Log opened at Sat, Dec 29 2012 05:23:21 UTC (actual time) Current log level is Debug Scheduler version 3.5.3 Multi-user license: Arne Henden 29-Dec-2012 05:23:21.6: ++ Observatory Startup ++ 29-Dec-2012 05:23:21.6: Start ACP Sequencer's StartupObs script 29-Dec-2012 05:23:31.6: Sequencer is now active 29-Dec-2012 05:23:37.1: Sequencer is no longer active 29-Dec-2012 05:23:37.1: ++ Auto Focus ++ 29-Dec-2012 05:23:37.1: Doing initial autofocus. 29-Dec-2012 05:23:37.1: Start special ACP AutoFocus script for scheduler 29-Dec-2012 05:23:47.1: Sequencer is now active 29-Dec-2012 05:26:13.9: Sequencer is no longer active 29-Dec-2012 05:26:13.9: Next periodic autofocus ASAP after 29-Dec-2012 07:25:56 UTC 29-Dec-2012 05:26:14.0: Plan GSC_3649-0825 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan 2MASS_23275353+5214532 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan IC_348 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan KH_15D has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan V1184_Tau has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan CB_32 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan CW_Mon has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan FL_Psc has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan HS_0218+3229 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan HS_0220+0603 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan HS_2214+2845 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan LT_Eri has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SDSS_J00115308-0647391 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan V0405_Peg has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan V1294_Tau has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA98 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA68_216 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA44_28 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA93_317 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA96_171 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA112_810 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA116_180 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA96_171 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan SA52_56 has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: Plan BB_Ari has Monitor Mode. Time to resubmit it. 29-Dec-2012 05:26:14.0: SelectRunning: No running plans 29-Dec-2012 05:26:14.0: Obs 1RXS_J1050103-140431 in Plan 1RXS_J1050103-140431 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.0: AirmassRange estimates ready after 29-Dec-2012 08:44:06 UTC 29-Dec-2012 05:26:14.1: Obs FL_Psc in Plan FL_Psc was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 20:48:02 UTC 29-Dec-2012 05:26:14.1: Obs GW_Lib in Plan GW_Lib was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 14:36:47 UTC 29-Dec-2012 05:26:14.1: Obs HM_Leo in Plan HM_Leo was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 06:16:32 UTC 29-Dec-2012 05:26:14.1: Obs HS_2214+2845 in Plan HS_2214+2845 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 18:04:21 UTC 29-Dec-2012 05:26:14.1: Obs IR_Com in Plan IR_Com was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 08:44:36 UTC 29-Dec-2012 05:26:14.1: Obs IU_Leo in Plan IU_Leo was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 07:30:07 UTC 29-Dec-2012 05:26:14.1: Obs IY_UMa in Plan IY_UMa was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.1: AirmassRange estimates ready after 29-Dec-2012 05:41:17 UTC 29-Dec-2012 05:26:14.1: Obs KH_15D in Plan KH_15D was vetoed by MoonAvoid constraint. 29-Dec-2012 05:26:14.1: MoonAvoid estimates ready after 29-Dec-2012 17:26:14 UTC 29-Dec-2012 05:26:14.2: Obs MP_Gem in Plan MP_Gem was vetoed by MoonAvoid constraint. 29-Dec-2012 05:26:14.2: MoonAvoid estimates ready after 29-Dec-2012 17:26:14 UTC 29-Dec-2012 05:26:14.2: Obs MR UMa in Plan MR_UMa was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 06:54:55 UTC 29-Dec-2012 05:26:14.2: Obs NGC_2438 in Plan NGC_2438 was vetoed by MoonAvoid constraint. 