Log opened at Sun, Jan 08 2023 00:17:46 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-01-08 00:17:46.5: REAL TIME internal clock initialized at 08-Jan-2023 00:17:46 UTC 2023-01-08 00:17:46.5: Dispatcher started at 08-Jan-2023 00:17:46 UTC 2023-01-08 00:17:46.6: Loaded Constraint plugin AirMass 2023-01-08 00:17:46.6: Loaded Constraint plugin AirmassRange 2023-01-08 00:17:46.7: Loaded Constraint plugin Horizon 2023-01-08 00:17:46.7: Loaded Constraint plugin HourAngle 2023-01-08 00:17:46.7: Loaded Constraint plugin MoonAvoid 2023-01-08 00:17:46.7: Loaded Constraint plugin MoonDown 2023-01-08 00:17:46.7: Loaded Constraint plugin SkyCondition 2023-01-08 00:17:46.7: Loaded Constraint plugin TimeRange 2023-01-08 00:17:47.5: 219 plans are now pending. 2023-01-08 00:17:47.6: Attach ACP sequencer 2023-01-08 00:17:53.7: ++ Weather Safe ++ 2023-01-08 00:17:54.4: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2023-01-08 00:17:54.4: Sequencer does sky flats 2023-01-08 00:19:04.6: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 2023-01-08 00:19:39.4: ++ Observatory Startup ++ 2023-01-08 00:19:39.4: Weather safety is now disabled 2023-01-08 00:19:39.4: Start ACP Sequencer's StartupObs script 2023-01-08 00:20:26.0: Weather safety is re-enabled 2023-01-08 00:20:26.0: Weather safety is now disabled 2023-01-08 00:20:26.0: Open the observatory dome/roof 2023-01-08 00:21:56.7: Weather safety is re-enabled 2023-01-08 00:21:56.7: Observatory startup succeeded, and dome opened successfully 2023-01-08 00:21:56.8: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-08 00:21:56.8: Last AutoFocus was completed at 06-Jan-2023 02:29:53 UTC 2023-01-08 00:21:56.8: Autofocus will be done ASAP. 2023-01-08 00:21:56.8: ++ Dusk Sky Flats ++ 2023-01-08 00:21:56.8: Start ACP AutoFlat script for Dusk flats 2023-01-08 01:15:35.2: ++ Auto Focus ++ 2023-01-08 01:15:35.2: Doing periodic autofocus. 2023-01-08 01:15:35.2: Start special ACP AutoFocus script for scheduler 2023-01-08 01:19:08.0: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-08 01:19:10.2: Plan V0704_And has Monitor Mode. Time to resubmit it. 2023-01-08 01:19:10.2: Plan V0704_And has Monitor Mode. Time to resubmit it. 2023-01-08 01:19:10.2: Plan AF_And has Monitor Mode. Time to resubmit it. 2023-01-08 01:19:10.2: Plan NSV-6690 has Monitor Mode. Time to resubmit it. 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan AO_Aur: 2023-01-08 01:19:10.3: 554 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 704 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 261 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 260 min, until 08-Jan-2023 05:39:32 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan AO_Aur: 2023-01-08 01:19:10.3: 554 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 704 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 261 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 260 min, until 08-Jan-2023 05:39:33 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan AX_Per: 2023-01-08 01:19:10.3: 343 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 708 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 12 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 12 min, until 08-Jan-2023 01:31:37 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan AZ_Cas: 2023-01-08 01:19:10.3: 363 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 710 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 19 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 19 min, until 08-Jan-2023 01:38:45 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan AZ_Cas: 2023-01-08 01:19:10.3: 363 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 711 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 20 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 19 min, until 08-Jan-2023 01:39:00 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan B0133+47: 2023-01-08 01:19:10.3: 333 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 701 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 10 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 9 min, until 08-Jan-2023 01:28:10 UTC 2023-01-08 01:19:10.3: Rising plan delay enabled for Plan B0133+47: 2023-01-08 01:19:10.3: 333 min. remaining to meet strict constraints. 2023-01-08 01:19:10.3: 701 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.3: but only 10 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.3: deferred (rising) for 9 min, until 08-Jan-2023 01:28:10 UTC 2023-01-08 01:19:10.4: Rising plan delay enabled for Plan ER_Aur: 2023-01-08 01:19:10.4: 538 min. remaining to meet strict constraints. 2023-01-08 01:19:10.4: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.4: but only 224 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.4: deferred (rising) for 222 min, until 08-Jan-2023 05:01:54 UTC 2023-01-08 01:19:10.4: Rising plan delay enabled for Plan ER_Aur: 2023-01-08 01:19:10.4: 538 min. remaining to meet strict constraints. 2023-01-08 01:19:10.4: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.4: but only 224 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.4: deferred (rising) for 222 min, until 08-Jan-2023 05:01:54 UTC 2023-01-08 01:19:10.4: Rising plan delay enabled for Plan FS_Aur: 2023-01-08 01:19:10.4: 548 min. remaining to meet strict constraints. 2023-01-08 01:19:10.4: 701 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.4: but only 260 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.4: deferred (rising) for 259 min, until 08-Jan-2023 05:38:19 UTC 2023-01-08 01:19:10.4: Rising plan delay enabled for Plan FS_Aur: 2023-01-08 01:19:10.4: 548 min. remaining to meet strict constraints. 2023-01-08 01:19:10.4: 701 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.4: but only 260 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.4: deferred (rising) for 259 min, until 08-Jan-2023 05:38:19 UTC 2023-01-08 01:19:10.4: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:19:10.4: 197 min. remaining to meet strict constraints. 2023-01-08 01:19:10.4: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.4: but only 8 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.4: deferred (rising) for 7 min, until 08-Jan-2023 01:26:24 UTC 2023-01-08 01:19:10.5: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:19:10.5: 197 min. remaining to meet strict constraints. 2023-01-08 01:19:10.5: 690 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.5: but only 4 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.5: deferred (rising) for 2 min, until 08-Jan-2023 01:21:18 UTC 2023-01-08 01:19:10.5: Rising plan delay enabled for Plan HQ_Per: 2023-01-08 01:19:10.5: 507 min. remaining to meet strict constraints. 2023-01-08 01:19:10.5: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.5: but only 194 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.5: deferred (rising) for 193 min, until 08-Jan-2023 04:32:36 UTC 2023-01-08 01:19:10.5: Rising plan delay enabled for Plan HQ_Per: 2023-01-08 01:19:10.5: 507 min. remaining to meet strict constraints. 2023-01-08 01:19:10.5: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.5: but only 195 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.5: deferred (rising) for 193 min, until 08-Jan-2023 04:32:46 UTC 2023-01-08 01:19:10.5: Rising plan delay enabled for Plan J072816: 2023-01-08 01:19:10.5: 720 min. remaining to meet strict constraints. 2023-01-08 01:19:10.5: 685 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.5: but only 352 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.5: deferred (rising) for 349 min, until 08-Jan-2023 07:08:53 UTC 2023-01-08 01:19:10.5: Rising plan delay enabled for Plan J072816: 2023-01-08 01:19:10.5: 720 min. remaining to meet strict constraints. 2023-01-08 01:19:10.5: 685 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.5: but only 352 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.5: deferred (rising) for 349 min, until 08-Jan-2023 07:08:53 UTC 2023-01-08 01:19:10.8: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-08 01:19:10.8: 437 min. remaining to meet strict constraints. 2023-01-08 01:19:10.8: 695 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.8: but only 170 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.8: deferred (rising) for 169 min, until 08-Jan-2023 04:08:20 UTC 2023-01-08 01:19:10.8: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-08 01:19:10.8: 437 min. remaining to meet strict constraints. 