Log opened at Thu, Dec 22 2022 04:14:53 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2022-12-22 04:14:53.2: REAL TIME internal clock initialized at 22-Dec-2022 04:14:53 UTC 2022-12-22 04:14:53.2: Dispatcher started at 22-Dec-2022 04:14:53 UTC 2022-12-22 04:14:53.4: Loaded Constraint plugin AirMass 2022-12-22 04:14:53.4: Loaded Constraint plugin AirmassRange 2022-12-22 04:14:53.4: Loaded Constraint plugin Horizon 2022-12-22 04:14:53.4: Loaded Constraint plugin HourAngle 2022-12-22 04:14:53.4: Loaded Constraint plugin MoonAvoid 2022-12-22 04:14:53.4: Loaded Constraint plugin MoonDown 2022-12-22 04:14:53.4: Loaded Constraint plugin SkyCondition 2022-12-22 04:14:53.4: Loaded Constraint plugin TimeRange 2022-12-22 04:14:54.2: 212 plans are now pending. 2022-12-22 04:14:54.3: Attach ACP sequencer 2022-12-22 04:15:00.4: ++ Weather Safe ++ 2022-12-22 04:15:01.1: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2022-12-22 04:15:01.1: Sequencer does sky flats 2022-12-22 04:15:11.7: ++ Observatory Startup ++ 2022-12-22 04:15:11.7: Weather safety is now disabled 2022-12-22 04:15:11.7: Start ACP Sequencer's StartupObs script 2022-12-22 04:15:56.5: Weather safety is re-enabled 2022-12-22 04:15:56.5: Weather safety is now disabled 2022-12-22 04:15:56.5: Open the observatory dome/roof 2022-12-22 04:17:27.2: Weather safety is re-enabled 2022-12-22 04:17:27.2: Observatory startup succeeded, and dome opened successfully 2022-12-22 04:17:27.2: Periodic AF schedule reset. Interval is now 1.0 hours 2022-12-22 04:17:27.2: Last AutoFocus was completed at 20-Dec-2022 03:46:50 UTC 2022-12-22 04:17:27.2: Autofocus will be done ASAP. 2022-12-22 04:17:27.2: ++ Auto Focus ++ 2022-12-22 04:17:27.2: Doing periodic autofocus. 2022-12-22 04:17:27.2: Start special ACP AutoFocus script for scheduler 2022-12-22 04:21:22.0: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2022-12-22 04:21:24.2: Plan AZ_Cas has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan TT_Ari has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan B0133+47 has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan AG_Peg has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan AX_Per has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan EG_And has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan EE_Cep has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.2: Plan CGCS_5926 has Monitor Mode. Time to resubmit it. 2022-12-22 04:21:24.3: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 04:21:24.3: 439 min. remaining to meet strict constraints. 2022-12-22 04:21:24.3: 516 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.3: but only 145 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.3: deferred (rising) for 144 min, until 22-Dec-2022 06:46:10 UTC 2022-12-22 04:21:24.3: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 04:21:24.3: 439 min. remaining to meet strict constraints. 2022-12-22 04:21:24.3: 516 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.3: but only 145 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.3: deferred (rising) for 144 min, until 22-Dec-2022 06:46:10 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 04:21:24.4: 363 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 502 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 160 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 157 min, until 22-Dec-2022 06:59:23 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 04:21:24.4: 363 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 502 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 160 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 157 min, until 22-Dec-2022 06:59:23 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan CW_Mon: 2022-12-22 04:21:24.4: 414 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 517 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 195 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 194 min, until 22-Dec-2022 07:35:57 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan CW_Mon: 2022-12-22 04:21:24.4: 414 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 517 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 195 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 194 min, until 22-Dec-2022 07:35:57 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 04:21:24.4: 423 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 108 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 107 min, until 22-Dec-2022 06:08:35 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 04:21:24.4: 423 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 108 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 107 min, until 22-Dec-2022 06:08:35 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 04:21:24.4: 433 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 514 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 144 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 143 min, until 22-Dec-2022 06:45:10 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 04:21:24.4: 433 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 514 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 144 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 143 min, until 22-Dec-2022 06:45:10 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan GR_Ori: 2022-12-22 04:21:24.4: 342 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 518 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 120 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 119 min, until 22-Dec-2022 06:21:11 UTC 2022-12-22 04:21:24.4: Rising plan delay enabled for Plan GR_Ori: 2022-12-22 04:21:24.4: 342 min. remaining to meet strict constraints. 2022-12-22 04:21:24.4: 518 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.4: but only 120 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.4: deferred (rising) for 119 min, until 22-Dec-2022 06:21:11 UTC 2022-12-22 04:21:24.5: Rising plan delay enabled for Plan HQ_Per: 2022-12-22 04:21:24.5: 391 min. remaining to meet strict constraints. 2022-12-22 04:21:24.5: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.5: but only 79 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.5: deferred (rising) for 78 min, until 22-Dec-2022 05:39:27 UTC 2022-12-22 04:21:24.5: Rising plan delay enabled for Plan HQ_Per: 2022-12-22 04:21:24.5: 391 min. remaining to meet strict constraints. 2022-12-22 04:21:24.5: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.5: but only 79 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.5: deferred (rising) for 78 min, until 22-Dec-2022 05:39:27 UTC 2022-12-22 04:21:24.5: Rising plan delay enabled for Plan J072816: 2022-12-22 04:21:24.5: 530 min. remaining to meet strict constraints. 2022-12-22 04:21:24.5: 498 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.5: but only 237 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.5: deferred (rising) for 234 min, until 22-Dec-2022 08:15:45 UTC 2022-12-22 04:21:24.5: Rising plan delay enabled for Plan J072816: 2022-12-22 04:21:24.5: 530 min. remaining to meet strict constraints. 2022-12-22 04:21:24.5: 498 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.5: but only 237 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.5: deferred (rising) for 234 min, until 22-Dec-2022 08:15:45 UTC 2022-12-22 04:21:24.6: Rising plan delay enabled for Plan KN_Lyn: 2022-12-22 04:21:24.6: 530 min. remaining to meet strict constraints. 2022-12-22 04:21:24.6: 488 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.6: but only 279 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.6: deferred (rising) for 276 min, until 22-Dec-2022 08:57:31 UTC 2022-12-22 04:21:24.6: Rising plan delay enabled for Plan MP_Gem: 2022-12-22 04:21:24.6: 475 min. remaining to meet strict constraints. 2022-12-22 04:21:24.6: 468 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.6: but only 182 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.6: deferred (rising) for 176 min, until 22-Dec-2022 07:17:54 UTC 2022-12-22 04:21:24.6: Rising plan delay enabled for Plan MP_Gem: 2022-12-22 04:21:24.6: 475 min. remaining to meet strict constraints. 2022-12-22 04:21:24.6: 492 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.6: but only 194 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.6: deferred (rising) for 191 min, until 22-Dec-2022 07:32:39 UTC 2022-12-22 04:21:24.7: Rising plan delay enabled for Plan NQ_Gem: 2022-12-22 04:21:24.7: 528 min. remaining to meet strict constraints. 2022-12-22 04:21:24.7: 520 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.7: but only 251 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.7: deferred (rising) for 251 min, until 22-Dec-2022 08:32:40 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 04:21:24.8: 321 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 508 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 55 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 53 min, until 22-Dec-2022 05:15:12 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 04:21:24.8: 321 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 508 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 55 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 53 min, until 22-Dec-2022 05:15:12 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan OI_158: 2022-12-22 04:21:24.8: 520 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 253 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 251 min, until 22-Dec-2022 08:33:23 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan OI_158: 2022-12-22 04:21:24.8: 520 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 253 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 251 min, until 22-Dec-2022 08:33:23 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 04:21:24.8: 422 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 495 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 115 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 112 min, until 22-Dec-2022 06:14:14 UTC 2022-12-22 04:21:24.8: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 04:21:24.8: 422 min. remaining to meet strict constraints. 