Log opened at Sun, Dec 25 2022 00:23:21 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2022-12-25 00:23:21.5: REAL TIME internal clock initialized at 25-Dec-2022 00:23:21 UTC 2022-12-25 00:23:21.5: Dispatcher started at 25-Dec-2022 00:23:21 UTC 2022-12-25 00:23:21.5: Loaded Constraint plugin AirMass 2022-12-25 00:23:21.5: Loaded Constraint plugin AirmassRange 2022-12-25 00:23:21.5: Loaded Constraint plugin Horizon 2022-12-25 00:23:21.5: Loaded Constraint plugin HourAngle 2022-12-25 00:23:21.5: Loaded Constraint plugin MoonAvoid 2022-12-25 00:23:21.6: Loaded Constraint plugin MoonDown 2022-12-25 00:23:21.6: Loaded Constraint plugin SkyCondition 2022-12-25 00:23:21.6: Loaded Constraint plugin TimeRange 2022-12-25 00:23:22.4: 217 plans are now pending. 2022-12-25 00:23:22.4: Attach ACP sequencer 2022-12-25 00:23:28.6: ++ Weather Safe ++ 2022-12-25 00:23:29.5: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2022-12-25 00:23:29.5: Sequencer does sky flats 2022-12-25 00:24:07.4: ++ Observatory Startup ++ 2022-12-25 00:24:07.4: Weather safety is now disabled 2022-12-25 00:24:07.4: Start ACP Sequencer's StartupObs script 2022-12-25 00:24:53.5: Weather safety is re-enabled 2022-12-25 00:24:53.5: Observatory startup succeeded 2022-12-25 00:24:53.5: Periodic AF schedule reset. Interval is now 1.0 hours 2022-12-25 00:24:53.5: Last AutoFocus was completed at 22-Dec-2022 09:03:32 UTC 2022-12-25 00:24:53.5: Autofocus will be done ASAP. 2022-12-25 00:24:53.5: ++ Dusk Sky Flats ++ 2022-12-25 00:24:53.5: Start ACP AutoFlat script for Dusk flats 2022-12-25 01:06:01.7: ++ Auto Focus ++ 2022-12-25 01:06:01.7: Doing periodic autofocus. 2022-12-25 01:06:01.7: Start special ACP AutoFocus script for scheduler 2022-12-25 01:10:22.3: Next periodic autofocus ASAP after 3600sec. 25-Dec-2022 02:10:04 UTC 2022-12-25 01:10:24.6: Plan OI_158 has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan SU_Lyn has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan V582_Aur has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan QZ_Aur has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan TV_Cam has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan KN_Lyn has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan GZ_Cnc has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.6: Plan V630_Cas has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan B0133+47 has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan MP_Gem has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan NQ_Gem has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan V1261_Ori has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan U_Leo has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Plan V838_Mon has Monitor Mode. Time to resubmit it. 2022-12-25 01:10:24.7: Rising plan delay enabled for Plan AE_And: 2022-12-25 01:10:24.7: 332 min. remaining to meet strict constraints. 2022-12-25 01:10:24.7: 691 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.7: but only 12 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.7: deferred (rising) for 9 min, until 25-Dec-2022 01:20:05 UTC 2022-12-25 01:10:24.7: Rising plan delay enabled for Plan AF_And: 2022-12-25 01:10:24.7: 331 min. remaining to meet strict constraints. 2022-12-25 01:10:24.7: 691 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.7: but only 12 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.7: deferred (rising) for 10 min, until 25-Dec-2022 01:20:36 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan AX_Per: 2022-12-25 01:10:24.8: 407 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 713 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 76 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 76 min, until 25-Dec-2022 02:26:41 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan AZ_Cas: 2022-12-25 01:10:24.8: 427 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 716 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 83 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 83 min, until 25-Dec-2022 02:34:04 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan AZ_Cas: 2022-12-25 01:10:24.8: 427 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 716 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 83 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 83 min, until 25-Dec-2022 02:34:04 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan B0133+47: 2022-12-25 01:10:24.8: 396 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 707 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 73 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 72 min, until 25-Dec-2022 02:23:14 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan B0133+47: 2022-12-25 01:10:24.8: 396 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 718 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 79 