Log opened at Wed, Jan 31 2018 02:35:43 UTC (actual time) Current log level is Debug Scheduler version 3.5.3 Multi-user license: Arne Henden 31-Jan-2018 02:35:43.3: Simulated clock initialized at 31-Jan-2018 02:35:43 UTC 31-Jan-2018 02:35:43.3: Loaded Constraint plugin AirMass 31-Jan-2018 02:35:43.3: Loaded Constraint plugin AirmassRange 31-Jan-2018 02:35:43.3: Loaded Constraint plugin Horizon 31-Jan-2018 02:35:43.3: Loaded Constraint plugin HourAngle 31-Jan-2018 02:35:43.3: Loaded Constraint plugin MoonAvoid 31-Jan-2018 02:35:43.3: Loaded Constraint plugin MoonDown 31-Jan-2018 02:35:43.3: Loaded Constraint plugin SkyCondition 31-Jan-2018 02:35:43.3: Loaded Constraint plugin TimeRange 31-Jan-2018 02:35:43.9: 28 plans are now pending. 31-Jan-2018 02:35:43.9: Attach ACP sequencer 31-Jan-2018 02:35:54.5: Dispatcher started at 31-Jan-2018 02:35:54 UTC 31-Jan-2018 02:35:54.5: Priority: W[0]=0.00 31-Jan-2018 02:35:54.5: Transit Altitude: W[1]=0.70 31-Jan-2018 02:35:54.5: Highest Altitude: W[6]=0.00 31-Jan-2018 02:35:54.5: Lateness: W[5]=0.00 31-Jan-2018 02:35:54.5: Slew Distance: W[2]=0.00 31-Jan-2018 02:35:54.5: Retry Count: W[3]=0.20 31-Jan-2018 02:35:54.5: Meridian Crossing: W[4]=0.00 31-Jan-2018 02:35:54.5: Obs Conditions: W[7]=0.40 31-Jan-2018 02:35:54.5: Rising Plan Delay: disabled 31-Jan-2018 02:36:05.0: Weather successfully connected. Wait for valid data... 31-Jan-2018 02:36:06.2: ++ Observatory Startup ++ 31-Jan-2018 02:36:06.2: Start ACP Sequencer's StartupObs script 31-Jan-2018 02:36:16.2: Sequencer is now active 31-Jan-2018 02:36:26.2: Sequencer is no longer active 31-Jan-2018 02:36:26.3: Open the observatory dome/roof 31-Jan-2018 02:37:32.6: ++ Auto Focus ++ 31-Jan-2018 02:37:32.7: Doing initial autofocus. 31-Jan-2018 02:37:32.7: Start special ACP AutoFocus script for scheduler 31-Jan-2018 02:37:42.7: Sequencer is now active 31-Jan-2018 02:41:08.9: Sequencer is no longer active 31-Jan-2018 02:41:08.9: Next periodic autofocus ASAP after 31-Jan-2018 05:40:50 UTC 31-Jan-2018 02:41:09.4: Plan V0959_Mon has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan CB_32 has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan SDSS073224 has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan M67 has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan T_Ori has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan V841_Oph has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan Mkn_501 has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.4: Plan RX_J0524+42 has Monitor Mode. Time to resubmit it. 31-Jan-2018 02:41:09.5: SelectRunning: No running plans 31-Jan-2018 02:41:09.5: Obs 2MASS_J19395313+0557550 in Plan 2MASS_J19395313+0557550 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.5: AirmassRange estimates ready after 31-Jan-2018 14:11:03 UTC 31-Jan-2018 02:41:09.5: Obs BC_Lac in Plan BC_Lac was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.5: AirmassRange estimates ready after 31-Jan-2018 15:47:17 UTC 31-Jan-2018 02:41:09.5: Obs IRAS_19067+2158 in Plan IRAS_19067+2158 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.5: AirmassRange estimates ready after 31-Jan-2018 13:02:27 UTC 31-Jan-2018 02:41:09.5: Obs IRAS_19183+2339 in Plan IRAS_19183+2339 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.5: AirmassRange estimates ready after 31-Jan-2018 13:10:31 UTC 31-Jan-2018 02:41:09.5: Obs M56 in Plan M56 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.5: AirmassRange estimates ready after 31-Jan-2018 12:54:08 UTC 31-Jan-2018 02:41:09.5: Obs M67 in Plan M67 was vetoed by AirMass constraint. 