29-Dec-2012 05:26:14.2: MoonAvoid estimates ready after 29-Dec-2012 17:26:14 UTC 29-Dec-2012 05:26:14.2: Obs PU_CMa in Plan PU_CMa was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 05:51:22 UTC 29-Dec-2012 05:26:14.2: Obs QZ_Lib in Plan QZ_Lib was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 13:04:41 UTC 29-Dec-2012 05:26:14.2: Obs QZ_Ser in Plan QZ_Ser was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 12:01:28 UTC 29-Dec-2012 05:26:14.2: Obs RZ_Leo in Plan RZ_Leo was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 08:30:10 UTC 29-Dec-2012 05:26:14.2: Obs SA100_267 in Plan SA100_267 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 07:20:56 UTC 29-Dec-2012 05:26:14.2: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 10:22:18 UTC 29-Dec-2012 05:26:14.2: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 08:14:24 UTC 29-Dec-2012 05:26:14.2: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 10:58:18 UTC 29-Dec-2012 05:26:14.2: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 13:05:36 UTC 29-Dec-2012 05:26:14.2: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 14:01:55 UTC 29-Dec-2012 05:26:14.2: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 16:09:01 UTC 29-Dec-2012 05:26:14.2: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 14:56:58 UTC 29-Dec-2012 05:26:14.2: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.2: AirmassRange estimates ready after 29-Dec-2012 17:03:07 UTC 29-Dec-2012 05:26:14.3: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 17:58:53 UTC 29-Dec-2012 05:26:14.3: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 15:52:33 UTC 29-Dec-2012 05:26:14.3: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 15:52:18 UTC 29-Dec-2012 05:26:14.3: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 17:58:11 UTC 29-Dec-2012 05:26:14.3: Obs SA112_810 in Plan SA112_810 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 19:03:53 UTC 29-Dec-2012 05:26:14.3: Obs SA112_810 in Plan SA112_810 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 16:57:43 UTC 29-Dec-2012 05:26:14.3: Obs SA116_180 in Plan SA116_180 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 21:18:43 UTC 29-Dec-2012 05:26:14.3: Obs SA124_970 in Plan SA124_970 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 05:29:24 UTC 29-Dec-2012 05:26:14.3: Obs SA132 in Plan SA132 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 13:25:43 UTC 29-Dec-2012 05:26:14.3: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 05:50:29 UTC 29-Dec-2012 05:26:14.3: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 21:30:43 UTC 29-Dec-2012 05:26:14.3: Obs SA52_56 in Plan SA52_56 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 05:36:30 UTC 29-Dec-2012 05:26:14.3: Obs SA52_56 in Plan SA52_56 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 13:48:36 UTC 29-Dec-2012 05:26:14.3: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 12:07:47 UTC 29-Dec-2012 05:26:14.3: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 14:05:52 UTC 29-Dec-2012 05:26:14.3: Obs SA68_216 in Plan SA68_216 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.3: AirmassRange estimates ready after 29-Dec-2012 21:46:57 UTC 29-Dec-2012 05:26:14.4: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 11:56:04 UTC 29-Dec-2012 05:26:14.4: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 13:49:36 UTC 29-Dec-2012 05:26:14.4: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 06:06:26 UTC 29-Dec-2012 05:26:14.4: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 30-Dec-2012 00:12:52 UTC 29-Dec-2012 05:26:14.4: Obs SA96_171 in Plan SA96_171 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 09:00:00 UTC 29-Dec-2012 05:26:14.4: Obs SA98 in Plan SA98 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 10:59:51 UTC 29-Dec-2012 05:26:14.4: Obs SA99_438 in Plan SA99_438 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 12:03:37 UTC 29-Dec-2012 05:26:14.4: Obs SA99_438 in Plan SA99_438 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 06:21:43 UTC 29-Dec-2012 05:26:14.4: Obs SDSS_J00115308-0647391 in Plan SDSS_J00115308-0647391 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 21:31:34 UTC 29-Dec-2012 05:26:14.4: Obs SDSS_J10051538+1911079 in Plan SDSS_J10051538+1911079 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 06:14:52 UTC 29-Dec-2012 05:26:14.4: Obs SDSS_J10065840+2337244 in Plan SDSS_J10065840+2337244 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 06:07:21 UTC 29-Dec-2012 05:26:14.4: Obs SDSS_J10353303+0551584 in Plan SDSS_J10353303+0551584 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 07:17:00 UTC 29-Dec-2012 05:26:14.4: Obs SDSS_J14354402+2336387 in Plan SDSS_J14354402+2336387 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.4: AirmassRange estimates ready after 29-Dec-2012 10:35:24 UTC 29-Dec-2012 05:26:14.5: Obs SDSS_J15381735+5123380 in Plan SDSS_J15381735+5123380 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 10:47:04 UTC 29-Dec-2012 05:26:14.5: Obs SDSS_J15445360+2553488 in Plan SDSS_J15445360+2553488 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 11:39:49 UTC 29-Dec-2012 05:26:14.5: Obs SDSS_J16424852+1347514 in Plan SDSS_J16424852+1347514 was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 13:03:22 UTC 29-Dec-2012 05:26:14.5: Obs V0380_Oph in Plan V0380_Oph was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 14:29:53 UTC 29-Dec-2012 05:26:14.5: Obs V0405_Peg in Plan V0405_Peg was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 19:12:13 UTC 29-Dec-2012 05:26:14.5: Obs V0406_Vir in Plan V0406_Vir was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 09:48:25 UTC 29-Dec-2012 05:26:14.5: Obs V1108_Her in Plan V1108_Her was vetoed by AirmassRange constraint. 