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 79 min, until 25-Dec-2022 02:29:48 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan EG_And: 2022-12-25 01:10:24.8: 332 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 713 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 25 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 24 min, until 25-Dec-2022 01:35:04 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan ER_Aur: 2022-12-25 01:10:24.8: 602 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 703 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 287 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 286 min, until 25-Dec-2022 05:56:46 UTC 2022-12-25 01:10:24.8: Rising plan delay enabled for Plan ER_Aur: 2022-12-25 01:10:24.8: 602 min. remaining to meet strict constraints. 2022-12-25 01:10:24.8: 704 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.8: but only 287 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.8: deferred (rising) for 286 min, until 25-Dec-2022 05:56:57 UTC 2022-12-25 01:10:24.9: Rising plan delay enabled for Plan GZ_Cet: 2022-12-25 01:10:24.9: 261 min. remaining to meet strict constraints. 2022-12-25 01:10:24.9: 704 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.9: but only 72 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.9: deferred (rising) for 71 min, until 25-Dec-2022 02:21:28 UTC 2022-12-25 01:10:24.9: Rising plan delay enabled for Plan GZ_Cet: 2022-12-25 01:10:24.9: 261 min. remaining to meet strict constraints. 2022-12-25 01:10:24.9: 695 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.9: but only 68 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.9: deferred (rising) for 65 min, until 25-Dec-2022 02:16:22 UTC 2022-12-25 01:10:24.9: Rising plan delay enabled for Plan HQ_Per: 2022-12-25 01:10:24.9: 571 min. remaining to meet strict constraints. 2022-12-25 01:10:24.9: 703 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.9: but only 258 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.9: deferred (rising) for 257 min, until 25-Dec-2022 05:27:39 UTC 2022-12-25 01:10:24.9: Rising plan delay enabled for Plan HQ_Per: 2022-12-25 01:10:24.9: 571 min. remaining to meet strict constraints. 2022-12-25 01:10:24.9: 704 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:24.9: but only 258 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:24.9: deferred (rising) for 257 min, until 25-Dec-2022 05:27:50 UTC 2022-12-25 01:10:25.2: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-25 01:10:25.2: 500 min. remaining to meet strict constraints. 2022-12-25 01:10:25.2: 701 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.2: but only 234 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.2: deferred (rising) for 232 min, until 25-Dec-2022 05:03:24 UTC 2022-12-25 01:10:25.2: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-25 01:10:25.2: 500 min. remaining to meet strict constraints. 2022-12-25 01:10:25.2: 701 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.2: but only 234 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.2: deferred (rising) for 232 min, until 25-Dec-2022 05:03:24 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:10:25.3: 483 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 439 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 36 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 8 min, until 25-Dec-2022 01:19:13 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:10:25.3: 483 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 347 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only -9 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: ending rising plan delay. Plan is now eligible. 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:10:25.3: 483 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 254 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only -55 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: ending rising plan delay. Plan is now eligible. 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TT_Ari: 2022-12-25 01:10:25.3: 364 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 702 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 101 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 99 min, until 25-Dec-2022 02:50:15 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TT_Ari: 2022-12-25 01:10:25.3: 364 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 696 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 98 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 96 min, until 25-Dec-2022 02:46:36 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TU_Cas: 2022-12-25 01:10:25.3: 332 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 713 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 6 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 6 min, until 