2022-12-22 04:21:24.8: 495 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.8: but only 115 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.8: deferred (rising) for 112 min, until 22-Dec-2022 06:14:14 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan S_Ori: 2022-12-22 04:21:24.9: 330 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 505 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 121 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 119 min, until 22-Dec-2022 06:20:55 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan SU_Lyn: 2022-12-22 04:21:24.9: 530 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 518 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 201 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 200 min, until 22-Dec-2022 07:42:17 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan SU_Lyn: 2022-12-22 04:21:24.9: 530 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 519 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 202 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 201 min, until 22-Dec-2022 07:42:48 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:21:24.9: 518 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 62 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 26 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: ending rising plan delay. Plan is now eligible. 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:21:24.9: 518 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 339 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 165 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 146 min, until 22-Dec-2022 06:48:07 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:21:24.9: 518 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 154 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 72 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 35 min, until 22-Dec-2022 04:57:07 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:21:24.9: 518 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 247 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 119 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 91 min, until 22-Dec-2022 05:52:37 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:21:24.9: 390 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 43 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 41 min, until 22-Dec-2022 05:03:08 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:21:24.9: 390 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 43 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 41 min, until 22-Dec-2022 05:03:08 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:21:24.9: 390 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 511 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 43 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 41 min, until 22-Dec-2022 05:03:08 UTC 2022-12-22 04:21:24.9: Rising plan delay enabled for Plan V1112_Per: 2022-12-22 04:21:24.9: 382 min. remaining to meet strict constraints. 2022-12-22 04:21:24.9: 509 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:24.9: but only 63 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:24.9: deferred (rising) for 62 min, until 22-Dec-2022 05:23:32 UTC 2022-12-22 04:21:25.0: Rising plan delay enabled for Plan V1261_Ori: 2022-12-22 04:21:25.0: 308 min. remaining to meet strict constraints. 2022-12-22 04:21:25.0: 521 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:25.0: but only 122 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:25.0: deferred (rising) for 122 min, until 22-Dec-2022 06:23:47 UTC 2022-12-22 04:21:25.1: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 04:21:25.1: 461 min. remaining to meet strict constraints. 2022-12-22 04:21:25.1: 503 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:25.1: but only 215 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:25.1: deferred (rising) for 212 min, until 22-Dec-2022 07:54:17 UTC 2022-12-22 04:21:25.1: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 04:21:25.1: 421 min. remaining to meet strict constraints. 2022-12-22 04:21:25.1: 518 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:25.1: but only 114 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:25.1: deferred (rising) for 113 min, until 22-Dec-2022 06:14:52 UTC 2022-12-22 04:21:25.1: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 04:21:25.1: 421 min. remaining to meet strict constraints. 2022-12-22 04:21:25.1: 518 min. remaining for the plan to fit before dawn. 2022-12-22 04:21:25.1: but only 114 min till start so Plan transits mid-way in its time span. 2022-12-22 04:21:25.1: deferred (rising) for 113 min, until 22-Dec-2022 06:14:52 UTC 2022-12-22 04:21:25.3: Dispatcher cycle time: 3.3 sec. 2022-12-22 04:21:25.3: Acquire data for Observation V407_Cas... 2022-12-22 04:21:25.3: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan V407_Cas) 2022-12-22 04:21:25.3: ++ Auto Focus ++ 2022-12-22 04:21:25.3: Doing periodic autofocus. 2022-12-22 04:21:25.3: Start special ACP AutoFocus script for scheduler 2022-12-22 04:24:25.5: Next periodic autofocus ASAP after 3600sec. 22-Dec-2022 05:24:11 UTC 2022-12-22 04:24:25.5: Send Observation V407_Cas to ACP Sequencer 2022-12-22 04:41:47.5: ACP data acquisition failed for Observation V407_Cas. 2022-12-22 04:41:47.5: (Observation V407_Cas interrupted by acquisition process failure.) 2022-12-22 04:41:47.7: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 04:41:47.7: 431 min. remaining to meet strict constraints. 2022-12-22 04:41:47.7: 494 min. remaining for the plan to fit before dawn. 2022-12-22 04:41:47.7: but only 208 min till start so Plan transits mid-way in its time span. 2022-12-22 04:41:47.7: deferred (rising) for 206 min, until 22-Dec-2022 08:08:42 UTC 2022-12-22 04:41:47.7: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 04:41:47.7: 431 min. remaining to meet strict constraints. 2022-12-22 04:41:47.7: 494 min. remaining for the plan to fit before dawn. 2022-12-22 04:41:47.7: but only 208 min till start so Plan transits mid-way in its time span. 2022-12-22 04:41:47.7: deferred (rising) for 206 min, until 22-Dec-2022 08:08:42 UTC 2022-12-22 04:41:47.7: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:41:47.7: 497 min. remaining to meet strict constraints. 2022-12-22 04:41:47.7: 41 min. remaining for the plan to fit before dawn. 2022-12-22 04:41:47.7: but only 6 min till start so Plan transits mid-way in its time span. 2022-12-22 04:41:47.7: ending rising plan delay. Plan is now eligible. 2022-12-22 04:41:47.9: Dispatcher cycle time: 0.3 sec. 2022-12-22 04:41:47.9: Acquire data for Observation TIC35022727... 2022-12-22 04:41:47.9: (belongs to Project Transit, Plan TIC35022727) 2022-12-22 04:41:47.9: Send Observation TIC35022727 to ACP Sequencer 2022-12-22 04:49:50.6: ACP data acquisition failed for Observation TIC35022727. 2022-12-22 04:49:50.6: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-22 04:49:50.8: Rising plan delay enabled for Plan RY_Lep: 2022-12-22 04:49:50.8: 245 min. remaining to meet strict constraints. 2022-12-22 04:49:50.8: 492 min. remaining for the plan to fit before dawn. 2022-12-22 04:49:50.8: but only 119 min till start so Plan transits mid-way in its time span. 2022-12-22 04:49:50.8: deferred (rising) for 119 min, until 22-Dec-2022 06:49:15 UTC 2022-12-22 04:49:50.8: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:49:50.8: 489 min. remaining to meet strict constraints. 2022-12-22 04:49:50.8: 33 min. remaining for the plan to fit before dawn. 2022-12-22 04:49:50.8: but only -1 min till start so Plan transits mid-way in its time span. 2022-12-22 04:49:50.8: ending rising plan delay. Plan is now eligible. 2022-12-22 04:49:50.9: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 04:49:50.9: 400 min. remaining to meet strict constraints. 2022-12-22 04:49:50.9: 410 min. remaining for the plan to fit before dawn. 2022-12-22 04:49:50.9: but only 154 min till start so Plan transits mid-way in its time span. 2022-12-22 04:49:50.9: deferred (rising) for 146 min, until 22-Dec-2022 07:15:59 UTC 2022-12-22 04:49:51.0: Dispatcher cycle time: 0.3 sec. 2022-12-22 04:49:51.0: Acquire data for Observation TT_Ari... 2022-12-22 04:49:51.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan TT_Ari) 2022-12-22 04:49:51.0: Send Observation TT_Ari to ACP Sequencer 2022-12-22 04:50:04.4: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 2022-12-22 04:50:08.8: ** ACP script "AcquireScheduler" failed: 2022-12-22 04:50:08.8: **Script Error** Source: ACP Message: The script was aborted. Location: line 1078 column 9. 2022-12-22 04:50:08.8: ACP OPERATOR ABORT: The operator killed the run 2022-12-22 04:50:08.8: ACP data acquisition failed for Observation TT_Ari. 2022-12-22 04:50:08.8: (Observation TT_Ari interrupted by acquisition process failure.) 2022-12-22 04:54:04.6: ++ Observatory Startup ++ 2022-12-22 04:54:04.6: Weather safety is now disabled 2022-12-22 04:54:04.6: Start ACP Sequencer's StartupObs script 2022-12-22 04:54:50.3: Weather safety is re-enabled 2022-12-22 04:54:50.3: Observatory startup succeeded 2022-12-22 04:54:50.3: Periodic AF schedule reset. Interval is now 1.0 hours 2022-12-22 04:54:50.3: Last AutoFocus was completed at 22-Dec-2022 04:24:11 UTC 2022-12-22 04:54:50.3: Next AutoFocus in 29.4 minutes or ASAP after that. 2022-12-22 04:54:52.1: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 04:54:52.1: 406 min. remaining to meet strict constraints. 2022-12-22 04:54:52.1: 483 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.1: but only 112 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.1: deferred (rising) for 111 min, until 22-Dec-2022 06:46:10 UTC 2022-12-22 04:54:52.1: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 04:54:52.1: 406 min. remaining to meet strict constraints. 