29-Dec-2012 05:26:14.5: AirmassRange estimates ready after 29-Dec-2012 14:33:32 UTC 29-Dec-2012 05:26:14.5: Obs V1108_Her in Plan V1108_Her was vetoed by AirMass constraint. 29-Dec-2012 05:26:14.5: AirMass estimates ready after 29-Dec-2012 14:33:32 UTC 29-Dec-2012 05:26:14.5: Obs V1404_Cyg in Plan V1404_Cyg was vetoed by AirMass constraint. 29-Dec-2012 05:26:14.5: AirMass estimates ready after 29-Dec-2012 17:03:35 UTC 29-Dec-2012 05:26:14.5: Obs V849 Her in Plan V849 Her was vetoed by AirMass constraint. 29-Dec-2012 05:26:14.5: AirMass estimates ready after 29-Dec-2012 13:02:00 UTC 29-Dec-2012 05:26:14.5: Efficiency: Selecting from 20 pending plans: 29-Dec-2012 05:26:14.7: Selected Plan SA68_216 (TotEff=1.87) 29-Dec-2012 05:26:14.7: Dispatcher cycle time: 0.7644013 sec. 29-Dec-2012 05:26:14.7: Acquire data for Observation SA68_216... 29-Dec-2012 05:26:14.7: (belongs to Project Landolt_2, Plan SA68_216) 29-Dec-2012 05:26:14.7: Send Observation SA68_216 to ACP Sequencer 29-Dec-2012 05:26:24.7: Sequencer is now active 29-Dec-2012 05:32:34.4: Sequencer is no longer active 29-Dec-2012 05:32:34.4: Post-job status check done (stat=Completed) 29-Dec-2012 05:32:34.4: Acquisition time: 379.720267 sec. 29-Dec-2012 05:32:34.4: Data for Observation SA68_216 acquired successfully. 29-Dec-2012 05:32:34.4: Image Efficiency: 25.0% 29-Dec-2012 05:32:34.4: Cycle Efficiency: 99.8% 29-Dec-2012 05:32:34.8: SelectRunning: No running plans 29-Dec-2012 05:32:34.8: Obs 2MASS_23275353+5214532 in Plan 2MASS_23275353+5214532 was vetoed by AirMass constraint. 29-Dec-2012 05:32:34.8: AirMass estimates ready after 29-Dec-2012 18:33:53 UTC 29-Dec-2012 05:32:34.8: Obs GSC_3649-0825 in Plan GSC_3649-0825 was vetoed by AirMass constraint. 29-Dec-2012 05:32:34.8: AirMass estimates ready after 29-Dec-2012 18:33:01 UTC 29-Dec-2012 05:32:34.9: Efficiency: Selecting from 18 pending plans: 29-Dec-2012 05:32:35.0: Selected Plan SA96_171 (TotEff=2.01) 29-Dec-2012 05:32:35.0: Dispatcher cycle time: 0.4992009 sec. 29-Dec-2012 05:32:35.0: Acquire data for Observation SA96_171... 29-Dec-2012 05:32:35.0: (belongs to Project Landolt_1, Plan SA96_171) 29-Dec-2012 05:32:35.0: Send Observation SA96_171 to ACP Sequencer 29-Dec-2012 05:32:45.1: Sequencer is now active 29-Dec-2012 05:38:45.3: Sequencer is no longer active 29-Dec-2012 05:38:45.3: Post-job status check done (stat=Completed) 29-Dec-2012 05:38:45.3: Acquisition time: 370.2510503 sec. 29-Dec-2012 05:38:45.3: Data for Observation SA96_171 acquired successfully. 29-Dec-2012 05:38:45.3: Image Efficiency: 25.6% 29-Dec-2012 05:38:45.3: Cycle Efficiency: 99.9% 29-Dec-2012 05:38:45.4: SelectRunning: No running plans 29-Dec-2012 05:38:45.5: Efficiency: Selecting from 18 pending plans: 29-Dec-2012 05:38:45.7: Selected Plan HS_0220+0603 (TotEff=1.90) 29-Dec-2012 05:38:45.7: Dispatcher cycle time: 0.2652005 sec. 29-Dec-2012 05:38:45.7: Acquire data for Observation HS 0220+0603... 29-Dec-2012 05:38:45.7: (belongs to Project HST_CV, Plan HS_0220+0603) 29-Dec-2012 05:38:45.7: Send Observation HS 0220+0603 to ACP Sequencer 29-Dec-2012 05:38:55.7: Sequencer is now active 29-Dec-2012 05:46:33.7: Sequencer is no longer active 29-Dec-2012 05:46:33.7: Post-job status check done (stat=Failed) 29-Dec-2012 05:46:33.7: ACP data acquisition failed for Observation HS 0220+0603. 29-Dec-2012 05:46:33.7: (Observation HS 0220+0603 interrupted by acquisition process failure.) 29-Dec-2012 05:46:33.9: SelectRunning: No running plans 29-Dec-2012 05:46:34.0: Efficiency: Selecting from 18 pending plans: 29-Dec-2012 05:46:34.5: Selected Plan HS_0218+3229 (TotEff=1.83) 29-Dec-2012 05:46:34.5: Dispatcher cycle time: 0.6084011 sec. 29-Dec-2012 05:46:34.5: Acquire data for Observation HS_0218+3229... 29-Dec-2012 05:46:34.5: (belongs to Project HST_CV, Plan HS_0218+3229) 29-Dec-2012 05:46:34.5: Send Observation HS_0218+3229 to ACP Sequencer 29-Dec-2012 05:46:44.5: Sequencer is now active 29-Dec-2012 05:53:15.5: Sequencer is no longer active 29-Dec-2012 05:53:15.5: Post-job status check done (stat=Failed) 29-Dec-2012 05:53:15.5: ACP data acquisition failed for Observation HS_0218+3229. 