2023-01-08 01:19:10.8: 695 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.8: but only 170 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.8: deferred (rising) for 169 min, until 08-Jan-2023 04:08:20 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 01:19:10.9: 538 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 682 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 231 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 228 min, until 08-Jan-2023 05:07:22 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 01:19:10.9: 538 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 682 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 231 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 228 min, until 08-Jan-2023 05:07:22 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan S5_0716+714: 2023-01-08 01:19:10.9: 720 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 708 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 357 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 356 min, until 08-Jan-2023 07:16:02 UTC 2023-01-08 01:19:10.9: [AirmassRange] Target will never be below the maximum air mass 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan SU_Lyn: 2023-01-08 01:19:10.9: 651 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 707 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 317 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 317 min, until 08-Jan-2023 06:36:24 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan SU_Lyn: 2023-01-08 01:19:10.9: 651 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 705 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 316 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 316 min, until 08-Jan-2023 06:35:25 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan TT_Ari: 2023-01-08 01:19:10.9: 300 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 697 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 37 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 36 min, until 08-Jan-2023 01:55:11 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan TT_Ari: 2023-01-08 01:19:10.9: 300 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 691 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 34 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 32 min, until 08-Jan-2023 01:51:32 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 01:19:10.9: 505 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 699 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 159 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 157 min, until 08-Jan-2023 03:56:58 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 01:19:10.9: 505 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 698 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 158 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 157 min, until 08-Jan-2023 03:56:16 UTC 2023-01-08 01:19:10.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 01:19:10.9: 505 min. remaining to meet strict constraints. 2023-01-08 01:19:10.9: 700 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:10.9: but only 159 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:10.9: deferred (rising) for 158 min, until 08-Jan-2023 03:57:12 UTC 2023-01-08 01:19:11.0: Rising plan delay enabled for Plan V1112_Per: 2023-01-08 01:19:11.0: 498 min. remaining to meet strict constraints. 2023-01-08 01:19:11.0: 696 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.0: but only 179 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.0: deferred (rising) for 177 min, until 08-Jan-2023 04:16:41 UTC 2023-01-08 01:19:11.0: Rising plan delay enabled for Plan V370_And: 2023-01-08 01:19:11.0: 350 min. remaining to meet strict constraints. 2023-01-08 01:19:11.0: 710 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.0: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.0: deferred (rising) for 35 min, until 08-Jan-2023 01:54:55 UTC 2023-01-08 01:19:11.0: Rising plan delay enabled for Plan V370_And: 2023-01-08 01:19:11.0: 350 min. remaining to meet strict constraints. 2023-01-08 01:19:11.0: 710 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.0: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.0: deferred (rising) for 35 min, until 08-Jan-2023 01:54:55 UTC 2023-01-08 01:19:11.0: [AirmassRange] Target will never be below the maximum air mass 2023-01-08 01:19:11.0: [AirmassRange] Target will never be below the maximum air mass 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan V479_And: 2023-01-08 01:19:11.1: 496 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 461 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: 33010 min. remaining for the plan to fit before "must run before" time. 2023-01-08 01:19:11.1: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 51 min, until 08-Jan-2023 02:10:33 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan V504_Per: 2023-01-08 01:19:11.1: 394 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 705 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 55 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 55 min, until 08-Jan-2023 02:14:22 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan V504_Per: 2023-01-08 01:19:11.1: 394 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 704 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 55 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 54 min, until 08-Jan-2023 02:14:07 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan V582_Aur: 2023-01-08 01:19:11.1: 537 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 702 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 238 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 237 min, until 08-Jan-2023 05:16:22 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan V582_Aur: 2023-01-08 01:19:11.1: 537 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 702 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 238 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 237 min, until 08-Jan-2023 05:16:22 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan YZ_Aur: 2023-01-08 01:19:11.1: 537 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 705 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 229 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 228 min, until 08-Jan-2023 05:08:00 UTC 2023-01-08 01:19:11.1: Rising plan delay enabled for Plan YZ_Aur: 2023-01-08 01:19:11.1: 537 min. remaining to meet strict constraints. 2023-01-08 01:19:11.1: 704 min. remaining for the plan to fit before dawn. 2023-01-08 01:19:11.1: but only 229 min till start so Plan transits mid-way in its time span. 2023-01-08 01:19:11.1: deferred (rising) for 228 min, until 08-Jan-2023 05:07:44 UTC 2023-01-08 01:19:11.3: Dispatcher cycle time: 3.3 sec. 2023-01-08 01:19:11.3: Acquire data for Observation V1687_Cyg... 2023-01-08 01:19:11.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V1687_Cyg) 2023-01-08 01:19:11.3: ++ Auto Focus ++ 2023-01-08 01:19:11.3: Doing periodic autofocus. 2023-01-08 01:19:11.3: Start special ACP AutoFocus script for scheduler 2023-01-08 01:22:08.5: Next periodic autofocus ASAP after 3600sec. 08-Jan-2023 02:21:55 UTC 2023-01-08 01:22:08.5: Send Observation V1687_Cyg to ACP Sequencer 2023-01-08 01:26:56.1: Acquisition time: 287.6480839 sec. 2023-01-08 01:26:56.1: Data for Observation V1687_Cyg of Plan V1687_Cyg acquired successfully. 2023-01-08 01:26:56.1: Plan V1687_Cyg completed successfully. 2023-01-08 01:26:56.1: Image Efficiency: 4.8% 2023-01-08 01:26:56.1: Cycle Efficiency: 98.9% 2023-01-08 01:26:56.4: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:26:56.4: 189 min. remaining to meet strict constraints. 2023-01-08 01:26:56.4: 691 min. remaining for the plan to fit before dawn. 2023-01-08 01:26:56.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 01:26:56.4: ending rising plan delay. Plan is now eligible. 2023-01-08 01:26:56.4: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:26:56.4: 189 min. remaining to meet strict constraints. 2023-01-08 01:26:56.4: 682 min. remaining for the plan to fit before dawn. 2023-01-08 01:26:56.4: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 01:26:56.4: ending rising plan delay. Plan is now eligible. 2023-01-08 01:26:56.6: Dispatcher cycle time: 0.3 sec. 2023-01-08 01:26:56.6: Acquire data for Observation V2493_Cyg... 2023-01-08 01:26:56.6: (belongs to Project AAVSO_MISC_SGUA_AUTO_ver2821, Plan V2493_Cyg) 2023-01-08 01:26:56.6: Send Observation V2493_Cyg to ACP Sequencer 2023-01-08 01:32:53.1: ACP data acquisition failed for Observation V2493_Cyg. 2023-01-08 01:32:53.1: (Observation V2493_Cyg interrupted by acquisition process failure.) 2023-01-08 01:32:53.2: Rising plan delay enabled for Plan AX_Per: 2023-01-08 01:32:53.2: 330 min. remaining to meet strict constraints. 2023-01-08 01:32:53.2: 695 min. remaining for the plan to fit before dawn. 2023-01-08 01:32:53.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 01:32:53.2: ending rising plan delay. Plan is now eligible. 2023-01-08 01:32:53.2: Rising plan delay enabled for Plan B0133+47: 2023-01-08 01:32:53.2: 319 min. remaining to meet strict constraints. 2023-01-08 01:32:53.2: 688 min. remaining for the plan to fit before dawn. 2023-01-08 01:32:53.2: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 01:32:53.2: ending rising plan delay. Plan is now eligible. 2023-01-08 01:32:53.2: Rising plan delay enabled for Plan B0133+47: 2023-01-08 01:32:53.2: 319 min. remaining to meet strict constraints. 2023-01-08 01:32:53.2: 688 min. remaining for the plan to fit before dawn. 2023-01-08 01:32:53.2: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 01:32:53.2: ending rising plan delay. Plan is now eligible. 2023-01-08 01:32:53.3: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:32:53.3: 183 min. remaining to meet strict constraints. 2023-01-08 01:32:53.3: 685 min. remaining for the plan to fit before dawn. 2023-01-08 01:32:53.3: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-08 01:32:53.3: ending rising plan delay. Plan is now eligible. 2023-01-08 01:32:53.3: Rising plan delay enabled for Plan GZ_Cet: 2023-01-08 01:32:53.3: 183 min. remaining to meet strict constraints. 2023-01-08 01:32:53.3: 676 min. remaining for the plan to fit before dawn. 2023-01-08 01:32:53.3: but only -9 min till start so Plan transits mid-way in its time span. 2023-01-08 01:32:53.3: ending rising plan delay. Plan is now eligible. 2023-01-08 01:32:53.5: Dispatcher cycle time: 0.3 sec. 2023-01-08 01:32:53.5: Acquire data for Observation EE_Cep... 2023-01-08 01:32:53.5: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan EE_Cep) 2023-01-08 01:32:53.5: Send Observation EE_Cep to ACP Sequencer 2023-01-08 01:47:13.2: Acquisition time: 859.7553248 sec. 2023-01-08 01:47:13.2: Data for Observation EE_Cep of Plan EE_Cep acquired successfully. 