Log opened at Thu, Dec 15 2022 01:37:35 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2022-12-15 01:37:35.9: REAL TIME internal clock initialized at 15-Dec-2022 01:37:35 UTC 2022-12-15 01:37:35.9: Dispatcher started at 15-Dec-2022 01:37:35 UTC 2022-12-15 01:37:35.9: Loaded Constraint plugin AirMass 2022-12-15 01:37:35.9: Loaded Constraint plugin AirmassRange 2022-12-15 01:37:35.9: Loaded Constraint plugin Horizon 2022-12-15 01:37:35.9: Loaded Constraint plugin HourAngle 2022-12-15 01:37:35.9: Loaded Constraint plugin MoonAvoid 2022-12-15 01:37:35.9: Loaded Constraint plugin MoonDown 2022-12-15 01:37:35.9: Loaded Constraint plugin SkyCondition 2022-12-15 01:37:35.9: Loaded Constraint plugin TimeRange 2022-12-15 01:37:36.7: 4 plans are now pending. 2022-12-15 01:37:36.7: Attach ACP sequencer 2022-12-15 01:37:42.9: ++ Weather Safe ++ 2022-12-15 01:37:43.9: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2022-12-15 01:37:43.9: Sequencer does sky flats 2022-12-15 01:37:48.0: ++ Observatory Startup ++ 2022-12-15 01:37:48.0: Weather safety is now disabled 2022-12-15 01:37:48.0: Start ACP Sequencer's StartupObs script 2022-12-15 01:38:03.1: Weather safety is re-enabled 2022-12-15 01:38:03.1: Weather safety is now disabled 2022-12-15 01:38:03.1: Open the observatory dome/roof 2022-12-15 01:39:03.8: Weather safety is re-enabled 2022-12-15 01:39:03.8: Observatory startup succeeded, and dome opened successfully 2022-12-15 01:39:03.8: Periodic AF schedule reset. Interval is now 1.0 hours 2022-12-15 01:39:03.8: Last AutoFocus was completed at 15-Dec-2022 01:21:25 UTC 2022-12-15 01:39:03.8: Next AutoFocus in 42.4 minutes or ASAP after that. 2022-12-15 01:39:03.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 01:39:03.9: 247 min. remaining to meet strict constraints. 2022-12-15 01:39:03.9: 498 min. remaining for the plan to fit before dawn. 2022-12-15 01:39:03.9: but only 93 min till start so Plan transits mid-way in its time span. 2022-12-15 01:39:03.9: deferred (rising) for 74 min, until 15-Dec-2022 02:54:03 UTC 2022-12-15 01:39:03.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 01:39:03.9: 247 min. remaining to meet strict constraints. 2022-12-15 01:39:03.9: 405 min. remaining for the plan to fit before dawn. 2022-12-15 01:39:03.9: but only 47 min till start so Plan transits mid-way in its time span. 2022-12-15 01:39:03.9: deferred (rising) for 19 min, until 15-Dec-2022 01:58:33 UTC 2022-12-15 01:39:03.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 01:39:03.9: 247 min. remaining to meet strict constraints. 2022-12-15 01:39:03.9: 313 min. remaining for the plan to fit before dawn. 2022-12-15 01:39:03.9: but only 1 min till start so Plan transits mid-way in its time span. 2022-12-15 01:39:03.9: ending rising plan delay. Plan is now eligible. 2022-12-15 01:39:03.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 01:39:03.9: 247 min. remaining to meet strict constraints. 2022-12-15 01:39:03.9: 220 min. remaining for the plan to fit before dawn. 2022-12-15 01:39:03.9: but only -45 min till start so Plan transits mid-way in its time span. 2022-12-15 01:39:03.9: ending rising plan delay. Plan is now eligible. 2022-12-15 01:39:04.0: Dispatcher cycle time: 0.2 sec. 2022-12-15 01:39:04.0: Acquire data for Observation TIC35022727... 2022-12-15 01:39:04.0: (belongs to Project Transit, Plan TIC35022727) 2022-12-15 01:39:04.0: Send Observation TIC35022727 to ACP Sequencer 2022-12-15 02:16:16.7: ACP data acquisition failed for Observation TIC35022727. 2022-12-15 02:16:16.7: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-15 02:16:16.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 02:16:16.9: 210 min. remaining to meet strict constraints. 2022-12-15 02:16:16.9: 368 min. remaining for the plan to fit before dawn. 2022-12-15 02:16:16.9: but only 10 min till start so Plan transits mid-way in its time span. 2022-12-15 02:16:16.9: ending rising plan delay. Plan is now eligible. 2022-12-15 02:16:16.9: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 02:16:16.9: 210 min. remaining to meet strict constraints. 2022-12-15 02:16:16.9: 276 min. remaining for the plan to fit before dawn. 2022-12-15 02:16:16.9: but only -36 min till start so Plan transits mid-way in its time span. 2022-12-15 02:16:16.9: ending rising plan delay. Plan is now eligible. 2022-12-15 02:16:16.9: Dispatcher cycle time: 0.0 sec. 2022-12-15 02:16:16.9: Acquire data for Observation TIC35022727... 