Log opened at Tue, Mar 12 2013 05:19:45 UTC (actual time) Current log level is Debug Scheduler version 3.5.3 Multi-user license: Arne Henden 12-Mar-2013 05:19:45.0: Simulated clock initialized at 12-Mar-2013 05:19:45 UTC 12-Mar-2013 05:19:45.0: Loaded Constraint plugin AirMass 12-Mar-2013 05:19:45.0: Loaded Constraint plugin AirmassRange 12-Mar-2013 05:19:45.0: Loaded Constraint plugin Horizon 12-Mar-2013 05:19:45.0: Loaded Constraint plugin HourAngle 12-Mar-2013 05:19:45.0: Loaded Constraint plugin MoonAvoid 12-Mar-2013 05:19:45.0: Loaded Constraint plugin MoonDown 12-Mar-2013 05:19:45.0: Loaded Constraint plugin SkyCondition 12-Mar-2013 05:19:45.0: Loaded Constraint plugin TimeRange 12-Mar-2013 05:19:45.6: 36 plans are now pending. 12-Mar-2013 05:19:45.6: Attach ACP sequencer 12-Mar-2013 05:19:51.9: Weather successfully connected. Wait for valid data... 12-Mar-2013 05:19:55.4: Dispatcher started at 12-Mar-2013 05:19:55 UTC 12-Mar-2013 05:19:55.4: Priority: W[0]=1.00 12-Mar-2013 05:19:55.4: Transit Altitude: W[1]=0.00 12-Mar-2013 05:19:55.4: Highest Altitude: W[6]=0.00 12-Mar-2013 05:19:55.4: Lateness: W[5]=0.70 12-Mar-2013 05:19:55.4: Slew Distance: W[2]=0.30 12-Mar-2013 05:19:55.4: Retry Count: W[3]=0.20 12-Mar-2013 05:19:55.4: Meridian Crossing: W[4]=0.30 12-Mar-2013 05:19:55.4: Obs Conditions: W[7]=0.40 12-Mar-2013 05:19:55.4: Rising Plan Delay: disabled 12-Mar-2013 05:19:56.6: ++ Observatory Startup ++ 12-Mar-2013 05:19:56.6: Start ACP Sequencer's StartupObs script 12-Mar-2013 05:20:06.7: Sequencer is now active 12-Mar-2013 05:20:11.9: Sequencer is no longer active 12-Mar-2013 05:20:11.9: ++ Auto Focus ++ 12-Mar-2013 05:20:11.9: Doing initial autofocus. 12-Mar-2013 05:20:11.9: Start special ACP AutoFocus script for scheduler 12-Mar-2013 05:20:21.9: Sequencer is now active 12-Mar-2013 05:23:44.9: Sequencer is no longer active 12-Mar-2013 05:23:44.9: Next periodic autofocus ASAP after 12-Mar-2013 07:23:20 UTC 12-Mar-2013 05:23:45.4: Plan SA110 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA109 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA61 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA61 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA132 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA84 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA106 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA106 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA103 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan SA103 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan MP_Gem has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan KH_15D has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan V1184_Tau has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan NGC_2438 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan V849 Her has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan CW_Mon has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan GW_Lib has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.4: Plan HM_Leo has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan HS_0455+8315 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan IR_Com has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan IY_UMa has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan LN_UMa has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan MR_UMa has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan QZ_Lib has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan QZ_Ser has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan RZ_Leo has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J07550770+1435476 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J09324957+4725230 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J10051538+1911079 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J10065840+2337244 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J14354402+2336387 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J15381735+5123380 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J15445360+2553488 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SDSS_J16424852+1347514 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan V0380_Oph has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan V0406_Vir has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan V0482_Cam has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan V1108_Her has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA98 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA99_438 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA52_56 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA100_267 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA99_438 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA124_970 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA52_56 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan SA100_267 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: Plan 1RXS_J1050103-140431 has Monitor Mode. Time to resubmit it. 12-Mar-2013 05:23:45.5: SelectRunning: No running plans 12-Mar-2013 05:23:45.6: Obs 2MASS_23275353+5214532 in Plan 2MASS_23275353+5214532 was vetoed by AirMass constraint. 12-Mar-2013 05:23:45.6: AirMass estimates ready after 12-Mar-2013 13:46:51 UTC 12-Mar-2013 05:23:45.6: Obs BB_Ari in Plan BB_Ari was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 17:47:54 UTC 12-Mar-2013 05:23:45.6: Obs CB_32 in Plan CB_32 was vetoed by AirMass constraint. 12-Mar-2013 05:23:45.6: AirMass estimates ready after 12-Mar-2013 21:43:55 UTC 12-Mar-2013 05:23:45.6: Obs FL_Psc in Plan FL_Psc was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 16:01:01 UTC 12-Mar-2013 05:23:45.6: Obs GSC_3649-0825 in Plan GSC_3649-0825 was vetoed by AirMass constraint. 12-Mar-2013 05:23:45.6: AirMass estimates ready after 12-Mar-2013 13:46:00 UTC 12-Mar-2013 05:23:45.6: Obs GW_Lib in Plan GW_Lib was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 09:49:46 UTC 12-Mar-2013 05:23:45.6: Obs HS_0218+3229 in Plan HS_0218+3229 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 17:14:43 UTC 12-Mar-2013 05:23:45.6: Obs HS 0220+0603 in Plan HS_0220+0603 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 18:13:45 UTC 12-Mar-2013 05:23:45.6: Obs HS_2214+2845 in Plan HS_2214+2845 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.6: AirmassRange estimates ready after 12-Mar-2013 13:17:20 UTC 12-Mar-2013 05:23:45.6: Obs IC_348 in Plan IC_348 was vetoed by AirMass constraint. 