2023-01-08 01:47:13.2: Plan EE_Cep completed successfully. 2023-01-08 01:47:13.2: Image Efficiency: 75.0% 2023-01-08 01:47:13.2: Cycle Efficiency: 100.0% 2023-01-08 01:47:13.4: Rising plan delay enabled for Plan GR_Ori: 2023-01-08 01:47:13.4: 429 min. remaining to meet strict constraints. 2023-01-08 01:47:13.4: 677 min. remaining for the plan to fit before dawn. 2023-01-08 01:47:13.4: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-08 01:47:13.4: deferred (rising) for 207 min, until 08-Jan-2023 05:14:19 UTC 2023-01-08 01:47:13.4: Rising plan delay enabled for Plan GR_Ori: 2023-01-08 01:47:13.4: 429 min. remaining to meet strict constraints. 2023-01-08 01:47:13.4: 677 min. remaining for the plan to fit before dawn. 2023-01-08 01:47:13.4: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-08 01:47:13.4: deferred (rising) for 207 min, until 08-Jan-2023 05:14:19 UTC 2023-01-08 01:47:13.6: Dispatcher cycle time: 0.3 sec. 2023-01-08 01:47:13.6: Acquire data for Observation CGCS_5926... 2023-01-08 01:47:13.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan CGCS_5926) 2023-01-08 01:47:13.6: Send Observation CGCS_5926 to ACP Sequencer 2023-01-08 02:11:57.0: Acquisition time: 1483.3273205 sec. 2023-01-08 02:11:57.0: Data for Observation CGCS_5926 of Plan CGCS_5926 acquired successfully. 2023-01-08 02:11:57.0: Plan CGCS_5926 completed successfully. 2023-01-08 02:11:57.0: Image Efficiency: 78.2% 2023-01-08 02:11:57.0: Cycle Efficiency: 100.0% 2023-01-08 02:11:57.2: Rising plan delay enabled for Plan S_Ori: 2023-01-08 02:11:57.2: 393 min. remaining to meet strict constraints. 2023-01-08 02:11:57.2: 640 min. remaining for the plan to fit before dawn. 2023-01-08 02:11:57.2: but only 184 min till start so Plan transits mid-way in its time span. 2023-01-08 02:11:57.2: deferred (rising) for 182 min, until 08-Jan-2023 05:14:04 UTC 2023-01-08 02:11:57.2: Rising plan delay enabled for Plan V1647_Ori: 2023-01-08 02:11:57.2: 425 min. remaining to meet strict constraints. 2023-01-08 02:11:57.2: 644 min. remaining for the plan to fit before dawn. 2023-01-08 02:11:57.2: but only 203 min till start so Plan transits mid-way in its time span. 2023-01-08 02:11:57.2: deferred (rising) for 202 min, until 08-Jan-2023 05:34:08 UTC 2023-01-08 02:11:57.2: Rising plan delay enabled for Plan V479_And: 2023-01-08 02:11:57.2: 444 min. remaining to meet strict constraints. 2023-01-08 02:11:57.2: 408 min. remaining for the plan to fit before dawn. 2023-01-08 02:11:57.2: 32958 min. remaining for the plan to fit before "must run before" time. 2023-01-08 02:11:57.2: but only 23 min till start so Plan transits mid-way in its time span. 2023-01-08 02:11:57.2: ending rising plan delay. Plan is now eligible. 2023-01-08 02:11:57.4: Dispatcher cycle time: 0.3 sec. 2023-01-08 02:11:57.4: Acquire data for Observation PV_Cep... 2023-01-08 02:11:57.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan PV_Cep) 2023-01-08 02:11:57.4: Send Observation PV_Cep to ACP Sequencer 2023-01-08 02:38:02.6: Acquisition time: 1565.1495289 sec. 2023-01-08 02:38:02.6: Data for Observation PV_Cep of Plan PV_Cep acquired successfully. 2023-01-08 02:38:02.6: Plan PV_Cep completed successfully. 2023-01-08 02:38:02.6: Image Efficiency: 78.6% 2023-01-08 02:38:02.6: Cycle Efficiency: 100.0% 2023-01-08 02:38:02.7: ++ Auto Focus ++ 2023-01-08 02:38:02.7: Doing periodic autofocus. 2023-01-08 02:38:02.7: Start special ACP AutoFocus script for scheduler 2023-01-08 02:41:51.8: Next periodic autofocus ASAP after 7200sec. 08-Jan-2023 04:41:38 UTC 2023-01-08 02:41:51.9: Rising plan delay enabled for Plan KN_Lyn: 2023-01-08 02:41:51.9: 689 min. remaining to meet strict constraints. 2023-01-08 02:41:51.9: 592 min. remaining for the plan to fit before dawn. 2023-01-08 02:41:51.9: but only 312 min till start so Plan transits mid-way in its time span. 2023-01-08 02:41:51.9: deferred (rising) for 308 min, until 08-Jan-2023 07:50:40 UTC 2023-01-08 02:41:51.9: Rising plan delay enabled for Plan MP_Gem: 2023-01-08 02:41:51.9: 508 min. remaining to meet strict constraints. 2023-01-08 02:41:51.9: 572 min. remaining for the plan to fit before dawn. 2023-01-08 02:41:51.9: but only 214 min till start so Plan transits mid-way in its time span. 2023-01-08 02:41:51.9: deferred (rising) for 209 min, until 08-Jan-2023 06:11:03 UTC 2023-01-08 02:41:51.9: Rising plan delay enabled for Plan MP_Gem: 2023-01-08 02:41:51.9: 508 min. remaining to meet strict constraints. 2023-01-08 02:41:51.9: 597 min. remaining for the plan to fit before dawn. 2023-01-08 02:41:51.9: but only 227 min till start so Plan transits mid-way in its time span. 2023-01-08 02:41:51.9: deferred (rising) for 223 min, until 08-Jan-2023 06:25:48 UTC 2023-01-08 02:41:51.9: Rising plan delay enabled for Plan V1261_Ori: 2023-01-08 02:41:51.9: 341 min. remaining to meet strict constraints. 2023-01-08 02:41:51.9: 626 min. remaining for the plan to fit before dawn. 2023-01-08 02:41:51.9: but only 155 min till start so Plan transits mid-way in its time span. 2023-01-08 02:41:51.9: deferred (rising) for 155 min, until 08-Jan-2023 05:17:03 UTC 2023-01-08 02:41:51.9: Rising plan delay enabled for Plan V479_And: 2023-01-08 02:41:51.9: 414 min. remaining to meet strict constraints. 2023-01-08 02:41:51.9: 378 min. remaining for the plan to fit before dawn. 2023-01-08 02:41:51.9: 32928 min. remaining for the plan to fit before "must run before" time. 2023-01-08 02:41:51.9: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-08 02:41:51.9: ending rising plan delay. Plan is now eligible. 2023-01-08 02:41:52.1: Dispatcher cycle time: 0.3 sec. 2023-01-08 02:41:52.1: Acquire data for Observation BO_Cep... 2023-01-08 02:41:52.1: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan BO_Cep) 2023-01-08 02:41:52.1: Send Observation BO_Cep to ACP Sequencer 2023-01-08 03:01:23.2: Acquisition time: 1171.0519851 sec. 2023-01-08 03:01:23.2: Data for Observation BO_Cep of Plan BO_Cep acquired successfully. 2023-01-08 03:01:23.2: Plan BO_Cep completed successfully. 2023-01-08 03:01:23.2: Image Efficiency: 67.5% 2023-01-08 03:01:23.2: Cycle Efficiency: 100.0% 2023-01-08 03:01:23.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-08 03:01:23.3: 376 min. remaining to meet strict constraints. 2023-01-08 03:01:23.3: 587 min. remaining for the plan to fit before dawn. 2023-01-08 03:01:23.3: but only 173 min till start so Plan transits mid-way in its time span. 2023-01-08 03:01:23.3: deferred (rising) for 171 min, until 08-Jan-2023 05:52:31 UTC 2023-01-08 03:01:23.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-08 03:01:23.3: 376 min. remaining to meet strict constraints. 2023-01-08 03:01:23.3: 587 min. remaining for the plan to fit before dawn. 2023-01-08 03:01:23.3: but only 173 min till start so Plan transits mid-way in its time span. 2023-01-08 03:01:23.3: deferred (rising) for 171 min, until 08-Jan-2023 05:52:31 UTC 2023-01-08 03:01:23.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-08 03:01:23.3: 427 min. remaining to meet strict constraints. 2023-01-08 03:01:23.3: 602 min. remaining for the plan to fit before dawn. 2023-01-08 03:01:23.3: but only 208 min till start so Plan transits mid-way in its time span. 2023-01-08 03:01:23.3: deferred (rising) for 207 min, until 08-Jan-2023 06:29:05 UTC 2023-01-08 03:01:23.3: Rising plan delay enabled for Plan CW_Mon: 2023-01-08 03:01:23.3: 427 min. remaining to meet strict constraints. 2023-01-08 03:01:23.3: 602 min. remaining for the plan to fit before dawn. 2023-01-08 03:01:23.3: but only 208 min till start so Plan transits mid-way in its time span. 2023-01-08 03:01:23.3: deferred (rising) for 207 min, until 08-Jan-2023 06:29:05 UTC 2023-01-08 03:01:23.4: Rising plan delay enabled for Plan V479_And: 2023-01-08 03:01:23.4: 394 min. remaining to meet strict constraints. 2023-01-08 03:01:23.4: 359 min. remaining for the plan to fit before dawn. 2023-01-08 03:01:23.4: 32908 min. remaining for the plan to fit before "must run before" time. 2023-01-08 03:01:23.4: but only -25 min till start so Plan transits mid-way in its time span. 2023-01-08 03:01:23.4: ending rising plan delay. Plan is now eligible. 2023-01-08 03:01:23.6: Dispatcher cycle time: 0.3 sec. 2023-01-08 03:01:23.6: Acquire data for Observation V504_Per... 2023-01-08 03:01:23.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V504_Per) 2023-01-08 03:01:23.6: Send Observation V504_Per to ACP Sequencer 2023-01-08 03:10:23.2: Acquisition time: 539.6169484 sec. 2023-01-08 03:10:23.2: Data for Observation V504_Per of Plan V504_Per acquired successfully. 2023-01-08 03:10:23.2: Plan V504_Per completed successfully. 2023-01-08 03:10:23.2: Image Efficiency: 34.1% 2023-01-08 03:10:23.2: Cycle Efficiency: 99.9% 2023-01-08 03:10:23.4: Rising plan delay enabled for Plan V479_And: 2023-01-08 03:10:23.4: 385 min. remaining to meet strict constraints. 2023-01-08 03:10:23.4: 350 min. remaining for the plan to fit before dawn. 2023-01-08 03:10:23.4: 32899 min. remaining for the plan to fit before "must run before" time. 2023-01-08 03:10:23.4: but only -34 min till start so Plan transits mid-way in its time span. 2023-01-08 03:10:23.4: ending rising plan delay. Plan is now eligible. 2023-01-08 03:10:23.4: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 03:10:23.4: 466 min. remaining to meet strict constraints. 