2022-12-15 02:16:16.9: (belongs to Project Transit, Plan TIC35022727) 2022-12-15 02:16:16.9: Send Observation TIC35022727 to ACP Sequencer 2022-12-15 02:40:13.0: ACP data acquisition failed for Observation TIC35022727. 2022-12-15 02:40:13.0: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-15 02:40:13.1: ++ Auto Focus ++ 2022-12-15 02:40:13.2: Doing periodic autofocus. 2022-12-15 02:40:13.2: Start special ACP AutoFocus script for scheduler 2022-12-15 02:44:19.4: Next periodic autofocus ASAP after 3600sec. 15-Dec-2022 03:43:59 UTC 2022-12-15 02:44:19.4: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 02:44:19.4: 182 min. remaining to meet strict constraints. 2022-12-15 02:44:19.4: 248 min. remaining for the plan to fit before dawn. 2022-12-15 02:44:19.4: but only -64 min till start so Plan transits mid-way in its time span. 2022-12-15 02:44:19.4: ending rising plan delay. Plan is now eligible. 2022-12-15 02:44:19.4: Dispatcher cycle time: 0.0 sec. 2022-12-15 02:44:19.4: Acquire data for Observation TIC35022727... 2022-12-15 02:44:19.4: (belongs to Project Transit, Plan TIC35022727) 2022-12-15 02:44:19.4: Send Observation TIC35022727 to ACP Sequencer 2022-12-15 02:53:21.7: ACP data acquisition failed for Observation TIC35022727. 2022-12-15 02:53:21.7: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-15 02:54:22.6: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 02:54:22.6: 172 min. remaining to meet strict constraints. 2022-12-15 02:54:22.6: 422 min. remaining for the plan to fit before dawn. 2022-12-15 02:54:22.6: but only 18 min till start so Plan transits mid-way in its time span. 2022-12-15 02:54:22.6: ending rising plan delay. Plan is now eligible. 2022-12-15 02:54:22.6: Dispatcher cycle time: 0.0 sec. 2022-12-15 02:54:22.6: Acquire data for Observation TIC35022727... 2022-12-15 02:54:22.6: (belongs to Project Transit, Plan TIC35022727) 2022-12-15 02:54:22.6: Send Observation TIC35022727 to ACP Sequencer 2022-12-15 03:01:49.1: ACP data acquisition failed for Observation TIC35022727. 2022-12-15 03:01:49.1: (Observation TIC35022727 interrupted by acquisition process failure.) 2022-12-15 03:13:59.8: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 03:13:59.8: 152 min. remaining to meet strict constraints. 2022-12-15 03:13:59.8: 403 min. remaining for the plan to fit before dawn. 2022-12-15 03:13:59.8: but only -1 min till start so Plan transits mid-way in its time span. 2022-12-15 03:13:59.8: ending rising plan delay. Plan is now eligible. 2022-12-15 03:13:59.8: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 03:13:59.8: 152 min. remaining to meet strict constraints. 2022-12-15 03:13:59.8: 310 min. remaining for the plan to fit before dawn. 2022-12-15 03:13:59.8: but only -47 min till start so Plan transits mid-way in its time span. 2022-12-15 03:13:59.8: ending rising plan delay. Plan is now eligible. 2022-12-15 03:13:59.8: Rising plan delay enabled for Plan TIC35022727: 2022-12-15 03:13:59.8: 152 min. remaining to meet strict constraints. 2022-12-15 03:13:59.8: 218 min. remaining for the plan to fit before dawn. 2022-12-15 03:13:59.8: but only -93 min till start so Plan transits mid-way in its time span. 2022-12-15 03:13:59.8: ending rising plan delay. Plan is now eligible. 2022-12-15 03:13:59.8: Dispatcher cycle time: 0.1 sec. 2022-12-15 03:13:59.8: Acquire data for Observation TIC35022727... 2022-12-15 03:13:59.8: (belongs to Project Transit, Plan TIC35022727) 2022-12-15 03:13:59.8: Send Observation TIC35022727 to ACP Sequencer 2022-12-15 04:31:10.9: **EXCEPTION IN SCHEDULER: 2022-12-15 04:31:10.9: ACP Has failed to acquire data more than 4 times in a row. Something is really wrong! 2022-12-15 04:31:10.9: Traceback: at DC3.Scheduler.Engine.DoSchedulePass() at DC3.Scheduler.Engine.Run() 2022-12-15 04:31:10.9: Weather safety is now disabled 2022-12-15 04:31:10.9: Close the observatory dome/roof. 2022-12-15 04:31:56.9: Weather safety is re-enabled 2022-12-15 04:31:56.9: No operator intervention command tool specified 2022-12-15 04:31:56.9: Run statistics: 2022-12-15 04:31:56.9: Observations: 5 2022-12-15 04:31:56.9: Considered: 0 2022-12-15 04:31:56.9: Completed: 0 2022-12-15 04:31:56.9: Skipped: 0 2022-12-15 04:31:56.9: Never Eligible: 5 2022-12-15 04:31:56.9: Failed: 0 2022-12-15 04:31:56.9: Shutter-Open efficiency: 0.00% 2022-12-15 04:31:56.9: Overall Efficiency: 99.90% 2022-12-15 04:31:56.9: Release ACP sequencer 2022-12-15 04:31:57.2: ACPSequencer: Failed to get ACP's DispatcherEnabled property. ACP is compromised. 2022-12-15 04:31:57.2: Object reference not set to an instance of an object. Log closed at Thu, Dec 15 2022 04:31:58 UTC (actual time)