for Plan M5-V84: 2023-01-09 13:06:47.6: 344 min. remaining to meet strict constraints. 2023-01-09 13:06:47.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:06:47.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:06:47.6: Rising plan delay enabled for Plan X_Boo: 2023-01-09 13:06:47.6: 326 min. remaining to meet strict constraints. 2023-01-09 13:06:47.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:06:47.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:06:47.7: Dispatcher cycle time: 0.1 sec. 2023-01-09 13:06:47.7: Acquire data for Observation AG_Dra... 2023-01-09 13:06:47.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan AG_Dra) 2023-01-09 13:06:47.7: Send Observation AG_Dra to ACP Sequencer 2023-01-09 13:07:02.8: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:07:02.8: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:07:02.8: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:07:02.8: ACP data acquisition failed for Observation AG_Dra. 2023-01-09 13:07:02.8: (Observation AG_Dra interrupted by acquisition process failure.) 2023-01-09 13:07:33.4: Rising plan delay enabled for Plan M3-V154: 2023-01-09 13:07:33.4: 308 min. remaining to meet strict constraints. 2023-01-09 13:07:33.4: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:07:33.4: ending rising plan delay. Plan is now eligible. 2023-01-09 13:07:33.4: Rising plan delay enabled for Plan PG_1424+240: 2023-01-09 13:07:33.4: 344 min. remaining to meet strict constraints. 2023-01-09 13:07:33.4: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:07:33.4: ending rising plan delay. Plan is now eligible. 2023-01-09 13:07:33.4: Rising plan delay enabled for Plan PG_1424+240: 2023-01-09 13:07:33.4: 344 min. remaining to meet strict constraints. 2023-01-09 13:07:33.4: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:07:33.4: ending rising plan delay. Plan is now eligible. 2023-01-09 13:07:33.4: Dispatcher cycle time: 0.1 sec. 2023-01-09 13:07:33.4: Acquire data for Observation PG_1424+240... 2023-01-09 13:07:33.4: (belongs to Project AAVSO_MISC_OAR_AUTO_ver2706, Plan PG_1424+240) 2023-01-09 13:07:33.4: Send Observation PG_1424+240 to ACP Sequencer 2023-01-09 13:07:48.5: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:07:48.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:07:48.5: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:07:48.5: ACP data acquisition failed for Observation PG_1424+240. 2023-01-09 13:07:48.5: (Observation PG_1424+240 interrupted by acquisition process failure.) 2023-01-09 13:07:48.6: Rising plan delay enabled for Plan M3-V154: 2023-01-09 13:07:48.6: 308 min. remaining to meet strict constraints. 2023-01-09 13:07:48.6: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:07:48.6: ending rising plan delay. Plan is now eligible. 2023-01-09 13:07:48.6: Dispatcher cycle time: 0.0 sec. 2023-01-09 13:07:48.6: Acquire data for Observation M3-V154... 2023-01-09 13:07:48.6: (belongs to Project AAVSO_P246_KPRB_AUTO_ver3160, Plan M3-V154) 2023-01-09 13:07:48.6: Send Observation M3-V154 to ACP Sequencer 2023-01-09 13:08:03.7: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:08:03.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:08:03.7: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:08:03.7: ACP data acquisition failed for Observation M3-V154. 2023-01-09 13:08:03.7: (Observation M3-V154 interrupted by acquisition process failure.) 2023-01-09 13:08:34.2: Rising plan delay enabled for Plan PG_1553+113: 2023-01-09 13:08:34.2: 404 min. remaining to meet strict constraints. 2023-01-09 13:08:34.2: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:08:34.2: ending rising plan delay. Plan is now eligible. 2023-01-09 13:08:34.2: Rising plan delay enabled for Plan PG_1553+113: 2023-01-09 13:08:34.2: 404 min. remaining to meet strict constraints. 2023-01-09 13:08:34.2: 0 min. remaining for the plan to fit before dawn. 2023-01-09 13:08:34.2: ending rising plan delay. Plan is now eligible. 2023-01-09 13:08:34.3: Dispatcher cycle time: 0.0 sec. 2023-01-09 13:08:34.3: Acquire data for Observation PG_1553+113... 2023-01-09 13:08:34.3: (belongs to Project AAVSO_MISC_OAR_AUTO_ver2706, Plan PG_1553+113) 2023-01-09 13:08:34.3: Send Observation PG_1553+113 to ACP Sequencer 2023-01-09 13:09:06.1: ** ACP script "AcquireScheduler" failed: 2023-01-09 13:09:06.1: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 2108 column 9. 2023-01-09 13:09:06.1: ACP ERROR: Run failed due to script error (see ACP run log) 2023-01-09 13:09:06.1: ACP data acquisition failed for Observation PG_1553+113. 2023-01-09 13:09:06.1: (Observation PG_1553+113 interrupted by acquisition process failure.) 2023-01-09 13:24:49.4: ++ Dawn Flats ++ 2023-01-09 13:24:49.4: Start ACP AutoFlat script for Dawn flats 2023-01-09 13:25:04.5: ** ACP script "AutoFlat" failed: 2023-01-09 13:25:04.5: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! Location: line 1956 column 13. 2023-01-09 13:25:34.9: -- Observatory Shutdown -- 2023-01-09 13:25:34.9: Weather safety is now disabled 2023-01-09 13:25:34.9: Start ACP Sequencer's ShutdownObs script 2023-01-09 13:26:37.1: ** ACP script "ShutdownObs" failed: 2023-01-09 13:26:37.1: **Script Error (Tracking has been stopped)** Source: MaxDome.Dome.1 Message: Bad rotation sensor or stalled motor Location: line 52 column 9. 2023-01-09 13:26:37.1: Weather safety is re-enabled 2023-01-09 13:26:37.1: **EXCEPTION IN SCHEDULER: 2023-01-09 13:26:37.1: Observatory shutdown failed, cannot continue. 2023-01-09 13:26:37.1: Traceback: at DC3.Scheduler.Engine.DoShutdownIf() at DC3.Scheduler.Engine.Run() 2023-01-09 13:26:37.1: Weather safety is now disabled 2023-01-09 13:26:37.1: Weather safety is re-enabled 2023-01-09 13:26:37.1: No operator intervention command tool specified 2023-01-09 13:26:37.3: Run statistics: 2023-01-09 13:26:37.3: Observations: 250 2023-01-09 13:26:37.3: Considered: 25 2023-01-09 13:26:37.3: Completed: 2 2023-01-09 13:26:37.3: Skipped: 0 2023-01-09 13:26:37.3: Never Eligible: 225 2023-01-09 13:26:37.3: Failed: 23 2023-01-09 13:26:37.3: Shutter-Open efficiency: 58.15% 2023-01-09 13:26:37.3: Overall Efficiency: 96.77% 2023-01-09 13:26:37.3: Release ACP sequencer 2023-01-09 13:26:37.3: ACPSequencer: Failed to get ACP's DispatcherEnabled property. ACP is compromised. 2023-01-09 13:26:37.3: Object reference not set to an instance of an object. Log closed at Mon, Jan 09 2023 13:26:38 UTC (actual time)