2023-01-08 03:10:23.4: 579 min. remaining for the plan to fit before dawn. 2023-01-08 03:10:23.4: but only 219 min till start so Plan transits mid-way in its time span. 2023-01-08 03:10:23.4: deferred (rising) for 217 min, until 08-Jan-2023 06:47:26 UTC 2023-01-08 03:10:23.6: Dispatcher cycle time: 0.3 sec. 2023-01-08 03:10:23.6: Acquire data for Observation V630_Cas... 2023-01-08 03:10:23.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V630_Cas) 2023-01-08 03:10:23.6: Send Observation V630_Cas to ACP Sequencer 2023-01-08 03:22:29.1: Acquisition time: 725.4532409 sec. 2023-01-08 03:22:29.1: Data for Observation V630_Cas of Plan V630_Cas acquired successfully. 2023-01-08 03:22:29.1: Plan V630_Cas completed successfully. 2023-01-08 03:22:29.1: Image Efficiency: 74.4% 2023-01-08 03:22:29.1: Cycle Efficiency: 100.0% 2023-01-08 03:22:29.3: Rising plan delay enabled for Plan V479_And: 2023-01-08 03:22:29.3: 373 min. remaining to meet strict constraints. 2023-01-08 03:22:29.3: 338 min. remaining for the plan to fit before dawn. 2023-01-08 03:22:29.3: 32887 min. remaining for the plan to fit before "must run before" time. 2023-01-08 03:22:29.3: but only -46 min till start so Plan transits mid-way in its time span. 2023-01-08 03:22:29.3: ending rising plan delay. Plan is now eligible. 2023-01-08 03:22:29.5: Dispatcher cycle time: 0.3 sec. 2023-01-08 03:22:29.5: Acquire data for Observation AX_Per... 2023-01-08 03:22:29.5: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan AX_Per) 2023-01-08 03:22:29.5: Send Observation AX_Per to ACP Sequencer 2023-01-08 03:27:40.9: Acquisition time: 311.4265565 sec. 2023-01-08 03:27:40.9: Data for Observation AX_Per of Plan AX_Per acquired successfully. 2023-01-08 03:27:40.9: Plan AX_Per completed successfully. 2023-01-08 03:27:40.9: Image Efficiency: 48.1% 2023-01-08 03:27:40.9: Cycle Efficiency: 99.9% 2023-01-08 03:27:41.1: Rising plan delay enabled for Plan V479_And: 2023-01-08 03:27:41.1: 368 min. remaining to meet strict constraints. 2023-01-08 03:27:41.1: 332 min. remaining for the plan to fit before dawn. 2023-01-08 03:27:41.1: 32882 min. remaining for the plan to fit before "must run before" time. 2023-01-08 03:27:41.1: but only -51 min till start so Plan transits mid-way in its time span. 2023-01-08 03:27:41.1: ending rising plan delay. Plan is now eligible. 2023-01-08 03:27:41.3: Dispatcher cycle time: 0.3 sec. 2023-01-08 03:27:41.3: Acquire data for Observation V479_And... 2023-01-08 03:27:41.3: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-08 03:27:41.3: Send Observation V479_And to ACP Sequencer 2023-01-08 03:41:28.4: Acquisition time: 827.064298 sec. 2023-01-08 03:41:28.4: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-08 03:41:28.4: Image Efficiency: 72.5% 2023-01-08 03:41:28.4: Cycle Efficiency: 100.0% 2023-01-08 03:41:28.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-08 03:41:28.6: 424 min. remaining to meet strict constraints. 2023-01-08 03:41:28.6: 559 min. remaining for the plan to fit before dawn. 2023-01-08 03:41:28.6: but only 201 min till start so Plan transits mid-way in its time span. 2023-01-08 03:41:28.6: deferred (rising) for 200 min, until 08-Jan-2023 07:01:50 UTC 2023-01-08 03:41:28.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-08 03:41:28.6: 424 min. remaining to meet strict constraints. 2023-01-08 03:41:28.6: 559 min. remaining for the plan to fit before dawn. 2023-01-08 03:41:28.6: but only 201 min till start so Plan transits mid-way in its time span. 2023-01-08 03:41:28.6: deferred (rising) for 200 min, until 08-Jan-2023 07:01:50 UTC 2023-01-08 03:41:28.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 03:41:28.6: 401 min. remaining to meet strict constraints. 2023-01-08 03:41:28.6: 484 min. remaining for the plan to fit before dawn. 2023-01-08 03:41:28.6: but only 156 min till start so Plan transits mid-way in its time span. 2023-01-08 03:41:28.6: deferred (rising) for 147 min, until 08-Jan-2023 06:09:08 UTC 2023-01-08 03:41:28.6: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 03:41:28.6: 401 min. remaining to meet strict constraints. 2023-01-08 03:41:28.6: 534 min. remaining for the plan to fit before dawn. 2023-01-08 03:41:28.6: 116838 min. remaining for the plan to fit before "must run before" time. 2023-01-08 03:41:28.6: but only 181 min till start so Plan transits mid-way in its time span. 2023-01-08 03:41:28.6: deferred (rising) for 177 min, until 08-Jan-2023 06:39:23 UTC 2023-01-08 03:41:28.8: Dispatcher cycle time: 0.2 sec. 2023-01-08 03:41:28.8: Acquire data for Observation EE_Cep... 2023-01-08 03:41:28.8: (belongs to Project AAVSO_P124_Staels_AUTO_ver3389, Plan EE_Cep) 2023-01-08 03:41:28.8: Send Observation EE_Cep to ACP Sequencer 2023-01-08 03:50:17.7: Acquisition time: 528.9264306 sec. 2023-01-08 03:50:17.7: Data for Observation EE_Cep of Plan EE_Cep acquired successfully. 2023-01-08 03:50:17.7: Plan EE_Cep completed successfully. 2023-01-08 03:50:17.7: Image Efficiency: 28.2% 2023-01-08 03:50:17.7: Cycle Efficiency: 100.0% 2023-01-08 03:50:17.9: Rising plan delay enabled for Plan L1022_IRS: 2023-01-08 03:50:17.9: 369 min. remaining to meet strict constraints. 2023-01-08 03:50:17.9: 551 min. remaining for the plan to fit before dawn. 2023-01-08 03:50:17.9: but only 178 min till start so Plan transits mid-way in its time span. 2023-01-08 03:50:17.9: deferred (rising) for 177 min, until 08-Jan-2023 06:48:05 UTC 2023-01-08 03:50:17.9: Rising plan delay enabled for Plan L1022_IRS: 2023-01-08 03:50:17.9: 369 min. remaining to meet strict constraints. 2023-01-08 03:50:17.9: 551 min. remaining for the plan to fit before dawn. 2023-01-08 03:50:17.9: but only 178 min till start so Plan transits mid-way in its time span. 2023-01-08 03:50:17.9: deferred (rising) for 177 min, until 08-Jan-2023 06:48:05 UTC 2023-01-08 03:50:17.9: Rising plan delay enabled for Plan RY_Lep: 2023-01-08 03:50:17.9: 238 min. remaining to meet strict constraints. 2023-01-08 03:50:17.9: 537 min. remaining for the plan to fit before dawn. 2023-01-08 03:50:17.9: but only 102 min till start so Plan transits mid-way in its time span. 2023-01-08 03:50:17.9: deferred (rising) for 100 min, until 08-Jan-2023 05:30:23 UTC 2023-01-08 03:50:18.0: Rising plan delay enabled for Plan V900_Mon: 2023-01-08 03:50:18.0: 369 min. remaining to meet strict constraints. 2023-01-08 03:50:18.0: 537 min. remaining for the plan to fit before dawn. 2023-01-08 03:50:18.0: but only 171 min till start so Plan transits mid-way in its time span. 2023-01-08 03:50:18.0: deferred (rising) for 169 min, until 08-Jan-2023 06:39:26 UTC 2023-01-08 03:50:18.1: Dispatcher cycle time: 0.3 sec. 2023-01-08 03:50:18.1: Acquire data for Observation V0704_And... 2023-01-08 03:50:18.1: (belongs to Project AAVSO_P253_CDAG_AUTO_ver3388, Plan V0704_And) 2023-01-08 03:50:18.1: Send Observation V0704_And to ACP Sequencer 2023-01-08 03:58:16.7: Acquisition time: 478.5908898 sec. 2023-01-08 03:58:16.7: Data for Observation V0704_And of Plan V0704_And acquired successfully. 2023-01-08 03:58:16.7: Plan V0704_And completed successfully. 2023-01-08 03:58:16.7: Image Efficiency: 45.1% 2023-01-08 03:58:16.7: Cycle Efficiency: 99.9% 2023-01-08 03:58:16.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 03:58:16.9: 346 min. remaining to meet strict constraints. 2023-01-08 03:58:16.9: 540 min. remaining for the plan to fit before dawn. 2023-01-08 03:58:16.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 03:58:16.9: ending rising plan delay. Plan is now eligible. 2023-01-08 03:58:16.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 03:58:16.9: 346 min. remaining to meet strict constraints. 2023-01-08 03:58:16.9: 540 min. remaining for the plan to fit before dawn. 2023-01-08 03:58:16.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 03:58:16.9: ending rising plan delay. Plan is now eligible. 2023-01-08 03:58:16.9: Rising plan delay enabled for Plan TV_Cam: 2023-01-08 03:58:16.9: 346 min. remaining to meet strict constraints. 2023-01-08 03:58:16.9: 539 min. remaining for the plan to fit before dawn. 2023-01-08 03:58:16.9: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 03:58:16.9: ending rising plan delay. Plan is now eligible. 2023-01-08 03:58:17.1: Dispatcher cycle time: 0.2 sec. 2023-01-08 03:58:17.1: Acquire data for Observation V407_Cas... 2023-01-08 03:58:17.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan V407_Cas) 2023-01-08 03:58:17.1: Send Observation V407_Cas to ACP Sequencer 2023-01-08 04:13:29.8: Acquisition time: 912.6989093 sec. 2023-01-08 04:13:29.8: Data for Observation V407_Cas of Plan V407_Cas acquired successfully. 2023-01-08 04:13:29.8: Plan V407_Cas completed successfully. 2023-01-08 04:13:29.8: Image Efficiency: 59.6% 2023-01-08 04:13:29.8: Cycle Efficiency: 100.0% 2023-01-08 04:13:30.0: Rising plan delay enabled for Plan NGC_1904: 2023-01-08 04:13:30.0: 149 min. remaining to meet strict constraints. 2023-01-08 04:13:30.0: 519 min. remaining for the plan to fit before dawn. 2023-01-08 04:13:30.0: but only 58 min till start so Plan transits mid-way in its time span. 2023-01-08 04:13:30.0: deferred (rising) for 56 min, until 08-Jan-2023 05:09:39 UTC 2023-01-08 04:13:30.0: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-08 04:13:30.0: 262 min. remaining to meet strict constraints. 2023-01-08 04:13:30.0: 521 min. remaining for the plan to fit before dawn. 2023-01-08 04:13:30.0: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 04:13:30.0: ending rising plan delay. Plan is now eligible. 