Log opened at Tue, Jun 18 2013 16:23:27 UTC (actual time) Current log level is Verbose Scheduler version 3.5.3 Multi-user license: Arne Henden 18-Jun-2013 16:23:27.5: Simulated clock initialized at 18-Jun-2013 16:23:27 UTC 18-Jun-2013 16:23:27.6: Loaded Constraint plugin AirMass 18-Jun-2013 16:23:27.6: Loaded Constraint plugin AirmassRange 18-Jun-2013 16:23:27.6: Loaded Constraint plugin Horizon 18-Jun-2013 16:23:27.6: Loaded Constraint plugin HourAngle 18-Jun-2013 16:23:27.6: Loaded Constraint plugin MoonAvoid 18-Jun-2013 16:23:27.6: Loaded Constraint plugin MoonDown 18-Jun-2013 16:23:27.6: Loaded Constraint plugin SkyCondition 18-Jun-2013 16:23:27.6: Loaded Constraint plugin TimeRange 18-Jun-2013 16:23:28.2: 109 plans are now pending. 18-Jun-2013 16:23:28.2: Attach ACP sequencer 18-Jun-2013 16:23:34.3: Weather successfully connected. Wait for valid data... 19-Jun-2013 02:15:40.6: Dispatcher started at 19-Jun-2013 02:15:40 UTC 19-Jun-2013 02:15:40.6: Priority: W[0]=1.00 19-Jun-2013 02:15:40.6: Transit Altitude: W[1]=0.00 19-Jun-2013 02:15:40.6: Highest Altitude: W[6]=0.00 19-Jun-2013 02:15:40.6: Lateness: W[5]=0.70 19-Jun-2013 02:15:40.6: Slew Distance: W[2]=0.30 19-Jun-2013 02:15:40.6: Retry Count: W[3]=0.20 19-Jun-2013 02:15:40.6: Meridian Crossing: W[4]=0.30 19-Jun-2013 02:15:40.6: Obs Conditions: W[7]=0.40 19-Jun-2013 02:15:40.6: Rising Plan Delay: disabled 19-Jun-2013 02:15:41.0: Run statistics: 19-Jun-2013 02:15:41.0: Observations: 147 19-Jun-2013 02:15:41.0: Considered: 4 19-Jun-2013 02:15:41.0: Completed: 2 19-Jun-2013 02:15:41.0: Skipped: 0 19-Jun-2013 02:15:41.0: Never Eligible: 143 19-Jun-2013 02:15:41.0: Failed: 2 Log closed at Wed, Jun 19 2013 02:15:41 UTC (actual time)