31-Jan-2018 02:41:09.5: AirMass estimates ready after 31-Jan-2018 03:38:06 UTC 31-Jan-2018 02:41:09.5: Obs Mkn_501 in Plan Mkn_501 was vetoed by AirMass constraint. 31-Jan-2018 02:41:09.5: AirMass estimates ready after 31-Jan-2018 10:14:22 UTC 31-Jan-2018 02:41:09.6: Obs NSVS_11201899 in Plan NSVS_11201899 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.6: AirmassRange estimates ready after 31-Jan-2018 13:03:28 UTC 31-Jan-2018 02:41:09.6: Obs SDSSJ121027+502735 in Plan SDSSJ121027+502735 was vetoed by AirMass constraint. 31-Jan-2018 02:41:09.6: AirMass estimates ready after 31-Jan-2018 05:12:55 UTC 31-Jan-2018 02:41:09.6: Obs U_Aqr in Plan U_Aqr was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:09.6: AirmassRange estimates ready after 31-Jan-2018 18:00:49 UTC 31-Jan-2018 02:41:10.3: Obs V1721_Aql in Plan V1721_Aql was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 13:34:40 UTC 31-Jan-2018 02:41:10.3: Obs V1722_Aql in Plan V1722_Aql was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 13:22:21 UTC 31-Jan-2018 02:41:10.3: Obs V1723_Aql in Plan V1723_Aql was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 13:48:43 UTC 31-Jan-2018 02:41:10.3: Obs V1724_Aql in Plan V1724_Aql was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 13:42:10 UTC 31-Jan-2018 02:41:10.3: Obs V1904_Cyg in Plan V1904_Cyg was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 14:54:51 UTC 31-Jan-2018 02:41:10.3: Obs V1907_Cyg in Plan V1907_Cyg was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 14:51:32 UTC 31-Jan-2018 02:41:10.3: Obs V2481_Cyg in Plan V2481_Cyg was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.3: AirmassRange estimates ready after 31-Jan-2018 14:27:29 UTC 31-Jan-2018 02:41:10.4: Obs V339_Del_TMO61 in Plan V339_Del_TMO61 was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.4: AirmassRange estimates ready after 31-Jan-2018 14:19:32 UTC 31-Jan-2018 02:41:10.4: Obs V841_Oph in Plan V841_Oph was vetoed by AirmassRange constraint. 31-Jan-2018 02:41:10.4: AirmassRange estimates ready after 31-Jan-2018 12:37:58 UTC 31-Jan-2018 02:41:10.4: Efficiency: Selecting from 17 pending plans: 31-Jan-2018 02:41:10.5: Selected Plan V0603_Per (TotEff=0.89) 31-Jan-2018 02:41:10.6: Dispatcher cycle time: 1.5630894 sec. 31-Jan-2018 02:41:10.6: Acquire data for Observation V0603_Per... 31-Jan-2018 02:41:10.6: (belongs to Project AAVSO_HGUA_Miras_Manual_ver167, Plan V0603_Per) 31-Jan-2018 02:41:10.6: Send Observation V0603_Per to ACP Sequencer 31-Jan-2018 02:41:20.6: Sequencer is now active 31-Jan-2018 02:54:54.3: Sequencer is no longer active 31-Jan-2018 02:54:54.3: Post-job status check done (stat=Completed) 31-Jan-2018 02:54:54.3: Acquisition time: 823.7461155 sec. 31-Jan-2018 02:54:54.3: Data for Observation V0603_Per acquired successfully. 31-Jan-2018 02:54:54.3: Image Efficiency: 47.3% 31-Jan-2018 02:54:54.3: Cycle Efficiency: 99.8% 31-Jan-2018 02:54:54.6: SelectRunning: No running plans 31-Jan-2018 02:54:54.7: STRICT VETO: 31-Jan-2018 02:54:54.7: Obs V0809_Cep in Plan V0809_Cep was vetoed by AirmassRange constraint. 