25-Dec-2022 01:16:28 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TV_Cam: 2022-12-25 01:10:25.3: 569 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 718 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 229 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 229 min, until 25-Dec-2022 04:59:57 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TV_Cam: 2022-12-25 01:10:25.3: 569 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 703 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 222 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 220 min, until 25-Dec-2022 04:51:20 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan TV_Cam: 2022-12-25 01:10:25.3: 569 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 703 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 222 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 220 min, until 25-Dec-2022 04:51:20 UTC 2022-12-25 01:10:25.3: Rising plan delay enabled for Plan V1112_Per: 2022-12-25 01:10:25.3: 561 min. remaining to meet strict constraints. 2022-12-25 01:10:25.3: 701 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.3: but only 242 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.3: deferred (rising) for 241 min, until 25-Dec-2022 05:11:44 UTC 2022-12-25 01:10:25.4: Rising plan delay enabled for Plan V370_And: 2022-12-25 01:10:25.4: 414 min. remaining to meet strict constraints. 2022-12-25 01:10:25.4: 715 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.4: but only 99 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.4: deferred (rising) for 99 min, until 25-Dec-2022 02:49:58 UTC 2022-12-25 01:10:25.4: Rising plan delay enabled for Plan V370_And: 2022-12-25 01:10:25.4: 414 min. remaining to meet strict constraints. 2022-12-25 01:10:25.4: 715 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.4: but only 99 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.4: deferred (rising) for 99 min, until 25-Dec-2022 02:49:58 UTC 2022-12-25 01:10:25.4: [AirmassRange] Target will never be below the maximum air mass 2022-12-25 01:10:25.4: Rising plan delay enabled for Plan V479_And: 2022-12-25 01:10:25.4: 560 min. remaining to meet strict constraints. 2022-12-25 01:10:25.4: 466 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.4: 53179 min. remaining for the plan to fit before "must run before" time. 2022-12-25 01:10:25.4: but only 140 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.4: deferred (rising) for 115 min, until 25-Dec-2022 03:05:37 UTC 2022-12-25 01:10:25.4: Rising plan delay enabled for Plan V504_Per: 2022-12-25 01:10:25.4: 458 min. remaining to meet strict constraints. 2022-12-25 01:10:25.4: 710 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.4: but only 119 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.4: deferred (rising) for 119 min, until 25-Dec-2022 03:09:26 UTC 2022-12-25 01:10:25.4: Rising plan delay enabled for Plan V504_Per: 2022-12-25 01:10:25.4: 458 min. remaining to meet strict constraints. 2022-12-25 01:10:25.4: 710 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.4: but only 119 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.4: deferred (rising) for 119 min, until 25-Dec-2022 03:09:26 UTC 2022-12-25 01:10:25.5: Rising plan delay enabled for Plan YZ_Aur: 2022-12-25 01:10:25.5: 601 min. remaining to meet strict constraints. 2022-12-25 01:10:25.5: 709 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.5: but only 292 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.5: deferred (rising) for 292 min, until 25-Dec-2022 06:02:26 UTC 2022-12-25 01:10:25.5: Rising plan delay enabled for Plan YZ_Aur: 2022-12-25 01:10:25.5: 601 min. remaining to meet strict constraints. 2022-12-25 01:10:25.5: 710 min. remaining for the plan to fit before dawn. 2022-12-25 01:10:25.5: but only 293 min till start so Plan transits mid-way in its time span. 2022-12-25 01:10:25.5: deferred (rising) for 292 min, until 25-Dec-2022 06:03:03 UTC 2022-12-25 01:10:25.7: Dispatcher cycle time: 3.4 sec. 2022-12-25 01:10:25.7: Acquire data for Observation V0704_And... 2022-12-25 01:10:25.7: (belongs to Project AAVSO_P253_CDAG_AUTO_ver2897, Plan V0704_And) 2022-12-25 01:10:25.7: Send Observation V0704_And to ACP Sequencer 2022-12-25 01:19:12.2: Acquisition time: 526.4297834 sec. 2022-12-25 01:19:12.2: Data for Observation V0704_And of Plan V0704_And acquired successfully. 2022-12-25 01:19:12.2: Plan V0704_And completed successfully. 2022-12-25 01:19:12.2: Image Efficiency: 45.3% 2022-12-25 01:19:12.2: Cycle Efficiency: 99.4% 2022-12-25 01:19:12.4: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:19:12.4: 474 min. remaining to meet strict constraints. 2022-12-25 01:19:12.4: 338 min. remaining for the plan to fit before dawn. 2022-12-25 01:19:12.4: but only -18 min till start so Plan transits mid-way in its time span. 2022-12-25 01:19:12.4: ending rising plan delay. Plan is now eligible. 