2023-01-08 04:13:30.0: Rising plan delay enabled for Plan NSVS_0421121: 2023-01-08 04:13:30.0: 262 min. remaining to meet strict constraints. 2023-01-08 04:13:30.0: 521 min. remaining for the plan to fit before dawn. 2023-01-08 04:13:30.0: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 04:13:30.0: ending rising plan delay. Plan is now eligible. 2023-01-08 04:13:30.1: Dispatcher cycle time: 0.3 sec. 2023-01-08 04:13:30.1: Acquire data for Observation TU_Cas... 2023-01-08 04:13:30.1: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan TU_Cas) 2023-01-08 04:13:30.2: Send Observation TU_Cas to ACP Sequencer 2023-01-08 04:36:28.4: Acquisition time: 1378.2599763 sec. 2023-01-08 04:36:28.4: Data for Observation TU_Cas of Plan TU_Cas acquired successfully. 2023-01-08 04:36:28.4: Plan TU_Cas completed successfully. 2023-01-08 04:36:28.4: Image Efficiency: 5.2% 2023-01-08 04:36:28.4: Cycle Efficiency: 100.0% 2023-01-08 04:36:28.6: Dispatcher cycle time: 0.0 sec. 2023-01-08 04:36:28.6: Acquire data for Observation V479_And... 2023-01-08 04:36:28.6: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-08 04:36:28.6: Send Observation V479_And to ACP Sequencer 2023-01-08 04:49:53.3: Acquisition time: 804.738023 sec. 2023-01-08 04:49:53.3: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-08 04:49:53.3: Image Efficiency: 74.6% 2023-01-08 04:49:53.3: Cycle Efficiency: 100.0% 2023-01-08 04:49:53.5: ++ Auto Focus ++ 2023-01-08 04:49:53.5: Doing periodic autofocus. 2023-01-08 04:49:53.5: Start special ACP AutoFocus script for scheduler 2023-01-08 04:53:47.6: Next periodic autofocus ASAP after 7200sec. 08-Jan-2023 06:53:28 UTC 2023-01-08 04:53:47.9: Dispatcher cycle time: 0.3 sec. 2023-01-08 04:53:47.9: Acquire data for Observation TV_Cam... 2023-01-08 04:53:47.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan TV_Cam) 2023-01-08 04:53:47.9: Send Observation TV_Cam to ACP Sequencer 2023-01-08 05:07:30.0: Acquisition time: 822.0469433 sec. 2023-01-08 05:07:30.0: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2023-01-08 05:07:30.0: Plan TV_Cam completed successfully. 2023-01-08 05:07:30.0: Image Efficiency: 60.1% 2023-01-08 05:07:30.0: Cycle Efficiency: 100.0% 2023-01-08 05:07:30.2: Rising plan delay enabled for Plan ER_Aur: 2023-01-08 05:07:30.2: 310 min. remaining to meet strict constraints. 2023-01-08 05:07:30.2: 470 min. remaining for the plan to fit before dawn. 2023-01-08 05:07:30.2: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 05:07:30.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:07:30.2: Rising plan delay enabled for Plan ER_Aur: 2023-01-08 05:07:30.2: 310 min. remaining to meet strict constraints. 2023-01-08 05:07:30.2: 470 min. remaining for the plan to fit before dawn. 2023-01-08 05:07:30.2: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 05:07:30.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:07:30.2: Rising plan delay enabled for Plan QX_Pup: 2023-01-08 05:07:30.2: 306 min. remaining to meet strict constraints. 2023-01-08 05:07:30.2: 472 min. remaining for the plan to fit before dawn. 2023-01-08 05:07:30.2: but only 144 min till start so Plan transits mid-way in its time span. 2023-01-08 05:07:30.2: deferred (rising) for 143 min, until 08-Jan-2023 07:31:13 UTC 2023-01-08 05:07:30.2: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 05:07:30.2: 309 min. remaining to meet strict constraints. 2023-01-08 05:07:30.2: 454 min. remaining for the plan to fit before dawn. 2023-01-08 05:07:30.2: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-08 05:07:30.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:07:30.2: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 05:07:30.2: 309 min. remaining to meet strict constraints. 2023-01-08 05:07:30.2: 454 min. remaining for the plan to fit before dawn. 2023-01-08 05:07:30.2: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-08 05:07:30.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:07:30.4: Dispatcher cycle time: 0.3 sec. 2023-01-08 05:07:30.4: Acquire data for Observation ER_Aur... 2023-01-08 05:07:30.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan ER_Aur) 2023-01-08 05:07:30.4: Send Observation ER_Aur to ACP Sequencer 2023-01-08 05:22:06.4: Acquisition time: 876.0112458 sec. 2023-01-08 05:22:06.4: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2023-01-08 05:22:06.4: Plan ER_Aur completed successfully. 2023-01-08 05:22:06.4: Image Efficiency: 62.0% 2023-01-08 05:22:06.4: Cycle Efficiency: 100.0% 2023-01-08 05:22:06.6: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-08 05:22:06.6: 470 min. remaining to meet strict constraints. 2023-01-08 05:22:06.6: 450 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.6: but only 220 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.6: deferred (rising) for 218 min, until 08-Jan-2023 09:00:33 UTC 2023-01-08 05:22:06.6: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-08 05:22:06.6: 470 min. remaining to meet strict constraints. 2023-01-08 05:22:06.6: 450 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.6: but only 220 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.6: deferred (rising) for 218 min, until 08-Jan-2023 09:00:33 UTC 2023-01-08 05:22:06.6: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 05:22:06.6: 295 min. remaining to meet strict constraints. 2023-01-08 05:22:06.6: 439 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.6: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.6: ending rising plan delay. Plan is now eligible. 2023-01-08 05:22:06.6: Rising plan delay enabled for Plan QZ_Aur: 2023-01-08 05:22:06.6: 295 min. remaining to meet strict constraints. 2023-01-08 05:22:06.6: 439 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.6: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.6: ending rising plan delay. Plan is now eligible. 2023-01-08 05:22:06.6: Rising plan delay enabled for Plan S_Ori: 2023-01-08 05:22:06.6: 203 min. remaining to meet strict constraints. 2023-01-08 05:22:06.6: 449 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.6: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.6: ending rising plan delay. Plan is now eligible. 2023-01-08 05:22:06.7: Rising plan delay enabled for Plan V582_Aur: 2023-01-08 05:22:06.7: 294 min. remaining to meet strict constraints. 2023-01-08 05:22:06.7: 459 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.7: ending rising plan delay. Plan is now eligible. 2023-01-08 05:22:06.7: Rising plan delay enabled for Plan V582_Aur: 2023-01-08 05:22:06.7: 294 min. remaining to meet strict constraints. 2023-01-08 05:22:06.7: 459 min. remaining for the plan to fit before dawn. 2023-01-08 05:22:06.7: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 05:22:06.7: ending rising plan delay. Plan is now eligible. 2023-01-08 05:22:06.8: Dispatcher cycle time: 0.3 sec. 2023-01-08 05:22:06.8: Acquire data for Observation V1261_Ori... 2023-01-08 05:22:06.8: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan V1261_Ori) 2023-01-08 05:22:06.8: Send Observation V1261_Ori to ACP Sequencer 2023-01-08 05:27:16.0: Acquisition time: 309.1839789 sec. 2023-01-08 05:27:16.0: Data for Observation V1261_Ori of Plan V1261_Ori acquired successfully. 2023-01-08 05:27:16.0: Plan V1261_Ori completed successfully. 2023-01-08 05:27:16.0: Image Efficiency: 45.2% 2023-01-08 05:27:16.0: Cycle Efficiency: 99.9% 2023-01-08 05:27:16.1: Dispatcher cycle time: 0.0 sec. 2023-01-08 05:27:16.1: Acquire data for Observation V479_And... 2023-01-08 05:27:16.1: (belongs to Project AAVSO_P305_KPRB_AUTO_ver3385, Plan V479_And) 2023-01-08 05:27:16.2: Send Observation V479_And to ACP Sequencer 2023-01-08 05:40:08.9: Acquisition time: 772.765582 sec. 2023-01-08 05:40:08.9: Data for Observation V479_And of Plan V479_And acquired successfully. 2023-01-08 05:40:08.9: Plan V479_And completed successfully. 2023-01-08 05:40:08.9: Image Efficiency: 77.6% 2023-01-08 05:40:08.9: Cycle Efficiency: 100.0% 2023-01-08 05:40:09.1: Rising plan delay enabled for Plan AO_Aur: 2023-01-08 05:40:09.1: 293 min. remaining to meet strict constraints. 2023-01-08 05:40:09.1: 443 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.1: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.1: Rising plan delay enabled for Plan AO_Aur: 2023-01-08 05:40:09.1: 293 min. remaining to meet strict constraints. 2023-01-08 05:40:09.1: 443 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.1: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.1: Rising plan delay enabled for Plan FS_Aur: 2023-01-08 05:40:09.1: 287 min. remaining to meet strict constraints. 2023-01-08 05:40:09.1: 440 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.1: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.1: Rising plan delay enabled for Plan FS_Aur: 2023-01-08 05:40:09.1: 287 min. remaining to meet strict constraints. 2023-01-08 05:40:09.1: 440 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.1: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.1: Rising plan delay enabled for Plan Mrk_180: 2023-01-08 05:40:09.1: 714 min. remaining to meet strict constraints. 2023-01-08 05:40:09.1: 447 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.1: but only 350 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.1: deferred (rising) for 349 min, until 08-Jan-2023 11:29:54 UTC 2023-01-08 05:40:09.2: Rising plan delay enabled for Plan R_Leo: 2023-01-08 05:40:09.2: 489 min. remaining to meet strict constraints. 