12-Mar-2013 05:23:45.6: AirMass estimates ready after 12-Mar-2013 18:38:32 UTC 12-Mar-2013 05:23:45.7: Obs LT_Eri in Plan LT_Eri was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 20:39:04 UTC 12-Mar-2013 05:23:45.7: Obs PU_CMa in Plan PU_CMa was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 13-Mar-2013 01:00:25 UTC 12-Mar-2013 05:23:45.7: Obs QZ_Lib in Plan QZ_Lib was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 08:17:40 UTC 12-Mar-2013 05:23:45.7: Obs QZ_Ser in Plan QZ_Ser was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 07:14:27 UTC 12-Mar-2013 05:23:45.7: Obs SA100_267 in Plan SA100_267 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 08:12:33 UTC 12-Mar-2013 05:23:45.7: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 05:35:17 UTC 12-Mar-2013 05:23:45.7: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 11:14:38 UTC 12-Mar-2013 05:23:45.7: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 08:18:35 UTC 12-Mar-2013 05:23:45.7: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.7: AirmassRange estimates ready after 12-Mar-2013 06:11:17 UTC 12-Mar-2013 05:23:45.8: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 09:14:54 UTC 12-Mar-2013 05:23:45.8: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 11:22:00 UTC 12-Mar-2013 05:23:45.8: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 10:09:57 UTC 12-Mar-2013 05:23:45.8: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 12:16:06 UTC 12-Mar-2013 05:23:45.8: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 11:05:32 UTC 12-Mar-2013 05:23:45.8: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 13:11:52 UTC 12-Mar-2013 05:23:45.8: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 11:05:17 UTC 12-Mar-2013 05:23:45.8: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 13:11:10 UTC 12-Mar-2013 05:23:45.8: Obs SA112_810 in Plan SA112_810 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 12:10:42 UTC 12-Mar-2013 05:23:45.8: Obs SA112_810 in Plan SA112_810 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 14:16:52 UTC 12-Mar-2013 05:23:45.8: Obs SA116_180 in Plan SA116_180 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 16:31:42 UTC 12-Mar-2013 05:23:45.8: Obs SA124_970 in Plan SA124_970 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 06:36:14 UTC 12-Mar-2013 05:23:45.8: Obs SA132 in Plan SA132 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 08:38:42 UTC 12-Mar-2013 05:23:45.8: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 16:43:42 UTC 12-Mar-2013 05:23:45.8: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 14:45:07 UTC 12-Mar-2013 05:23:45.8: Obs SA52_56 in Plan SA52_56 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.8: AirmassRange estimates ready after 12-Mar-2013 09:01:35 UTC 12-Mar-2013 05:23:45.9: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 09:18:51 UTC 12-Mar-2013 05:23:45.9: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 07:20:46 UTC 12-Mar-2013 05:23:45.9: Obs SA68_216 in Plan SA68_216 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 15:06:36 UTC 12-Mar-2013 05:23:45.9: Obs SA68_216 in Plan SA68_216 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 16:59:56 UTC 12-Mar-2013 05:23:45.9: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 07:09:03 UTC 12-Mar-2013 05:23:45.9: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 09:02:35 UTC 12-Mar-2013 05:23:45.9: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 17:20:26 UTC 12-Mar-2013 05:23:45.9: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 19:25:51 UTC 12-Mar-2013 05:23:45.9: Obs SA96_171 in Plan SA96_171 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 20:19:06 UTC 12-Mar-2013 05:23:45.9: Obs SA96_171 in Plan SA96_171 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 22:26:06 UTC 12-Mar-2013 05:23:45.9: Obs SA98 in Plan SA98 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 13-Mar-2013 00:27:56 UTC 12-Mar-2013 05:23:45.9: Obs SA98 in Plan SA98 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 06:12:50 UTC 12-Mar-2013 05:23:45.9: Obs SA99_438 in Plan SA99_438 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 07:16:36 UTC 12-Mar-2013 05:23:45.9: Obs SDSS_J00115308-0647391 in Plan SDSS_J00115308-0647391 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:45.9: AirmassRange estimates ready after 12-Mar-2013 16:44:33 UTC 12-Mar-2013 05:23:46.0: Obs SDSS_J14354402+2336387 in Plan SDSS_J14354402+2336387 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 05:48:23 UTC 12-Mar-2013 05:23:46.0: Obs SDSS_J15381735+5123380 in Plan SDSS_J15381735+5123380 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 06:00:03 UTC 12-Mar-2013 05:23:46.0: Obs SDSS_J15445360+2553488 in Plan SDSS_J15445360+2553488 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 06:52:48 UTC 12-Mar-2013 05:23:46.0: Obs SDSS_J16424852+1347514 in Plan SDSS_J16424852+1347514 was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 08:16:21 UTC 12-Mar-2013 05:23:46.0: Obs V0380_Oph in Plan V0380_Oph was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 09:42:52 UTC 12-Mar-2013 05:23:46.0: Obs V0405_Peg in Plan V0405_Peg was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 14:25:12 UTC 12-Mar-2013 05:23:46.0: Obs V1108_Her in Plan V1108_Her was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 09:46:31 UTC 12-Mar-2013 05:23:46.0: Obs V1294_Tau in Plan V1294_Tau was vetoed by AirmassRange constraint. 12-Mar-2013 05:23:46.0: AirmassRange estimates ready after 12-Mar-2013 19:50:49 UTC 12-Mar-2013 05:23:46.0: Obs V1404_Cyg in Plan V1404_Cyg was vetoed by AirMass constraint. 12-Mar-2013 05:23:46.0: AirMass estimates ready after 12-Mar-2013 12:16:34 UTC 12-Mar-2013 05:23:46.0: Obs V849 Her in Plan V849 Her was vetoed by AirMass constraint. 12-Mar-2013 05:23:46.0: AirMass estimates ready after 12-Mar-2013 08:14:59 UTC 12-Mar-2013 05:23:46.0: Efficiency: Selecting from 24 pending plans: 12-Mar-2013 05:23:46.6: Selected Plan SA99_438 (TotEff=1.87) 12-Mar-2013 05:23:46.6: Dispatcher cycle time: 1.7316031 sec. 12-Mar-2013 05:23:46.6: Acquire data for Observation SA99_438... 12-Mar-2013 05:23:46.6: (belongs to Project Landolt_1, Plan SA99_438) 12-Mar-2013 05:23:46.6: Send Observation SA99_438 to ACP Sequencer 12-Mar-2013 05:23:56.6: Sequencer is now active 12-Mar-2013 05:27:34.1: Sequencer is no longer active 12-Mar-2013 05:27:34.1: Post-job status check done (stat=Completed) 12-Mar-2013 05:27:34.1: Acquisition time: 227.4795996 sec. 12-Mar-2013 05:27:34.1: Data for Observation SA99_438 acquired successfully. 12-Mar-2013 05:27:34.1: Image Efficiency: 24.0% 12-Mar-2013 05:27:34.1: Cycle Efficiency: 99.2% 12-Mar-2013 05:27:34.5: SelectRunning: No running plans 12-Mar-2013 05:27:34.6: Efficiency: Selecting from 23 pending plans: 12-Mar-2013 05:27:34.8: Selected Plan SA100_267 (TotEff=2.09) 12-Mar-2013 05:27:34.8: Dispatcher cycle time: 0.5928011 sec. 12-Mar-2013 05:27:34.8: Acquire data for Observation SA100_267... 