2022-12-25 01:19:12.4: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:19:12.4: 474 min. remaining to meet strict constraints. 2022-12-25 01:19:12.4: 245 min. remaining for the plan to fit before dawn. 2022-12-25 01:19:12.4: but only -64 min till start so Plan transits mid-way in its time span. 2022-12-25 01:19:12.4: ending rising plan delay. Plan is now eligible. 2022-12-25 01:19:12.4: Rising plan delay enabled for Plan TU_Cas: 2022-12-25 01:19:12.4: 323 min. remaining to meet strict constraints. 2022-12-25 01:19:12.4: 704 min. remaining for the plan to fit before dawn. 2022-12-25 01:19:12.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-25 01:19:12.4: ending rising plan delay. Plan is now eligible. 2022-12-25 01:19:12.7: Dispatcher cycle time: 0.4 sec. 2022-12-25 01:19:12.7: Acquire data for Observation HAT199_01773... 2022-12-25 01:19:12.7: (belongs to Project AAVSO_Kepler_HQA_AUTO_ver2706, Plan HAT199_01773) 2022-12-25 01:19:12.7: Send Observation HAT199_01773 to ACP Sequencer 2022-12-25 01:35:44.5: Acquisition time: 991.7194739 sec. 2022-12-25 01:35:44.5: Data for Observation HAT199_01773 of Plan HAT199_01773 acquired successfully. 2022-12-25 01:35:44.5: Plan HAT199_01773 completed successfully. 2022-12-25 01:35:44.5: Image Efficiency: 63.5% 2022-12-25 01:35:44.5: Cycle Efficiency: 100.0% 2022-12-25 01:35:44.6: Rising plan delay enabled for Plan AE_And: 2022-12-25 01:35:44.6: 307 min. remaining to meet strict constraints. 2022-12-25 01:35:44.6: 666 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.6: but only -12 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.6: ending rising plan delay. Plan is now eligible. 2022-12-25 01:35:44.6: Rising plan delay enabled for Plan AF_And: 2022-12-25 01:35:44.6: 306 min. remaining to meet strict constraints. 2022-12-25 01:35:44.6: 666 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.6: but only -12 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.6: ending rising plan delay. Plan is now eligible. 2022-12-25 01:35:44.7: Rising plan delay enabled for Plan EG_And: 2022-12-25 01:35:44.7: 306 min. remaining to meet strict constraints. 2022-12-25 01:35:44.7: 688 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.7: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.7: ending rising plan delay. Plan is now eligible. 2022-12-25 01:35:44.7: Rising plan delay enabled for Plan QZ_Aur: 2022-12-25 01:35:44.7: 576 min. remaining to meet strict constraints. 2022-12-25 01:35:44.7: 692 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.7: but only 285 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.7: deferred (rising) for 285 min, until 25-Dec-2022 06:20:46 UTC 2022-12-25 01:35:44.7: Rising plan delay enabled for Plan QZ_Aur: 2022-12-25 01:35:44.7: 576 min. remaining to meet strict constraints. 2022-12-25 01:35:44.7: 662 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.7: but only 269 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.7: deferred (rising) for 266 min, until 25-Dec-2022 06:02:26 UTC 2022-12-25 01:35:44.7: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:35:44.7: 458 min. remaining to meet strict constraints. 2022-12-25 01:35:44.7: 321 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.7: but only -34 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.7: ending rising plan delay. Plan is now eligible. 2022-12-25 01:35:44.7: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:35:44.7: 458 min. remaining to meet strict constraints. 2022-12-25 01:35:44.7: 414 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.7: but only 11 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.7: ending rising plan delay. Plan is now eligible. 2022-12-25 01:35:44.8: Rising plan delay enabled for Plan V582_Aur: 2022-12-25 01:35:44.8: 576 min. remaining to meet strict constraints. 2022-12-25 01:35:44.8: 682 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.8: but only 276 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.8: deferred (rising) for 275 min, until 25-Dec-2022 06:11:26 UTC 2022-12-25 01:35:44.8: Rising plan delay enabled for Plan V582_Aur: 2022-12-25 01:35:44.8: 576 min. remaining to meet strict constraints. 2022-12-25 01:35:44.8: 692 min. remaining for the plan to fit before dawn. 2022-12-25 01:35:44.8: but only 281 min till start so Plan transits mid-way in its time span. 2022-12-25 01:35:44.8: deferred (rising) for 281 min, until 25-Dec-2022 06:17:37 UTC 2022-12-25 01:35:45.1: Dispatcher cycle time: 0.5 sec. 2022-12-25 01:35:45.1: Acquire data for Observation V407_Cyg... 2022-12-25 01:35:45.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3381, Plan V407_Cyg) 2022-12-25 01:35:45.1: Send Observation V407_Cyg to ACP Sequencer 2022-12-25 01:53:02.8: Acquisition time: 1037.7349147 sec. 2022-12-25 01:53:02.8: Data for Observation V407_Cyg of Plan V407_Cyg acquired successfully. 