2022-12-22 04:54:52.1: 483 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.1: but only 112 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.1: deferred (rising) for 111 min, until 22-Dec-2022 06:46:10 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 04:54:52.2: 330 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 469 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 126 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 124 min, until 22-Dec-2022 06:59:23 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 04:54:52.2: 330 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 469 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 126 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 124 min, until 22-Dec-2022 06:59:23 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan CW_Mon: 2022-12-22 04:54:52.2: 380 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 161 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 161 min, until 22-Dec-2022 07:35:57 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan CW_Mon: 2022-12-22 04:54:52.2: 380 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 161 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 161 min, until 22-Dec-2022 07:35:57 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 04:54:52.2: 389 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 75 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 73 min, until 22-Dec-2022 06:08:35 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 04:54:52.2: 389 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 75 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 73 min, until 22-Dec-2022 06:08:35 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 04:54:52.2: 399 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 481 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 111 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 110 min, until 22-Dec-2022 06:45:10 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 04:54:52.2: 399 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 481 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 111 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 110 min, until 22-Dec-2022 06:45:10 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan GR_Ori: 2022-12-22 04:54:52.2: 309 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 87 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 86 min, until 22-Dec-2022 06:21:11 UTC 2022-12-22 04:54:52.2: Rising plan delay enabled for Plan GR_Ori: 2022-12-22 04:54:52.2: 309 min. remaining to meet strict constraints. 2022-12-22 04:54:52.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.2: but only 87 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.2: deferred (rising) for 86 min, until 22-Dec-2022 06:21:11 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 04:54:52.6: 417 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 481 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 194 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 193 min, until 22-Dec-2022 08:08:42 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 04:54:52.6: 417 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 481 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 194 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 193 min, until 22-Dec-2022 08:08:42 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan HQ_Per: 2022-12-22 04:54:52.6: 358 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 46 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 44 min, until 22-Dec-2022 05:39:27 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan HQ_Per: 2022-12-22 04:54:52.6: 358 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 46 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 44 min, until 22-Dec-2022 05:39:27 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan J072816: 2022-12-22 04:54:52.6: 496 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 465 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 203 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 200 min, until 22-Dec-2022 08:15:44 UTC 2022-12-22 04:54:52.6: Rising plan delay enabled for Plan J072816: 2022-12-22 04:54:52.6: 496 min. remaining to meet strict constraints. 2022-12-22 04:54:52.6: 465 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.6: but only 203 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.6: deferred (rising) for 200 min, until 22-Dec-2022 08:15:44 UTC 2022-12-22 04:54:52.7: Rising plan delay enabled for Plan KN_Lyn: 2022-12-22 04:54:52.7: 496 min. remaining to meet strict constraints. 2022-12-22 04:54:52.7: 454 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.7: but only 246 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.7: deferred (rising) for 242 min, until 22-Dec-2022 08:57:31 UTC 2022-12-22 04:54:52.7: Rising plan delay enabled for Plan MP_Gem: 2022-12-22 04:54:52.7: 442 min. remaining to meet strict constraints. 2022-12-22 04:54:52.7: 434 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.7: but only 148 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.7: deferred (rising) for 143 min, until 22-Dec-2022 07:17:54 UTC 2022-12-22 04:54:52.7: Rising plan delay enabled for Plan MP_Gem: 2022-12-22 04:54:52.7: 442 min. remaining to meet strict constraints. 2022-12-22 04:54:52.7: 459 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.7: but only 161 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.7: deferred (rising) for 157 min, until 22-Dec-2022 07:32:39 UTC 2022-12-22 04:54:52.8: Rising plan delay enabled for Plan NQ_Gem: 2022-12-22 04:54:52.8: 495 min. remaining to meet strict constraints. 2022-12-22 04:54:52.8: 487 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.8: but only 218 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.8: deferred (rising) for 217 min, until 22-Dec-2022 08:32:40 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 04:54:52.9: 288 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 475 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 22 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 20 min, until 22-Dec-2022 05:15:12 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 04:54:52.9: 288 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 475 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 22 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 20 min, until 22-Dec-2022 05:15:12 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan OI_158: 2022-12-22 04:54:52.9: 487 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 478 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 219 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 218 min, until 22-Dec-2022 08:33:23 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan OI_158: 2022-12-22 04:54:52.9: 487 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 478 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 219 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 218 min, until 22-Dec-2022 08:33:23 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 04:54:52.9: 389 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 461 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 82 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 79 min, until 22-Dec-2022 06:14:13 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 04:54:52.9: 389 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 461 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 82 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 79 min, until 22-Dec-2022 06:14:13 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan RY_Lep: 2022-12-22 04:54:52.9: 240 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 487 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 114 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 114 min, until 22-Dec-2022 06:49:14 UTC 2022-12-22 04:54:52.9: Rising plan delay enabled for Plan S_Ori: 2022-12-22 04:54:52.9: 297 min. remaining to meet strict constraints. 2022-12-22 04:54:52.9: 472 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:52.9: but only 88 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:52.9: deferred (rising) for 86 min, until 22-Dec-2022 06:20:55 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan SU_Lyn: 2022-12-22 04:54:53.0: 496 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 485 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 168 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 167 min, until 22-Dec-2022 07:42:48 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan SU_Lyn: 2022-12-22 04:54:53.0: 496 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 168 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 167 min, until 22-Dec-2022 07:42:16 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:54:53.0: 484 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 121 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 39 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 2 min, until 22-Dec-2022 04:57:06 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:54:53.0: 484 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 213 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 85 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 57 min, until 22-Dec-2022 05:52:36 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:54:53.0: 484 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 306 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 131 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 113 min, until 22-Dec-2022 06:48:06 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 04:54:53.0: 484 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 28 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only -6 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: ending rising plan delay. Plan is now eligible. 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:54:53.0: 357 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 9 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 8 min, until 22-Dec-2022 05:03:07 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:54:53.0: 357 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 9 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 8 min, until 22-Dec-2022 05:03:07 UTC 2022-12-22 04:54:53.0: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 04:54:53.0: 357 min. remaining to meet strict constraints. 2022-12-22 04:54:53.0: 477 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.0: but only 9 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.0: deferred (rising) for 8 min, until 22-Dec-2022 05:03:07 UTC 2022-12-22 04:54:53.1: Rising plan delay enabled for Plan V1112_Per: 2022-12-22 04:54:53.1: 349 min. remaining to meet strict constraints. 2022-12-22 04:54:53.1: 475 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.1: but only 30 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.1: deferred (rising) for 28 min, until 22-Dec-2022 05:23:32 UTC 2022-12-22 04:54:53.1: Rising plan delay enabled for Plan V1261_Ori: 2022-12-22 04:54:53.1: 275 min. remaining to meet strict constraints. 