31-Jan-2018 02:54:54.7: AirmassRange estimates ready after 31-Jan-2018 15:49:44 UTC 31-Jan-2018 02:54:54.7: Efficiency: Selecting from 15 pending plans: 31-Jan-2018 02:54:54.8: Selected Plan FY_Cam (TotEff=0.89) 31-Jan-2018 02:54:54.9: Dispatcher cycle time: 0.3740214 sec. 31-Jan-2018 02:54:54.9: Acquire data for Observation FY_Cam... 31-Jan-2018 02:54:54.9: (belongs to Project AAVSO_HGUA_Miras_Manual_ver167, Plan FY_Cam) 31-Jan-2018 02:54:54.9: Send Observation FY_Cam to ACP Sequencer 31-Jan-2018 02:55:04.9: Sequencer is now active 31-Jan-2018 03:08:19.5: Sequencer is no longer active 31-Jan-2018 03:08:19.5: Post-job status check done (stat=Completed) 31-Jan-2018 03:08:19.5: Acquisition time: 804.5410171 sec. 31-Jan-2018 03:08:19.5: Data for Observation FY_Cam acquired successfully. 31-Jan-2018 03:08:19.5: Image Efficiency: 48.5% 31-Jan-2018 03:08:19.5: Cycle Efficiency: 99.9% 31-Jan-2018 03:08:20.1: SelectRunning: No running plans 31-Jan-2018 03:08:20.2: Efficiency: Selecting from 14 pending plans: 31-Jan-2018 03:08:20.6: Selected Plan T_Ori (TotEff=0.87) 31-Jan-2018 03:08:20.8: Dispatcher cycle time: 0.6700384 sec. 31-Jan-2018 03:08:20.8: Acquire data for Observation T_Ori... 31-Jan-2018 03:08:20.8: (belongs to Project AAVSO_Monitoring, Plan T_Ori) 31-Jan-2018 03:08:20.8: Doing 3 sets 31-Jan-2018 03:08:20.8: Send Observation T_Ori to ACP Sequencer 31-Jan-2018 03:08:30.8: Sequencer is now active 31-Jan-2018 03:12:58.1: Sequencer is no longer active 31-Jan-2018 03:12:58.1: Post-job status check done (stat=Completed) 31-Jan-2018 03:12:58.1: Send Observation T_Ori to ACP Sequencer 31-Jan-2018 03:13:08.1: Sequencer is now active 31-Jan-2018 03:15:56.1: Sequencer is no longer active 31-Jan-2018 03:15:56.1: Post-job status check done (stat=Completed) 31-Jan-2018 03:15:56.1: Send Observation T_Ori to ACP Sequencer 31-Jan-2018 03:16:06.1: Sequencer is now active 31-Jan-2018 03:18:52.9: Sequencer is no longer active 31-Jan-2018 03:18:52.9: Post-job status check done (stat=Completed) 31-Jan-2018 03:18:52.9: Acquisition time: 632.1311557 sec. 31-Jan-2018 03:18:52.9: Data for Observation T_Ori acquired successfully. 31-Jan-2018 03:18:52.9: Image Efficiency: 42.7% 31-Jan-2018 03:18:52.9: Cycle Efficiency: 99.9% 31-Jan-2018 03:18:53.1: SelectRunning: No running plans 31-Jan-2018 03:18:53.1: STRICT VETO: 31-Jan-2018 03:18:53.1: Obs GSC_3649-0825 in Plan GSC_3649-0825 was vetoed by AirMass constraint. 31-Jan-2018 03:18:53.1: AirMass estimates ready after 31-Jan-2018 16:24:29 UTC 31-Jan-2018 03:18:53.2: Efficiency: Selecting from 12 pending plans: 31-Jan-2018 03:18:53.2: Selected Plan CB_32 (TotEff=0.88) 31-Jan-2018 03:18:53.3: Dispatcher cycle time: 0.2770158 sec. 31-Jan-2018 03:18:53.3: Acquire data for Observation CB_32... 31-Jan-2018 03:18:53.3: (belongs to Project Staels, Plan CB_32) 31-Jan-2018 03:18:53.4: Send Observation CB_32 to ACP Sequencer 31-Jan-2018 03:19:03.4: Sequencer is now active 31-Jan-2018 03:22:22.5: Sequencer is no longer active 31-Jan-2018 03:22:22.5: Post-job status check done (stat=Completed) 31-Jan-2018 03:22:22.5: Acquisition time: 209.172964 sec. 31-Jan-2018 03:22:22.5: Data for Observation CB_32 acquired successfully. 31-Jan-2018 03:22:22.6: Image Efficiency: 43.0% 31-Jan-2018 03:22:22.6: Cycle Efficiency: 99.9% 31-Jan-2018 03:22:22.7: SelectRunning: No running plans 31-Jan-2018 03:22:22.8: Efficiency: Selecting from 11 pending plans: 31-Jan-2018 03:22:22.9: Selected Plan WZ_Per (TotEff=0.83) 31-Jan-2018 03:22:23.0: Dispatcher cycle time: 0.2530144 sec. 31-Jan-2018 03:22:23.0: Acquire data for Observation WZ_Per... 31-Jan-2018 03:22:23.0: (belongs to Project AAVSO_HGUA_Miras_Manual_ver167, Plan WZ_Per) 31-Jan-2018 03:22:23.0: Send Observation WZ_Per to ACP Sequencer 31-Jan-2018 03:22:33.0: Sequencer is now active 31-Jan-2018 03:36:24.8: Sequencer is no longer active 31-Jan-2018 03:36:24.8: Post-job status check done (stat=Completed) 31-Jan-2018 03:36:24.8: Acquisition time: 841.8441507 sec. 31-Jan-2018 03:36:24.8: Data for Observation WZ_Per acquired successfully. 