12-Mar-2013 05:27:34.8: (belongs to Project Landolt_1, Plan SA100_267) 12-Mar-2013 05:27:34.8: Send Observation SA100_267 to ACP Sequencer 12-Mar-2013 05:27:44.8: Sequencer is now active 12-Mar-2013 05:30:50.7: Sequencer is no longer active 12-Mar-2013 05:30:50.7: Post-job status check done (stat=Failed) 12-Mar-2013 05:30:50.7: ACP data acquisition failed for Observation SA100_267. 12-Mar-2013 05:30:50.7: (Observation SA100_267 interrupted by acquisition process failure.) 12-Mar-2013 05:30:50.8: SelectRunning: No running plans 12-Mar-2013 05:30:51.0: Efficiency: Selecting from 22 pending plans: 12-Mar-2013 05:30:51.1: Selected Plan V1184_Tau (TotEff=2.00) 12-Mar-2013 05:30:51.1: Dispatcher cycle time: 0.2964005 sec. 12-Mar-2013 05:30:51.1: Acquire data for Observation V1184_Tau... 12-Mar-2013 05:30:51.1: (belongs to Project Staels, Plan V1184_Tau) 12-Mar-2013 05:30:51.2: Send Observation V1184_Tau to ACP Sequencer 12-Mar-2013 05:30:53.6: Dispatcher stopped at 12-Mar-2013 05:30:53 UTC 12-Mar-2013 05:30:53.6: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 12-Mar-2013 05:31:01.2: Sequencer is now active 12-Mar-2013 05:31:09.4: Sequencer is no longer active 12-Mar-2013 05:31:09.4: ** Sequencer script "AcquireScheduler" failed: 12-Mar-2013 05:31:09.4: **Script Error** Source: ACP Message: The script was aborted. at line 870 column 9. Script Context: 867: ' OBS.PA doesn't change regardless of target type. 868: ' 869: slewDist = StartSlewToTarget(True) ' Handles various target types => 870: Call SUP.WaitForSlew() ' Wait for the slew to complete. ^ 871: If SUP.HaveRotator Then SUP.WaitForRotator ' And for rotator slew 872: Else 873: slewDist = StartSlewToTarget(False) ' Kludge for simulator and no slew -- end -- 12-Mar-2013 05:31:12.5: Post-job status check done (stat=Running) 12-Mar-2013 05:31:12.5: RUN FAILED: Scheduler was stopped during run 12-Mar-2013 05:31:12.5: ACP data acquisition failed for Observation V1184_Tau. 12-Mar-2013 05:31:12.5: (Observation V1184_Tau interrupted by operator or system.) 12-Mar-2013 05:40:23.6: Dispatcher started at 12-Mar-2013 05:40:23 UTC 12-Mar-2013 05:40:23.6: Priority: W[0]=1.00 12-Mar-2013 05:40:23.6: Transit Altitude: W[1]=0.00 12-Mar-2013 05:40:23.6: Highest Altitude: W[6]=0.00 12-Mar-2013 05:40:23.6: Lateness: W[5]=0.70 12-Mar-2013 05:40:23.6: Slew Distance: W[2]=0.30 12-Mar-2013 05:40:23.6: Retry Count: W[3]=0.20 12-Mar-2013 05:40:23.6: Meridian Crossing: W[4]=0.30 12-Mar-2013 05:40:23.6: Obs Conditions: W[7]=0.40 12-Mar-2013 05:40:23.6: Rising Plan Delay: disabled 12-Mar-2013 05:40:24.3: ++ Observatory Startup ++ 12-Mar-2013 05:40:24.3: Start ACP Sequencer's StartupObs script 12-Mar-2013 05:40:34.3: Sequencer is now active 12-Mar-2013 05:40:39.5: Sequencer is no longer active 12-Mar-2013 05:40:39.5: ++ Auto Focus ++ 12-Mar-2013 05:40:39.6: Doing initial autofocus. 12-Mar-2013 05:40:39.6: Start special ACP AutoFocus script for scheduler 12-Mar-2013 05:40:49.6: Sequencer is now active 12-Mar-2013 05:43:53.5: Sequencer is no longer active 12-Mar-2013 05:43:53.5: Next periodic autofocus ASAP after 12-Mar-2013 07:43:11 UTC 12-Mar-2013 05:43:53.5: SelectRunning: No running plans 12-Mar-2013 05:43:53.6: Efficiency: Selecting from 22 pending plans: 12-Mar-2013 05:43:53.7: Selected Plan SA52_56 (TotEff=2.02) 12-Mar-2013 05:43:53.8: Dispatcher cycle time: 0.2964005 sec. 12-Mar-2013 05:43:53.8: Acquire data for Observation SA52_56... 12-Mar-2013 05:43:53.8: (belongs to Project Landolt_1, Plan SA52_56) 12-Mar-2013 05:43:53.8: Send Observation SA52_56 to ACP Sequencer 12-Mar-2013 05:44:03.8: Sequencer is now active 12-Mar-2013 05:45:15.4: Sequencer is no longer active 12-Mar-2013 05:45:15.4: Post-job status check done (stat=Failed) 12-Mar-2013 05:45:15.4: ACP data acquisition failed for Observation SA52_56. 12-Mar-2013 05:45:15.4: (Observation SA52_56 interrupted by acquisition process failure.) 12-Mar-2013 05:45:15.6: SelectRunning: No running plans 12-Mar-2013 05:45:15.7: Efficiency: Selecting from 21 pending plans: 12-Mar-2013 05:45:15.8: Selected Plan KH_15D (TotEff=2.00) 12-Mar-2013 05:45:15.9: Dispatcher cycle time: 0.3120005 sec. 12-Mar-2013 05:45:15.9: Acquire data for Observation KH_15D... 12-Mar-2013 05:45:15.9: (belongs to Project Staels, Plan KH_15D) 12-Mar-2013 05:45:15.9: Send Observation KH_15D to ACP Sequencer 12-Mar-2013 05:45:25.9: Sequencer is now active 12-Mar-2013 05:47:00.7: Sequencer is no longer active 12-Mar-2013 05:47:00.7: Post-job status check done (stat=Failed) 12-Mar-2013 05:47:00.7: ACP data acquisition failed for Observation KH_15D. 12-Mar-2013 05:47:00.7: (Observation KH_15D interrupted by acquisition process failure.) 12-Mar-2013 05:47:00.8: SelectRunning: No running plans 12-Mar-2013 05:47:00.9: Efficiency: Selecting from 20 pending plans: 12-Mar-2013 05:47:01.0: Selected Plan CW_Mon (TotEff=1.99) 12-Mar-2013 05:47:01.1: Dispatcher cycle time: 0.2808005 sec. 12-Mar-2013 05:47:01.1: Acquire data for Observation CW_Mon... 12-Mar-2013 05:47:01.1: (belongs to Project HST_CV, Plan CW_Mon) 12-Mar-2013 05:47:01.1: Send Observation CW_Mon to ACP Sequencer 12-Mar-2013 05:47:11.1: Sequencer is now active 12-Mar-2013 05:48:32.3: Dispatcher stopped at 12-Mar-2013 05:48:32 UTC 12-Mar-2013 05:48:32.3: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 12-Mar-2013 05:48:38.8: Sequencer is no longer active 12-Mar-2013 05:48:38.8: ** Sequencer script "AcquireScheduler" failed: 12-Mar-2013 05:48:38.8: **Script Error** Source: ACP Message: The script was aborted. at line 1531 column 5. Script Context: 1528: End If 1529: End If 1530: => 1531: If Not SUP.AutoGuide(True) Then ^ 1532: If Not IMG Is Nothing Then 1533: If IMG.ExposureInterval > Prefs.AutoGuiding.MaxUnguidedExposureInterval Then 1534: If STRICT_AUTOGUIDING And Not PLN.BestEfforts Then -- end -- 12-Mar-2013 05:48:41.8: Post-job status check done (stat=Running) 12-Mar-2013 05:48:42.2: RUN FAILED: Scheduler was stopped during run 12-Mar-2013 05:48:42.2: ACP data acquisition failed for Observation CW_Mon. 12-Mar-2013 05:48:42.2: (Observation CW_Mon interrupted by operator or system.) 12-Mar-2013 05:59:00.8: Dispatcher started at 12-Mar-2013 05:59:00 UTC 12-Mar-2013 05:59:00.8: Priority: W[0]=1.00 12-Mar-2013 05:59:00.8: Transit Altitude: W[1]=0.00 12-Mar-2013 05:59:00.8: Highest Altitude: W[6]=0.00 12-Mar-2013 05:59:00.8: Lateness: W[5]=0.70 12-Mar-2013 05:59:00.8: Slew Distance: W[2]=0.30 12-Mar-2013 05:59:00.8: Retry Count: W[3]=0.20 12-Mar-2013 05:59:00.8: Meridian Crossing: W[4]=0.30 12-Mar-2013 05:59:00.8: Obs Conditions: W[7]=0.40 12-Mar-2013 05:59:00.8: Rising Plan Delay: disabled 12-Mar-2013 05:59:00.9: ++ Observatory Startup ++ 12-Mar-2013 05:59:00.9: Start ACP Sequencer's StartupObs script 12-Mar-2013 05:59:10.9: Sequencer is now active 12-Mar-2013 05:59:16.0: Sequencer is no longer active 12-Mar-2013 05:59:16.0: ++ Auto Focus ++ 12-Mar-2013 05:59:16.0: Doing initial autofocus. 