2022-12-22 04:54:53.1: 488 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.1: but only 89 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.1: deferred (rising) for 88 min, until 22-Dec-2022 06:23:47 UTC 2022-12-22 04:54:53.1: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 04:54:53.1: 428 min. remaining to meet strict constraints. 2022-12-22 04:54:53.1: 469 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.1: but only 181 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.1: deferred (rising) for 179 min, until 22-Dec-2022 07:54:16 UTC 2022-12-22 04:54:53.1: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 04:54:53.1: 395 min. remaining to meet strict constraints. 2022-12-22 04:54:53.1: 405 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.1: but only 149 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.1: deferred (rising) for 141 min, until 22-Dec-2022 07:15:58 UTC 2022-12-22 04:54:53.2: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 04:54:53.2: 388 min. remaining to meet strict constraints. 2022-12-22 04:54:53.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.2: but only 80 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.2: deferred (rising) for 79 min, until 22-Dec-2022 06:14:51 UTC 2022-12-22 04:54:53.2: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 04:54:53.2: 388 min. remaining to meet strict constraints. 2022-12-22 04:54:53.2: 484 min. remaining for the plan to fit before dawn. 2022-12-22 04:54:53.2: but only 80 min till start so Plan transits mid-way in its time span. 2022-12-22 04:54:53.2: deferred (rising) for 79 min, until 22-Dec-2022 06:14:51 UTC 2022-12-22 04:54:53.3: Dispatcher cycle time: 3.0 sec. 2022-12-22 04:54:53.3: Acquire data for Observation V630_Cas... 2022-12-22 04:54:53.3: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan V630_Cas) 2022-12-22 04:54:53.3: Send Observation V630_Cas to ACP Sequencer 2022-12-22 05:06:58.2: Acquisition time: 724.87108 sec. 2022-12-22 05:06:58.2: Data for Observation V630_Cas of Plan V630_Cas acquired successfully. 2022-12-22 05:06:58.2: Plan V630_Cas completed successfully. 2022-12-22 05:06:58.2: Image Efficiency: 74.2% 2022-12-22 05:06:58.2: Cycle Efficiency: 99.6% 2022-12-22 05:06:58.3: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2022-12-22 05:06:58.3: 379 min. remaining to meet strict constraints. 2022-12-22 05:06:58.3: 463 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.3: but only 177 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.3: deferred (rising) for 175 min, until 22-Dec-2022 08:02:54 UTC 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 05:06:58.4: 359 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 469 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only 169 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: deferred (rising) for 167 min, until 22-Dec-2022 07:54:56 UTC 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 05:06:58.4: 359 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 469 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only 169 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: deferred (rising) for 167 min, until 22-Dec-2022 07:54:56 UTC 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan NGC_1904: 2022-12-22 05:06:58.4: 162 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 460 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only 71 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: deferred (rising) for 69 min, until 22-Dec-2022 06:16:31 UTC 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:06:58.4: 472 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 16 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only -18 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: ending rising plan delay. Plan is now eligible. 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:06:58.4: 472 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 109 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only 27 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: ending rising plan delay. Plan is now eligible. 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 05:06:58.4: 344 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 465 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: ending rising plan delay. Plan is now eligible. 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 05:06:58.4: 344 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 465 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: ending rising plan delay. Plan is now eligible. 2022-12-22 05:06:58.4: Rising plan delay enabled for Plan TV_Cam: 2022-12-22 05:06:58.4: 344 min. remaining to meet strict constraints. 2022-12-22 05:06:58.4: 465 min. remaining for the plan to fit before dawn. 2022-12-22 05:06:58.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 05:06:58.4: ending rising plan delay. Plan is now eligible. 2022-12-22 05:06:58.6: Dispatcher cycle time: 0.3 sec. 2022-12-22 05:06:58.6: Acquire data for Observation DW_Cas... 2022-12-22 05:06:58.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan DW_Cas) 2022-12-22 05:06:58.6: Send Observation DW_Cas to ACP Sequencer 2022-12-22 05:18:06.4: Acquisition time: 667.775609 sec. 2022-12-22 05:18:06.4: Data for Observation DW_Cas of Plan DW_Cas acquired successfully. 2022-12-22 05:18:06.4: Plan DW_Cas completed successfully. 2022-12-22 05:18:06.4: Image Efficiency: 56.9% 2022-12-22 05:18:06.4: Cycle Efficiency: 100.0% 2022-12-22 05:18:06.6: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 05:18:06.6: 265 min. remaining to meet strict constraints. 2022-12-22 05:18:06.6: 452 min. remaining for the plan to fit before dawn. 2022-12-22 05:18:06.6: but only -1 min till start so Plan transits mid-way in its time span. 2022-12-22 05:18:06.6: ending rising plan delay. Plan is now eligible. 2022-12-22 05:18:06.6: Rising plan delay enabled for Plan NSVS_0421121: 2022-12-22 05:18:06.6: 265 min. remaining to meet strict constraints. 2022-12-22 05:18:06.6: 452 min. remaining for the plan to fit before dawn. 2022-12-22 05:18:06.6: but only -1 min till start so Plan transits mid-way in its time span. 2022-12-22 05:18:06.6: ending rising plan delay. Plan is now eligible. 2022-12-22 05:18:06.6: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:18:06.6: 461 min. remaining to meet strict constraints. 2022-12-22 05:18:06.6: 98 min. remaining for the plan to fit before dawn. 2022-12-22 05:18:06.6: but only 16 min till start so Plan transits mid-way in its time span. 2022-12-22 05:18:06.6: ending rising plan delay. Plan is now eligible. 2022-12-22 05:18:06.8: Dispatcher cycle time: 0.3 sec. 2022-12-22 05:18:06.8: Acquire data for Observation B0133+47... 2022-12-22 05:18:06.8: (belongs to Project AAVSO_MISC_RMU_AUTO_ver2706, Plan B0133+47) 2022-12-22 05:18:06.8: Send Observation B0133+47 to ACP Sequencer 2022-12-22 05:30:07.9: Acquisition time: 721.0999985 sec. 2022-12-22 05:30:07.9: Data for Observation B0133+47 of Plan B0133+47 acquired successfully. 2022-12-22 05:30:07.9: Plan B0133+47 completed successfully. 2022-12-22 05:30:07.9: Image Efficiency: 74.9% 2022-12-22 05:30:07.9: Cycle Efficiency: 100.0% 2022-12-22 05:30:08.0: ++ Auto Focus ++ 2022-12-22 05:30:08.0: Doing periodic autofocus. 2022-12-22 05:30:08.0: Start special ACP AutoFocus script for scheduler 2022-12-22 05:33:57.5: Next periodic autofocus ASAP after 3600sec. 22-Dec-2022 06:33:38 UTC 2022-12-22 05:33:57.6: Rising plan delay enabled for Plan OJ287: 2022-12-22 05:33:57.6: 457 min. remaining to meet strict constraints. 2022-12-22 05:33:57.6: 434 min. remaining for the plan to fit before dawn. 2022-12-22 05:33:57.6: but only 255 min till start so Plan transits mid-way in its time span. 2022-12-22 05:33:57.6: deferred (rising) for 253 min, until 22-Dec-2022 09:47:16 UTC 2022-12-22 05:33:57.6: Rising plan delay enabled for Plan OJ287: 2022-12-22 05:33:57.6: 457 min. remaining to meet strict constraints. 2022-12-22 05:33:57.6: 434 min. remaining for the plan to fit before dawn. 2022-12-22 05:33:57.6: but only 255 min till start so Plan transits mid-way in its time span. 2022-12-22 05:33:57.6: deferred (rising) for 253 min, until 22-Dec-2022 09:47:16 UTC 2022-12-22 05:33:57.6: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:33:57.6: 445 min. remaining to meet strict constraints. 2022-12-22 05:33:57.6: 82 min. remaining for the plan to fit before dawn. 2022-12-22 05:33:57.6: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 05:33:57.6: ending rising plan delay. Plan is now eligible. 2022-12-22 05:33:57.8: Dispatcher cycle time: 0.3 sec. 2022-12-22 05:33:57.8: Acquire data for Observation CGCS_5926... 2022-12-22 05:33:57.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan CGCS_5926) 2022-12-22 05:33:57.8: Send Observation CGCS_5926 to ACP Sequencer 2022-12-22 05:59:16.5: Acquisition time: 1518.7148339 sec. 2022-12-22 05:59:16.5: Data for Observation CGCS_5926 of Plan CGCS_5926 acquired successfully. 2022-12-22 05:59:16.5: Plan CGCS_5926 completed successfully. 2022-12-22 05:59:16.5: Image Efficiency: 76.4% 2022-12-22 05:59:16.5: Cycle Efficiency: 100.0% 2022-12-22 05:59:16.7: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:59:16.7: 420 min. remaining to meet strict constraints. 2022-12-22 05:59:16.7: 56 min. remaining for the plan to fit before dawn. 2022-12-22 05:59:16.7: but only -25 min till start so Plan transits mid-way in its time span. 2022-12-22 05:59:16.7: ending rising plan delay. Plan is now eligible. 2022-12-22 05:59:16.7: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 05:59:16.7: 420 min. remaining to meet strict constraints. 2022-12-22 05:59:16.7: 149 min. remaining for the plan to fit before dawn. 2022-12-22 05:59:16.7: but only 21 min till start so Plan transits mid-way in its time span. 2022-12-22 05:59:16.7: ending rising plan delay. Plan is now eligible. 2022-12-22 05:59:16.9: Dispatcher cycle time: 0.3 sec. 2022-12-22 05:59:16.9: Acquire data for Observation HQ_Per... 2022-12-22 05:59:16.9: (belongs to Project AAVSO_MISC_WEL_AUTO_ver2706, Plan HQ_Per) 2022-12-22 05:59:17.0: Send Observation HQ_Per to ACP Sequencer 2022-12-22 06:15:08.4: Acquisition time: 951.4348584 sec. 2022-12-22 06:15:08.4: Data for Observation HQ_Per of Plan HQ_Per acquired successfully. 2022-12-22 06:15:08.4: Plan HQ_Per completed successfully. 