31-Jan-2018 03:36:24.9: Image Efficiency: 46.3% 31-Jan-2018 03:36:24.9: Cycle Efficiency: 100.0% 31-Jan-2018 03:36:25.1: SelectRunning: No running plans 31-Jan-2018 03:36:25.2: Efficiency: Selecting from 10 pending plans: 31-Jan-2018 03:36:25.6: Selected Plan V0959_Mon (TotEff=0.82) 31-Jan-2018 03:36:25.7: Dispatcher cycle time: 0.5970341 sec. 31-Jan-2018 03:36:25.7: Acquire data for Observation V0959_Mon... 31-Jan-2018 03:36:25.7: (belongs to Project Nova_Monitoring, Plan V0959_Mon) 31-Jan-2018 03:36:25.7: Send Observation V0959_Mon to ACP Sequencer 31-Jan-2018 03:36:35.7: Sequencer is now active 31-Jan-2018 03:51:51.6: Sequencer is no longer active 31-Jan-2018 03:51:51.6: Post-job status check done (stat=Completed) 31-Jan-2018 03:51:51.6: Acquisition time: 925.9129592 sec. 31-Jan-2018 03:51:51.6: Data for Observation V0959_Mon acquired successfully. 31-Jan-2018 03:51:51.6: Image Efficiency: 68.0% 31-Jan-2018 03:51:51.6: Cycle Efficiency: 99.9% 31-Jan-2018 03:51:51.8: SelectRunning: No running plans 31-Jan-2018 03:51:51.8: STRICT VETO: 31-Jan-2018 03:51:51.8: Obs AF_And in Plan AF_And was vetoed by AirMass constraint. 31-Jan-2018 03:51:51.8: AirMass estimates ready after 31-Jan-2018 18:00:12 UTC 31-Jan-2018 03:51:51.9: Efficiency: Selecting from 9 pending plans: 31-Jan-2018 03:51:51.9: Selected Plan MP_Gem (TotEff=0.81) 31-Jan-2018 03:51:52.1: Dispatcher cycle time: 0.2760158 sec. 31-Jan-2018 03:51:52.1: Acquire data for Observation MP_Gem... 31-Jan-2018 03:51:52.1: (belongs to Project Staels, Plan MP_Gem) 31-Jan-2018 03:51:52.1: Send Observation MP_Gem to ACP Sequencer 31-Jan-2018 03:52:02.1: Sequencer is now active 31-Jan-2018 04:22:28.1: Sequencer is no longer active 31-Jan-2018 04:22:28.1: Post-job status check done (stat=Completed) 31-Jan-2018 04:22:28.1: Acquisition time: 1836.0470159 sec. 31-Jan-2018 04:22:28.1: Data for Observation MP_Gem acquired successfully. 31-Jan-2018 04:22:28.1: Image Efficiency: 78.4% 31-Jan-2018 04:22:28.1: Cycle Efficiency: 100.0% 31-Jan-2018 04:22:28.4: SelectRunning: No running plans 31-Jan-2018 04:22:28.5: Obs NGC_7790 in Plan NGC_7790 was vetoed by AirmassRange constraint. 31-Jan-2018 04:22:28.5: AirmassRange estimates ready after 31-Jan-2018 16:39:05 UTC 31-Jan-2018 04:22:28.5: Efficiency: Selecting from 7 pending plans: 31-Jan-2018 04:22:28.6: Selected Plan CM_Cas (TotEff=0.72) 31-Jan-2018 04:22:28.7: Dispatcher cycle time: 0.2740156 sec. 31-Jan-2018 04:22:28.7: Acquire data for Observation CM_Cas... 31-Jan-2018 04:22:28.7: (belongs to Project AAVSO_HGUA_Miras_Manual_ver167, Plan CM_Cas) 31-Jan-2018 04:22:28.7: Send Observation CM_Cas to ACP Sequencer 31-Jan-2018 04:22:38.7: Sequencer is now active 31-Jan-2018 04:37:09.3: Sequencer is no longer active 31-Jan-2018 04:37:09.3: Post-job status check done (stat=Completed) 31-Jan-2018 04:37:09.3: Acquisition time: 880.6163684 sec. 31-Jan-2018 04:37:09.3: Data for Observation CM_Cas acquired successfully. 31-Jan-2018 04:37:09.3: Image Efficiency: 44.3% 31-Jan-2018 04:37:09.3: Cycle Efficiency: 100.0% 31-Jan-2018 04:37:09.5: SelectRunning: No running plans 31-Jan-2018 04:37:09.6: Efficiency: Selecting from 6 pending plans: 31-Jan-2018 04:37:09.6: Selected Plan RX_J0524+42 (TotEff=0.67) 31-Jan-2018 04:37:09.7: Dispatcher cycle time: 0.1840105 sec. 31-Jan-2018 04:37:09.7: Acquire data for Observation RX_J0524+42... 