2023-01-08 05:40:09.2: 439 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.2: but only 237 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.2: deferred (rising) for 236 min, until 08-Jan-2023 09:36:41 UTC 2023-01-08 05:40:09.2: Rising plan delay enabled for Plan RY_Lep: 2023-01-08 05:40:09.2: 128 min. remaining to meet strict constraints. 2023-01-08 05:40:09.2: 427 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.2: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.2: Rising plan delay enabled for Plan V1647_Ori: 2023-01-08 05:40:09.2: 217 min. remaining to meet strict constraints. 2023-01-08 05:40:09.2: 436 min. remaining for the plan to fit before dawn. 2023-01-08 05:40:09.2: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 05:40:09.2: ending rising plan delay. Plan is now eligible. 2023-01-08 05:40:09.4: Dispatcher cycle time: 0.3 sec. 2023-01-08 05:40:09.4: Acquire data for Observation V1112_Per... 2023-01-08 05:40:09.4: (belongs to Project AAVSO_P167_HGUA_AUTO_ver2706, Plan V1112_Per) 2023-01-08 05:40:09.4: Send Observation V1112_Per to ACP Sequencer 2023-01-08 05:56:17.2: Acquisition time: 967.7958466 sec. 2023-01-08 05:56:17.2: Data for Observation V1112_Per of Plan V1112_Per acquired successfully. 2023-01-08 05:56:17.2: Plan V1112_Per completed successfully. 2023-01-08 05:56:17.2: Image Efficiency: 74.4% 2023-01-08 05:56:17.2: Cycle Efficiency: 100.0% 2023-01-08 05:56:17.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-08 05:56:17.3: 201 min. remaining to meet strict constraints. 2023-01-08 05:56:17.3: 412 min. remaining for the plan to fit before dawn. 2023-01-08 05:56:17.3: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-08 05:56:17.3: ending rising plan delay. Plan is now eligible. 2023-01-08 05:56:17.3: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-08 05:56:17.3: 201 min. remaining to meet strict constraints. 2023-01-08 05:56:17.3: 412 min. remaining for the plan to fit before dawn. 2023-01-08 05:56:17.3: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-08 05:56:17.3: ending rising plan delay. Plan is now eligible. 2023-01-08 05:56:17.6: Dispatcher cycle time: 0.3 sec. 2023-01-08 05:56:17.6: Acquire data for Observation QZ_Aur... 2023-01-08 05:56:17.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan QZ_Aur) 2023-01-08 05:56:17.6: Send Observation QZ_Aur to ACP Sequencer 2023-01-08 06:28:51.2: Acquisition time: 1953.6004777 sec. 2023-01-08 06:28:51.2: Data for Observation QZ_Aur of Plan QZ_Aur acquired successfully. 2023-01-08 06:28:51.2: Plan QZ_Aur completed successfully. 2023-01-08 06:28:51.2: Image Efficiency: 71.6% 2023-01-08 06:28:51.2: Cycle Efficiency: 100.0% 2023-01-08 06:28:51.4: Rising plan delay enabled for Plan BX_Pup: 2023-01-08 06:28:51.4: 166 min. remaining to meet strict constraints. 2023-01-08 06:28:51.4: 392 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.4: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.4: deferred (rising) for 75 min, until 08-Jan-2023 07:44:25 UTC 2023-01-08 06:28:51.4: Rising plan delay enabled for Plan BX_Pup: 2023-01-08 06:28:51.4: 166 min. remaining to meet strict constraints. 2023-01-08 06:28:51.4: 392 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.4: but only 76 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.4: deferred (rising) for 75 min, until 08-Jan-2023 07:44:25 UTC 2023-01-08 06:28:51.4: Rising plan delay enabled for Plan MP_Gem: 2023-01-08 06:28:51.4: 281 min. remaining to meet strict constraints. 2023-01-08 06:28:51.4: 370 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.4: ending rising plan delay. Plan is now eligible. 2023-01-08 06:28:51.4: Rising plan delay enabled for Plan MP_Gem: 2023-01-08 06:28:51.4: 281 min. remaining to meet strict constraints. 2023-01-08 06:28:51.4: 345 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.4: but only -12 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.4: ending rising plan delay. Plan is now eligible. 2023-01-08 06:28:51.5: Rising plan delay enabled for Plan U_Leo: 2023-01-08 06:28:51.5: 483 min. remaining to meet strict constraints. 2023-01-08 06:28:51.5: 393 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.5: but only 226 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.5: deferred (rising) for 225 min, until 08-Jan-2023 10:14:40 UTC 2023-01-08 06:28:51.5: Rising plan delay enabled for Plan U_Leo: 2023-01-08 06:28:51.5: 483 min. remaining to meet strict constraints. 2023-01-08 06:28:51.5: 393 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.5: but only 226 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.5: deferred (rising) for 225 min, until 08-Jan-2023 10:14:40 UTC 2023-01-08 06:28:51.5: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 06:28:51.5: 234 min. remaining to meet strict constraints. 2023-01-08 06:28:51.5: 316 min. remaining for the plan to fit before dawn. 2023-01-08 06:28:51.5: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-08 06:28:51.5: ending rising plan delay. Plan is now eligible. 2023-01-08 06:28:51.7: Dispatcher cycle time: 0.4 sec. 2023-01-08 06:28:51.7: Acquire data for Observation NSVS_0421121... 2023-01-08 06:28:51.7: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan NSVS_0421121) 2023-01-08 06:28:51.7: Send Observation NSVS_0421121 to ACP Sequencer 2023-01-08 06:46:59.6: Acquisition time: 1087.8804994 sec. 2023-01-08 06:46:59.6: Data for Observation NSVS_0421121 of Plan NSVS_0421121 acquired successfully. 2023-01-08 06:46:59.6: Plan NSVS_0421121 completed successfully. 2023-01-08 06:46:59.6: Image Efficiency: 82.7% 2023-01-08 06:46:59.6: Cycle Efficiency: 100.0% 2023-01-08 06:46:59.9: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 06:46:59.9: 216 min. remaining to meet strict constraints. 2023-01-08 06:46:59.9: 298 min. remaining for the plan to fit before dawn. 2023-01-08 06:46:59.9: but only -29 min till start so Plan transits mid-way in its time span. 2023-01-08 06:46:59.9: ending rising plan delay. Plan is now eligible. 2023-01-08 06:46:59.9: Rising plan delay enabled for Plan V838_Mon: 2023-01-08 06:46:59.9: 216 min. remaining to meet strict constraints. 2023-01-08 06:46:59.9: 349 min. remaining for the plan to fit before dawn. 2023-01-08 06:46:59.9: 116653 min. remaining for the plan to fit before "must run before" time. 2023-01-08 06:46:59.9: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-08 06:46:59.9: ending rising plan delay. Plan is now eligible. 2023-01-08 06:46:59.9: Rising plan delay enabled for Plan V900_Mon: 2023-01-08 06:46:59.9: 192 min. remaining to meet strict constraints. 2023-01-08 06:46:59.9: 360 min. remaining for the plan to fit before dawn. 2023-01-08 06:46:59.9: but only -5 min till start so Plan transits mid-way in its time span. 2023-01-08 06:46:59.9: ending rising plan delay. Plan is now eligible. 2023-01-08 06:47:00.1: Dispatcher cycle time: 0.3 sec. 2023-01-08 06:47:00.1: Acquire data for Observation AO_Aur... 2023-01-08 06:47:00.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan AO_Aur) 2023-01-08 06:47:00.1: Send Observation AO_Aur to ACP Sequencer 2023-01-08 06:59:11.0: Acquisition time: 730.9438686 sec. 2023-01-08 06:59:11.0: Data for Observation AO_Aur of Plan AO_Aur acquired successfully. 2023-01-08 06:59:11.0: Plan AO_Aur completed successfully. 2023-01-08 06:59:11.0: Image Efficiency: 35.6% 2023-01-08 06:59:11.0: Cycle Efficiency: 100.0% 2023-01-08 06:59:11.1: ++ Auto Focus ++ 2023-01-08 06:59:11.2: Doing periodic autofocus. 2023-01-08 06:59:11.2: Start special ACP AutoFocus script for scheduler 2023-01-08 07:02:23.5: Next periodic autofocus ASAP after 7200sec. 08-Jan-2023 09:02:10 UTC 2023-01-08 07:02:23.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-08 07:02:23.6: 223 min. remaining to meet strict constraints. 2023-01-08 07:02:23.6: 358 min. remaining for the plan to fit before dawn. 2023-01-08 07:02:23.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 07:02:23.6: ending rising plan delay. Plan is now eligible. 2023-01-08 07:02:23.6: Rising plan delay enabled for Plan HQ_Mon: 2023-01-08 07:02:23.6: 223 min. remaining to meet strict constraints. 2023-01-08 07:02:23.6: 358 min. remaining for the plan to fit before dawn. 2023-01-08 07:02:23.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 07:02:23.6: ending rising plan delay. Plan is now eligible. 2023-01-08 07:02:23.6: Rising plan delay enabled for Plan IU_Leo: 2023-01-08 07:02:23.6: 472 min. remaining to meet strict constraints. 2023-01-08 07:02:23.6: 355 min. remaining for the plan to fit before dawn. 2023-01-08 07:02:23.6: but only 224 min till start so Plan transits mid-way in its time span. 2023-01-08 07:02:23.6: deferred (rising) for 223 min, until 08-Jan-2023 10:45:48 UTC 2023-01-08 07:02:23.6: Rising plan delay enabled for Plan IU_Leo: 2023-01-08 07:02:23.6: 472 min. remaining to meet strict constraints. 2023-01-08 07:02:23.6: 355 min. remaining for the plan to fit before dawn. 2023-01-08 07:02:23.6: but only 224 min till start so Plan transits mid-way in its time span. 2023-01-08 07:02:23.6: deferred (rising) for 223 min, until 08-Jan-2023 10:45:48 UTC 2023-01-08 07:02:23.8: Dispatcher cycle time: 0.3 sec. 2023-01-08 07:02:23.8: Acquire data for Observation CW_Mon... 2023-01-08 07:02:23.8: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan CW_Mon) 2023-01-08 07:02:23.8: Send Observation CW_Mon to ACP Sequencer 2023-01-08 07:12:06.8: Acquisition time: 582.9819651 sec. 2023-01-08 07:12:06.8: Data for Observation CW_Mon of Plan CW_Mon acquired successfully. 2023-01-08 07:12:06.8: Plan CW_Mon completed successfully. 2023-01-08 07:12:06.8: Image Efficiency: 61.7% 2023-01-08 07:12:06.8: Cycle Efficiency: 99.9% 2023-01-08 07:12:07.0: Rising plan delay enabled for Plan J072816: 2023-01-08 07:12:07.0: 391 min. remaining to meet strict constraints. 