2022-12-22 06:15:08.4: Image Efficiency: 58.8% 2022-12-22 06:15:08.4: Cycle Efficiency: 100.0% 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 06:15:08.6: 309 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 397 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan ER_Aur: 2022-12-22 06:15:08.6: 309 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 397 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan QX_Pup: 2022-12-22 06:15:08.6: 305 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 399 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only 144 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: deferred (rising) for 142 min, until 22-Dec-2022 08:38:04 UTC 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 06:15:08.6: 309 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 381 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only 2 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 06:15:08.6: 309 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 381 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only 2 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:15:08.6: 404 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 133 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only 5 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.6: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:15:08.6: 404 min. remaining to meet strict constraints. 2022-12-22 06:15:08.6: 41 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.6: but only -40 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.6: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.7: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 06:15:08.7: 308 min. remaining to meet strict constraints. 2022-12-22 06:15:08.7: 404 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.7: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.7: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.7: Rising plan delay enabled for Plan YZ_Aur: 2022-12-22 06:15:08.7: 308 min. remaining to meet strict constraints. 2022-12-22 06:15:08.7: 404 min. remaining for the plan to fit before dawn. 2022-12-22 06:15:08.7: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 06:15:08.7: ending rising plan delay. Plan is now eligible. 2022-12-22 06:15:08.8: Dispatcher cycle time: 0.3 sec. 2022-12-22 06:15:08.8: Acquire data for Observation V407_Cas... 2022-12-22 06:15:08.8: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver2706, Plan V407_Cas) 2022-12-22 06:15:08.8: Send Observation V407_Cas to ACP Sequencer 2022-12-22 06:30:36.3: Acquisition time: 927.4367751 sec. 2022-12-22 06:30:36.3: Data for Observation V407_Cas of Plan V407_Cas acquired successfully. 2022-12-22 06:30:36.3: Plan V407_Cas completed successfully. 2022-12-22 06:30:36.3: Image Efficiency: 60.4% 2022-12-22 06:30:36.3: Cycle Efficiency: 100.0% 2022-12-22 06:30:36.4: Rising plan delay enabled for Plan GZ_Cnc: 2022-12-22 06:30:36.4: 400 min. remaining to meet strict constraints. 2022-12-22 06:30:36.4: 376 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.4: but only 218 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.4: deferred (rising) for 216 min, until 22-Dec-2022 10:07:25 UTC 2022-12-22 06:30:36.4: Rising plan delay enabled for Plan GZ_Cnc: 2022-12-22 06:30:36.4: 400 min. remaining to meet strict constraints. 2022-12-22 06:30:36.4: 376 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.4: but only 218 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: deferred (rising) for 216 min, until 22-Dec-2022 10:07:25 UTC 2022-12-22 06:30:36.5: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 06:30:36.5: 293 min. remaining to meet strict constraints. 2022-12-22 06:30:36.5: 365 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.5: but only -13 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: ending rising plan delay. Plan is now eligible. 2022-12-22 06:30:36.5: Rising plan delay enabled for Plan QZ_Aur: 2022-12-22 06:30:36.5: 293 min. remaining to meet strict constraints. 2022-12-22 06:30:36.5: 365 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.5: but only -13 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: ending rising plan delay. Plan is now eligible. 2022-12-22 06:30:36.5: Rising plan delay enabled for Plan S_Ori: 2022-12-22 06:30:36.5: 201 min. remaining to meet strict constraints. 2022-12-22 06:30:36.5: 376 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.5: but only -7 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: ending rising plan delay. Plan is now eligible. 2022-12-22 06:30:36.5: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:30:36.5: 388 min. remaining to meet strict constraints. 2022-12-22 06:30:36.5: 25 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.5: but only -56 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: ending rising plan delay. Plan is now eligible. 2022-12-22 06:30:36.5: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:30:36.5: 388 min. remaining to meet strict constraints. 2022-12-22 06:30:36.5: 118 min. remaining for the plan to fit before dawn. 2022-12-22 06:30:36.5: but only -10 min till start so Plan transits mid-way in its time span. 2022-12-22 06:30:36.5: ending rising plan delay. Plan is now eligible. 2022-12-22 06:30:36.7: Dispatcher cycle time: 0.3 sec. 2022-12-22 06:30:36.7: Acquire data for Observation ER_Aur... 2022-12-22 06:30:36.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan ER_Aur) 2022-12-22 06:30:36.7: Send Observation ER_Aur to ACP Sequencer 2022-12-22 06:46:24.5: Acquisition time: 947.7590969 sec. 2022-12-22 06:46:24.5: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2022-12-22 06:46:24.5: Plan ER_Aur completed successfully. 2022-12-22 06:46:24.5: Image Efficiency: 59.1% 2022-12-22 06:46:24.5: Cycle Efficiency: 100.0% 2022-12-22 06:46:24.6: ++ Auto Focus ++ 2022-12-22 06:46:24.6: Doing periodic autofocus. 2022-12-22 06:46:24.6: Start special ACP AutoFocus script for scheduler 2022-12-22 06:50:14.3: Next periodic autofocus ASAP after 7200sec. 22-Dec-2022 08:49:50 UTC 2022-12-22 06:50:14.3: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 06:50:14.3: 290 min. remaining to meet strict constraints. 2022-12-22 06:50:14.3: 367 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.3: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.3: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan AO_Aur: 2022-12-22 06:50:14.4: 290 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 367 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 06:50:14.4: 284 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 365 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan FS_Aur: 2022-12-22 06:50:14.4: 284 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 365 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan RY_Lep: 2022-12-22 06:50:14.4: 125 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 372 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:50:14.4: 369 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 98 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only -29 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.4: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 06:50:14.4: 369 min. remaining to meet strict constraints. 2022-12-22 06:50:14.4: 190 min. remaining for the plan to fit before dawn. 2022-12-22 06:50:14.4: but only 16 min till start so Plan transits mid-way in its time span. 2022-12-22 06:50:14.4: ending rising plan delay. Plan is now eligible. 2022-12-22 06:50:14.6: Dispatcher cycle time: 0.3 sec. 2022-12-22 06:50:14.6: Acquire data for Observation FS_Aur... 2022-12-22 06:50:14.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan FS_Aur) 2022-12-22 06:50:14.6: Send Observation FS_Aur to ACP Sequencer 2022-12-22 07:02:19.8: Acquisition time: 725.1520766 sec. 2022-12-22 07:02:19.8: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2022-12-22 07:02:19.8: Plan FS_Aur completed successfully. 2022-12-22 07:02:19.8: Image Efficiency: 74.4% 2022-12-22 07:02:19.8: Cycle Efficiency: 100.0% 2022-12-22 07:02:19.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 07:02:19.9: 202 min. remaining to meet strict constraints. 2022-12-22 07:02:19.9: 341 min. remaining for the plan to fit before dawn. 2022-12-22 07:02:19.9: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:02:19.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:02:19.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 07:02:19.9: 202 min. remaining to meet strict constraints. 2022-12-22 07:02:19.9: 341 min. remaining for the plan to fit before dawn. 2022-12-22 07:02:19.9: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:02:19.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:02:20.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:02:20.0: 357 min. remaining to meet strict constraints. 2022-12-22 07:02:20.0: 178 min. remaining for the plan to fit before dawn. 2022-12-22 07:02:20.0: but only 4 min till start so Plan transits mid-way in its time span. 2022-12-22 07:02:20.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:02:20.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:02:20.0: 357 min. remaining to meet strict constraints. 2022-12-22 07:02:20.0: 86 min. remaining for the plan to fit before dawn. 2022-12-22 07:02:20.0: but only -41 min till start so Plan transits mid-way in its time span. 2022-12-22 07:02:20.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:02:20.2: Dispatcher cycle time: 0.3 sec. 2022-12-22 07:02:20.2: Acquire data for Observation V1261_Ori... 2022-12-22 07:02:20.2: (belongs to Project AAVSO_MISC_SBL_AUTO_ver2706, Plan V1261_Ori) 2022-12-22 07:02:20.2: Send Observation V1261_Ori to ACP Sequencer 2022-12-22 07:07:38.9: Acquisition time: 318.6619437 sec. 2022-12-22 07:07:38.9: Data for Observation V1261_Ori of Plan V1261_Ori acquired successfully. 2022-12-22 07:07:38.9: Plan V1261_Ori completed successfully. 2022-12-22 07:07:38.9: Image Efficiency: 47.0% 2022-12-22 07:07:38.9: Cycle Efficiency: 99.9% 2022-12-22 07:07:39.0: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 07:07:39.0: 197 min. remaining to meet strict constraints. 2022-12-22 07:07:39.0: 336 min. remaining for the plan to fit before dawn. 2022-12-22 07:07:39.0: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-22 07:07:39.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:07:39.