31-Jan-2018 04:37:09.7: (belongs to Project Walker, Plan RX_J0524+42) 31-Jan-2018 04:37:09.7: Doing 30 sets 31-Jan-2018 04:37:09.7: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 04:37:19.7: Sequencer is now active 31-Jan-2018 05:03:37.9: Sequencer is no longer active 31-Jan-2018 05:03:37.9: Post-job status check done (stat=Completed) 31-Jan-2018 05:03:37.9: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 05:03:47.9: Sequencer is now active 31-Jan-2018 05:28:54.5: Sequencer is no longer active 31-Jan-2018 05:28:54.5: Post-job status check done (stat=Completed) 31-Jan-2018 05:28:54.5: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 05:29:04.5: Sequencer is now active 31-Jan-2018 05:54:16.5: Sequencer is no longer active 31-Jan-2018 05:54:16.5: Post-job status check done (stat=Completed) 31-Jan-2018 05:54:16.8: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 05:54:26.9: Sequencer is now active 31-Jan-2018 06:19:47.0: Sequencer is no longer active 31-Jan-2018 06:19:47.0: Post-job status check done (stat=Completed) 31-Jan-2018 06:19:47.0: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 06:19:57.1: Sequencer is now active 31-Jan-2018 06:45:10.5: Sequencer is no longer active 31-Jan-2018 06:45:10.5: Post-job status check done (stat=Completed) 31-Jan-2018 06:45:10.8: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 06:45:20.8: Sequencer is now active 31-Jan-2018 07:10:28.8: Sequencer is no longer active 31-Jan-2018 07:10:28.8: Post-job status check done (stat=Completed) 31-Jan-2018 07:10:28.9: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 07:10:38.9: Sequencer is now active 31-Jan-2018 07:35:36.7: Sequencer is no longer active 31-Jan-2018 07:35:36.7: Post-job status check done (stat=Completed) 31-Jan-2018 07:35:36.7: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 07:35:46.7: Sequencer is now active 31-Jan-2018 08:00:44.4: Sequencer is no longer active 31-Jan-2018 08:00:44.4: Post-job status check done (stat=Completed) 31-Jan-2018 08:00:44.4: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 08:00:54.4: Sequencer is now active 31-Jan-2018 08:25:54.6: Sequencer is no longer active 31-Jan-2018 08:25:54.6: Post-job status check done (stat=Completed) 31-Jan-2018 08:25:54.6: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 08:26:04.6: Sequencer is now active 31-Jan-2018 08:51:00.7: Sequencer is no longer active 31-Jan-2018 08:51:00.7: Post-job status check done (stat=Completed) 31-Jan-2018 08:51:00.7: Send Observation RX_J0524+42 to ACP Sequencer 31-Jan-2018 08:51:10.7: Sequencer is now active 31-Jan-2018 09:16:12.6: Sequencer is no longer active 31-Jan-2018 09:16:12.6: Post-job status check done (stat=Completed) 31-Jan-2018 09:16:12.6: TestConstraints: AirMass vetoed/failed for end time of Obs 31-Jan-2018 09:16:12.6: ***Running Plan RX_J0524+42 (best efforts) completed early: 31-Jan-2018 09:16:12.6: Obs RX_J0524+42 would would not meet constraints 31-Jan-2018 09:16:12.6: Acquisition time: 16742.7286293 sec. 31-Jan-2018 09:16:12.6: Data for Observation RX_J0524+42 acquired successfully. 31-Jan-2018 09:16:12.6: Image Efficiency: 78.8% 31-Jan-2018 09:16:12.6: Cycle Efficiency: 100.0% 31-Jan-2018 09:16:12.9: ++ Auto Focus ++ 31-Jan-2018 09:16:13.0: Doing periodic autofocus. 