2023-01-08 07:12:07.0: 332 min. remaining for the plan to fit before dawn. 2023-01-08 07:12:07.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 07:12:07.0: ending rising plan delay. Plan is now eligible. 2023-01-08 07:12:07.0: Rising plan delay enabled for Plan J072816: 2023-01-08 07:12:07.0: 391 min. remaining to meet strict constraints. 2023-01-08 07:12:07.0: 332 min. remaining for the plan to fit before dawn. 2023-01-08 07:12:07.0: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 07:12:07.0: ending rising plan delay. Plan is now eligible. 2023-01-08 07:12:07.3: Dispatcher cycle time: 0.4 sec. 2023-01-08 07:12:07.3: Acquire data for Observation AZ_Cas... 2023-01-08 07:12:07.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan AZ_Cas) 2023-01-08 07:12:07.3: Send Observation AZ_Cas to ACP Sequencer 2023-01-08 07:15:31.3: Acquisition time: 203.9452958 sec. 2023-01-08 07:15:31.3: Data for Observation AZ_Cas of Plan AZ_Cas acquired successfully. 2023-01-08 07:15:31.3: Plan AZ_Cas completed successfully. 2023-01-08 07:15:31.3: Image Efficiency: 15.7% 2023-01-08 07:15:31.3: Cycle Efficiency: 99.8% 2023-01-08 07:15:31.5: Rising plan delay enabled for Plan J072816: 2023-01-08 07:15:31.5: 387 min. remaining to meet strict constraints. 2023-01-08 07:15:31.5: 329 min. remaining for the plan to fit before dawn. 2023-01-08 07:15:31.5: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 07:15:31.5: ending rising plan delay. Plan is now eligible. 2023-01-08 07:15:31.5: Rising plan delay enabled for Plan J072816: 2023-01-08 07:15:31.5: 387 min. remaining to meet strict constraints. 2023-01-08 07:15:31.5: 329 min. remaining for the plan to fit before dawn. 2023-01-08 07:15:31.5: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-08 07:15:31.5: ending rising plan delay. Plan is now eligible. 2023-01-08 07:15:31.8: Dispatcher cycle time: 0.3 sec. 2023-01-08 07:15:31.8: Acquire data for Observation RY_Lep... 2023-01-08 07:15:31.8: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan RY_Lep) 2023-01-08 07:15:31.8: Send Observation RY_Lep to ACP Sequencer 2023-01-08 07:33:01.4: Acquisition time: 1049.6115534 sec. 2023-01-08 07:33:01.4: Data for Observation RY_Lep of Plan RY_Lep acquired successfully. 2023-01-08 07:33:01.4: Plan RY_Lep completed successfully. 2023-01-08 07:33:01.4: Image Efficiency: 6.4% 2023-01-08 07:33:01.4: Cycle Efficiency: 100.0% 2023-01-08 07:33:01.6: Rising plan delay enabled for Plan QX_Pup: 2023-01-08 07:33:01.6: 161 min. remaining to meet strict constraints. 2023-01-08 07:33:01.6: 326 min. remaining for the plan to fit before dawn. 2023-01-08 07:33:01.6: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-08 07:33:01.6: ending rising plan delay. Plan is now eligible. 2023-01-08 07:33:01.9: Dispatcher cycle time: 0.4 sec. 2023-01-08 07:33:01.9: Acquire data for Observation V838_Mon... 2023-01-08 07:33:01.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan V838_Mon) 2023-01-08 07:33:01.9: Doing 2 sets 2023-01-08 07:33:01.9: Send Observation V838_Mon to ACP Sequencer 2023-01-08 08:16:01.0: Send Observation V838_Mon to ACP Sequencer 2023-01-08 08:56:45.4: Acquisition time: 5023.4691988 sec. 2023-01-08 08:56:45.4: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-01-08 08:56:45.4: Plan V838_Mon completed successfully. 2023-01-08 08:56:45.4: Image Efficiency: 83.6% 2023-01-08 08:56:45.4: Cycle Efficiency: 100.0% 2023-01-08 08:56:45.6: Rising plan delay enabled for Plan IR_Com: 2023-01-08 08:56:45.6: 486 min. remaining to meet strict constraints. 2023-01-08 08:56:45.6: 241 min. remaining for the plan to fit before dawn. 2023-01-08 08:56:45.6: but only 211 min till start so Plan transits mid-way in its time span. 2023-01-08 08:56:45.6: deferred (rising) for 210 min, until 08-Jan-2023 12:27:07 UTC 2023-01-08 08:56:45.6: Rising plan delay enabled for Plan IR_Com: 2023-01-08 08:56:45.6: 486 min. remaining to meet strict constraints. 2023-01-08 08:56:45.6: 241 min. remaining for the plan to fit before dawn. 2023-01-08 08:56:45.6: but only 211 min till start so Plan transits mid-way in its time span. 2023-01-08 08:56:45.6: deferred (rising) for 210 min, until 08-Jan-2023 12:27:07 UTC 2023-01-08 08:56:45.6: Rising plan delay enabled for Plan M3-V154: 2023-01-08 08:56:45.6: 563 min. remaining to meet strict constraints. 2023-01-08 08:56:45.6: 251 min. remaining for the plan to fit before dawn. 2023-01-08 08:56:45.6: deferred (rising) for 250 min, until 08-Jan-2023 13:07:28 UTC 2023-01-08 08:56:45.7: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-08 08:56:45.7: 472 min. remaining to meet strict constraints. 2023-01-08 08:56:45.7: 248 min. remaining for the plan to fit before dawn. 2023-01-08 08:56:45.7: but only 200 min till start so Plan transits mid-way in its time span. 2023-01-08 08:56:45.7: deferred (rising) for 199 min, until 08-Jan-2023 12:16:44 UTC 2023-01-08 08:56:45.7: Rising plan delay enabled for Plan RZ_Leo: 2023-01-08 08:56:45.7: 377 min. remaining to meet strict constraints. 2023-01-08 08:56:45.7: 241 min. remaining for the plan to fit before dawn. 2023-01-08 08:56:45.7: but only 149 min till start so Plan transits mid-way in its time span. 2023-01-08 08:56:45.7: deferred (rising) for 148 min, until 08-Jan-2023 11:25:07 UTC 2023-01-08 08:56:45.9: Dispatcher cycle time: 0.4 sec. 2023-01-08 08:56:45.9: Acquire data for Observation MP_Gem... 2023-01-08 08:56:45.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan MP_Gem) 2023-01-08 08:56:45.9: Send Observation MP_Gem to ACP Sequencer 2023-01-08 09:48:53.6: ACP data acquisition failed for Observation MP_Gem. 2023-01-08 09:48:53.6: (Observation MP_Gem interrupted by acquisition process failure.) 2023-01-08 09:48:53.7: ++ Auto Focus ++ 2023-01-08 09:48:53.7: Doing periodic autofocus. 2023-01-08 09:48:53.7: Start special ACP AutoFocus script for scheduler 2023-01-08 09:53:17.4: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2023-01-08 09:53:17.5: Rising plan delay enabled for Plan 3C_279: 2023-01-08 09:53:17.5: 374 min. remaining to meet strict constraints. 2023-01-08 09:53:17.5: 191 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.5: but only 175 min till start so Plan transits mid-way in its time span. 2023-01-08 09:53:17.5: deferred (rising) for 174 min, until 08-Jan-2023 12:47:55 UTC 2023-01-08 09:53:17.5: Rising plan delay enabled for Plan 3C_279: 2023-01-08 09:53:17.5: 374 min. remaining to meet strict constraints. 2023-01-08 09:53:17.5: 191 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.5: but only 175 min till start so Plan transits mid-way in its time span. 2023-01-08 09:53:17.5: deferred (rising) for 174 min, until 08-Jan-2023 12:47:55 UTC 2023-01-08 09:53:17.5: Rising plan delay enabled for Plan HS1340+1524: 2023-01-08 09:53:17.5: 480 min. remaining to meet strict constraints. 2023-01-08 09:53:17.5: 190 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.5: deferred (rising) for 190 min, until 08-Jan-2023 13:03:20 UTC 2023-01-08 09:53:17.5: Rising plan delay enabled for Plan HS1340+1524: 2023-01-08 09:53:17.5: 480 min. remaining to meet strict constraints. 2023-01-08 09:53:17.5: 190 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.5: deferred (rising) for 190 min, until 08-Jan-2023 13:03:20 UTC 2023-01-08 09:53:17.6: Rising plan delay enabled for Plan PG_1424+240: 2023-01-08 09:53:17.6: 542 min. remaining to meet strict constraints. 2023-01-08 09:53:17.6: 194 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.6: deferred (rising) for 193 min, until 08-Jan-2023 13:07:11 UTC 2023-01-08 09:53:17.6: Rising plan delay enabled for Plan PG_1424+240: 2023-01-08 09:53:17.6: 542 min. remaining to meet strict constraints. 2023-01-08 09:53:17.6: 194 min. remaining for the plan to fit before dawn. 2023-01-08 09:53:17.6: deferred (rising) for 193 min, until 08-Jan-2023 13:07:11 UTC 2023-01-08 09:53:17.7: Dispatcher cycle time: 0.3 sec. 2023-01-08 09:53:17.7: Acquire data for Observation FS_Aur... 2023-01-08 09:53:17.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan FS_Aur) 2023-01-08 09:53:17.7: ++ Auto Focus ++ 2023-01-08 09:53:17.8: Doing periodic autofocus. 2023-01-08 09:53:17.8: Start special ACP AutoFocus script for scheduler 2023-01-08 09:56:56.2: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2023-01-08 09:56:56.2: Send Observation FS_Aur to ACP Sequencer 2023-01-08 10:02:44.6: ACP data acquisition failed for Observation FS_Aur. 2023-01-08 10:02:44.6: (Observation FS_Aur interrupted by acquisition process failure.) 2023-01-08 10:02:44.7: ++ Auto Focus ++ 2023-01-08 10:02:44.7: Doing periodic autofocus. 2023-01-08 10:02:44.7: Start special ACP AutoFocus script for scheduler 2023-01-08 10:07:14.0: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2023-01-08 10:07:14.1: Rising plan delay enabled for Plan AG_Dra: 2023-01-08 10:07:14.1: 703 min. remaining to meet strict constraints. 2023-01-08 10:07:14.1: 179 min. remaining for the plan to fit before dawn. 2023-01-08 10:07:14.1: deferred (rising) for 179 min, until 08-Jan-2023 13:06:22 UTC 2023-01-08 10:07:14.1: Rising plan delay enabled for Plan AG_Dra: 2023-01-08 10:07:14.1: 703 min. remaining to meet strict constraints. 2023-01-08 10:07:14.1: 179 min. remaining for the plan to fit before dawn. 2023-01-08 10:07:14.1: deferred (rising) for 179 min, until 08-Jan-2023 13:06:22 UTC 2023-01-08 10:07:14.1: Rising plan delay enabled for Plan NSV-6690: 2023-01-08 10:07:14.1: 530 min. remaining to meet strict constraints. 