29-Dec-2012 05:53:15.5: (Observation HS_0218+3229 interrupted by acquisition process failure.) 29-Dec-2012 05:53:15.7: SelectRunning: No running plans 29-Dec-2012 05:53:15.8: STRICT VETO: 29-Dec-2012 05:53:15.8: Obs SA100_267 in Plan SA100_267 was vetoed by AirmassRange constraint. 29-Dec-2012 05:53:15.8: AirmassRange estimates ready after 29-Dec-2012 12:59:34 UTC 29-Dec-2012 05:53:15.8: STRICT VETO: 29-Dec-2012 05:53:15.8: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 29-Dec-2012 05:53:15.8: AirmassRange estimates ready after 29-Dec-2012 19:32:08 UTC 29-Dec-2012 05:53:15.8: Efficiency: Selecting from 17 pending plans: 29-Dec-2012 05:53:15.9: Selected Plan LT_Eri (TotEff=1.82) 29-Dec-2012 05:53:15.9: Dispatcher cycle time: 0.2808005 sec. 29-Dec-2012 05:53:15.9: Acquire data for Observation LT_Eri... 29-Dec-2012 05:53:15.9: (belongs to Project HST_CV, Plan LT_Eri) 29-Dec-2012 05:53:15.9: Send Observation LT_Eri to ACP Sequencer 29-Dec-2012 05:53:26.0: Sequencer is now active 29-Dec-2012 05:56:05.6: Sequencer is no longer active 29-Dec-2012 05:56:05.6: Post-job status check done (stat=Failed) 29-Dec-2012 05:56:05.6: ACP data acquisition failed for Observation LT_Eri. 29-Dec-2012 05:56:05.6: (Observation LT_Eri interrupted by acquisition process failure.) 29-Dec-2012 05:56:05.7: SelectRunning: No running plans 29-Dec-2012 05:56:05.8: Efficiency: Selecting from 16 pending plans: 29-Dec-2012 05:56:05.9: Selected Plan BB_Ari (TotEff=1.82) 29-Dec-2012 05:56:06.0: Dispatcher cycle time: 0.2496004 sec. 29-Dec-2012 05:56:06.0: Acquire data for Observation BB_Ari... 29-Dec-2012 05:56:06.0: (belongs to Project HST_CV, Plan BB_Ari) 29-Dec-2012 05:56:06.0: Send Observation BB_Ari to ACP Sequencer 29-Dec-2012 05:56:16.0: Sequencer is now active 29-Dec-2012 06:01:29.2: Sequencer is no longer active 29-Dec-2012 06:01:29.2: Post-job status check done (stat=Failed) 29-Dec-2012 06:01:29.2: ACP data acquisition failed for Observation BB_Ari. 29-Dec-2012 06:01:29.2: (Observation BB_Ari interrupted by acquisition process failure.) 29-Dec-2012 06:01:29.3: SelectRunning: No running plans 29-Dec-2012 06:01:29.4: Efficiency: Selecting from 15 pending plans: 29-Dec-2012 06:01:29.5: Selected Plan IC_348 (TotEff=1.79) 29-Dec-2012 06:01:29.5: Dispatcher cycle time: 0.2184003 sec. 29-Dec-2012 06:01:29.5: Acquire data for Observation IC_348... 29-Dec-2012 06:01:29.5: (belongs to Project Staels, Plan IC_348) 29-Dec-2012 06:01:29.5: Send Observation IC_348 to ACP Sequencer 29-Dec-2012 06:01:39.5: Sequencer is now active 29-Dec-2012 06:06:15.1: Sequencer is no longer active 29-Dec-2012 06:06:15.1: Post-job status check done (stat=Completed) 29-Dec-2012 06:06:15.1: Acquisition time: 285.6365017 sec. 29-Dec-2012 06:06:15.1: Data for Observation IC_348 acquired successfully. 29-Dec-2012 06:06:15.2: Image Efficiency: 31.5% 29-Dec-2012 06:06:15.2: Cycle Efficiency: 99.9% 29-Dec-2012 06:06:15.3: SelectRunning: No running plans 29-Dec-2012 06:06:15.3: Efficiency: Selecting from 14 pending plans: 29-Dec-2012 06:06:15.4: Selected Plan V1294_Tau (TotEff=1.79) 29-Dec-2012 06:06:15.5: Dispatcher cycle time: 0.2028003 sec. 29-Dec-2012 06:06:15.5: Acquire data for Observation V1294_Tau... 29-Dec-2012 06:06:15.5: (belongs to Project HST_CV, Plan V1294_Tau) 29-Dec-2012 06:06:15.5: Send Observation V1294_Tau to ACP Sequencer 29-Dec-2012 06:06:25.5: Sequencer is now active 29-Dec-2012 06:20:50.8: Sequencer is no longer active 29-Dec-2012 06:20:50.8: Post-job status check done (stat=Completed) 29-Dec-2012 06:20:50.8: Acquisition time: 875.3029375 sec. 29-Dec-2012 06:20:50.8: Data for Observation V1294_Tau acquired successfully. 29-Dec-2012 06:20:50.8: Image Efficiency: 61.7% 29-Dec-2012 06:20:50.8: Cycle Efficiency: 100.0% 29-Dec-2012 06:20:50.9: SelectRunning: No running plans 29-Dec-2012 06:20:50.9: STRICT VETO: 29-Dec-2012 06:20:50.9: Obs SA124_970 in Plan SA124_970 was vetoed by AirmassRange constraint. 29-Dec-2012 06:20:50.9: AirmassRange estimates ready after 29-Dec-2012 11:23:15 UTC 29-Dec-2012 06:20:51.0: STRICT VETO: 29-Dec-2012 06:20:51.0: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 29-Dec-2012 06:20:51.0: AirmassRange estimates ready after 29-Dec-2012 22:07:28 UTC 29-Dec-2012 06:20:51.0: Efficiency: Selecting from 15 pending plans: 29-Dec-2012 06:20:51.1: Selected Plan CB_32 (TotEff=1.76) 29-Dec-2012 06:20:51.1: Dispatcher cycle time: 0.2184004 sec. 29-Dec-2012 06:20:51.1: Acquire data for Observation CB_32... 