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2022-12-22 07:07:39.1: 197 min. remaining to meet strict constraints. 2022-12-22 07:07:39.1: 336 min. remaining for the plan to fit before dawn. 2022-12-22 07:07:39.1: but only -5 min till start so Plan transits mid-way in its time span. 2022-12-22 07:07:39.1: ending rising plan delay. Plan is now eligible. 2022-12-22 07:07:39.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:07:39.1: 351 min. remaining to meet strict constraints. 2022-12-22 07:07:39.1: 173 min. remaining for the plan to fit before dawn. 2022-12-22 07:07:39.1: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:07:39.1: ending rising plan delay. Plan is now eligible. 2022-12-22 07:07:39.1: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:07:39.1: 351 min. remaining to meet strict constraints. 2022-12-22 07:07:39.1: 81 min. remaining for the plan to fit before dawn. 2022-12-22 07:07:39.1: but only -47 min till start so Plan transits mid-way in its time span. 2022-12-22 07:07:39.1: ending rising plan delay. Plan is now eligible. 2022-12-22 07:07:39.3: Dispatcher cycle time: 0.3 sec. 2022-12-22 07:07:39.3: Acquire data for Observation TV_Cam... 2022-12-22 07:07:39.3: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver2706, Plan TV_Cam) 2022-12-22 07:07:39.3: Send Observation TV_Cam to ACP Sequencer 2022-12-22 07:22:59.0: Acquisition time: 919.7375313 sec. 2022-12-22 07:22:59.0: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2022-12-22 07:22:59.0: Plan TV_Cam completed successfully. 2022-12-22 07:22:59.0: Image Efficiency: 60.9% 2022-12-22 07:22:59.0: Cycle Efficiency: 100.0% 2022-12-22 07:22:59.2: Rising plan delay enabled for Plan MP_Gem: 2022-12-22 07:22:59.2: 294 min. remaining to meet strict constraints. 2022-12-22 07:22:59.2: 286 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.2: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.2: ending rising plan delay. Plan is now eligible. 2022-12-22 07:22:59.3: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:22:59.3: 336 min. remaining to meet strict constraints. 2022-12-22 07:22:59.3: 65 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.3: but only -62 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.3: ending rising plan delay. Plan is now eligible. 2022-12-22 07:22:59.3: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:22:59.3: 336 min. remaining to meet strict constraints. 2022-12-22 07:22:59.3: 158 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.3: but only -16 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.3: ending rising plan delay. Plan is now eligible. 2022-12-22 07:22:59.3: Rising plan delay enabled for Plan U_Leo: 2022-12-22 07:22:59.3: 348 min. remaining to meet strict constraints. 2022-12-22 07:22:59.3: 334 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.3: but only 239 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.3: deferred (rising) for 238 min, until 22-Dec-2022 11:21:32 UTC 2022-12-22 07:22:59.3: Rising plan delay enabled for Plan U_Leo: 2022-12-22 07:22:59.3: 348 min. remaining to meet strict constraints. 2022-12-22 07:22:59.3: 334 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.3: but only 239 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.3: deferred (rising) for 238 min, until 22-Dec-2022 11:21:32 UTC 2022-12-22 07:22:59.3: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 07:22:59.3: 246 min. remaining to meet strict constraints. 2022-12-22 07:22:59.3: 257 min. remaining for the plan to fit before dawn. 2022-12-22 07:22:59.3: but only 1 min till start so Plan transits mid-way in its time span. 2022-12-22 07:22:59.3: ending rising plan delay. Plan is now eligible. 2022-12-22 07:22:59.5: Dispatcher cycle time: 0.3 sec. 2022-12-22 07:22:59.5: Acquire data for Observation QZ_Aur... 2022-12-22 07:22:59.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan QZ_Aur) 2022-12-22 07:22:59.5: Send Observation QZ_Aur to ACP Sequencer 2022-12-22 07:55:57.7: Acquisition time: 1978.1989825 sec. 2022-12-22 07:55:57.7: Data for Observation QZ_Aur of Plan QZ_Aur acquired successfully. 2022-12-22 07:55:57.7: Plan QZ_Aur completed successfully. 2022-12-22 07:55:57.7: Image Efficiency: 70.8% 2022-12-22 07:55:57.7: Cycle Efficiency: 100.0% 2022-12-22 07:55:57.8: Rising plan delay enabled for Plan BX_Pup: 2022-12-22 07:55:57.8: 146 min. remaining to meet strict constraints. 2022-12-22 07:55:57.8: 300 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:57.8: but only 56 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:57.8: deferred (rising) for 55 min, until 22-Dec-2022 08:51:17 UTC 2022-12-22 07:55:57.8: Rising plan delay enabled for Plan BX_Pup: 2022-12-22 07:55:57.8: 146 min. remaining to meet strict constraints. 2022-12-22 07:55:57.8: 300 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:57.8: but only 56 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:57.8: deferred (rising) for 55 min, until 22-Dec-2022 08:51:17 UTC 2022-12-22 07:55:57.9: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 07:55:57.9: 190 min. remaining to meet strict constraints. 2022-12-22 07:55:57.9: 300 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:57.9: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:57.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:57.9: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 07:55:57.9: 190 min. remaining to meet strict constraints. 2022-12-22 07:55:57.9: 300 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:57.9: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:57.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:57.9: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:55:57.9: 303 min. remaining to meet strict constraints. 2022-12-22 07:55:57.9: 32 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:57.9: but only -95 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:57.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:58.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:55:58.0: 303 min. remaining to meet strict constraints. 2022-12-22 07:55:58.0: 125 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:58.0: but only -49 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:58.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:58.0: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 07:55:58.0: 214 min. remaining to meet strict constraints. 2022-12-22 07:55:58.0: 224 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:58.0: but only -31 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:58.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:58.0: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 07:55:58.0: 247 min. remaining to meet strict constraints. 2022-12-22 07:55:58.0: 288 min. remaining for the plan to fit before dawn. 2022-12-22 07:55:58.0: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 07:55:58.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:55:58.2: Dispatcher cycle time: 0.4 sec. 2022-12-22 07:55:58.2: Acquire data for Observation AZ_Cas... 2022-12-22 07:55:58.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan AZ_Cas) 2022-12-22 07:55:58.2: Send Observation AZ_Cas to ACP Sequencer 2022-12-22 07:59:02.5: Acquisition time: 184.2943699 sec. 2022-12-22 07:59:02.5: Data for Observation AZ_Cas of Plan AZ_Cas acquired successfully. 2022-12-22 07:59:02.5: Plan AZ_Cas completed successfully. 2022-12-22 07:59:02.5: Image Efficiency: 16.2% 2022-12-22 07:59:02.5: Cycle Efficiency: 99.8% 2022-12-22 07:59:02.9: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 07:59:02.9: 187 min. remaining to meet strict constraints. 2022-12-22 07:59:02.9: 297 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:02.9: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:02.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:02.9: Rising plan delay enabled for Plan L1022_IRS: 2022-12-22 07:59:02.9: 187 min. remaining to meet strict constraints. 2022-12-22 07:59:02.9: 297 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:02.9: but only -3 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:02.9: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:03.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:59:03.0: 300 min. remaining to meet strict constraints. 2022-12-22 07:59:03.0: 29 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:03.0: but only -98 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:03.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:03.0: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 07:59:03.0: 300 min. remaining to meet strict constraints. 2022-12-22 07:59:03.0: 122 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:03.0: but only -52 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:03.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:03.0: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 07:59:03.0: 210 min. remaining to meet strict constraints. 2022-12-22 07:59:03.0: 221 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:03.0: but only -34 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:03.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:03.0: Rising plan delay enabled for Plan V838_Mon: 2022-12-22 07:59:03.0: 244 min. remaining to meet strict constraints. 2022-12-22 07:59:03.0: 285 min. remaining for the plan to fit before dawn. 2022-12-22 07:59:03.0: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 07:59:03.0: ending rising plan delay. Plan is now eligible. 2022-12-22 07:59:03.2: Dispatcher cycle time: 0.3 sec. 2022-12-22 07:59:03.2: Acquire data for Observation CW_Mon... 2022-12-22 07:59:03.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan CW_Mon) 2022-12-22 07:59:03.2: Send Observation CW_Mon to ACP Sequencer 2022-12-22 08:09:03.5: Acquisition time: 600.3130133 sec. 2022-12-22 08:09:03.5: Data for Observation CW_Mon of Plan CW_Mon acquired successfully. 2022-12-22 08:09:03.5: Plan CW_Mon completed successfully. 2022-12-22 08:09:03.5: Image Efficiency: 59.9% 2022-12-22 08:09:03.5: Cycle Efficiency: 99.9% 2022-12-22 08:09:03.6: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2022-12-22 08:09:03.6: 197 min. remaining to meet strict constraints. 2022-12-22 08:09:03.6: 281 min. remaining for the plan to fit before dawn. 2022-12-22 08:09:03.6: but only -4 min till start so Plan transits mid-way in its time span. 2022-12-22 08:09:03.6: ending rising plan delay. Plan is now eligible. 