12-Mar-2013 05:59:16.0: Start special ACP AutoFocus script for scheduler 12-Mar-2013 05:59:26.0: Sequencer is now active 12-Mar-2013 06:03:07.2: Sequencer is no longer active 12-Mar-2013 06:03:07.2: Next periodic autofocus ASAP after 12-Mar-2013 08:02:16 UTC 12-Mar-2013 06:03:07.2: SelectRunning: No running plans 12-Mar-2013 06:03:07.4: Efficiency: Selecting from 21 pending plans: 12-Mar-2013 06:03:07.5: Selected Plan MP_Gem (TotEff=1.97) 12-Mar-2013 06:03:07.5: Dispatcher cycle time: 0.2808005 sec. 12-Mar-2013 06:03:07.5: Acquire data for Observation MP_Gem... 12-Mar-2013 06:03:07.5: (belongs to Project Staels, Plan MP_Gem) 12-Mar-2013 06:03:07.5: Send Observation MP_Gem to ACP Sequencer 12-Mar-2013 06:03:17.5: Sequencer is now active 12-Mar-2013 06:08:31.5: Sequencer is no longer active 12-Mar-2013 06:08:31.5: Post-job status check done (stat=Completed) 12-Mar-2013 06:08:31.5: Acquisition time: 323.9501689 sec. 12-Mar-2013 06:08:31.5: Data for Observation MP_Gem acquired successfully. 12-Mar-2013 06:08:31.5: Image Efficiency: 41.6% 12-Mar-2013 06:08:31.5: Cycle Efficiency: 99.9% 12-Mar-2013 06:08:31.6: SelectRunning: No running plans 12-Mar-2013 06:08:31.7: Efficiency: Selecting from 20 pending plans: 12-Mar-2013 06:08:31.9: Selected Plan NGC_2438 (TotEff=1.93) 12-Mar-2013 06:08:31.9: Dispatcher cycle time: 0.3120005 sec. 12-Mar-2013 06:08:31.9: Acquire data for Observation NGC_2438... 12-Mar-2013 06:08:31.9: (belongs to Project Staels, Plan NGC_2438) 12-Mar-2013 06:08:31.9: Send Observation NGC_2438 to ACP Sequencer 12-Mar-2013 06:08:41.9: Sequencer is now active 12-Mar-2013 06:14:11.8: Sequencer is no longer active 12-Mar-2013 06:14:11.8: Post-job status check done (stat=Completed) 12-Mar-2013 06:14:11.8: Acquisition time: 339.893397 sec. 12-Mar-2013 06:14:11.8: Data for Observation NGC_2438 acquired successfully. 12-Mar-2013 06:14:11.8: Image Efficiency: 52.9% 12-Mar-2013 06:14:11.8: Cycle Efficiency: 99.9% 12-Mar-2013 06:14:11.9: SelectRunning: No running plans 12-Mar-2013 06:14:12.1: Efficiency: Selecting from 21 pending plans: 12-Mar-2013 06:14:12.2: Selected Plan SDSS_J07550770+1435476 (TotEff=1.86) 12-Mar-2013 06:14:12.2: Dispatcher cycle time: 0.2808004 sec. 12-Mar-2013 06:14:12.2: Acquire data for Observation SDSS_J07550770+1435476... 12-Mar-2013 06:14:12.2: (belongs to Project HST_CV, Plan SDSS_J07550770+1435476) 12-Mar-2013 06:14:12.2: Send Observation SDSS_J07550770+1435476 to ACP Sequencer 12-Mar-2013 06:14:22.3: Sequencer is now active 12-Mar-2013 06:26:19.7: Sequencer is no longer active 12-Mar-2013 06:26:19.7: Post-job status check done (stat=Completed) 12-Mar-2013 06:26:19.7: Acquisition time: 727.5072778 sec. 12-Mar-2013 06:26:19.7: Data for Observation SDSS_J07550770+1435476 acquired successfully. 12-Mar-2013 06:26:19.8: Image Efficiency: 74.2% 12-Mar-2013 06:26:19.8: Cycle Efficiency: 100.0% 12-Mar-2013 06:26:19.9: SelectRunning: No running plans 12-Mar-2013 06:26:20.0: Efficiency: Selecting from 20 pending plans: 12-Mar-2013 06:26:20.1: Selected Plan SA98 (TotEff=1.96) 12-Mar-2013 06:26:20.2: Dispatcher cycle time: 0.2964005 sec. 12-Mar-2013 06:26:20.2: Acquire data for Observation SA98... 12-Mar-2013 06:26:20.2: (belongs to Project Landolt_2, Plan SA98) 12-Mar-2013 06:26:20.2: Send Observation SA98 to ACP Sequencer 12-Mar-2013 06:26:30.2: Sequencer is now active 12-Mar-2013 06:31:46.6: Sequencer is no longer active 12-Mar-2013 06:31:46.6: Post-job status check done (stat=Completed) 12-Mar-2013 06:31:46.6: Acquisition time: 326.3837733 sec. 12-Mar-2013 06:31:46.6: Data for Observation SA98 acquired successfully. 12-Mar-2013 06:31:46.6: Image Efficiency: 39.8% 12-Mar-2013 06:31:46.6: Cycle Efficiency: 99.9% 12-Mar-2013 06:31:46.7: SelectRunning: No running plans 12-Mar-2013 06:31:46.8: Efficiency: Selecting from 19 pending plans: 12-Mar-2013 06:31:46.9: Selected Plan HS_0455+8315 (TotEff=1.85) 12-Mar-2013 06:31:47.0: Dispatcher cycle time: 0.2652005 sec. 12-Mar-2013 06:31:47.0: Acquire data for Observation HS_0455+8315... 12-Mar-2013 06:31:47.0: (belongs to Project HST_CV, Plan HS_0455+8315) 12-Mar-2013 06:31:47.0: Send Observation HS_0455+8315 to ACP Sequencer 12-Mar-2013 06:31:57.0: Sequencer is now active 12-Mar-2013 06:45:20.6: Sequencer is no longer active 12-Mar-2013 06:45:20.6: Post-job status check done (stat=Completed) 12-Mar-2013 06:45:20.6: Acquisition time: 813.588229 sec. 12-Mar-2013 06:45:20.6: Data for Observation HS_0455+8315 acquired successfully. 12-Mar-2013 06:45:20.6: Image Efficiency: 66.3% 12-Mar-2013 06:45:20.6: Cycle Efficiency: 100.0% 12-Mar-2013 06:45:20.7: SelectRunning: No running plans 12-Mar-2013 06:45:20.8: Efficiency: Selecting from 19 pending plans: 12-Mar-2013 06:45:20.9: Selected Plan SA124_970 (TotEff=1.84) 12-Mar-2013 06:45:20.9: Dispatcher cycle time: 0.2496005 sec. 12-Mar-2013 06:45:20.9: Acquire data for Observation SA124_970... 12-Mar-2013 06:45:20.9: (belongs to Project Landolt_2, Plan SA124_970) 12-Mar-2013 06:45:21.0: Send Observation SA124_970 to ACP Sequencer 12-Mar-2013 06:45:31.0: Sequencer is now active 12-Mar-2013 06:51:17.7: Sequencer is no longer active 12-Mar-2013 06:51:17.7: Post-job status check done (stat=Completed) 12-Mar-2013 06:51:17.7: Acquisition time: 356.7414266 sec. 12-Mar-2013 06:51:17.7: Data for Observation SA124_970 acquired successfully. 12-Mar-2013 06:51:17.7: Image Efficiency: 26.6% 12-Mar-2013 06:51:17.7: Cycle Efficiency: 99.9% 12-Mar-2013 06:51:17.8: SelectRunning: No running plans 12-Mar-2013 06:51:17.9: STRICT VETO: 12-Mar-2013 06:51:17.9: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 12-Mar-2013 06:51:17.9: AirmassRange estimates ready after 12-Mar-2013 14:00:20 UTC 12-Mar-2013 06:51:17.9: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 06:51:18.0: Selected Plan 1RXS_J1050103-140431 (TotEff=1.79) 12-Mar-2013 06:51:18.1: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 06:51:18.1: Acquire data for Observation 1RXS_J1050103-140431... 12-Mar-2013 06:51:18.1: (belongs to Project HST_CV, Plan 1RXS_J1050103-140431) 12-Mar-2013 06:51:18.1: Send Observation 1RXS_J1050103-140431 to ACP Sequencer 12-Mar-2013 06:51:28.1: Sequencer is now active 12-Mar-2013 07:08:48.5: Sequencer is no longer active 12-Mar-2013 07:08:48.5: Post-job status check done (stat=Completed) 12-Mar-2013 07:08:48.5: Acquisition time: 1050.412245 sec. 12-Mar-2013 07:08:48.5: Data for Observation 1RXS_J1050103-140431 acquired successfully. 12-Mar-2013 07:08:48.5: Image Efficiency: 51.4% 12-Mar-2013 07:08:48.5: Cycle Efficiency: 100.0% 12-Mar-2013 07:08:48.6: SelectRunning: No running plans 12-Mar-2013 07:08:48.7: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 07:08:48.8: Selected Plan HM_Leo (TotEff=1.81) 12-Mar-2013 07:08:48.8: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 07:08:48.8: Acquire data for Observation HM_Leo... 12-Mar-2013 07:08:48.8: (belongs to Project HST_CV, Plan HM_Leo) 12-Mar-2013 07:08:48.9: Send Observation HM_Leo to ACP Sequencer 12-Mar-2013 07:08:58.9: Sequencer is now active 12-Mar-2013 07:21:45.1: Sequencer is no longer active 12-Mar-2013 07:21:45.1: Post-job status check done (stat=Completed) 12-Mar-2013 07:21:45.1: Acquisition time: 776.2573635 sec. 12-Mar-2013 07:21:45.1: Data for Observation HM_Leo acquired successfully. 