29-Dec-2012 06:20:51.1: (belongs to Project Staels, Plan CB_32) 29-Dec-2012 06:20:51.1: Send Observation CB_32 to ACP Sequencer 29-Dec-2012 06:21:01.1: Sequencer is now active 29-Dec-2012 06:25:08.5: Sequencer is no longer active 29-Dec-2012 06:25:08.5: Post-job status check done (stat=Completed) 29-Dec-2012 06:25:08.5: Acquisition time: 257.4004521 sec. 29-Dec-2012 06:25:08.5: Data for Observation CB_32 acquired successfully. 29-Dec-2012 06:25:08.5: Image Efficiency: 34.9% 29-Dec-2012 06:25:08.5: Cycle Efficiency: 99.9% 29-Dec-2012 06:25:08.7: SelectRunning: No running plans 29-Dec-2012 06:25:08.8: Efficiency: Selecting from 15 pending plans: 29-Dec-2012 06:25:08.9: Selected Plan V1184_Tau (TotEff=1.67) 29-Dec-2012 06:25:08.9: Dispatcher cycle time: 0.2496005 sec. 29-Dec-2012 06:25:08.9: Acquire data for Observation V1184_Tau... 29-Dec-2012 06:25:08.9: (belongs to Project Staels, Plan V1184_Tau) 29-Dec-2012 06:25:08.9: Send Observation V1184_Tau to ACP Sequencer 29-Dec-2012 06:25:18.9: Sequencer is now active 29-Dec-2012 06:27:54.8: Sequencer is no longer active 29-Dec-2012 06:27:54.8: Post-job status check done (stat=Failed) 29-Dec-2012 06:27:54.8: ACP data acquisition failed for Observation V1184_Tau. 29-Dec-2012 06:27:54.8: (Observation V1184_Tau interrupted by acquisition process failure.) 29-Dec-2012 06:27:54.9: SelectRunning: No running plans 29-Dec-2012 06:27:55.0: Efficiency: Selecting from 14 pending plans: 29-Dec-2012 06:27:55.1: Selected Plan PU_CMa (TotEff=1.47) 29-Dec-2012 06:27:55.1: Dispatcher cycle time: 0.2184004 sec. 29-Dec-2012 06:27:55.1: Acquire data for Observation PU_CMa... 29-Dec-2012 06:27:55.1: (belongs to Project HST_CV, Plan PU_CMa) 29-Dec-2012 06:27:55.1: Send Observation PU_CMa to ACP Sequencer 29-Dec-2012 06:28:05.2: Sequencer is now active 29-Dec-2012 06:41:11.8: Sequencer is no longer active 29-Dec-2012 06:41:11.8: Post-job status check done (stat=Completed) 29-Dec-2012 06:41:11.8: Acquisition time: 796.6163993 sec. 29-Dec-2012 06:41:11.8: Data for Observation PU_CMa acquired successfully. 29-Dec-2012 06:41:11.8: Image Efficiency: 67.8% 29-Dec-2012 06:41:11.8: Cycle Efficiency: 100.0% 29-Dec-2012 06:41:11.9: SelectRunning: No running plans 29-Dec-2012 06:41:12.0: Efficiency: Selecting from 13 pending plans: 29-Dec-2012 06:41:12.0: Selected Plan SA99_438 (TotEff=1.85) 29-Dec-2012 06:41:12.1: Dispatcher cycle time: 0.1872003 sec. 29-Dec-2012 06:41:12.1: Acquire data for Observation SA99_438... 29-Dec-2012 06:41:12.1: (belongs to Project Landolt_1, Plan SA99_438) 29-Dec-2012 06:41:12.1: Send Observation SA99_438 to ACP Sequencer 29-Dec-2012 06:41:22.1: Sequencer is now active 29-Dec-2012 06:45:20.7: Sequencer is no longer active 29-Dec-2012 06:45:20.7: Post-job status check done (stat=Completed) 29-Dec-2012 06:45:20.7: Acquisition time: 248.6800368 sec. 29-Dec-2012 06:45:20.7: Data for Observation SA99_438 acquired successfully. 29-Dec-2012 06:45:20.8: Image Efficiency: 22.1% 29-Dec-2012 06:45:20.8: Cycle Efficiency: 99.9% 29-Dec-2012 06:45:20.9: SelectRunning: No running plans 29-Dec-2012 06:45:20.9: Efficiency: Selecting from 12 pending plans: 29-Dec-2012 06:45:21.0: Selected Plan SA98 (TotEff=1.75) 29-Dec-2012 06:45:21.1: Dispatcher cycle time: 0.1872003 sec. 29-Dec-2012 06:45:21.1: Acquire data for Observation SA98... 29-Dec-2012 06:45:21.1: (belongs to Project Landolt_1, Plan SA98) 29-Dec-2012 06:45:21.1: Send Observation SA98 to ACP Sequencer 29-Dec-2012 06:45:31.1: Sequencer is now active 29-Dec-2012 06:51:49.0: Sequencer is no longer active 29-Dec-2012 06:51:49.0: Post-job status check done (stat=Completed) 29-Dec-2012 06:51:49.0: Acquisition time: 387.9570815 sec. 29-Dec-2012 06:51:49.0: Data for Observation SA98 acquired successfully. 29-Dec-2012 06:51:49.0: Image Efficiency: 33.5% 29-Dec-2012 06:51:49.0: Cycle Efficiency: 99.9% 29-Dec-2012 06:51:49.1: SelectRunning: No running plans 29-Dec-2012 06:51:49.2: Efficiency: Selecting from 11 pending plans: 29-Dec-2012 06:51:49.3: Selected Plan SA52_56 (TotEff=1.70) 29-Dec-2012 06:51:49.3: Dispatcher cycle time: 0.1716003 sec. 29-Dec-2012 06:51:49.3: Acquire data for Observation SA52_56... 29-Dec-2012 06:51:49.3: (belongs to Project Landolt_1, Plan SA52_56) 29-Dec-2012 06:51:49.3: Send Observation SA52_56 to ACP Sequencer 29-Dec-2012 06:51:59.3: Sequencer is now active 29-Dec-2012 06:57:11.1: Sequencer is no longer active 29-Dec-2012 06:57:11.1: Post-job status check done (stat=Completed) 29-Dec-2012 06:57:11.1: Acquisition time: 321.7827652 sec. 29-Dec-2012 06:57:11.1: Data for Observation SA52_56 acquired successfully. 