2022-12-22 08:09:03.7: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 08:09:03.7: 223 min. remaining to meet strict constraints. 2022-12-22 08:09:03.7: 287 min. remaining for the plan to fit before dawn. 2022-12-22 08:09:03.7: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 08:09:03.7: ending rising plan delay. Plan is now eligible. 2022-12-22 08:09:03.7: Rising plan delay enabled for Plan HQ_Mon: 2022-12-22 08:09:03.7: 223 min. remaining to meet strict constraints. 2022-12-22 08:09:03.7: 287 min. remaining for the plan to fit before dawn. 2022-12-22 08:09:03.7: but only 0 min till start so Plan transits mid-way in its time span. 2022-12-22 08:09:03.7: ending rising plan delay. Plan is now eligible. 2022-12-22 08:09:03.7: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 08:09:03.7: 290 min. remaining to meet strict constraints. 2022-12-22 08:09:03.7: 112 min. remaining for the plan to fit before dawn. 2022-12-22 08:09:03.7: but only -62 min till start so Plan transits mid-way in its time span. 2022-12-22 08:09:03.7: ending rising plan delay. Plan is now eligible. 2022-12-22 08:09:03.7: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 08:09:03.7: 290 min. remaining to meet strict constraints. 2022-12-22 08:09:03.7: 19 min. remaining for the plan to fit before dawn. 2022-12-22 08:09:03.7: but only -108 min till start so Plan transits mid-way in its time span. 2022-12-22 08:09:03.7: ending rising plan delay. Plan is now eligible. 2022-12-22 08:09:04.0: Dispatcher cycle time: 0.3 sec. 2022-12-22 08:09:04.0: Acquire data for Observation AO_Aur... 2022-12-22 08:09:04.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan AO_Aur) 2022-12-22 08:09:04.0: Send Observation AO_Aur to ACP Sequencer 2022-12-22 08:17:25.3: ACP data acquisition failed for Observation AO_Aur. 2022-12-22 08:17:25.3: (Observation AO_Aur interrupted by acquisition process failure.) 2022-12-22 08:17:25.5: Rising plan delay enabled for Plan J072816: 2022-12-22 08:17:25.5: 294 min. remaining to meet strict constraints. 2022-12-22 08:17:25.5: 262 min. remaining for the plan to fit before dawn. 2022-12-22 08:17:25.5: but only 1 min till start so Plan transits mid-way in its time span. 2022-12-22 08:17:25.5: ending rising plan delay. Plan is now eligible. 2022-12-22 08:17:25.5: Rising plan delay enabled for Plan J072816: 2022-12-22 08:17:25.5: 294 min. remaining to meet strict constraints. 2022-12-22 08:17:25.5: 262 min. remaining for the plan to fit before dawn. 2022-12-22 08:17:25.5: but only 1 min till start so Plan transits mid-way in its time span. 2022-12-22 08:17:25.5: ending rising plan delay. Plan is now eligible. 2022-12-22 08:17:25.5: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 08:17:25.5: 282 min. remaining to meet strict constraints. 2022-12-22 08:17:25.5: 103 min. remaining for the plan to fit before dawn. 2022-12-22 08:17:25.5: but only -70 min till start so Plan transits mid-way in its time span. 2022-12-22 08:17:25.5: ending rising plan delay. Plan is now eligible. 2022-12-22 08:17:25.5: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 08:17:25.5: 282 min. remaining to meet strict constraints. 2022-12-22 08:17:25.5: 11 min. remaining for the plan to fit before dawn. 2022-12-22 08:17:25.5: but only -116 min till start so Plan transits mid-way in its time span. 2022-12-22 08:17:25.5: ending rising plan delay. Plan is now eligible. 2022-12-22 08:17:25.7: Dispatcher cycle time: 0.3 sec. 2022-12-22 08:17:25.7: Acquire data for Observation AO_Aur... 2022-12-22 08:17:25.7: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver2706, Plan AO_Aur) 2022-12-22 08:17:25.7: Send Observation AO_Aur to ACP Sequencer 2022-12-22 08:26:34.4: Acquisition time: 548.678331 sec. 2022-12-22 08:26:34.4: Data for Observation AO_Aur of Plan AO_Aur acquired successfully. 2022-12-22 08:26:34.4: Plan AO_Aur completed successfully. 2022-12-22 08:26:34.4: Image Efficiency: 51.0% 2022-12-22 08:26:34.4: Cycle Efficiency: 99.9% 2022-12-22 08:26:34.6: Rising plan delay enabled for Plan J072816: 2022-12-22 08:26:34.6: 285 min. remaining to meet strict constraints. 2022-12-22 08:26:34.6: 253 min. remaining for the plan to fit before dawn. 2022-12-22 08:26:34.6: but only -8 min till start so Plan transits mid-way in its time span. 2022-12-22 08:26:34.6: ending rising plan delay. Plan is now eligible. 2022-12-22 08:26:34.6: Rising plan delay enabled for Plan J072816: 2022-12-22 08:26:34.6: 285 min. remaining to meet strict constraints. 2022-12-22 08:26:34.6: 253 min. remaining for the plan to fit before dawn. 2022-12-22 08:26:34.6: but only -8 min till start so Plan transits mid-way in its time span. 2022-12-22 08:26:34.6: ending rising plan delay. Plan is now eligible. 2022-12-22 08:26:34.6: Rising plan delay enabled for Plan TIC279999655: 2022-12-22 08:26:34.6: 272 min. remaining to meet strict constraints. 2022-12-22 08:26:34.6: 94 min. remaining for the plan to fit before dawn. 2022-12-22 08:26:34.6: but only -79 min till start so Plan transits mid-way in its time span. 2022-12-22 08:26:34.6: ending rising plan delay. Plan is now eligible. 2022-12-22 08:26:34.9: Dispatcher cycle time: 0.3 sec. 2022-12-22 08:26:34.9: Acquire data for Observation QZ_Aur... 2022-12-22 08:26:34.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan QZ_Aur) 2022-12-22 08:26:34.9: Send Observation QZ_Aur to ACP Sequencer 2022-12-22 08:56:34.1: Acquisition time: 1799.2701797 sec. 2022-12-22 08:56:34.1: Data for Observation QZ_Aur of Plan QZ_Aur acquired successfully. 2022-12-22 08:56:34.1: Plan QZ_Aur completed successfully. 2022-12-22 08:56:34.2: Image Efficiency: 77.8% 2022-12-22 08:56:34.2: Cycle Efficiency: 100.0% 2022-12-22 08:56:34.3: ++ Auto Focus ++ 2022-12-22 08:56:34.3: Doing periodic autofocus. 2022-12-22 08:56:34.3: Start special ACP AutoFocus script for scheduler 2022-12-22 09:00:15.1: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2022-12-22 09:00:15.1: Rising plan delay enabled for Plan KN_Lyn: 2022-12-22 09:00:15.1: 251 min. remaining to meet strict constraints. 2022-12-22 09:00:15.1: 209 min. remaining for the plan to fit before dawn. 2022-12-22 09:00:15.1: but only 1 min till start so Plan transits mid-way in its time span. 2022-12-22 09:00:15.1: ending rising plan delay. Plan is now eligible. 2022-12-22 09:00:15.2: Rising plan delay enabled for Plan PKS_1222+216: 2022-12-22 09:00:15.2: 251 min. remaining to meet strict constraints. 2022-12-22 09:00:15.2: 239 min. remaining for the plan to fit before dawn. 2022-12-22 09:00:15.2: deferred (rising) for 239 min, until 22-Dec-2022 12:59:28 UTC 2022-12-22 09:00:15.2: Rising plan delay enabled for Plan PKS_1222+216: 2022-12-22 09:00:15.2: 251 min. remaining to meet strict constraints. 2022-12-22 09:00:15.2: 239 min. remaining for the plan to fit before dawn. 2022-12-22 09:00:15.2: deferred (rising) for 239 min, until 22-Dec-2022 12:59:28 UTC 2022-12-22 09:00:15.2: Rising plan delay enabled for Plan RZ_Leo: 2022-12-22 09:00:15.2: 251 min. remaining to meet strict constraints. 2022-12-22 09:00:15.2: 232 min. remaining for the plan to fit before dawn. 2022-12-22 09:00:15.2: but only 213 min till start so Plan transits mid-way in its time span. 2022-12-22 09:00:15.2: deferred (rising) for 211 min, until 22-Dec-2022 12:31:59 UTC 2022-12-22 09:00:15.4: Dispatcher cycle time: 0.3 sec. 2022-12-22 09:00:15.4: Acquire data for Observation TV_Cam... 2022-12-22 09:00:15.4: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan TV_Cam) 2022-12-22 09:00:15.4: ++ Auto Focus ++ 2022-12-22 09:00:15.4: Doing periodic autofocus. 2022-12-22 09:00:15.4: Start special ACP AutoFocus script for scheduler 2022-12-22 09:03:51.6: Next periodic autofocus ASAP after 7200sec. 22-Dec-2022 11:03:32 UTC 2022-12-22 09:03:51.6: Send Observation TV_Cam to ACP Sequencer 2022-12-22 09:18:51.6: Acquisition time: 899.9806274 sec. 2022-12-22 09:18:51.6: Data for Observation TV_Cam of Plan TV_Cam acquired successfully. 2022-12-22 09:18:51.6: Plan TV_Cam completed successfully. 2022-12-22 09:18:51.6: Image Efficiency: 62.2% 2022-12-22 09:18:51.6: Cycle Efficiency: 100.0% 2022-12-22 09:18:51.8: Rising plan delay enabled for Plan IR_Com: 2022-12-22 09:18:51.8: 232 min. remaining to meet strict constraints. 2022-12-22 09:18:51.8: 214 min. remaining for the plan to fit before dawn. 2022-12-22 09:18:51.8: deferred (rising) for 212 min, until 22-Dec-2022 12:51:46 UTC 2022-12-22 09:18:51.8: Rising plan delay enabled for Plan IR_Com: 2022-12-22 09:18:51.8: 232 min. remaining to meet strict constraints. 2022-12-22 09:18:51.8: 214 min. remaining for the plan to fit before dawn. 2022-12-22 09:18:51.8: deferred (rising) for 212 min, until 22-Dec-2022 12:51:46 UTC 2022-12-22 09:18:51.8: Rising plan delay enabled for Plan KN_Lyn: 2022-12-22 09:18:51.8: 232 min. remaining to meet strict constraints. 2022-12-22 09:18:51.8: 190 min. remaining for the plan to fit before dawn. 2022-12-22 09:18:51.8: but only -17 min till start so Plan transits mid-way in its time span. 2022-12-22 09:18:51.8: ending rising plan delay. Plan is now eligible. 2022-12-22 09:18:52.1: Dispatcher cycle time: 0.3 sec. 2022-12-22 09:18:52.1: Acquire data for Observation OI_158... 2022-12-22 09:18:52.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan OI_158) 2022-12-22 09:18:52.1: Send Observation OI_158 to ACP Sequencer 2022-12-22 09:31:55.5: ACP data acquisition failed for Observation OI_158. 2022-12-22 09:31:55.5: (Observation OI_158 interrupted by acquisition process failure.) 2022-12-22 09:31:55.9: Dispatcher cycle time: 0.3 sec. 2022-12-22 09:31:55.9: Acquire data for Observation YZ_Aur... 2022-12-22 09:31:55.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan YZ_Aur) 2022-12-22 09:31:55.9: Send Observation YZ_Aur to ACP Sequencer 2022-12-22 09:40:37.3: Acquisition time: 521.4736466 sec. 2022-12-22 09:40:37.3: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2022-12-22 09:40:37.4: Plan YZ_Aur completed successfully. 2022-12-22 09:40:37.4: Image Efficiency: 34.5% 2022-12-22 09:40:37.4: Cycle Efficiency: 99.9% 2022-12-22 09:40:37.8: Dispatcher cycle time: 0.3 sec. 2022-12-22 09:40:37.8: Acquire data for Observation MP_Gem... 2022-12-22 09:40:37.8: (belongs to Project AAVSO_MISC_SBL_AUTO_ver2706, Plan MP_Gem) 2022-12-22 09:40:37.8: Send Observation MP_Gem to ACP Sequencer 2022-12-22 09:56:58.9: ACP data acquisition failed for Observation MP_Gem. 2022-12-22 09:56:58.9: (Observation MP_Gem interrupted by acquisition process failure.) 