31-Jan-2018 09:16:13.0: Start special ACP AutoFocus script for scheduler 31-Jan-2018 09:16:23.0: Sequencer is now active 31-Jan-2018 12:56:07.9: Sequencer is no longer active 31-Jan-2018 12:56:07.9: ** Sequencer script "AutoFocusScheduler" failed: 31-Jan-2018 12:56:07.9: **Script Error** Source: ACP Message: The script was aborted. at line 69 column 9. Script Context: 66: Telescope.Tracking = True ' AcquireStar needs tracking scope 67: Else 68: Call SUP.StartSlewJ2000("FocusArea", CT.RightAscension, CT.Declination) => 69: Call SUP.WaitForSlew() ^ 70: End If 71: 72: If Not SUP.AutoFocus(CT.RightAscension, CT.Declination) Then -- end -- 31-Jan-2018 12:56:07.9: ** Autofocus failed (n=1), will retry ASAP after 0 min. 31-Jan-2018 12:56:07.9: SelectRunning: No running plans 31-Jan-2018 12:56:07.9: Obs GSC_4030_204 in Plan GSC_4030_204 was vetoed by AirMass constraint. 31-Jan-2018 12:56:07.9: AirMass estimates ready after 31-Jan-2018 17:48:24 UTC 31-Jan-2018 12:56:07.9: Plan M56 would extend past daylight, deferred to next night 31-Jan-2018 12:56:07.9: Plan M67 would extend past daylight, deferred to next night 31-Jan-2018 12:56:07.9: Plan SDSS073224 would extend past daylight, deferred to next night 31-Jan-2018 12:56:07.9: Plan SDSSJ121027+502735 would extend past daylight, deferred to next night 31-Jan-2018 12:56:08.0: Plan V0524_Cas would extend past daylight, deferred to next night 31-Jan-2018 12:56:08.0: Plan V0965_Per would extend past daylight, deferred to next night 31-Jan-2018 12:56:08.0: Efficiency: Selecting from 2 pending plans: 31-Jan-2018 12:56:08.0: Selected Plan V841_Oph (TotEff=0.71) 31-Jan-2018 12:56:08.0: Dispatcher cycle time: 0.1310075 sec. 31-Jan-2018 12:56:08.0: Acquire data for Observation V841_Oph... 31-Jan-2018 12:56:08.0: (belongs to Project AAVSO_Monitoring, Plan V841_Oph) 31-Jan-2018 12:56:08.1: Send Observation V841_Oph to ACP Sequencer 31-Jan-2018 12:56:18.1: Sequencer is now active 31-Jan-2018 12:56:23.2: Sequencer is no longer active 31-Jan-2018 12:56:23.2: ** Sequencer script "AcquireScheduler" failed: 31-Jan-2018 12:56:23.2: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! at line 1741 column 9. Script Context: 1738: SUP.CalcSimImageCoordinates TargetRA, TargetDec ' Calculate simulator image 1739: End If 1740: Else => 1741: SUP.StartSlewJ2000 OBS.Name, TargetRA, TargetDec ' START THE SLEW ^ 1742: End If 1743: If SUP.HaveRotator Then SUP.StartRotateToPA OBS.PA, TargetRA ' Always start rotator slew 1744: -- end -- 31-Jan-2018 12:56:26.2: Post-job status check done (stat=Running) 31-Jan-2018 12:56:26.2: ACP ERROR: Run failed due to script error (see ACP run log) 31-Jan-2018 12:56:26.2: ACP data acquisition failed for Observation V841_Oph. 31-Jan-2018 12:56:26.2: (Observation V841_Oph interrupted by acquisition process failure.) 31-Jan-2018 12:56:26.3: ++ Auto Focus ++ 31-Jan-2018 12:56:26.4: Doing periodic autofocus. 31-Jan-2018 12:56:26.4: Start special ACP AutoFocus script for scheduler 31-Jan-2018 12:56:36.4: Sequencer is now active 31-Jan-2018 12:56:41.6: Sequencer is no longer active 31-Jan-2018 12:56:41.6: ** Sequencer script "AutoFocusScheduler" failed: 31-Jan-2018 12:56:41.6: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! at line 68 column 9. Script Context: 65: If Util.Prefs.AutoFocus.UseAcquireStar Then 66: Telescope.Tracking = True ' AcquireStar needs tracking scope 67: Else => 68: Call SUP.StartSlewJ2000("FocusArea", CT.RightAscension, CT.Declination) ^ 69: Call SUP.WaitForSlew() 70: End If 71: -- end -- 31-Jan-2018 12:56:41.6: ** Autofocus