29-Dec-2012 06:57:11.1: Image Efficiency: 29.5% 29-Dec-2012 06:57:11.1: Cycle Efficiency: 99.9% 29-Dec-2012 06:57:11.2: SelectRunning: No running plans 29-Dec-2012 06:57:11.3: Efficiency: Selecting from 11 pending plans: 29-Dec-2012 06:57:11.4: Selected Plan CW_Mon (TotEff=1.67) 29-Dec-2012 06:57:11.4: Dispatcher cycle time: 0.1716003 sec. 29-Dec-2012 06:57:11.4: Acquire data for Observation CW_Mon... 29-Dec-2012 06:57:11.4: (belongs to Project HST_CV, Plan CW_Mon) 29-Dec-2012 06:57:11.4: Send Observation CW_Mon to ACP Sequencer 29-Dec-2012 06:57:21.4: Sequencer is now active 29-Dec-2012 07:02:26.1: Sequencer is no longer active 29-Dec-2012 07:02:26.1: Post-job status check done (stat=Failed) 29-Dec-2012 07:02:26.1: ACP data acquisition failed for Observation CW_Mon. 29-Dec-2012 07:02:26.1: (Observation CW_Mon interrupted by acquisition process failure.) 29-Dec-2012 07:02:26.2: SelectRunning: No running plans 29-Dec-2012 07:02:26.3: Efficiency: Selecting from 10 pending plans: 29-Dec-2012 07:02:26.4: Selected Plan SDSS_J07550770+1435476 (TotEff=1.51) 29-Dec-2012 07:02:26.4: Dispatcher cycle time: 0.1716003 sec. 29-Dec-2012 07:02:26.4: Acquire data for Observation SDSS_J07550770+1435476... 29-Dec-2012 07:02:26.4: (belongs to Project HST_CV, Plan SDSS_J07550770+1435476) 29-Dec-2012 07:02:26.4: Send Observation SDSS_J07550770+1435476 to ACP Sequencer 29-Dec-2012 07:02:36.4: Sequencer is now active 29-Dec-2012 07:09:59.2: Sequencer is no longer active 29-Dec-2012 07:09:59.2: Post-job status check done (stat=Failed) 29-Dec-2012 07:09:59.2: ACP data acquisition failed for Observation SDSS_J07550770+1435476. 29-Dec-2012 07:09:59.2: (Observation SDSS_J07550770+1435476 interrupted by acquisition process failure.) 29-Dec-2012 07:09:59.3: SelectRunning: No running plans 29-Dec-2012 07:09:59.4: Efficiency: Selecting from 9 pending plans: 29-Dec-2012 07:09:59.5: Selected Plan V0482_Cam (TotEff=1.40) 29-Dec-2012 07:09:59.5: Dispatcher cycle time: 0.1404002 sec. 29-Dec-2012 07:09:59.5: Acquire data for Observation V0482_Cam... 29-Dec-2012 07:09:59.5: (belongs to Project HST_CV, Plan V0482_Cam) 29-Dec-2012 07:09:59.5: Send Observation V0482_Cam to ACP Sequencer 29-Dec-2012 07:10:09.5: Sequencer is now active 29-Dec-2012 07:23:20.1: Sequencer is no longer active 29-Dec-2012 07:23:20.1: Post-job status check done (stat=Completed) 29-Dec-2012 07:23:20.1: Acquisition time: 800.6412063 sec. 29-Dec-2012 07:23:20.1: Data for Observation V0482_Cam acquired successfully. 29-Dec-2012 07:23:20.2: Image Efficiency: 67.4% 29-Dec-2012 07:23:20.2: Cycle Efficiency: 100.0% 29-Dec-2012 07:23:20.3: SelectRunning: No running plans 29-Dec-2012 07:23:20.3: Efficiency: Selecting from 10 pending plans: 29-Dec-2012 07:23:20.4: Selected Plan SA100_267 (TotEff=1.54) 29-Dec-2012 07:23:20.4: Dispatcher cycle time: 0.1716003 sec. 29-Dec-2012 07:23:20.4: Acquire data for Observation SA100_267... 29-Dec-2012 07:23:20.4: (belongs to Project Landolt_1, Plan SA100_267) 29-Dec-2012 07:23:20.4: Send Observation SA100_267 to ACP Sequencer 29-Dec-2012 07:23:30.5: Sequencer is now active 29-Dec-2012 07:29:37.4: Sequencer is no longer active 29-Dec-2012 07:29:37.4: Post-job status check done (stat=Completed) 29-Dec-2012 07:29:37.5: Acquisition time: 377.0214622 sec. 29-Dec-2012 07:29:37.5: Data for Observation SA100_267 acquired successfully. 29-Dec-2012 07:29:37.5: Image Efficiency: 25.2% 29-Dec-2012 07:29:37.5: Cycle Efficiency: 100.0% 29-Dec-2012 07:29:37.6: ++ Auto Focus ++ 29-Dec-2012 07:29:37.6: Doing periodic autofocus. 29-Dec-2012 07:29:37.6: Start special ACP AutoFocus script for scheduler 29-Dec-2012 07:29:47.6: Sequencer is now active 29-Dec-2012 07:32:22.3: Sequencer is no longer active 29-Dec-2012 07:32:22.3: Next periodic autofocus ASAP after 29-Dec-2012 09:32:05 UTC 29-Dec-2012 07:32:22.3: SelectRunning: No running plans 29-Dec-2012 07:32:22.4: Efficiency: Selecting from 10 pending plans: 29-Dec-2012 07:32:22.4: Selected Plan HS_0455+8315 (TotEff=1.53) 29-Dec-2012 07:32:22.4: Dispatcher cycle time: 0.1716003 sec. 29-Dec-2012 07:32:22.4: Acquire data for Observation HS_0455+8315... 29-Dec-2012 07:32:22.4: (belongs to Project HST_CV, Plan HS_0455+8315) 29-Dec-2012 07:32:22.5: Send Observation HS_0455+8315 to ACP Sequencer 29-Dec-2012 07:32:32.5: Sequencer is now active 29-Dec-2012 07:47:26.0: Sequencer is no longer active 29-Dec-2012 07:47:26.0: Post-job status check done (stat=Completed) 29-Dec-2012 07:47:26.0: Acquisition time: 903.5545871 sec. 29-Dec-2012 07:47:26.0: Data for Observation HS_0455+8315 acquired successfully. 