2023-01-08 10:07:14.1: 184 min. remaining for the plan to fit before dawn. 2023-01-08 10:07:14.1: deferred (rising) for 184 min, until 08-Jan-2023 13:12:06 UTC 2023-01-08 10:07:14.2: Rising plan delay enabled for Plan X_Boo: 2023-01-08 10:07:14.2: 510 min. remaining to meet strict constraints. 2023-01-08 10:07:14.2: 179 min. remaining for the plan to fit before dawn. 2023-01-08 10:07:14.2: deferred (rising) for 179 min, until 08-Jan-2023 13:06:15 UTC 2023-01-08 10:07:14.2: Rising plan delay enabled for Plan X_Boo: 2023-01-08 10:07:14.2: 510 min. remaining to meet strict constraints. 2023-01-08 10:07:14.2: 179 min. remaining for the plan to fit before dawn. 2023-01-08 10:07:14.2: deferred (rising) for 179 min, until 08-Jan-2023 13:06:15 UTC 2023-01-08 10:07:14.2: Dispatcher cycle time: 0.2 sec. 2023-01-08 10:07:14.2: Acquire data for Observation V838_Mon... 2023-01-08 10:07:14.2: (belongs to Project AAVSO_P304_SPP_AUTO_ver3394, Plan V838_Mon) 2023-01-08 10:07:14.2: Doing 4 sets 2023-01-08 10:07:14.2: Send Observation V838_Mon to ACP Sequencer 2023-01-08 10:19:55.0: ***Running Plan V838_Mon (best efforts) completed early: 2023-01-08 10:19:55.0: Obs V838_Mon would not meet strict constraints 2023-01-08 10:19:55.0: Acquisition time: 760.7820397 sec. 2023-01-08 10:19:55.0: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-01-08 10:19:55.0: Plan V838_Mon completed successfully. 2023-01-08 10:19:55.0: Image Efficiency: 45.7% 2023-01-08 10:19:55.0: Cycle Efficiency: 100.0% 2023-01-08 10:19:55.2: ++ Auto Focus ++ 2023-01-08 10:19:55.2: Doing periodic autofocus. 2023-01-08 10:19:55.2: Start special ACP AutoFocus script for scheduler 2023-01-08 10:23:47.8: ** Autofocus failed (n=4), will retry ASAP after 15 min. 2023-01-08 10:23:48.0: Dispatcher cycle time: 0.1 sec. 2023-01-08 10:23:48.0: Acquire data for Observation V838_Mon... 2023-01-08 10:23:48.0: (belongs to Project AAVSO_P237_CWT_AUTO_ver2685, Plan V838_Mon) 2023-01-08 10:23:48.0: Send Observation V838_Mon to ACP Sequencer 2023-01-08 10:29:52.9: ACP data acquisition failed for Observation V838_Mon. 2023-01-08 10:29:52.9: (Observation V838_Mon interrupted by acquisition process failure.) 2023-01-08 10:29:53.1: Dispatcher cycle time: 0.2 sec. 2023-01-08 10:29:53.1: Acquire data for Observation MP_Gem... 2023-01-08 10:29:53.1: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3394, Plan MP_Gem) 2023-01-08 10:29:53.1: Send Observation MP_Gem to ACP Sequencer 2023-01-08 10:37:03.3: ACP data acquisition failed for Observation MP_Gem. 2023-01-08 10:37:03.3: (Observation MP_Gem interrupted by acquisition process failure.) 2023-01-08 10:37:03.5: Dispatcher cycle time: 0.1 sec. 2023-01-08 10:37:03.5: Acquire data for Observation KN_Lyn... 2023-01-08 10:37:03.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3394, Plan KN_Lyn) 2023-01-08 10:37:03.5: Send Observation KN_Lyn to ACP Sequencer 2023-01-08 11:16:12.9: Acquisition time: 2349.3509799 sec. 2023-01-08 11:16:12.9: Data for Observation KN_Lyn of Plan KN_Lyn acquired successfully. 2023-01-08 11:16:12.9: Plan KN_Lyn completed successfully. 2023-01-08 11:16:12.9: Image Efficiency: 76.6% 2023-01-08 11:16:12.9: Cycle Efficiency: 100.0% 2023-01-08 11:16:13.0: ++ Auto Focus ++ 2023-01-08 11:16:13.0: Doing periodic autofocus. 2023-01-08 11:16:13.0: Start special ACP AutoFocus script for scheduler 2023-01-08 11:19:53.3: Next periodic autofocus ASAP after 7200sec. 08-Jan-2023 13:19:34 UTC 2023-01-08 11:19:53.4: Rising plan delay enabled for Plan NGC_5634: 2023-01-08 11:19:53.4: 379 min. remaining to meet strict constraints. 2023-01-08 11:19:53.4: 80 min. remaining for the plan to fit before dawn. 2023-01-08 11:19:53.4: deferred (rising) for 77 min, until 08-Jan-2023 12:36:56 UTC 2023-01-08 11:19:53.4: Dispatcher cycle time: 0.1 sec. 2023-01-08 11:19:53.4: Acquire data for Observation SU_Lyn... 2023-01-08 11:19:53.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan SU_Lyn) 2023-01-08 11:19:53.5: Send Observation SU_Lyn to ACP Sequencer 2023-01-08 11:27:45.6: Acquisition time: 472.1983859 sec. 2023-01-08 11:27:45.6: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2023-01-08 11:27:45.7: Plan SU_Lyn completed successfully. 2023-01-08 11:27:45.7: Image Efficiency: 36.4% 2023-01-08 11:27:45.7: Cycle Efficiency: 100.0% 2023-01-08 11:27:45.8: Rising plan delay enabled for Plan RZ_Leo: 2023-01-08 11:27:45.8: 226 min. remaining to meet strict constraints. 2023-01-08 11:27:45.8: 90 min. remaining for the plan to fit before dawn. 2023-01-08 11:27:45.8: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-08 11:27:45.8: ending rising plan delay. Plan is now eligible. 2023-01-08 11:27:45.9: Dispatcher cycle time: 0.1 sec. 2023-01-08 11:27:45.9: Acquire data for Observation RZ_Leo... 2023-01-08 11:27:45.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan RZ_Leo) 2023-01-08 11:27:45.9: Send Observation RZ_Leo to ACP Sequencer 2023-01-08 11:43:24.6: Acquisition time: 938.7105488 sec. 2023-01-08 11:43:24.6: Data for Observation RZ_Leo of Plan RZ_Leo acquired successfully. 2023-01-08 11:43:24.6: Plan RZ_Leo completed successfully. 2023-01-08 11:43:24.6: Image Efficiency: 76.7% 2023-01-08 11:43:24.6: Cycle Efficiency: 100.0% 2023-01-08 11:43:24.8: Rising plan delay enabled for Plan M5-V42: 2023-01-08 11:43:24.8: 431 min. remaining to meet strict constraints. 2023-01-08 11:43:24.8: 83 min. remaining for the plan to fit before dawn. 2023-01-08 11:43:24.8: deferred (rising) for 83 min, until 08-Jan-2023 13:06:27 UTC 2023-01-08 11:43:24.8: Rising plan delay enabled for Plan M5-V84: 2023-01-08 11:43:24.8: 431 min. remaining to meet strict constraints. 2023-01-08 11:43:24.8: 83 min. remaining for the plan to fit before dawn. 2023-01-08 11:43:24.8: deferred (rising) for 83 min, until 08-Jan-2023 13:06:27 UTC 2023-01-08 11:43:24.8: Rising plan delay enabled for Plan Pal_5: 2023-01-08 11:43:24.8: 422 min. remaining to meet strict constraints. 2023-01-08 11:43:24.8: 65 min. remaining for the plan to fit before dawn. 2023-01-08 11:43:24.8: deferred (rising) for 62 min, until 08-Jan-2023 12:46:06 UTC 2023-01-08 11:43:24.9: Dispatcher cycle time: 0.1 sec. 2023-01-08 11:43:24.9: Acquire data for Observation U_Leo... 2023-01-08 11:43:24.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan U_Leo) 2023-01-08 11:43:24.9: Send Observation U_Leo to ACP Sequencer 2023-01-08 11:54:23.3: Acquisition time: 658.3892493 sec. 2023-01-08 11:54:23.3: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-01-08 11:54:23.3: Plan U_Leo completed successfully. 2023-01-08 11:54:23.3: Image Efficiency: 72.9% 2023-01-08 11:54:23.3: Cycle Efficiency: 100.0% 2023-01-08 11:54:23.4: Rising plan delay enabled for Plan PG_1553+113: 2023-01-08 11:54:23.4: 482 min. remaining to meet strict constraints. 2023-01-08 11:54:23.4: 74 min. remaining for the plan to fit before dawn. 2023-01-08 11:54:23.4: deferred (rising) for 73 min, until 08-Jan-2023 13:08:17 UTC 2023-01-08 11:54:23.4: Rising plan delay enabled for Plan PG_1553+113: 2023-01-08 11:54:23.4: 482 min. remaining to meet strict constraints. 2023-01-08 11:54:23.4: 74 min. remaining for the plan to fit before dawn. 2023-01-08 11:54:23.4: deferred (rising) for 73 min, until 08-Jan-2023 13:08:17 UTC 2023-01-08 11:54:23.5: Dispatcher cycle time: 0.1 sec. 2023-01-08 11:54:23.5: Acquire data for Observation S5_0716+714... 2023-01-08 11:54:23.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan S5_0716+714) 2023-01-08 11:54:23.5: Send Observation S5_0716+714 to ACP Sequencer 2023-01-08 12:00:17.3: Acquisition time: 353.7789463 sec. 2023-01-08 12:00:17.3: Data for Observation S5_0716+714 of Plan S5_0716+714 acquired successfully. 2023-01-08 12:00:17.3: Plan S5_0716+714 completed successfully. 2023-01-08 12:00:17.3: Image Efficiency: 50.9% 2023-01-08 12:00:17.3: Cycle Efficiency: 100.0% 2023-01-08 12:00:17.5: Dispatcher cycle time: 0.1 sec. 2023-01-08 12:00:17.5: Acquire data for Observation Mrk_180... 2023-01-08 12:00:17.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan Mrk_180) 2023-01-08 12:00:17.5: Send Observation Mrk_180 to ACP Sequencer 2023-01-08 12:06:15.8: Acquisition time: 358.2755341 sec. 2023-01-08 12:06:15.8: Data for Observation Mrk_180 of Plan Mrk_180 acquired successfully. 2023-01-08 12:06:15.8: Plan Mrk_180 completed successfully. 2023-01-08 12:06:15.8: Image Efficiency: 50.2% 2023-01-08 12:06:15.8: Cycle Efficiency: 100.0% 2023-01-08 12:06:16.0: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-08 12:06:16.0: 364 min. remaining to meet strict constraints. 2023-01-08 12:06:16.0: 56 min. remaining for the plan to fit before dawn. 2023-01-08 12:06:16.0: deferred (rising) for 55 min, until 08-Jan-2023 13:01:41 UTC 2023-01-08 12:06:16.0: Dispatcher cycle time: 0.1 sec. 2023-01-08 12:06:16.0: Acquire data for Observation J072816... 2023-01-08 12:06:16.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3394, Plan J072816) 2023-01-08 12:06:16.0: Send Observation J072816 to ACP Sequencer 2023-01-08 12:31:45.7: Acquisition time: 1529.6449753 sec. 2023-01-08 12:31:45.7: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-08 12:31:45.7: Plan J072816 completed successfully. 2023-01-08 12:31:45.7: Image Efficiency: 74.5% 2023-01-08 12:31:45.7: Cycle Efficiency: 100.0% 2023-01-08 12:31:46.0: Run statistics: 2023-01-08 12:31:46.0: Observations: 261 2023-01-08 12:31:46.0: Considered: 72 2023-01-08 12:31:46.0: Completed: 2 2023-01-08 12:31:46.0: Skipped: 64 2023-01-08 12:31:46.0: Never Eligible: 189 2023-01-08 12:31:46.0: Failed: 6 Log closed at Sun, Jan 08 2023 12:31:46 UTC (actual time)