failed (n=2), will retry ASAP after 5 min. 31-Jan-2018 12:56:41.9: SelectRunning: No running plans 31-Jan-2018 12:56:41.9: Plan Mkn_501 would extend past daylight, deferred to next night 31-Jan-2018 12:56:41.9: No pending plans that can be started now. 31-Jan-2018 12:56:41.9: Dispatcher cycle time: 0.0280016 sec. 31-Jan-2018 12:57:12.4: SelectRunning: No running plans 31-Jan-2018 12:57:12.4: No pending plans that can be started now. 31-Jan-2018 12:57:12.4: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 12:57:42.6: SelectRunning: No running plans 31-Jan-2018 12:57:42.6: No pending plans that can be started now. 31-Jan-2018 12:57:42.6: Dispatcher cycle time: 0.0130007 sec. 31-Jan-2018 12:58:12.7: SelectRunning: No running plans 31-Jan-2018 12:58:12.7: No pending plans that can be started now. 31-Jan-2018 12:58:12.7: Dispatcher cycle time: 0.0130008 sec. 31-Jan-2018 12:58:42.9: SelectRunning: No running plans 31-Jan-2018 12:58:42.9: No pending plans that can be started now. 31-Jan-2018 12:58:42.9: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 12:59:13.1: SelectRunning: No running plans 31-Jan-2018 12:59:13.1: No pending plans that can be started now. 31-Jan-2018 12:59:13.1: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 12:59:43.8: SelectRunning: No running plans 31-Jan-2018 12:59:43.8: No pending plans that can be started now. 31-Jan-2018 12:59:43.8: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:00:14.2: SelectRunning: No running plans 31-Jan-2018 13:00:14.2: No pending plans that can be started now. 31-Jan-2018 13:00:14.2: Dispatcher cycle time: 0.0130007 sec. 31-Jan-2018 13:00:44.4: SelectRunning: No running plans 31-Jan-2018 13:00:44.4: No pending plans that can be started now. 31-Jan-2018 13:00:44.4: Dispatcher cycle time: 0.0110006 sec. 31-Jan-2018 13:01:14.6: SelectRunning: No running plans 31-Jan-2018 13:01:14.6: No pending plans that can be started now. 31-Jan-2018 13:01:14.6: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:01:44.7: ++ Auto Focus ++ 31-Jan-2018 13:01:44.8: Doing periodic autofocus. 31-Jan-2018 13:01:44.8: Start special ACP AutoFocus script for scheduler 31-Jan-2018 13:01:54.8: Sequencer is now active 31-Jan-2018 13:01:59.9: Sequencer is no longer active 31-Jan-2018 13:01:59.9: ** Sequencer script "AutoFocusScheduler" failed: 31-Jan-2018 13:01:59.9: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! at line 68 column 9. Script Context: 65: If Util.Prefs.AutoFocus.UseAcquireStar Then 66: Telescope.Tracking = True ' AcquireStar needs tracking scope 67: Else => 68: Call SUP.StartSlewJ2000("FocusArea", CT.RightAscension, CT.Declination) ^ 69: Call SUP.WaitForSlew() 70: End If 71: -- end -- 31-Jan-2018 13:01:59.9: ** Autofocus failed (n=3), will retry ASAP after 10 min. 31-Jan-2018 13:01:59.9: SelectRunning: No running plans 31-Jan-2018 13:01:59.9: No pending plans that can be started now. 31-Jan-2018 13:01:59.9: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:02:30.2: SelectRunning: No running plans 31-Jan-2018 13:02:30.2: Plan IRAS_19067+2158 would extend past daylight, deferred to next night 31-Jan-2018 13:02:30.2: No pending plans that can be started now. 31-Jan-2018 13:02:30.2: Dispatcher cycle time: 0.0130008 sec. 31-Jan-2018 13:03:00.7: SelectRunning: No running plans 31-Jan-2018 13:03:00.7: No pending plans that can be started now. 31-Jan-2018 13:03:00.7: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:03:30.8: SelectRunning: No running plans 31-Jan-2018 