29-Dec-2012 07:47:26.0: Image Efficiency: 59.8% 29-Dec-2012 07:47:26.0: Cycle Efficiency: 100.0% 29-Dec-2012 07:47:26.2: SelectRunning: No running plans 29-Dec-2012 07:47:26.2: Efficiency: Selecting from 9 pending plans: 29-Dec-2012 07:47:26.3: Selected Plan HM_Leo (TotEff=1.11) 29-Dec-2012 07:47:26.3: Dispatcher cycle time: 0.1560003 sec. 29-Dec-2012 07:47:26.3: Acquire data for Observation HM_Leo... 29-Dec-2012 07:47:26.3: (belongs to Project HST_CV, Plan HM_Leo) 29-Dec-2012 07:47:26.3: Send Observation HM_Leo to ACP Sequencer 29-Dec-2012 07:47:36.3: Sequencer is now active 29-Dec-2012 07:57:06.0: Sequencer is no longer active 29-Dec-2012 07:57:06.0: Post-job status check done (stat=Failed) 29-Dec-2012 07:57:06.0: ACP data acquisition failed for Observation HM_Leo. 29-Dec-2012 07:57:06.0: (Observation HM_Leo interrupted by acquisition process failure.) 29-Dec-2012 07:57:06.2: SelectRunning: No running plans 29-Dec-2012 07:57:06.2: Efficiency: Selecting from 8 pending plans: 29-Dec-2012 07:57:06.3: Selected Plan SDSS_J10353303+0551584 (TotEff=1.39) 29-Dec-2012 07:57:06.3: Dispatcher cycle time: 0.1404003 sec. 29-Dec-2012 07:57:06.3: Acquire data for Observation SDSS_J10353303+0551584... 29-Dec-2012 07:57:06.3: (belongs to Project HST_CV, Plan SDSS_J10353303+0551584) 29-Dec-2012 07:57:06.3: Send Observation SDSS_J10353303+0551584 to ACP Sequencer 29-Dec-2012 07:57:16.3: Sequencer is now active 29-Dec-2012 08:18:49.4: Sequencer is no longer active 29-Dec-2012 08:18:49.4: Post-job status check done (stat=Completed) 29-Dec-2012 08:18:49.4: Acquisition time: 1303.0400887 sec. 29-Dec-2012 08:18:49.4: Data for Observation SDSS_J10353303+0551584 acquired successfully. 29-Dec-2012 08:18:49.4: Image Efficiency: 41.4% 29-Dec-2012 08:18:49.4: Cycle Efficiency: 100.0% 29-Dec-2012 08:18:49.5: SelectRunning: No running plans 29-Dec-2012 08:18:49.5: Efficiency: Selecting from 8 pending plans: 29-Dec-2012 08:18:49.6: Selected Plan SA103 (TotEff=1.95) 29-Dec-2012 08:18:49.6: Dispatcher cycle time: 0.1248002 sec. 29-Dec-2012 08:18:49.6: Acquire data for Observation SA103... 29-Dec-2012 08:18:49.6: (belongs to Project Landolt_2, Plan SA103) 29-Dec-2012 08:18:49.6: Send Observation SA103 to ACP Sequencer 29-Dec-2012 08:18:59.6: Sequencer is now active 29-Dec-2012 08:27:45.7: Sequencer is no longer active 29-Dec-2012 08:27:45.7: Post-job status check done (stat=Completed) 29-Dec-2012 08:27:45.7: Acquisition time: 536.0793416 sec. 29-Dec-2012 08:27:45.7: Data for Observation SA103 acquired successfully. 29-Dec-2012 08:27:45.7: Image Efficiency: 24.2% 29-Dec-2012 08:27:45.7: Cycle Efficiency: 100.0% 29-Dec-2012 08:27:45.8: SelectRunning: No running plans 29-Dec-2012 08:27:45.9: Efficiency: Selecting from 7 pending plans: 29-Dec-2012 08:27:45.9: Selected Plan SDSS_J10051538+1911079 (TotEff=1.42) 29-Dec-2012 08:27:46.0: Dispatcher cycle time: 0.1248002 sec. 29-Dec-2012 08:27:46.0: Acquire data for Observation SDSS_J10051538+1911079... 29-Dec-2012 08:27:46.0: (belongs to Project HST_CV, Plan SDSS_J10051538+1911079) 29-Dec-2012 08:27:46.0: Send Observation SDSS_J10051538+1911079 to ACP Sequencer 29-Dec-2012 08:27:56.0: Sequencer is now active 29-Dec-2012 08:37:54.0: Sequencer is no longer active 29-Dec-2012 08:37:54.0: Post-job status check done (stat=Failed) 29-Dec-2012 08:37:54.0: ACP data acquisition failed for Observation SDSS_J10051538+1911079. 29-Dec-2012 08:37:54.0: (Observation SDSS_J10051538+1911079 interrupted by acquisition process failure.) 29-Dec-2012 08:37:54.1: SelectRunning: No running plans 29-Dec-2012 08:37:54.2: Efficiency: Selecting from 7 pending plans: 29-Dec-2012 08:37:54.2: Selected Plan SDSS_J10065840+2337244 (TotEff=1.43) 29-Dec-2012 08:37:54.2: Dispatcher cycle time: 0.1248002 sec. 29-Dec-2012 08:37:54.2: Acquire data for Observation SDSS_J10065840+2337244... 29-Dec-2012 08:37:54.2: (belongs to Project HST_CV, Plan SDSS_J10065840+2337244) 29-Dec-2012 08:37:54.2: Send Observation SDSS_J10065840+2337244 to ACP Sequencer 29-Dec-2012 08:38:04.2: Sequencer is now active 29-Dec-2012 08:51:59.9: Sequencer is no longer active 29-Dec-2012 08:51:59.9: Post-job status check done (stat=Completed) 29-Dec-2012 08:51:59.9: Acquisition time: 845.7086854 sec. 29-Dec-2012 08:51:59.9: Data for Observation SDSS_J10065840+2337244 acquired successfully. 29-Dec-2012 08:52:00.0: Image Efficiency: 63.8% 29-Dec-2012 08:52:00.0: Cycle Efficiency: 100.0% 29-Dec-2012 08:52:00.1: SelectRunning: No running plans 29-Dec-2012 08:52:00.1: Efficiency: Selecting from 8 pending plans: 29-Dec-2012 08:52:00.2: Selected Plan SDSS_J09324957+4725230 (TotEff=1.43) 29-Dec-2012 08:52:00.2: Dispatcher cycle time: 0.1560003 sec. 29-Dec-2012 08:52:00.2: Acquire data for Observation SDSS_J09324957+4725230... 