2022-12-25 01:53:02.8: Plan V407_Cyg completed successfully. 2022-12-25 01:53:02.8: Image Efficiency: 53.9% 2022-12-25 01:53:02.8: Cycle Efficiency: 100.0% 2022-12-25 01:53:03.0: Rising plan delay enabled for Plan AO_Aur: 2022-12-25 01:53:03.0: 576 min. remaining to meet strict constraints. 2022-12-25 01:53:03.0: 666 min. remaining for the plan to fit before dawn. 2022-12-25 01:53:03.0: but only 282 min till start so Plan transits mid-way in its time span. 2022-12-25 01:53:03.0: deferred (rising) for 281 min, until 25-Dec-2022 06:34:22 UTC 2022-12-25 01:53:03.0: Rising plan delay enabled for Plan AO_Aur: 2022-12-25 01:53:03.0: 576 min. remaining to meet strict constraints. 2022-12-25 01:53:03.0: 666 min. remaining for the plan to fit before dawn. 2022-12-25 01:53:03.0: but only 282 min till start so Plan transits mid-way in its time span. 2022-12-25 01:53:03.0: deferred (rising) for 281 min, until 25-Dec-2022 06:34:22 UTC 2022-12-25 01:53:03.0: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:53:03.0: 440 min. remaining to meet strict constraints. 2022-12-25 01:53:03.0: 396 min. remaining for the plan to fit before dawn. 2022-12-25 01:53:03.0: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-25 01:53:03.0: ending rising plan delay. Plan is now eligible. 2022-12-25 01:53:03.0: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 01:53:03.0: 440 min. remaining to meet strict constraints. 2022-12-25 01:53:03.0: 304 min. remaining for the plan to fit before dawn. 2022-12-25 01:53:03.0: but only -52 min till start so Plan transits mid-way in its time span. 2022-12-25 01:53:03.0: ending rising plan delay. Plan is now eligible. 2022-12-25 01:53:03.3: Dispatcher cycle time: 0.3 sec. 2022-12-25 01:53:03.3: Acquire data for Observation SS_Cyg... 2022-12-25 01:53:03.3: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan SS_Cyg) 2022-12-25 01:53:03.3: Send Observation SS_Cyg to ACP Sequencer 2022-12-25 02:03:20.2: Acquisition time: 616.9201475 sec. 2022-12-25 02:03:20.2: Data for Observation SS_Cyg of Plan SS_Cyg acquired successfully. 2022-12-25 02:03:20.2: Plan SS_Cyg completed successfully. 2022-12-25 02:03:20.2: Image Efficiency: 48.6% 2022-12-25 02:03:20.2: Cycle Efficiency: 99.9% 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-25 02:03:20.4: 559 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 654 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only 271 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: deferred (rising) for 270 min, until 25-Dec-2022 06:33:22 UTC 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-25 02:03:20.4: 559 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 654 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only 271 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: deferred (rising) for 270 min, until 25-Dec-2022 06:33:22 UTC 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan J072816: 2022-12-25 02:03:20.4: 720 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 638 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only 363 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: deferred (rising) for 360 min, until 25-Dec-2022 08:03:57 UTC 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan J072816: 2022-12-25 02:03:20.4: 720 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 638 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only 363 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: deferred (rising) for 360 min, until 25-Dec-2022 08:03:57 UTC 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:03:20.4: 430 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 386 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only -16 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: ending rising plan delay. Plan is now eligible. 2022-12-25 02:03:20.4: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:03:20.4: 430 min. remaining to meet strict constraints. 2022-12-25 02:03:20.4: 294 min. remaining for the plan to fit before dawn. 2022-12-25 02:03:20.4: but only -62 min till start so Plan transits mid-way in its time span. 2022-12-25 02:03:20.4: ending rising plan delay. Plan is now eligible. 2022-12-25 02:03:20.6: Dispatcher cycle time: 0.3 sec. 2022-12-25 02:03:20.6: Acquire data for Observation AG_Peg... 2022-12-25 02:03:20.6: (belongs to Project AAVSO_MISC_SBL_AUTO_ver2706, Plan AG_Peg) 2022-12-25 02:03:20.7: Send Observation AG_Peg to ACP Sequencer 2022-12-25 02:06:59.4: Acquisition time: 218.6992845 sec. 2022-12-25 02:06:59.4: Data for Observation AG_Peg of Plan AG_Peg acquired successfully. 2022-12-25 02:06:59.4: Plan AG_Peg completed successfully. 2022-12-25 02:06:59.4: Image Efficiency: 41.1% 2022-12-25 02:06:59.4: Cycle Efficiency: 99.8% 2022-12-25 02:06:59.6: Rising plan delay enabled for Plan SU_Lyn: 2022-12-25 02:06:59.6: 658 min. remaining to meet strict constraints. 