13:03:30.8: Plan NSVS_11201899 would extend past daylight, deferred to next night 31-Jan-2018 13:03:30.8: No pending plans that can be started now. 31-Jan-2018 13:03:30.8: Dispatcher cycle time: 0.0140008 sec. 31-Jan-2018 13:04:01.0: SelectRunning: No running plans 31-Jan-2018 13:04:01.0: No pending plans that can be started now. 31-Jan-2018 13:04:01.0: Dispatcher cycle time: 0.018001 sec. 31-Jan-2018 13:04:31.2: SelectRunning: No running plans 31-Jan-2018 13:04:31.3: No pending plans that can be started now. 31-Jan-2018 13:04:31.3: Dispatcher cycle time: 0.0110006 sec. 31-Jan-2018 13:05:01.4: SelectRunning: No running plans 31-Jan-2018 13:05:01.4: No pending plans that can be started now. 31-Jan-2018 13:05:01.4: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:05:31.6: SelectRunning: No running plans 31-Jan-2018 13:05:31.6: No pending plans that can be started now. 31-Jan-2018 13:05:31.6: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:06:01.7: SelectRunning: No running plans 31-Jan-2018 13:06:01.7: No pending plans that can be started now. 31-Jan-2018 13:06:01.7: Dispatcher cycle time: 0.0120007 sec. 31-Jan-2018 13:06:31.9: ++ Dawn Flats ++ 31-Jan-2018 13:06:32.0: Start ACP AutoFlat script for Dawn 31-Jan-2018 13:06:42.0: Sequencer is now active 31-Jan-2018 13:16:11.7: Sequencer is no longer active 31-Jan-2018 13:16:11.7: ** Sequencer script "AutoFlat" failed: 31-Jan-2018 13:16:11.7: **Script Error (Tracking has been stopped)** Source: ASCOM.SiTechDll.Telescope Message: sttgaSiTech Says: Motor(s) in Blinky Mode! at line 1372 column 13. Script Context: 1369: Console.PrintLine " (tracking on)" 1370: Telescope.Tracking = True 1371: End If => 1372: SUP.StartSlewJ2000 SLEWLABEL, RA, Dec ' Start the slew ^ 1373: SUP.WaitForSlew 1374: Util.WaitUntil EvTime(0) + PreSlewTime ' Wait till time to start 1375: Console.PrintLine "Starting dawn flats. High Sun at " & _ -- end -- 31-Jan-2018 13:16:11.9: -- Observatory Shutdown -- 31-Jan-2018 13:16:12.0: Weather disconnected. 31-Jan-2018 13:16:12.0: Start ACP Sequencer's ShutdownObs script 31-Jan-2018 13:16:22.0: Sequencer is now active 31-Jan-2018 13:57:13.0: Dispatcher stopped at 31-Jan-2018 13:57:13 UTC 31-Jan-2018 13:57:13.0: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 31-Jan-2018 13:57:14.8: Sequencer is no longer active 31-Jan-2018 13:57:14.8: ** Sequencer script "ShutdownObs" failed: 31-Jan-2018 13:57:14.8: **Script Error** Source: ACP Message: The script was aborted. at line 38 column 9. Script Context: 35: 36: if(Telescope.Connected) { 37: Console.PrintLine("Parking scope"); => 38: Telescope.Park(); // Park the scope if possible, and/or close/park dome ^ 39: Console.PrintLine("OK"); 40: if(Telescope.Connected) { 41: Console.PrintLine("Disconnecting Scope"); -- end -- 31-Jan-2018 13:57:14.9: **EXCEPTION IN SCHEDULER: 31-Jan-2018 13:57:14.9: Observatory shutdown failed, cannot continue. 31-Jan-2018 13:57:14.9: Traceback: at DC3.Scheduler.Engine.DoShutdownIf() at DC3.Scheduler.Engine.Run() 31-Jan-2018 13:57:14.9: Run statistics: 31-Jan-2018 13:57:14.9: Observations: 51 31-Jan-2018 13:57:14.9: Considered: 35 31-Jan-2018 13:57:14.9: Completed: 21 31-Jan-2018 13:57:14.9: Skipped: 10 31-Jan-2018 13:57:14.9: Never Eligible: 16 31-Jan-2018 13:57:14.9: Failed: 4 31-Jan-2018 13:57:14.9: Shutter-Open efficiency: 70.86% 31-Jan-2018 13:57:14.9: Overall Efficiency: 99.90% 31-Jan-2018 13:57:14.9: Release ACP sequencer Log closed at Wed, Jan 31 2018 13:57:16 UTC (actual time)