Log opened at Thu, Mar 20 2014 01:58:14 UTC (actual time) Current log level is Verbose Scheduler version 3.5.3 Multi-user license: Arne Henden 20-Mar-2014 01:58:14.3: Simulated clock initialized at 20-Mar-2014 01:58:14 UTC 20-Mar-2014 01:58:14.3: Loaded Constraint plugin AirMass 20-Mar-2014 01:58:14.3: Loaded Constraint plugin AirmassRange 20-Mar-2014 01:58:14.3: Loaded Constraint plugin Horizon 20-Mar-2014 01:58:14.3: Loaded Constraint plugin HourAngle 20-Mar-2014 01:58:14.4: Loaded Constraint plugin MoonAvoid 20-Mar-2014 01:58:14.4: Loaded Constraint plugin MoonDown 20-Mar-2014 01:58:14.4: Loaded Constraint plugin SkyCondition 20-Mar-2014 01:58:14.4: Loaded Constraint plugin TimeRange 20-Mar-2014 01:58:15.0: 83 plans are now pending. 20-Mar-2014 01:58:15.0: Attach ACP sequencer 20-Mar-2014 01:58:37.3: Weather successfully connected. Wait for valid data... 20-Mar-2014 01:59:34.5: Dispatcher started at 20-Mar-2014 01:59:34 UTC 20-Mar-2014 01:59:34.5: Priority: W[0]=1.00 20-Mar-2014 01:59:34.5: Transit Altitude: W[1]=0.70 20-Mar-2014 01:59:34.5: Highest Altitude: W[6]=0.00 20-Mar-2014 01:59:34.5: Lateness: W[5]=0.00 20-Mar-2014 01:59:34.5: Slew Distance: W[2]=0.30 20-Mar-2014 01:59:34.5: Retry Count: W[3]=0.20 20-Mar-2014 01:59:34.5: Meridian Crossing: W[4]=0.30 20-Mar-2014 01:59:34.5: Obs Conditions: W[7]=0.40 20-Mar-2014 01:59:34.5: Rising Plan Delay: disabled 20-Mar-2014 01:59:37.1: ++ Observatory Startup ++ 20-Mar-2014 01:59:37.4: Start ACP Sequencer's StartupObs script 20-Mar-2014 02:11:01.1: ++ Auto Focus ++ 20-Mar-2014 02:11:01.1: Doing initial autofocus. 20-Mar-2014 02:11:01.1: Start special ACP AutoFocus script for scheduler 20-Mar-2014 02:15:15.0: ** Autofocus failed (n=1), will retry ASAP after 0 min. 20-Mar-2014 02:15:18.5: Plan SA110 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA61 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA132 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA84 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA106 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA103 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA98 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan V841_Oph has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan V0959_Mon has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan MP_Gem has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan KH_15D has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan NGC_2438 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan V849_Her has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan RZ_Leo has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan V2676_Oph has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan V5582_Sgr has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan PNV_J1902 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SDSS073224 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA99_438 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA52_56 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA100_267 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA99_438 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SA124_970 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SN_2014G has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan SN_2014J has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan M56 has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan T_CMi has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan WZ_Lyr has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:18.5: Plan X_Dra has Monitor Mode. Time to resubmit it. 20-Mar-2014 02:15:19.9: Dispatcher cycle time: 2.8548051 sec. 20-Mar-2014 02:15:19.9: Acquire data for Observation SN_2014J... 20-Mar-2014 02:15:19.9: (belongs to Project AAVSO_Monitoring, Plan SN_2014J) 20-Mar-2014 02:15:19.9: Doing 3 sets 20-Mar-2014 02:15:19.9: Send Observation SN_2014J to ACP Sequencer 20-Mar-2014 02:15:52.4: ** Script interrupted by weather safety event. 20-Mar-2014 02:15:55.5: ACP ABORT: Acquisition process was interrupted by weather unsafe. 20-Mar-2014 02:15:55.5: ACP data acquisition failed for Observation SN_2014J. 20-Mar-2014 02:15:55.5: (Plan SN_2014J will be resubmitted in its entirety. 20-Mar-2014 02:15:55.5: (Observation SN_2014J interrupted by weather unsafe event.) 20-Mar-2014 02:15:57.3: -- Weather Unsafe -- 20-Mar-2014 02:36:03.0: ++ Weather Safe ++ 20-Mar-2014 02:36:04.0: ++ Observatory Startup ++ 20-Mar-2014 02:36:04.0: Start ACP Sequencer's StartupObs script 20-Mar-2014 02:36:24.1: Open the observatory dome/roof 20-Mar-2014 02:37:18.8: ++ Auto Focus ++ 20-Mar-2014 02:37:18.8: Doing initial autofocus. 20-Mar-2014 02:37:18.8: Start special ACP AutoFocus script for scheduler 20-Mar-2014 02:40:35.2: ** Autofocus failed (n=2), will retry ASAP after 5 min. 20-Mar-2014 02:40:37.6: Dispatcher cycle time: 0.4992009 sec. 20-Mar-2014 02:40:37.6: Acquire data for Observation SN_2014J... 20-Mar-2014 02:40:37.6: (belongs to Project AAVSO_Monitoring, Plan SN_2014J) 20-Mar-2014 02:40:37.6: Doing 3 sets 20-Mar-2014 02:40:37.6: Send Observation SN_2014J to ACP Sequencer 20-Mar-2014 02:41:12.5: ** Script interrupted by weather safety event. 20-Mar-2014 02:41:15.6: ACP ABORT: Acquisition process was interrupted by weather unsafe. 20-Mar-2014 02:41:15.6: ACP data acquisition failed for Observation SN_2014J. 20-Mar-2014 02:41:15.6: (Plan SN_2014J will be resubmitted in its entirety. 20-Mar-2014 02:41:15.6: (Observation SN_2014J interrupted by weather unsafe event.) 20-Mar-2014 02:41:16.2: -- Weather Unsafe -- 20-Mar-2014 03:01:18.9: ++ Weather Safe ++ 20-Mar-2014 03:01:21.9: ++ Observatory Startup ++ 20-Mar-2014 03:01:21.9: Start ACP Sequencer's StartupObs script 20-Mar-2014 03:01:41.3: Open the observatory dome/roof 20-Mar-2014 03:02:03.0: **EXCEPTION IN SCHEDULER: 20-Mar-2014 03:02:03.0: DOME FAILURE: Dome reports shutter error status while opening 20-Mar-2014 03:02:03.1: Traceback: at DC3.Scheduler.ACPSequencer.OpenDome() at DC3.Scheduler.Engine.DoStartupIf(Boolean openDome) at DC3.Scheduler.Engine.Run() 20-Mar-2014 03:02:03.2: Run statistics: 20-Mar-2014 03:02:03.2: Observations: 138 20-Mar-2014 03:02:03.2: Considered: 28 20-Mar-2014 03:02:03.2: Completed: 0 20-Mar-2014 03:02:03.2: Skipped: 25 20-Mar-2014 03:02:03.2: Never Eligible: 110 20-Mar-2014 03:02:03.2: Failed: 3 20-Mar-2014 03:02:03.2: Shutter-Open efficiency: 0.00% 20-Mar-2014 03:02:03.2: Overall Efficiency: 68.51% 20-Mar-2014 03:02:03.2: Release ACP sequencer Log closed at Thu, Mar 20 2014 03:02:04 UTC (actual time)