2022-12-25 02:06:59.6: 655 min. remaining for the plan to fit before dawn. 2022-12-25 02:06:59.6: but only 324 min till start so Plan transits mid-way in its time span. 2022-12-25 02:06:59.6: deferred (rising) for 324 min, until 25-Dec-2022 07:31:01 UTC 2022-12-25 02:06:59.6: Rising plan delay enabled for Plan SU_Lyn: 2022-12-25 02:06:59.6: 658 min. remaining to meet strict constraints. 2022-12-25 02:06:59.6: 661 min. remaining for the plan to fit before dawn. 2022-12-25 02:06:59.6: but only 327 min till start so Plan transits mid-way in its time span. 2022-12-25 02:06:59.6: deferred (rising) for 327 min, until 25-Dec-2022 07:34:55 UTC 2022-12-25 02:06:59.6: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:06:59.6: 426 min. remaining to meet strict constraints. 2022-12-25 02:06:59.6: 290 min. remaining for the plan to fit before dawn. 2022-12-25 02:06:59.6: but only -66 min till start so Plan transits mid-way in its time span. 2022-12-25 02:06:59.6: ending rising plan delay. Plan is now eligible. 2022-12-25 02:06:59.6: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:06:59.6: 426 min. remaining to meet strict constraints. 2022-12-25 02:06:59.6: 383 min. remaining for the plan to fit before dawn. 2022-12-25 02:06:59.6: but only -19 min till start so Plan transits mid-way in its time span. 2022-12-25 02:06:59.6: ending rising plan delay. Plan is now eligible. 2022-12-25 02:06:59.8: Dispatcher cycle time: 0.3 sec. 2022-12-25 02:06:59.8: Acquire data for Observation V2492_Cyg... 2022-12-25 02:06:59.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3381, Plan V2492_Cyg) 2022-12-25 02:06:59.8: Send Observation V2492_Cyg to ACP Sequencer 2022-12-25 02:50:10.6: Acquisition time: 2590.7909522 sec. 2022-12-25 02:50:10.6: Data for Observation V2492_Cyg of Plan V2492_Cyg acquired successfully. 2022-12-25 02:50:10.6: Plan V2492_Cyg completed successfully. 2022-12-25 02:50:10.6: Image Efficiency: 83.4% 2022-12-25 02:50:10.6: Cycle Efficiency: 100.0% 2022-12-25 02:50:10.7: ++ Auto Focus ++ 2022-12-25 02:50:10.7: Doing periodic autofocus. 2022-12-25 02:50:10.7: Start special ACP AutoFocus script for scheduler 2022-12-25 02:53:58.4: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan GR_Ori: 2022-12-25 02:53:58.5: 418 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 607 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only 196 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: deferred (rising) for 195 min, until 25-Dec-2022 06:09:23 UTC 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan GR_Ori: 2022-12-25 02:53:58.5: 418 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 607 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only 196 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: deferred (rising) for 195 min, until 25-Dec-2022 06:09:23 UTC 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan S5_0716+714: 2022-12-25 02:53:58.5: 685 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 610 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only 317 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: deferred (rising) for 317 min, until 25-Dec-2022 08:11:06 UTC 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:53:58.5: 379 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 243 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only -113 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: ending rising plan delay. Plan is now eligible. 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan TIC35022727: 2022-12-25 02:53:58.5: 379 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 336 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only -66 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: ending rising plan delay. Plan is now eligible. 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan TT_Ari: 2022-12-25 02:53:58.5: 260 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 598 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: ending rising plan delay. Plan is now eligible. 2022-12-25 02:53:58.5: Rising plan delay enabled for Plan TT_Ari: 2022-12-25 02:53:58.5: 260 min. remaining to meet strict constraints. 2022-12-25 02:53:58.5: 592 min. remaining for the plan to fit before dawn. 2022-12-25 02:53:58.5: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-25 02:53:58.5: ending rising plan delay. Plan is now eligible. 2022-12-25 02:53:58.7: Dispatcher cycle time: 0.3 sec. 2022-12-25 02:53:58.7: Acquire data for Observation TIC35022727... 2022-12-25 02:53:58.7: (belongs to Project Transit, Plan TIC35022727) 2022-12-25 02:53:58.7: ++ Auto Focus ++ 2022-12-25 02:53:58.8: Doing periodic autofocus. 