Log opened at Mon, Nov 12 2012 00:59:14 UTC (actual time) Current log level is Debug Scheduler version 3.5.3 Multi-user license: Arne Henden 12-Nov-2012 00:59:14.4: Simulated clock initialized at 12-Nov-2012 00:59:14 UTC 12-Nov-2012 00:59:14.5: Loaded Constraint plugin AirMass 12-Nov-2012 00:59:14.5: Loaded Constraint plugin AirmassRange 12-Nov-2012 00:59:14.5: Loaded Constraint plugin Horizon 12-Nov-2012 00:59:14.5: Loaded Constraint plugin HourAngle 12-Nov-2012 00:59:14.5: Loaded Constraint plugin MoonAvoid 12-Nov-2012 00:59:14.5: Loaded Constraint plugin MoonDown 12-Nov-2012 00:59:14.5: Loaded Constraint plugin SkyCondition 12-Nov-2012 00:59:14.5: Loaded Constraint plugin TimeRange 12-Nov-2012 00:59:15.0: 3 plans are now pending. 12-Nov-2012 00:59:15.0: Attach ACP sequencer 15-Nov-2012 04:59:11.4: Dispatcher started at 15-Nov-2012 04:59:11 UTC 15-Nov-2012 04:59:11.4: Priority: W[0]=1.00 15-Nov-2012 04:59:11.4: Transit Altitude: W[1]=0.70 15-Nov-2012 04:59:11.4: Highest Altitude: W[6]=0.00 15-Nov-2012 04:59:11.4: Lateness: W[5]=0.00 15-Nov-2012 04:59:11.4: Slew Distance: W[2]=0.30 15-Nov-2012 04:59:11.4: Retry Count: W[3]=0.20 15-Nov-2012 04:59:11.4: Meridian Crossing: W[4]=0.30 15-Nov-2012 04:59:11.4: Obs Conditions: W[7]=0.40 15-Nov-2012 04:59:11.4: Rising Plan Delay: disabled 15-Nov-2012 04:59:12.4: Run statistics: 15-Nov-2012 04:59:12.4: Observations: 6 15-Nov-2012 04:59:12.4: Considered: 3 15-Nov-2012 04:59:12.4: Completed: 3 15-Nov-2012 04:59:12.4: Skipped: 0 15-Nov-2012 04:59:12.4: Never Eligible: 3 15-Nov-2012 04:59:12.4: Failed: 0 Log closed at Thu, Nov 15 2012 04:59:12 UTC (actual time)