2022-12-22 09:56:59.1: Rising plan delay enabled for Plan OJ287: 2022-12-22 09:56:59.1: 194 min. remaining to meet strict constraints. 2022-12-22 09:56:59.1: 171 min. remaining for the plan to fit before dawn. 2022-12-22 09:56:59.1: but only -7 min till start so Plan transits mid-way in its time span. 2022-12-22 09:56:59.1: ending rising plan delay. Plan is now eligible. 2022-12-22 09:56:59.1: Rising plan delay enabled for Plan OJ287: 2022-12-22 09:56:59.1: 194 min. remaining to meet strict constraints. 2022-12-22 09:56:59.1: 171 min. remaining for the plan to fit before dawn. 2022-12-22 09:56:59.1: but only -7 min till start so Plan transits mid-way in its time span. 2022-12-22 09:56:59.1: ending rising plan delay. Plan is now eligible. 2022-12-22 09:56:59.3: Dispatcher cycle time: 0.3 sec. 2022-12-22 09:56:59.3: Acquire data for Observation KN_Lyn... 2022-12-22 09:56:59.3: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan KN_Lyn) 2022-12-22 09:56:59.3: Send Observation KN_Lyn to ACP Sequencer 2022-12-22 10:34:56.2: Acquisition time: 2276.8608276 sec. 2022-12-22 10:34:56.2: Data for Observation KN_Lyn of Plan KN_Lyn acquired successfully. 2022-12-22 10:34:56.2: Plan KN_Lyn completed successfully. 2022-12-22 10:34:56.2: Image Efficiency: 79.0% 2022-12-22 10:34:56.2: Cycle Efficiency: 100.0% 2022-12-22 10:34:56.3: Rising plan delay enabled for Plan HS1340+1524: 2022-12-22 10:34:56.3: 156 min. remaining to meet strict constraints. 2022-12-22 10:34:56.3: 144 min. remaining for the plan to fit before dawn. 2022-12-22 10:34:56.3: deferred (rising) for 143 min, until 22-Dec-2022 12:58:22 UTC 2022-12-22 10:34:56.3: Rising plan delay enabled for Plan HS1340+1524: 2022-12-22 10:34:56.3: 156 min. remaining to meet strict constraints. 2022-12-22 10:34:56.3: 144 min. remaining for the plan to fit before dawn. 2022-12-22 10:34:56.3: deferred (rising) for 143 min, until 22-Dec-2022 12:58:22 UTC 2022-12-22 10:34:56.4: Rising plan delay enabled for Plan M3-V154: 2022-12-22 10:34:56.4: 156 min. remaining to meet strict constraints. 2022-12-22 10:34:56.4: 147 min. remaining for the plan to fit before dawn. 2022-12-22 10:34:56.4: deferred (rising) for 147 min, until 22-Dec-2022 13:02:30 UTC 2022-12-22 10:34:56.5: Dispatcher cycle time: 0.2 sec. 2022-12-22 10:34:56.5: Acquire data for Observation L1022_IRS... 2022-12-22 10:34:56.5: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3087, Plan L1022_IRS) 2022-12-22 10:34:56.5: Send Observation L1022_IRS to ACP Sequencer 2022-12-22 10:41:29.5: ACP data acquisition failed for Observation L1022_IRS. 2022-12-22 10:41:29.5: (Observation L1022_IRS interrupted by acquisition process failure.) 2022-12-22 10:41:29.8: Dispatcher cycle time: 0.2 sec. 2022-12-22 10:41:29.8: Acquire data for Observation YZ_Aur... 2022-12-22 10:41:29.8: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver2706, Plan YZ_Aur) 2022-12-22 10:41:29.8: Send Observation YZ_Aur to ACP Sequencer 2022-12-22 10:50:38.2: Acquisition time: 548.3763104 sec. 2022-12-22 10:50:38.2: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2022-12-22 10:50:38.2: Plan YZ_Aur completed successfully. 2022-12-22 10:50:38.2: Image Efficiency: 32.8% 2022-12-22 10:50:38.2: Cycle Efficiency: 100.0% 2022-12-22 10:50:38.4: Rising plan delay enabled for Plan 3C_279: 2022-12-22 10:50:38.4: 140 min. remaining to meet strict constraints. 2022-12-22 10:50:38.4: 129 min. remaining for the plan to fit before dawn. 2022-12-22 10:50:38.4: deferred (rising) for 128 min, until 22-Dec-2022 12:59:28 UTC 2022-12-22 10:50:38.4: Rising plan delay enabled for Plan 3C_279: 2022-12-22 10:50:38.4: 140 min. remaining to meet strict constraints. 2022-12-22 10:50:38.4: 129 min. remaining for the plan to fit before dawn. 2022-12-22 10:50:38.4: deferred (rising) for 128 min, until 22-Dec-2022 12:59:28 UTC 2022-12-22 10:50:38.5: Dispatcher cycle time: 0.2 sec. 2022-12-22 10:50:38.5: Acquire data for Observation SU_Lyn... 2022-12-22 10:50:38.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan SU_Lyn) 2022-12-22 10:50:38.5: Send Observation SU_Lyn to ACP Sequencer 2022-12-22 10:58:35.4: Acquisition time: 476.878423 sec. 2022-12-22 10:58:35.4: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2022-12-22 10:58:35.4: Plan SU_Lyn completed successfully. 2022-12-22 10:58:35.4: Image Efficiency: 45.5% 2022-12-22 10:58:35.4: Cycle Efficiency: 100.0% 2022-12-22 10:58:35.6: Rising plan delay enabled for Plan PG_1424+240: 2022-12-22 10:58:35.6: 133 min. remaining to meet strict constraints. 2022-12-22 10:58:35.6: 124 min. remaining for the plan to fit before dawn. 2022-12-22 10:58:35.6: deferred (rising) for 123 min, until 22-Dec-2022 13:02:13 UTC 2022-12-22 10:58:35.6: Rising plan delay enabled for Plan PG_1424+240: 2022-12-22 10:58:35.6: 133 min. remaining to meet strict constraints. 2022-12-22 10:58:35.6: 124 min. remaining for the plan to fit before dawn. 2022-12-22 10:58:35.6: deferred (rising) for 123 min, until 22-Dec-2022 13:02:13 UTC 2022-12-22 10:58:35.7: Dispatcher cycle time: 0.2 sec. 2022-12-22 10:58:35.7: Acquire data for Observation ER_Aur... 2022-12-22 10:58:35.7: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver2706, Plan ER_Aur) 2022-12-22 10:58:35.7: Send Observation ER_Aur to ACP Sequencer 2022-12-22 11:13:33.6: Acquisition time: 897.9416598 sec. 2022-12-22 11:13:33.6: Data for Observation ER_Aur of Plan ER_Aur acquired successfully. 2022-12-22 11:13:33.7: Plan ER_Aur completed successfully. 2022-12-22 11:13:33.7: Image Efficiency: 62.4% 2022-12-22 11:13:33.7: Cycle Efficiency: 100.0% 2022-12-22 11:13:33.8: ++ Auto Focus ++ 2022-12-22 11:13:33.8: Doing periodic autofocus. 2022-12-22 11:13:33.8: Start special ACP AutoFocus script for scheduler 2022-12-22 11:17:34.4: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2022-12-22 11:17:34.4: Rising plan delay enabled for Plan AG_Dra: 2022-12-22 11:17:34.4: 114 min. remaining to meet strict constraints. 2022-12-22 11:17:34.4: 104 min. remaining for the plan to fit before dawn. 2022-12-22 11:17:34.4: deferred (rising) for 103 min, until 22-Dec-2022 13:01:24 UTC 2022-12-22 11:17:34.4: Rising plan delay enabled for Plan AG_Dra: 2022-12-22 11:17:34.4: 114 min. remaining to meet strict constraints. 2022-12-22 11:17:34.4: 104 min. remaining for the plan to fit before dawn. 2022-12-22 11:17:34.4: deferred (rising) for 103 min, until 22-Dec-2022 13:01:24 UTC 2022-12-22 11:17:34.4: Rising plan delay enabled for Plan NSV-6690: 2022-12-22 11:17:34.4: 114 min. remaining to meet strict constraints. 2022-12-22 11:17:34.4: 75 min. remaining for the plan to fit before dawn. 2022-12-22 11:17:34.4: deferred (rising) for 71 min, until 22-Dec-2022 12:29:08 UTC 2022-12-22 11:17:34.5: Rising plan delay enabled for Plan X_Boo: 2022-12-22 11:17:34.5: 114 min. remaining to meet strict constraints. 2022-12-22 11:17:34.5: 104 min. remaining for the plan to fit before dawn. 2022-12-22 11:17:34.5: deferred (rising) for 103 min, until 22-Dec-2022 13:01:17 UTC 2022-12-22 11:17:34.5: Rising plan delay enabled for Plan X_Boo: 2022-12-22 11:17:34.5: 114 min. remaining to meet strict constraints. 2022-12-22 11:17:34.5: 104 min. remaining for the plan to fit before dawn. 2022-12-22 11:17:34.5: deferred (rising) for 103 min, until 22-Dec-2022 13:01:17 UTC 2022-12-22 11:17:34.5: Dispatcher cycle time: 0.2 sec. 2022-12-22 11:17:34.5: Acquire data for Observation V838_Mon... 2022-12-22 11:17:34.5: (belongs to Project AAVSO_P237_CWT_AUTO_ver2685, Plan V838_Mon) 2022-12-22 11:17:34.5: ++ Auto Focus ++ 2022-12-22 11:17:34.6: Doing periodic autofocus. 2022-12-22 11:17:34.6: Start special ACP AutoFocus script for scheduler 2022-12-22 11:20:48.2: ** Autofocus failed (n=2), will retry ASAP after 5 min. 2022-12-22 11:20:48.2: Send Observation V838_Mon to ACP Sequencer 2022-12-22 11:25:01.2: ACP data acquisition failed for Observation V838_Mon. 2022-12-22 11:25:01.2: (Observation V838_Mon interrupted by acquisition process failure.) 2022-12-22 11:25:01.4: Rising plan delay enabled for Plan U_Leo: 2022-12-22 11:25:01.4: 106 min. remaining to meet strict constraints. 2022-12-22 11:25:01.4: 92 min. remaining for the plan to fit before dawn. 2022-12-22 11:25:01.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 11:25:01.4: ending rising plan delay. Plan is now eligible. 2022-12-22 11:25:01.4: Rising plan delay enabled for Plan U_Leo: 2022-12-22 11:25:01.4: 106 min. remaining to meet strict constraints. 2022-12-22 11:25:01.4: 92 min. remaining for the plan to fit before dawn. 2022-12-22 11:25:01.4: but only -2 min till start so Plan transits mid-way in its time span. 2022-12-22 11:25:01.4: ending rising plan delay. Plan is now eligible. 2022-12-22 11:25:01.5: Dispatcher cycle time: 0.1 sec. 2022-12-22 11:25:01.5: Acquire data for Observation OJ287... 2022-12-22 11:25:01.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan OJ287) 2022-12-22 11:25:01.5: Send Observation OJ287 to ACP Sequencer 2022-12-22 11:43:20.6: ACP data acquisition failed for Observation OJ287. 2022-12-22 11:43:20.6: (Observation OJ287 interrupted by acquisition process failure.) 2022-12-22 11:43:21.0: ++ Auto Focus ++ 2022-12-22 11:43:21.0: Doing periodic autofocus. 2022-12-22 11:43:21.0: Start special ACP AutoFocus script for scheduler 2022-12-22 11:46:58.1: ** Autofocus failed (n=3), will retry ASAP after 10 min. 2022-12-22 11:46:58.2: Dispatcher cycle time: 0.1 sec. 2022-12-22 11:46:58.2: Acquire data for Observation J072816... 2022-12-22 11:46:58.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver2706, Plan J072816) 2022-12-22 11:46:58.2: Send Observation J072816 to ACP Sequencer 2022-12-22 12:14:06.3: Acquisition time: 1628.0721837 sec. 2022-12-22 12:14:06.3: Data for Observation J072816 of Plan J072816 acquired successfully. 2022-12-22 12:14:06.3: Plan J072816 completed successfully. 2022-12-22 12:14:06.3: Image Efficiency: 70.0% 2022-12-22 12:14:06.3: Cycle Efficiency: 100.0% 2022-12-22 12:14:06.5: Run statistics: 2022-12-22 12:14:06.5: Observations: 268 2022-12-22 12:14:06.5: Considered: 68 2022-12-22 12:14:06.5: Completed: 0 2022-12-22 12:14:06.5: Skipped: 59 2022-12-22 12:14:06.5: Never Eligible: 200 2022-12-22 12:14:06.5: Failed: 9 Log closed at Thu, Dec 22 2022 12:14:06 UTC (actual time)