2022-12-25 02:53:58.8: Start special ACP AutoFocus script for scheduler 2022-12-25 02:57:05.7: Next periodic autofocus ASAP after 3600sec. 25-Dec-2022 03:56:52 UTC 2022-12-25 02:57:05.8: Send Observation TIC35022727 to ACP Sequencer 2022-12-25 04:17:12.0: ACP data acquisition failed for Observation TIC35022727. 2022-12-25 04:17:12.0: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-25 04:17:12.1: ++ Auto Focus ++ 2022-12-25 04:17:12.2: Doing periodic autofocus. 2022-12-25 04:17:12.2: Start special ACP AutoFocus script for scheduler 2022-12-25 04:19:07.0: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2022-12-25 04:19:07.0: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-25 04:19:07.0: 354 min. remaining to meet strict constraints. 2022-12-25 04:19:07.0: 506 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.0: but only 150 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.0: deferred (rising) for 148 min, until 25-Dec-2022 06:47:35 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-25 04:19:07.1: 354 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 506 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 150 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 148 min, until 25-Dec-2022 06:47:35 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan CW_Mon: 2022-12-25 04:19:07.1: 404 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 521 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 185 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 185 min, until 25-Dec-2022 07:24:08 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan CW_Mon: 2022-12-25 04:19:07.1: 404 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 521 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 185 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 185 min, until 25-Dec-2022 07:24:08 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan KN_Lyn: 2022-12-25 04:19:07.1: 647 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 289 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 289 min, until 25-Dec-2022 09:08:21 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan MP_Gem: 2022-12-25 04:19:07.1: 466 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 201 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 201 min, until 25-Dec-2022 07:40:32 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan MP_Gem: 2022-12-25 04:19:07.1: 466 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 471 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 172 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 166 min, until 25-Dec-2022 07:06:06 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan NQ_Gem: 2022-12-25 04:19:07.1: 519 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 244 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 244 min, until 25-Dec-2022 08:23:46 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan OI_158: 2022-12-25 04:19:07.1: 511 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 250 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 250 min, until 25-Dec-2022 08:29:58 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan OI_158: 2022-12-25 04:19:07.1: 511 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 515 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 243 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 242 min, until 25-Dec-2022 08:21:35 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan S_Ori: 2022-12-25 04:19:07.1: 321 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 509 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 112 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 110 min, until 25-Dec-2022 06:09:08 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-25 04:19:07.1: 508 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 343 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 155 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 137 min, until 25-Dec-2022 06:36:19 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-25 04:19:07.1: 508 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 65 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 17 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: ending rising plan delay. Plan is now eligible. 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-25 04:19:07.1: 508 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 158 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 63 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 26 min, until 25-Dec-2022 04:45:19 UTC 2022-12-25 04:19:07.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-25 04:19:07.1: 508 min. remaining to meet strict constraints. 2022-12-25 04:19:07.1: 250 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.1: but only 109 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.1: deferred (rising) for 81 min, until 25-Dec-2022 05:40:49 UTC 2022-12-25 04:19:07.2: Rising plan delay enabled for Plan V1261_Ori: 2022-12-25 04:19:07.2: 299 min. remaining to meet strict constraints. 