Log opened at Wed, Dec 08 2021 06:21:13 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 8.3.2 Part of ACP Expert Release 8.3 Full license: Arne Henden 2021-12-08 06:21:14.0: REAL TIME internal clock initialized at 08-Dec-2021 06:21:14 UTC 2021-12-08 06:21:14.0: Dispatcher started at 08-Dec-2021 06:21:14 UTC 2021-12-08 06:21:14.6: Loaded Constraint plugin AirMass 2021-12-08 06:21:14.7: Loaded Constraint plugin AirmassRange 2021-12-08 06:21:14.8: Loaded Constraint plugin Horizon 2021-12-08 06:21:14.8: Loaded Constraint plugin HourAngle 2021-12-08 06:21:14.9: Loaded Constraint plugin MoonAvoid 2021-12-08 06:21:14.9: Loaded Constraint plugin MoonDown 2021-12-08 06:21:15.0: Loaded Constraint plugin SkyCondition 2021-12-08 06:21:15.0: Loaded Constraint plugin TimeRange 2021-12-08 06:21:16.6: 200 plans are now pending. 2021-12-08 06:21:16.8: Attach ACP sequencer 2021-12-08 06:21:23.8: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2021-12-08 06:21:23.8: Sequencer does sky flats 2021-12-08 06:21:24.6: HTTP command listener failed to start: Access is denied 2021-12-08 06:21:24.6: If this is Windows 8-10, you will need to add permission (ACL) to listen on port 9123. 2021-12-08 06:21:24.6: See Scheduler Help > Configuring the Program > Noteworthy Configuration Options, at the bottom. 2021-12-08 06:21:24.9: ++ Weather Safe ++ 2021-12-08 06:21:43.8: ++ Observatory Startup ++ 2021-12-08 06:21:43.8: Weather safety is now disabled 2021-12-08 06:21:43.8: Start ACP Sequencer's StartupObs script 2021-12-08 06:22:35.9: Weather safety is re-enabled 2021-12-08 06:22:35.9: Weather safety is now disabled 2021-12-08 06:22:35.9: Open the observatory dome/roof 2021-12-08 06:23:36.7: Weather safety is re-enabled 2021-12-08 06:23:36.7: Observatory startup succeeded, and dome opened successfully 2021-12-08 06:23:36.7: ++ Auto Focus ++ 2021-12-08 06:23:36.7: Doing initial autofocus. 2021-12-08 06:23:36.7: Start special ACP AutoFocus script for scheduler 2021-12-08 06:27:59.9: ** ACP script "AutoFocusScheduler" failed: 2021-12-08 06:28:00.0: **Script Error (Tracking has been stopped)** Source: MaxIm.CCDCamera Message: **Exposure failed after being successfully started Location: line 81 column 2. 2021-12-08 06:28:00.0: ** Autofocus failed (n=1), will retry ASAP after 0 min. 2021-12-08 06:28:07.4: Plan MV_Lyr has Monitor Mode. Time to resubmit it. 2021-12-08 06:28:07.4: Plan GM_Aur has Monitor Mode. Time to resubmit it. 2021-12-08 06:28:07.4: Plan V1204_Tau has Monitor Mode. Time to resubmit it. 2021-12-08 06:28:08.7: Plan M67 couldn't be run before latest time, failed. 2021-12-08 06:28:08.7: Plan Melotte_111 couldn't be run before latest time, failed. 2021-12-08 06:28:08.8: Plan NGC_7790 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.2: Plan Romanov_V20 couldn't be run before latest time, failed. 2021-12-08 06:28:09.4: [AirmassRange] Target will never be below the maximum air mass 2021-12-08 06:28:09.8: [AirmassRange] Target will never be below the maximum air mass 2021-12-08 06:28:09.8: [AirmassRange] Target will never be below the maximum air mass 2021-12-08 06:28:12.1: Dispatcher cycle time: 11.7 sec. 2021-12-08 06:28:12.1: Acquire data for Observation V1204_Tau... 2021-12-08 06:28:12.1: (belongs to Project AAVSO_P226_WFM_AUTO_ver2663, Plan V1204_Tau) 2021-12-08 06:28:12.1: **EXCEPTION IN SCHEDULER: 2021-12-08 06:28:12.1: DOME FAILURE: Dome reports shutter error status 2021-12-08 06:28:12.2: Traceback: at DC3.Scheduler.ACPSequencer.get_DomeOpen() at DC3.Scheduler.Engine.DoStartupIf(Boolean openDome) at DC3.Scheduler.Engine.DoSchedulePass() at DC3.Scheduler.Engine.Run() 2021-12-08 06:28:12.2: Weather safety is now disabled 2021-12-08 06:28:12.2: Weather safety is re-enabled 2021-12-08 06:28:12.2: DOME/ROOF FAILURE: In addition, attempting to close your dome/roof this error occurred: 2021-12-08 06:28:12.2: DOME FAILURE: Dome reports shutter error status when asked to close. 2021-12-08 06:28:12.2: No operator intervention command tool specified 2021-12-08 06:28:12.3: Release ACP sequencer Log closed at Wed, Dec 08 2021 06:28:14 UTC (actual time)