12-Mar-2013 07:21:45.1: Image Efficiency: 69.5% 12-Mar-2013 07:21:45.1: Cycle Efficiency: 100.0% 12-Mar-2013 07:21:45.3: SelectRunning: No running plans 12-Mar-2013 07:21:45.3: Obs SA61 in Plan SA61 vetoed for sequencer hard limit. 12-Mar-2013 07:21:45.3: (deferred for 57 min, until 12-Mar-2013 08:18:45 UTC 12-Mar-2013 07:21:45.4: Efficiency: Selecting from 19 pending plans: 12-Mar-2013 07:21:45.5: Selected Plan SA99_438 (TotEff=1.85) 12-Mar-2013 07:21:45.5: Dispatcher cycle time: 0.2652005 sec. 12-Mar-2013 07:21:45.5: Acquire data for Observation SA99_438... 12-Mar-2013 07:21:45.5: (belongs to Project Landolt_2, Plan SA99_438) 12-Mar-2013 07:21:45.5: Send Observation SA99_438 to ACP Sequencer 12-Mar-2013 07:21:55.5: Sequencer is now active 12-Mar-2013 07:25:35.7: Sequencer is no longer active 12-Mar-2013 07:25:35.7: Post-job status check done (stat=Completed) 12-Mar-2013 07:25:35.7: Acquisition time: 230.2096043 sec. 12-Mar-2013 07:25:35.7: Data for Observation SA99_438 acquired successfully. 12-Mar-2013 07:25:35.7: Image Efficiency: 23.9% 12-Mar-2013 07:25:35.7: Cycle Efficiency: 99.9% 12-Mar-2013 07:25:35.9: SelectRunning: No running plans 12-Mar-2013 07:25:36.0: Efficiency: Selecting from 18 pending plans: 12-Mar-2013 07:25:36.1: Selected Plan V0482_Cam (TotEff=1.83) 12-Mar-2013 07:25:36.1: Dispatcher cycle time: 0.2652005 sec. 12-Mar-2013 07:25:36.1: Acquire data for Observation V0482_Cam... 12-Mar-2013 07:25:36.1: (belongs to Project HST_CV, Plan V0482_Cam) 12-Mar-2013 07:25:36.1: Send Observation V0482_Cam to ACP Sequencer 12-Mar-2013 07:25:46.1: Sequencer is now active 12-Mar-2013 07:44:46.6: Sequencer is no longer active 12-Mar-2013 07:44:46.6: Post-job status check done (stat=Completed) 12-Mar-2013 07:44:46.6: Acquisition time: 1150.4396206 sec. 12-Mar-2013 07:44:46.6: Data for Observation V0482_Cam acquired successfully. 12-Mar-2013 07:44:46.6: Image Efficiency: 46.9% 12-Mar-2013 07:44:46.6: Cycle Efficiency: 100.0% 12-Mar-2013 07:44:46.7: SelectRunning: No running plans 12-Mar-2013 07:44:46.7: STRICT VETO: 12-Mar-2013 07:44:46.7: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 12-Mar-2013 07:44:46.7: AirmassRange estimates ready after 12-Mar-2013 16:15:51 UTC 12-Mar-2013 07:44:46.8: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 07:44:46.9: Selected Plan SA103 (TotEff=1.80) 12-Mar-2013 07:44:46.9: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 07:44:46.9: Acquire data for Observation SA103... 12-Mar-2013 07:44:46.9: (belongs to Project Landolt_1, Plan SA103) 12-Mar-2013 07:44:46.9: Send Observation SA103 to ACP Sequencer 12-Mar-2013 07:44:57.0: Sequencer is now active 12-Mar-2013 07:54:42.6: Sequencer is no longer active 12-Mar-2013 07:54:42.6: Post-job status check done (stat=Completed) 12-Mar-2013 07:54:42.6: Acquisition time: 595.6870463 sec. 12-Mar-2013 07:54:42.6: Data for Observation SA103 acquired successfully. 12-Mar-2013 07:54:42.7: Image Efficiency: 21.8% 12-Mar-2013 07:54:42.7: Cycle Efficiency: 100.0% 12-Mar-2013 07:54:42.8: SelectRunning: No running plans 12-Mar-2013 07:54:42.8: Efficiency: Selecting from 15 pending plans: 12-Mar-2013 07:54:42.9: Selected Plan SDSS_J10353303+0551584 (TotEff=1.80) 12-Mar-2013 07:54:43.0: Dispatcher cycle time: 0.2028004 sec. 12-Mar-2013 07:54:43.0: Acquire data for Observation SDSS_J10353303+0551584... 12-Mar-2013 07:54:43.0: (belongs to Project HST_CV, Plan SDSS_J10353303+0551584) 12-Mar-2013 07:54:43.0: Send Observation SDSS_J10353303+0551584 to ACP Sequencer 12-Mar-2013 07:54:53.0: Sequencer is now active 12-Mar-2013 08:14:50.0: Sequencer is no longer active 12-Mar-2013 08:14:50.0: Post-job status check done (stat=Completed) 12-Mar-2013 08:14:50.0: Acquisition time: 1206.9741199 sec. 12-Mar-2013 08:14:50.0: Data for Observation SDSS_J10353303+0551584 acquired successfully. 12-Mar-2013 08:14:50.0: Image Efficiency: 44.7% 12-Mar-2013 08:14:50.0: Cycle Efficiency: 100.0% 12-Mar-2013 08:14:50.1: ++ Auto Focus ++ 12-Mar-2013 08:14:50.1: Doing periodic autofocus. 12-Mar-2013 08:14:50.1: Start special ACP AutoFocus script for scheduler 12-Mar-2013 08:15:00.1: Sequencer is now active 12-Mar-2013 08:18:21.3: Sequencer is no longer active 12-Mar-2013 08:18:21.3: Next periodic autofocus ASAP after 12-Mar-2013 10:17:23 UTC 12-Mar-2013 08:18:21.3: SelectRunning: No running plans 12-Mar-2013 08:18:21.4: Efficiency: Selecting from 18 pending plans: 12-Mar-2013 08:18:21.5: Selected Plan SA100_267 (TotEff=1.85) 12-Mar-2013 08:18:21.6: Dispatcher cycle time: 0.2496004 sec. 12-Mar-2013 08:18:21.6: Acquire data for Observation SA100_267... 12-Mar-2013 08:18:21.6: (belongs to Project Landolt_2, Plan SA100_267) 12-Mar-2013 08:18:21.6: Send Observation SA100_267 to ACP Sequencer 12-Mar-2013 08:18:31.6: Sequencer is now active 12-Mar-2013 08:24:07.2: Sequencer is no longer active 12-Mar-2013 08:24:07.2: Post-job status check done (stat=Completed) 12-Mar-2013 08:24:07.2: Acquisition time: 345.6498071 sec. 12-Mar-2013 08:24:07.2: Data for Observation SA100_267 acquired successfully. 12-Mar-2013 08:24:07.2: Image Efficiency: 27.5% 12-Mar-2013 08:24:07.2: Cycle Efficiency: 99.9% 12-Mar-2013 08:24:07.4: SelectRunning: No running plans 12-Mar-2013 08:24:07.4: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 12-Mar-2013 08:24:07.4: AirmassRange estimates ready after 12-Mar-2013 17:32:37 UTC 12-Mar-2013 08:24:07.5: Efficiency: Selecting from 18 pending plans: 12-Mar-2013 08:24:07.6: Selected Plan SDSS_J10051538+1911079 (TotEff=1.84) 12-Mar-2013 08:24:07.6: Dispatcher cycle time: 0.2964006 sec. 12-Mar-2013 08:24:07.6: Acquire data for Observation SDSS_J10051538+1911079... 12-Mar-2013 08:24:07.6: (belongs to Project HST_CV, Plan SDSS_J10051538+1911079) 12-Mar-2013 08:24:07.6: Send Observation SDSS_J10051538+1911079 to ACP Sequencer 12-Mar-2013 08:24:17.7: Sequencer is now active 12-Mar-2013 08:37:59.4: Sequencer is no longer active 12-Mar-2013 08:37:59.4: Post-job status check done (stat=Completed) 12-Mar-2013 08:37:59.4: Acquisition time: 831.7310608 sec. 12-Mar-2013 08:37:59.4: Data for Observation SDSS_J10051538+1911079 acquired successfully. 12-Mar-2013 08:37:59.4: Image Efficiency: 64.9% 12-Mar-2013 08:37:59.4: Cycle Efficiency: 100.0% 12-Mar-2013 08:37:59.5: SelectRunning: No running plans 12-Mar-2013 08:37:59.6: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 08:37:59.7: Selected Plan SDSS_J10065840+2337244 (TotEff=1.85) 12-Mar-2013 08:37:59.7: Dispatcher cycle time: 0.2496005 sec. 12-Mar-2013 08:37:59.7: Acquire data for Observation SDSS_J10065840+2337244... 