2022-12-25 04:19:07.2: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.2: but only 115 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.2: deferred (rising) for 115 min, until 25-Dec-2022 06:14:31 UTC 2022-12-25 04:19:07.2: Rising plan delay enabled for Plan V1647_Ori: 2022-12-25 04:19:07.2: 353 min. remaining to meet strict constraints. 2022-12-25 04:19:07.2: 514 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.2: but only 131 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.2: deferred (rising) for 130 min, until 25-Dec-2022 06:29:11 UTC 2022-12-25 04:19:07.2: Rising plan delay enabled for Plan V479_And: 2022-12-25 04:19:07.2: 372 min. remaining to meet strict constraints. 2022-12-25 04:19:07.2: 277 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.2: 52990 min. remaining for the plan to fit before "must run before" time. 2022-12-25 04:19:07.2: but only -48 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.2: ending rising plan delay. Plan is now eligible. 2022-12-25 04:19:07.2: Rising plan delay enabled for Plan V838_Mon: 2022-12-25 04:19:07.2: 452 min. remaining to meet strict constraints. 2022-12-25 04:19:07.2: 529 min. remaining for the plan to fit before dawn. 2022-12-25 04:19:07.2: but only 216 min till start so Plan transits mid-way in its time span. 2022-12-25 04:19:07.2: deferred (rising) for 216 min, until 25-Dec-2022 07:56:01 UTC 2022-12-25 04:19:07.4: Dispatcher cycle time: 0.4 sec. 2022-12-25 04:19:07.4: Acquire data for Observation EE_Cep... 2022-12-25 04:19:07.4: (belongs to Project AAVSO_P124_Staels_AUTO_ver2706, Plan EE_Cep) 2022-12-25 04:19:07.4: ++ Auto Focus ++ 2022-12-25 04:19:07.4: Doing periodic autofocus. 2022-12-25 04:19:07.4: Start special ACP AutoFocus script for scheduler 2022-12-25 04:20:32.3: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2022-12-25 04:20:32.3: Send Observation EE_Cep to ACP Sequencer 2022-12-25 04:29:25.3: Acquisition time: 533.0138623 sec. 2022-12-25 04:29:25.3: Data for Observation EE_Cep of Plan EE_Cep acquired successfully. 2022-12-25 04:29:25.3: Plan EE_Cep completed successfully. 2022-12-25 04:29:25.3: Image Efficiency: 33.7% 2022-12-25 04:29:25.3: Cycle Efficiency: 99.9% 2022-12-25 04:29:25.5: ++ Auto Focus ++ 2022-12-25 04:29:25.5: Doing periodic autofocus. 2022-12-25 04:29:25.5: Start special ACP AutoFocus script for scheduler 2022-12-25 04:31:50.2: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2022-12-25 04:31:50.3: Rising plan delay enabled for Plan HQ_Mon: 2022-12-25 04:31:50.3: 429 min. remaining to meet strict constraints. 2022-12-25 04:31:50.3: 505 min. remaining for the plan to fit before dawn. 2022-12-25 04:31:50.3: but only 206 min till start so Plan transits mid-way in its time span. 2022-12-25 04:31:50.3: deferred (rising) for 205 min, until 25-Dec-2022 07:56:54 UTC 2022-12-25 04:31:50.3: Rising plan delay enabled for Plan HQ_Mon: 2022-12-25 04:31:50.3: 429 min. remaining to meet strict constraints. 2022-12-25 04:31:50.3: 505 min. remaining for the plan to fit before dawn. 2022-12-25 04:31:50.3: but only 206 min till start so Plan transits mid-way in its time span. 2022-12-25 04:31:50.3: deferred (rising) for 205 min, until 25-Dec-2022 07:56:54 UTC 2022-12-25 04:31:50.3: Rising plan delay enabled for Plan TIC279999655: 2022-12-25 04:31:50.3: 495 min. remaining to meet strict constraints. 2022-12-25 04:31:50.3: 53 min. remaining for the plan to fit before dawn. 2022-12-25 04:31:50.3: but only 4 min till start so Plan transits mid-way in its time span. 2022-12-25 04:31:50.3: ending rising plan delay. Plan is now eligible. 2022-12-25 04:31:50.3: Rising plan delay enabled for Plan V479_And: 2022-12-25 04:31:50.3: 359 min. remaining to meet strict constraints. 2022-12-25 04:31:50.3: 265 min. remaining for the plan to fit before dawn. 2022-12-25 04:31:50.3: 52978 min. remaining for the plan to fit before "must run before" time. 2022-12-25 04:31:50.3: but only -61 min till start so Plan transits mid-way in its time span. 2022-12-25 04:31:50.3: ending rising plan delay. Plan is now eligible. 2022-12-25 04:31:50.5: Dispatcher cycle time: 0.3 sec. 2022-12-25 04:31:50.5: Acquire data for Observation BO_Cep... 2022-12-25 04:31:50.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan BO_Cep) 2022-12-25 04:31:50.8: Send Observation BO_Cep to ACP Sequencer 2022-12-25 14:52:19.8: ACP data acquisition failed for Observation BO_Cep. 2022-12-25 14:52:19.8: (Observation BO_Cep interrupted by acquisition process failure.) 2022-12-25 14:52:20.0: Run statistics: 2022-12-25 14:52:20.0: Observations: 296 2022-12-25 14:52:20.0: Considered: 64 2022-12-25 14:52:20.0: Completed: 0 2022-12-25 14:52:20.0: Skipped: 60 2022-12-25 14:52:20.0: Never Eligible: 232 2022-12-25 14:52:20.0: Failed: 4 Log closed at Sun, Dec 25 2022 14:52:20 UTC (actual time)