29-Dec-2012 08:52:00.2: (belongs to Project HST_CV, Plan SDSS_J09324957+4725230) 29-Dec-2012 08:52:00.2: Send Observation SDSS_J09324957+4725230 to ACP Sequencer 29-Dec-2012 08:52:10.2: Sequencer is now active 29-Dec-2012 09:07:56.4: Sequencer is no longer active 29-Dec-2012 09:07:56.4: Post-job status check done (stat=Completed) 29-Dec-2012 09:07:56.4: Acquisition time: 956.1422794 sec. 29-Dec-2012 09:07:56.4: Data for Observation SDSS_J09324957+4725230 acquired successfully. 29-Dec-2012 09:07:56.4: Image Efficiency: 56.5% 29-Dec-2012 09:07:56.4: Cycle Efficiency: 100.0% 29-Dec-2012 09:07:56.5: SelectRunning: No running plans 29-Dec-2012 09:07:56.6: Efficiency: Selecting from 8 pending plans: 29-Dec-2012 09:07:56.6: Selected Plan 1RXS_J1050103-140431 (TotEff=1.57) 29-Dec-2012 09:07:56.6: Dispatcher cycle time: 0.1560003 sec. 29-Dec-2012 09:07:56.6: Acquire data for Observation 1RXS_J1050103-140431... 29-Dec-2012 09:07:56.6: (belongs to Project HST_CV, Plan 1RXS_J1050103-140431) 29-Dec-2012 09:07:56.7: Send Observation 1RXS_J1050103-140431 to ACP Sequencer 29-Dec-2012 09:08:06.7: Sequencer is now active 29-Dec-2012 09:21:29.3: Sequencer is no longer active 29-Dec-2012 09:21:29.3: Post-job status check done (stat=Failed) 29-Dec-2012 09:21:29.3: ACP data acquisition failed for Observation 1RXS_J1050103-140431. 29-Dec-2012 09:21:29.3: (Observation 1RXS_J1050103-140431 interrupted by acquisition process failure.) 29-Dec-2012 09:21:29.4: SelectRunning: No running plans 29-Dec-2012 09:21:29.4: Efficiency: Selecting from 7 pending plans: 29-Dec-2012 09:21:29.5: Selected Plan SA96_171 (TotEff=1.78) 29-Dec-2012 09:21:29.5: Dispatcher cycle time: 0.1248002 sec. 29-Dec-2012 09:21:29.5: Acquire data for Observation SA96_171... 29-Dec-2012 09:21:29.5: (belongs to Project Landolt_2, Plan SA96_171) 29-Dec-2012 09:21:29.5: Send Observation SA96_171 to ACP Sequencer 29-Dec-2012 09:21:39.5: Sequencer is now active 29-Dec-2012 09:32:07.4: Sequencer is no longer active 29-Dec-2012 09:32:07.4: Post-job status check done (stat=Completed) 29-Dec-2012 09:32:07.4: Acquisition time: 637.8695203 sec. 29-Dec-2012 09:32:07.4: Data for Observation SA96_171 acquired successfully. 29-Dec-2012 09:32:07.4: Image Efficiency: 14.9% 29-Dec-2012 09:32:07.4: Cycle Efficiency: 100.0% 29-Dec-2012 09:32:07.5: ++ Auto Focus ++ 29-Dec-2012 09:32:07.5: Doing periodic autofocus. 29-Dec-2012 09:32:07.5: Start special ACP AutoFocus script for scheduler 29-Dec-2012 09:32:17.5: Sequencer is now active 29-Dec-2012 14:39:33.5: Sequencer is no longer active 29-Dec-2012 14:39:33.5: ** Sequencer script "AutoFocusScheduler" failed: 29-Dec-2012 14:39:33.5: **Script Error** Source: ACP Message: The script was aborted. at line 69 column 9. Script Context: 66: Telescope.Tracking = True ' AcquireStar needs tracking scope 67: Else 68: Call SUP.StartSlewJ2000("FocusArea", CT.RightAscension, CT.Declination) => 69: Call SUP.WaitForSlew() ^ 70: End If 71: 72: If Not SUP.AutoFocus(CT.RightAscension, CT.Declination) Then -- end -- 29-Dec-2012 14:39:33.5: ** Autofocus failed (n=1), will retry ASAP after 0 min. 29-Dec-2012 14:40:04.1: -- Observatory Shutdown -- 29-Dec-2012 14:40:04.1: Weather disconnected. 29-Dec-2012 14:40:04.1: Start ACP Sequencer's ShutdownObs script 29-Dec-2012 14:40:14.1: Sequencer is now active 29-Dec-2012 14:50:15.4: Sequencer is no longer active 29-Dec-2012 14:50:15.4: ** Sequencer script "ShutdownObs" failed: 29-Dec-2012 14:50:15.4: **Script Error** Source: ACP Message: The script was aborted. at line 38 column 9. Script Context: 35: 36: if(Telescope.Connected) { 37: Console.PrintLine("Parking scope"); => 38: Telescope.Park(); // Park the scope if possible, and/or close/park dome ^ 39: Console.PrintLine("OK"); 40: if(Telescope.Connected) { 41: Console.PrintLine("Disconnecting Scope"); -- end -- 29-Dec-2012 14:50:15.4: **EXCEPTION IN SCHEDULER: 29-Dec-2012 14:50:15.4: Observatory shutdown failed, cannot continue. 29-Dec-2012 14:50:15.4: Traceback: at DC3.Scheduler.Engine.DoShutdownIf() at DC3.Scheduler.Engine.Run() 29-Dec-2012 14:50:15.5: Run statistics: 29-Dec-2012 14:50:15.5: Observations: 102 29-Dec-2012 14:50:15.5: Considered: 46 29-Dec-2012 14:50:15.5: Completed: 19 29-Dec-2012 14:50:15.5: Skipped: 13 29-Dec-2012 14:50:15.5: Never Eligible: 56 29-Dec-2012 14:50:15.5: Failed: 14 29-Dec-2012 14:50:15.5: Shutter-Open efficiency: 40.16% 29-Dec-2012 14:50:15.5: Overall Efficiency: 97.09% 29-Dec-2012 14:50:15.5: Release ACP sequencer Log closed at Sat, Dec 29 2012 14:50:17 UTC (actual time)