12-Mar-2013 08:37:59.8: (belongs to Project HST_CV, Plan SDSS_J10065840+2337244) 12-Mar-2013 08:37:59.8: Send Observation SDSS_J10065840+2337244 to ACP Sequencer 12-Mar-2013 08:38:09.8: Sequencer is now active 12-Mar-2013 08:43:27.6: Sequencer is no longer active 12-Mar-2013 08:43:27.6: Post-job status check done (stat=Failed) 12-Mar-2013 08:43:27.6: ACP data acquisition failed for Observation SDSS_J10065840+2337244. 12-Mar-2013 08:43:27.6: (Observation SDSS_J10065840+2337244 interrupted by acquisition process failure.) 12-Mar-2013 08:43:27.7: SelectRunning: No running plans 12-Mar-2013 08:43:27.8: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 08:43:28.0: Selected Plan SDSS_J09324957+4725230 (TotEff=1.84) 12-Mar-2013 08:43:28.0: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 08:43:28.0: Acquire data for Observation SDSS_J09324957+4725230... 12-Mar-2013 08:43:28.0: (belongs to Project HST_CV, Plan SDSS_J09324957+4725230) 12-Mar-2013 08:43:28.0: Send Observation SDSS_J09324957+4725230 to ACP Sequencer 12-Mar-2013 08:43:38.0: Sequencer is now active 12-Mar-2013 08:55:40.6: Sequencer is no longer active 12-Mar-2013 08:55:40.6: Post-job status check done (stat=Completed) 12-Mar-2013 08:55:40.6: Acquisition time: 732.6552868 sec. 12-Mar-2013 08:55:40.6: Data for Observation SDSS_J09324957+4725230 acquired successfully. 12-Mar-2013 08:55:40.7: Image Efficiency: 73.7% 12-Mar-2013 08:55:40.7: Cycle Efficiency: 100.0% 12-Mar-2013 08:55:40.8: SelectRunning: No running plans 12-Mar-2013 08:55:40.9: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 08:55:41.0: Selected Plan IU_Leo (TotEff=1.84) 12-Mar-2013 08:55:41.0: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 08:55:41.0: Acquire data for Observation IU_Leo... 12-Mar-2013 08:55:41.0: (belongs to Project HST_CV, Plan IU_Leo) 12-Mar-2013 08:55:41.0: Send Observation IU_Leo to ACP Sequencer 12-Mar-2013 08:55:51.0: Sequencer is now active 12-Mar-2013 09:08:52.6: Sequencer is no longer active 12-Mar-2013 09:08:52.6: Post-job status check done (stat=Completed) 12-Mar-2013 09:08:52.6: Acquisition time: 791.5765904 sec. 12-Mar-2013 09:08:52.6: Data for Observation IU_Leo acquired successfully. 12-Mar-2013 09:08:52.6: Image Efficiency: 68.2% 12-Mar-2013 09:08:52.6: Cycle Efficiency: 100.0% 12-Mar-2013 09:08:52.7: SelectRunning: No running plans 12-Mar-2013 09:08:52.8: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 09:08:52.9: Selected Plan SA52_56 (TotEff=1.85) 12-Mar-2013 09:08:53.0: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 09:08:53.0: Acquire data for Observation SA52_56... 12-Mar-2013 09:08:53.0: (belongs to Project Landolt_2, Plan SA52_56) 12-Mar-2013 09:08:53.0: Send Observation SA52_56 to ACP Sequencer 12-Mar-2013 09:09:03.0: Sequencer is now active 12-Mar-2013 09:13:54.3: Sequencer is no longer active 12-Mar-2013 09:13:54.3: Post-job status check done (stat=Completed) 12-Mar-2013 09:13:54.3: Acquisition time: 301.2989292 sec. 12-Mar-2013 09:13:54.3: Data for Observation SA52_56 acquired successfully. 12-Mar-2013 09:13:54.3: Image Efficiency: 31.5% 12-Mar-2013 09:13:54.3: Cycle Efficiency: 99.9% 12-Mar-2013 09:13:54.4: SelectRunning: No running plans 12-Mar-2013 09:13:54.5: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 09:13:54.6: Selected Plan RZ_Leo (TotEff=1.84) 12-Mar-2013 09:13:54.7: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 09:13:54.7: Acquire data for Observation RZ_Leo... 12-Mar-2013 09:13:54.7: (belongs to Project HST_CV, Plan RZ_Leo) 12-Mar-2013 09:13:54.7: Send Observation RZ_Leo to ACP Sequencer 12-Mar-2013 09:14:04.7: Sequencer is now active 12-Mar-2013 09:32:15.7: Sequencer is no longer active 12-Mar-2013 09:32:15.7: Post-job status check done (stat=Completed) 12-Mar-2013 09:32:15.7: Acquisition time: 1100.9875338 sec. 12-Mar-2013 09:32:15.7: Data for Observation RZ_Leo acquired successfully. 12-Mar-2013 09:32:15.7: Image Efficiency: 49.0% 12-Mar-2013 09:32:15.7: Cycle Efficiency: 100.0% 12-Mar-2013 09:32:15.8: SelectRunning: No running plans 12-Mar-2013 09:32:15.8: Obs SA132 in Plan SA132 was vetoed by AirmassRange constraint. 12-Mar-2013 09:32:15.8: AirmassRange estimates ready after 12-Mar-2013 14:37:46 UTC 12-Mar-2013 09:32:15.9: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 09:32:16.0: Selected Plan V0406_Vir (TotEff=1.81) 12-Mar-2013 09:32:16.0: Dispatcher cycle time: 0.2340004 sec. 12-Mar-2013 09:32:16.0: Acquire data for Observation V0406_Vir... 12-Mar-2013 09:32:16.0: (belongs to Project HST_CV, Plan V0406_Vir) 12-Mar-2013 09:32:16.0: Send Observation V0406_Vir to ACP Sequencer 12-Mar-2013 09:32:26.0: Sequencer is now active 12-Mar-2013 09:50:49.8: Sequencer is no longer active 12-Mar-2013 09:50:49.8: Post-job status check done (stat=Completed) 12-Mar-2013 09:50:49.8: Acquisition time: 1113.7795563 sec. 12-Mar-2013 09:50:49.8: Data for Observation V0406_Vir acquired successfully. 12-Mar-2013 09:50:49.8: Image Efficiency: 48.5% 12-Mar-2013 09:50:49.8: Cycle Efficiency: 100.0% 12-Mar-2013 09:50:49.9: SelectRunning: No running plans 12-Mar-2013 09:50:50.0: STRICT VETO: 12-Mar-2013 09:50:50.0: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 12-Mar-2013 09:50:50.0: AirmassRange estimates ready after 12-Mar-2013 17:04:33 UTC 12-Mar-2013 09:50:50.0: Efficiency: Selecting from 17 pending plans: 12-Mar-2013 09:50:50.1: Selected Plan LN_UMa (TotEff=1.83) 12-Mar-2013 09:50:50.2: Dispatcher cycle time: 0.2496004 sec. 12-Mar-2013 09:50:50.2: Acquire data for Observation LN_UMa... 12-Mar-2013 09:50:50.2: (belongs to Project HST_CV, Plan LN_UMa) 12-Mar-2013 09:50:50.2: Send Observation LN_UMa to ACP Sequencer 12-Mar-2013 09:51:00.2: Sequencer is now active 12-Mar-2013 10:06:45.0: Sequencer is no longer active 12-Mar-2013 10:06:45.0: Post-job status check done (stat=Completed) 12-Mar-2013 10:06:45.0: Acquisition time: 954.8620771 sec. 12-Mar-2013 10:06:45.0: Data for Observation LN_UMa acquired successfully. 12-Mar-2013 10:06:45.1: Image Efficiency: 56.5% 12-Mar-2013 10:06:45.1: Cycle Efficiency: 100.0% 12-Mar-2013 10:06:45.2: SelectRunning: No running plans 12-Mar-2013 10:06:45.3: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 10:06:45.4: Selected Plan IY_UMa (TotEff=1.83) 12-Mar-2013 10:06:45.5: Dispatcher cycle time: 0.2964005 sec. 12-Mar-2013 10:06:45.5: Acquire data for Observation IY_UMa... 12-Mar-2013 10:06:45.5: (belongs to Project HST_CV, Plan IY_UMa) 12-Mar-2013 10:06:45.5: Send Observation IY_UMa to ACP Sequencer 12-Mar-2013 10:06:55.5: Sequencer is now active 12-Mar-2013 10:18:44.1: Sequencer is no longer active 12-Mar-2013 10:18:44.1: Post-job status check done (stat=Completed) 12-Mar-2013 10:18:44.1: Acquisition time: 718.6308622 sec. 12-Mar-2013 10:18:44.1: Data for Observation IY_UMa acquired successfully. 