Log opened at Tue, May 13 2014 03:51:26 UTC (actual time) Current log level is Verbose Scheduler version 3.5.3 Multi-user license: Arne Henden 13-May-2014 03:51:26.3: Simulated clock initialized at 13-May-2014 03:51:26 UTC 13-May-2014 03:51:26.4: Loaded Constraint plugin AirMass 13-May-2014 03:51:26.4: Loaded Constraint plugin AirmassRange 13-May-2014 03:51:26.4: Loaded Constraint plugin Horizon 13-May-2014 03:51:26.4: Loaded Constraint plugin HourAngle 13-May-2014 03:51:26.4: Loaded Constraint plugin MoonAvoid 13-May-2014 03:51:26.4: Loaded Constraint plugin MoonDown 13-May-2014 03:51:26.4: Loaded Constraint plugin SkyCondition 13-May-2014 03:51:26.4: Loaded Constraint plugin TimeRange 13-May-2014 03:51:27.0: 146 plans are now pending. 13-May-2014 03:51:27.0: Attach ACP sequencer 13-May-2014 03:51:38.5: Dispatcher started at 13-May-2014 03:51:38 UTC 13-May-2014 03:51:38.5: Priority: W[0]=1.00 13-May-2014 03:51:38.5: Transit Altitude: W[1]=0.70 13-May-2014 03:51:38.5: Highest Altitude: W[6]=0.00 13-May-2014 03:51:38.5: Lateness: W[5]=0.00 13-May-2014 03:51:38.5: Slew Distance: W[2]=0.30 13-May-2014 03:51:38.5: Retry Count: W[3]=0.20 13-May-2014 03:51:38.5: Meridian Crossing: W[4]=0.30 13-May-2014 03:51:38.5: Obs Conditions: W[7]=0.40 13-May-2014 03:51:38.5: Rising Plan Delay: disabled 13-May-2014 03:51:49.1: Weather successfully connected. Wait for valid data... 13-May-2014 03:51:53.9: ++ Observatory Startup ++ 13-May-2014 03:51:53.9: Start ACP Sequencer's StartupObs script 13-May-2014 03:52:32.6: Open the observatory dome/roof 13-May-2014 03:53:31.0: ++ Auto Focus ++ 13-May-2014 03:53:31.0: Doing initial autofocus. 13-May-2014 03:53:31.0: Start special ACP AutoFocus script for scheduler 13-May-2014 03:56:28.0: Next periodic autofocus ASAP after 13-May-2014 05:56:17 UTC 13-May-2014 03:56:31.8: Plan SN_2014J has Monitor Mode. Time to resubmit it. 13-May-2014 03:56:33.1: Dispatcher cycle time: 3.3384058 sec. 13-May-2014 03:56:33.1: Acquire data for Observation SN_2014J... 13-May-2014 03:56:33.1: (belongs to Project AAVSO_Monitoring, Plan SN_2014J) 13-May-2014 03:56:33.1: Doing 3 sets 13-May-2014 03:56:33.1: Send Observation SN_2014J to ACP Sequencer 13-May-2014 04:03:18.9: Send Observation SN_2014J to ACP Sequencer 13-May-2014 04:09:08.3: Send Observation SN_2014J to ACP Sequencer 13-May-2014 04:14:44.4: Acquisition time: 1091.2853167 sec. 13-May-2014 04:14:44.4: Data for Observation SN_2014J acquired successfully. 13-May-2014 04:14:44.5: Image Efficiency: 41.1% 13-May-2014 04:14:44.5: Cycle Efficiency: 99.7% 13-May-2014 04:14:47.7: **EXCEPTION IN SCHEDULER: 13-May-2014 04:14:47.7: DOME FAILURE: Dome reports shutter error status 13-May-2014 04:14:47.7: Traceback: at DC3.Scheduler.ACPSequencer.get_DomeOpen() at DC3.Scheduler.Engine.DoStartupIf(Boolean openDome) at DC3.Scheduler.Engine.Run() 13-May-2014 04:14:47.8: Run statistics: 13-May-2014 04:14:47.8: Observations: 173 13-May-2014 04:14:47.8: Considered: 20 13-May-2014 04:14:47.8: Completed: 1 13-May-2014 04:14:47.8: Skipped: 15 13-May-2014 04:14:47.8: Never Eligible: 153 13-May-2014 04:14:47.8: Failed: 4 13-May-2014 04:14:47.8: Shutter-Open efficiency: 41.11% 13-May-2014 04:14:47.8: Overall Efficiency: 99.90% 13-May-2014 04:14:47.8: Release ACP sequencer Log closed at Tue, May 13 2014 04:14:49 UTC (actual time)