12-Mar-2013 10:18:44.1: Image Efficiency: 75.1% 12-Mar-2013 10:18:44.1: Cycle Efficiency: 100.0% 12-Mar-2013 10:18:44.2: ++ Auto Focus ++ 12-Mar-2013 10:18:44.2: Doing periodic autofocus. 12-Mar-2013 10:18:44.2: Start special ACP AutoFocus script for scheduler 12-Mar-2013 10:18:54.3: Sequencer is now active 12-Mar-2013 10:21:20.1: Sequencer is no longer active 12-Mar-2013 10:21:20.1: Next periodic autofocus ASAP after 12-Mar-2013 12:21:05 UTC 12-Mar-2013 10:21:20.1: SelectRunning: No running plans 12-Mar-2013 10:21:20.1: Efficiency: Selecting from 16 pending plans: 12-Mar-2013 10:21:20.2: Selected Plan MR_UMa (TotEff=1.82) 12-Mar-2013 10:21:20.3: Dispatcher cycle time: 0.2184004 sec. 12-Mar-2013 10:21:20.3: Acquire data for Observation MR UMa... 12-Mar-2013 10:21:20.3: (belongs to Project HST_CV, Plan MR_UMa) 12-Mar-2013 10:21:20.3: Send Observation MR UMa to ACP Sequencer 12-Mar-2013 10:21:30.3: Sequencer is now active 12-Mar-2013 10:34:43.2: Sequencer is no longer active 12-Mar-2013 10:34:43.2: Post-job status check done (stat=Completed) 12-Mar-2013 10:34:43.2: Acquisition time: 802.8710101 sec. 12-Mar-2013 10:34:43.2: Data for Observation MR UMa acquired successfully. 12-Mar-2013 10:34:43.2: Image Efficiency: 67.2% 12-Mar-2013 10:34:43.2: Cycle Efficiency: 100.0% 12-Mar-2013 10:34:43.3: SelectRunning: No running plans 12-Mar-2013 10:34:43.4: Efficiency: Selecting from 15 pending plans: 12-Mar-2013 10:34:43.5: Selected Plan SA106 (TotEff=1.81) 12-Mar-2013 10:34:43.5: Dispatcher cycle time: 0.2184004 sec. 12-Mar-2013 10:34:43.5: Acquire data for Observation SA106... 12-Mar-2013 10:34:43.5: (belongs to Project Landolt_1, Plan SA106) 12-Mar-2013 10:34:43.5: Send Observation SA106 to ACP Sequencer 12-Mar-2013 10:34:53.5: Sequencer is now active 12-Mar-2013 10:41:29.3: Sequencer is no longer active 12-Mar-2013 10:41:29.3: Post-job status check done (stat=Completed) 12-Mar-2013 10:41:29.3: Acquisition time: 405.7723127 sec. 12-Mar-2013 10:41:29.3: Data for Observation SA106 acquired successfully. 12-Mar-2013 10:41:29.3: Image Efficiency: 32.0% 12-Mar-2013 10:41:29.3: Cycle Efficiency: 99.9% 12-Mar-2013 10:41:29.4: SelectRunning: No running plans 12-Mar-2013 10:41:29.5: Efficiency: Selecting from 14 pending plans: 12-Mar-2013 10:41:29.6: Selected Plan IR_Com (TotEff=1.81) 12-Mar-2013 10:41:29.6: Dispatcher cycle time: 0.2028004 sec. 12-Mar-2013 10:41:29.6: Acquire data for Observation IR_Com... 12-Mar-2013 10:41:29.6: (belongs to Project HST_CV, Plan IR_Com) 12-Mar-2013 10:41:29.6: Send Observation IR_Com to ACP Sequencer 12-Mar-2013 10:41:39.6: Sequencer is now active 12-Mar-2013 10:56:12.1: Sequencer is no longer active 12-Mar-2013 10:56:12.1: Post-job status check done (stat=Completed) 12-Mar-2013 10:56:12.1: Acquisition time: 882.49355 sec. 12-Mar-2013 10:56:12.1: Data for Observation IR_Com acquired successfully. 12-Mar-2013 10:56:12.1: Image Efficiency: 61.2% 12-Mar-2013 10:56:12.1: Cycle Efficiency: 100.0% 12-Mar-2013 10:56:12.2: SelectRunning: No running plans 12-Mar-2013 10:56:12.3: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 12-Mar-2013 10:56:12.3: AirmassRange estimates ready after 12-Mar-2013 18:02:33 UTC 12-Mar-2013 10:56:12.3: Efficiency: Selecting from 12 pending plans: 12-Mar-2013 10:56:12.4: Selected Plan SDSS_J14354402+2336387 (TotEff=1.65) 12-Mar-2013 10:56:12.4: Dispatcher cycle time: 0.1872003 sec. 12-Mar-2013 10:56:12.4: Acquire data for Observation SDSS_J14354402+2336387... 12-Mar-2013 10:56:12.4: (belongs to Project HST_CV, Plan SDSS_J14354402+2336387) 12-Mar-2013 10:56:12.4: Send Observation SDSS_J14354402+2336387 to ACP Sequencer 12-Mar-2013 10:56:22.5: Sequencer is now active 12-Mar-2013 11:11:33.2: Sequencer is no longer active 12-Mar-2013 11:11:33.2: Post-job status check done (stat=Completed) 12-Mar-2013 11:11:33.2: Acquisition time: 920.7604173 sec. 12-Mar-2013 11:11:33.2: Data for Observation SDSS_J14354402+2336387 acquired successfully. 12-Mar-2013 11:11:33.2: Image Efficiency: 58.6% 12-Mar-2013 11:11:33.2: Cycle Efficiency: 100.0% 12-Mar-2013 11:11:33.3: SelectRunning: No running plans 12-Mar-2013 11:11:33.4: Efficiency: Selecting from 13 pending plans: 12-Mar-2013 11:11:33.5: Selected Plan GW_Lib (TotEff=1.90) 12-Mar-2013 11:11:33.5: Dispatcher cycle time: 0.1872003 sec. 12-Mar-2013 11:11:33.5: Acquire data for Observation GW_Lib... 12-Mar-2013 11:11:33.5: (belongs to Project HST_CV, Plan GW_Lib) 12-Mar-2013 11:11:33.5: Send Observation GW_Lib to ACP Sequencer 12-Mar-2013 11:11:43.5: Sequencer is now active 12-Mar-2013 11:24:17.2: Sequencer is no longer active 12-Mar-2013 11:24:17.2: Post-job status check done (stat=Completed) 12-Mar-2013 11:24:17.2: Acquisition time: 763.6837413 sec. 12-Mar-2013 11:24:17.2: Data for Observation GW_Lib acquired successfully. 12-Mar-2013 11:24:17.2: Image Efficiency: 70.7% 12-Mar-2013 11:24:17.2: Cycle Efficiency: 100.0% 12-Mar-2013 11:24:17.3: SelectRunning: No running plans 12-Mar-2013 11:24:17.4: Efficiency: Selecting from 14 pending plans: 12-Mar-2013 11:24:17.5: Selected Plan QZ_Lib (TotEff=1.74) 12-Mar-2013 11:24:17.5: Dispatcher cycle time: 0.2028003 sec. 12-Mar-2013 11:24:17.5: Acquire data for Observation QZ_Lib... 12-Mar-2013 11:24:17.5: (belongs to Project HST_CV, Plan QZ_Lib) 12-Mar-2013 11:24:17.5: Send Observation QZ_Lib to ACP Sequencer 12-Mar-2013 11:24:27.6: Sequencer is now active 12-Mar-2013 11:36:42.5: Sequencer is no longer active 12-Mar-2013 11:36:42.5: Post-job status check done (stat=Completed) 12-Mar-2013 11:36:42.5: Acquisition time: 744.9949086 sec. 12-Mar-2013 11:36:42.5: Data for Observation QZ_Lib acquired successfully. 12-Mar-2013 11:36:42.5: Image Efficiency: 72.5% 12-Mar-2013 11:36:42.5: Cycle Efficiency: 100.0% 12-Mar-2013 11:36:42.7: SelectRunning: No running plans 12-Mar-2013 11:36:42.8: Efficiency: Selecting from 13 pending plans: 12-Mar-2013 11:36:42.8: Selected Plan SA103 (TotEff=1.96) 12-Mar-2013 11:36:42.9: Dispatcher cycle time: 0.2184004 sec. 12-Mar-2013 11:36:42.9: Acquire data for Observation SA103... 12-Mar-2013 11:36:42.9: (belongs to Project Landolt_2, Plan SA103) 12-Mar-2013 11:36:42.9: Send Observation SA103 to ACP Sequencer 12-Mar-2013 11:36:52.9: Sequencer is now active 12-Mar-2013 11:42:57.7: Sequencer is no longer active 12-Mar-2013 11:42:57.7: Post-job status check done (stat=Completed) 12-Mar-2013 11:42:57.7: Acquisition time: 374.8686584 sec. 12-Mar-2013 11:42:57.7: Data for Observation SA103 acquired successfully. 12-Mar-2013 11:42:57.8: Image Efficiency: 34.7% 12-Mar-2013 11:42:57.8: Cycle Efficiency: 99.9% 12-Mar-2013 11:42:57.9: SelectRunning: No running plans 12-Mar-2013 11:42:57.9: STRICT VETO: 12-Mar-2013 11:42:57.9: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 12-Mar-2013 11:42:57.9: AirmassRange estimates ready after 12-Mar-2013 18:57:33 UTC 12-Mar-2013 11:42:57.9: STRICT VETO: 12-Mar-2013 11:42:57.9: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 12-Mar-2013 11:42:57.9: AirmassRange estimates ready after 12-Mar-2013 18:58:45 UTC 12-Mar-2013 11:42:57.9: Efficiency: Selecting from 10 pending plans: 12-Mar-2013 11:42:58.0: Selected Plan SDSS_J15445360+2553488 (TotEff=1.61) 12-Mar-2013 11:42:58.0: Dispatcher cycle time: 0.1716003 sec. 12-Mar-2013 11:42:58.0: Acquire data for Observation SDSS_J15445360+2553488... 12-Mar-2013 11:42:58.0: (belongs to Project HST_CV, Plan SDSS_J15445360+2553488) 12-Mar-2013 11:42:58.0: Send Observation SDSS_J15445360+2553488 to ACP Sequencer 12-Mar-2013 11:43:08.1: Sequencer is now active 12-Mar-2013 11:56:40.0: Sequencer is no longer active 12-Mar-2013 11:56:40.0: Post-job status check done (stat=Completed) 12-Mar-2013 11:56:40.0: Acquisition time: 821.9654437 sec. 12-Mar-2013 11:56:40.0: Data for Observation SDSS_J15445360+2553488 acquired successfully. 12-Mar-2013 11:56:40.0: Image Efficiency: 65.7% 12-Mar-2013 11:56:40.0: Cycle Efficiency: 100.0% 12-Mar-2013 11:56:40.1: SelectRunning: No running plans 12-Mar-2013 11:56:40.2: Efficiency: Selecting from 9 pending plans: 12-Mar-2013 11:56:40.2: Selected Plan QZ_Ser (TotEff=1.63) 12-Mar-2013 11:56:40.3: Dispatcher cycle time: 0.1404003 sec. 12-Mar-2013 11:56:40.3: Acquire data for Observation QZ_Ser... 12-Mar-2013 11:56:40.3: (belongs to Project HST_CV, Plan QZ_Ser) 12-Mar-2013 11:56:40.3: Send Observation QZ_Ser to ACP Sequencer 12-Mar-2013 11:56:50.3: Sequencer is now active 12-Mar-2013 12:10:29.8: Sequencer is no longer active 12-Mar-2013 12:10:29.8: Post-job status check done (stat=Completed) 12-Mar-2013 12:10:29.8: Acquisition time: 829.5782571 sec. 12-Mar-2013 12:10:29.8: Data for Observation QZ_Ser acquired successfully. 12-Mar-2013 12:10:29.9: Image Efficiency: 65.1% 12-Mar-2013 12:10:29.9: Cycle Efficiency: 100.0% 12-Mar-2013 12:10:30.0: SelectRunning: No running plans 12-Mar-2013 12:10:30.0: Efficiency: Selecting from 8 pending plans: 12-Mar-2013 12:10:30.1: Selected Plan SA84 (TotEff=1.75) 12-Mar-2013 12:10:30.1: Dispatcher cycle time: 0.1404002 sec. 12-Mar-2013 12:10:30.1: Acquire data for Observation SA84... 12-Mar-2013 12:10:30.1: (belongs to Project Landolt_1, Plan SA84) 12-Mar-2013 12:10:30.1: Send Observation SA84 to ACP Sequencer 12-Mar-2013 12:10:40.1: Sequencer is now active 12-Mar-2013 12:15:46.3: Sequencer is no longer active 12-Mar-2013 12:15:46.3: Post-job status check done (stat=Completed) 12-Mar-2013 12:15:46.3: Acquisition time: 316.1501553 sec. 12-Mar-2013 12:15:46.3: Data for Observation SA84 acquired successfully. 12-Mar-2013 12:15:46.3: Image Efficiency: 41.1% 12-Mar-2013 12:15:46.3: Cycle Efficiency: 100.0% 12-Mar-2013 12:15:46.4: SelectRunning: No running plans 12-Mar-2013 12:15:46.4: Efficiency: Selecting from 8 pending plans: 12-Mar-2013 12:15:46.5: Selected Plan SA112_810 (TotEff=1.76) 12-Mar-2013 12:15:46.5: Dispatcher cycle time: 0.1248002 sec. 12-Mar-2013 12:15:46.5: Acquire data for Observation SA112_810... 12-Mar-2013 12:15:46.5: (belongs to Project Landolt_2, Plan SA112_810) 12-Mar-2013 12:15:46.5: Send Observation SA112_810 to ACP Sequencer 12-Mar-2013 12:15:56.5: Sequencer is now active 12-Mar-2013 12:21:30.7: Sequencer is no longer active 12-Mar-2013 12:21:30.7: Post-job status check done (stat=Completed) 12-Mar-2013 12:21:30.7: Acquisition time: 344.1522044 sec. 12-Mar-2013 12:21:30.7: Data for Observation SA112_810 acquired successfully. 12-Mar-2013 12:21:30.7: Image Efficiency: 27.6% 12-Mar-2013 12:21:30.7: Cycle Efficiency: 100.0% 12-Mar-2013 12:21:30.8: ++ Auto Focus ++ 12-Mar-2013 12:21:30.8: Doing periodic autofocus. 12-Mar-2013 12:21:30.8: Start special ACP AutoFocus script for scheduler 12-Mar-2013 12:21:40.8: Sequencer is now active 12-Mar-2013 12:25:46.5: Sequencer is no longer active 12-Mar-2013 12:25:46.5: Next periodic autofocus ASAP after 12-Mar-2013 14:25:09 UTC 12-Mar-2013 12:25:46.5: SelectRunning: No running plans 12-Mar-2013 12:25:46.5: Plan SA109 would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan SA110 would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan SA61 would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan SDSS_J15381735+5123380 would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan SDSS_J16424852+1347514 would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan V0380_Oph would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan V1108_Her would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan V1404_Cyg would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: Plan V849 Her would extend past daylight, deferred to next night 12-Mar-2013 12:25:46.5: No pending plans that can be started now. 12-Mar-2013 12:25:46.5: Dispatcher cycle time: 0.0156 sec. 12-Mar-2013 12:26:17.1: SelectRunning: No running plans 12-Mar-2013 12:26:17.1: No pending plans that can be started now. 12-Mar-2013 12:26:17.1: Dispatcher cycle time: 0 sec. 12-Mar-2013 12:26:47.6: SelectRunning: No running plans 12-Mar-2013 12:26:47.6: No pending plans that can be started now. 12-Mar-2013 12:26:47.6: Dispatcher cycle time: 0 sec. 12-Mar-2013 12:27:18.1: SelectRunning: No running plans 12-Mar-2013 12:27:18.1: No pending plans that can be started now. 12-Mar-2013 12:27:18.1: Dispatcher cycle time: 0 sec. 12-Mar-2013 12:27:48.8: ++ Dawn Flats ++ 12-Mar-2013 12:27:48.8: Start ACP AutoFlat script for Dawn 12-Mar-2013 12:27:58.9: Sequencer is now active 12-Mar-2013 13:16:03.3: Sequencer is no longer active 12-Mar-2013 13:16:03.3: -- Observatory Shutdown -- 12-Mar-2013 13:16:03.3: Weather disconnected. 12-Mar-2013 13:16:03.3: Start ACP Sequencer's ShutdownObs script 12-Mar-2013 13:16:13.4: Sequencer is now active 12-Mar-2013 13:21:41.3: Sequencer is no longer active 12-Mar-2013 13:21:41.3: Weather successfully connected. Wait for valid data... 12-Mar-2013 13:44:25.6: Dispatcher stopped at 12-Mar-2013 13:44:25 UTC 12-Mar-2013 13:44:25.6: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 13-Mar-2013 03:37:18.2: Dispatcher started at 13-Mar-2013 03:37:18 UTC 13-Mar-2013 03:37:18.2: Priority: W[0]=1.00 13-Mar-2013 03:37:18.2: Transit Altitude: W[1]=0.00 13-Mar-2013 03:37:18.2: Highest Altitude: W[6]=0.00 13-Mar-2013 03:37:18.2: Lateness: W[5]=0.70 13-Mar-2013 03:37:18.2: Slew Distance: W[2]=0.30 13-Mar-2013 03:37:18.2: Retry Count: W[3]=0.20 13-Mar-2013 03:37:18.2: Meridian Crossing: W[4]=0.30 13-Mar-2013 03:37:18.2: Obs Conditions: W[7]=0.40 13-Mar-2013 03:37:18.2: Rising Plan Delay: disabled 13-Mar-2013 03:37:19.1: Run statistics: 13-Mar-2013 03:37:19.1: Observations: 102 13-Mar-2013 03:37:19.1: Considered: 60 13-Mar-2013 03:37:19.1: Completed: 35 13-Mar-2013 03:37:19.1: Skipped: 14 13-Mar-2013 03:37:19.1: Never Eligible: 42 13-Mar-2013 03:37:19.1: Failed: 11 Log closed at Wed, Mar 13 2013 03:37:19 UTC (actual time)