Log opened at Wed, Nov 07 2012 02:07:21 UTC (actual time) Current log level is Debug Scheduler version 3.5.3 Multi-user license: Arne Henden 07-Nov-2012 02:07:21.8: Simulated clock initialized at 07-Nov-2012 02:07:21 UTC 07-Nov-2012 02:07:21.9: Loaded Constraint plugin AirMass 07-Nov-2012 02:07:21.9: Loaded Constraint plugin AirmassRange 07-Nov-2012 02:07:21.9: Loaded Constraint plugin Horizon 07-Nov-2012 02:07:21.9: Loaded Constraint plugin HourAngle 07-Nov-2012 02:07:21.9: Loaded Constraint plugin MoonAvoid 07-Nov-2012 02:07:21.9: Loaded Constraint plugin MoonDown 07-Nov-2012 02:07:21.9: Loaded Constraint plugin SkyCondition 07-Nov-2012 02:07:21.9: Loaded Constraint plugin TimeRange 07-Nov-2012 02:07:22.5: 42 plans are now pending. 07-Nov-2012 02:07:22.5: Attach ACP sequencer Log level changed from Debug to SuperDebug 07-Nov-2012 02:08:35.1: Dispatcher started at 07-Nov-2012 02:08:35 UTC 07-Nov-2012 02:08:35.1: Priority: W[0]=1.00 07-Nov-2012 02:08:35.1: Transit Altitude: W[1]=0.70 07-Nov-2012 02:08:35.1: Highest Altitude: W[6]=0.00 07-Nov-2012 02:08:35.1: Lateness: W[5]=0.00 07-Nov-2012 02:08:35.1: Slew Distance: W[2]=0.30 07-Nov-2012 02:08:35.1: Retry Count: W[3]=0.20 07-Nov-2012 02:08:35.1: Meridian Crossing: W[4]=0.30 07-Nov-2012 02:08:35.1: Obs Conditions: W[7]=0.40 07-Nov-2012 02:08:35.1: Rising Plan Delay: in effect 07-Nov-2012 02:08:36.1: ++ Observatory Startup ++ 07-Nov-2012 02:08:36.1: Start ACP Sequencer's StartupObs script 07-Nov-2012 02:08:46.1: Sequencer is now active 07-Nov-2012 02:08:51.7: Sequencer is no longer active 07-Nov-2012 02:08:52.3: SelectRunning: No running plans 07-Nov-2012 02:08:52.3: Obs CW_Mon in Plan CW_Mon was vetoed by AirMass constraint. 07-Nov-2012 02:08:52.3: AirMass estimates ready after 07-Nov-2012 07:00:25 UTC 07-Nov-2012 02:08:52.3: Rising plan delay enabled: 07-Nov-2012 02:08:52.3: TimeSpan: 859 sec. 07-Nov-2012 02:08:52.3: Centroid: ra=02.36 dec=32.72 07-Nov-2012 02:08:52.3: LST: 22.27 07-Nov-2012 02:08:52.3: HA: 04.09 07-Nov-2012 02:08:52.3: Plan HS_0218+3229 is rising, with 542 min. remaining to meet strict constraints. 07-Nov-2012 02:08:52.3: only 245 min till transit 07-Nov-2012 02:08:52.3: deferred (rising) for 245 min, until 07-Nov-2012 06:14:13 UTC 07-Nov-2012 02:08:52.3: Obs SA100_267 in Plan SA100_267 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.3: AirmassRange estimates ready after 07-Nov-2012 08:37:20 UTC 07-Nov-2012 02:08:52.3: Obs SA100_267 in Plan SA100_267 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.3: AirmassRange estimates ready after 07-Nov-2012 10:45:24 UTC 07-Nov-2012 02:08:52.3: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.3: AirmassRange estimates ready after 07-Nov-2012 11:38:52 UTC 07-Nov-2012 02:08:52.3: Obs SA103 in Plan SA103 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.3: AirmassRange estimates ready after 07-Nov-2012 13:46:46 UTC 07-Nov-2012 02:08:52.4: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 14:22:46 UTC 07-Nov-2012 02:08:52.4: Obs SA106 in Plan SA106 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 16:30:04 UTC 07-Nov-2012 02:08:52.4: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 19:33:29 UTC 07-Nov-2012 02:08:52.4: Obs SA109 in Plan SA109 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 17:26:23 UTC 07-Nov-2012 02:08:52.4: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 20:27:35 UTC 07-Nov-2012 02:08:52.4: Obs SA110 in Plan SA110 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 02:17:58 UTC 07-Nov-2012 02:08:52.4: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 03:12:58 UTC 07-Nov-2012 02:08:52.4: Obs SA111 in Plan SA111 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 21:23:21 UTC 07-Nov-2012 02:08:52.4: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 21:22:39 UTC 07-Nov-2012 02:08:52.4: Obs SA1119 in Plan SA1119 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 03:14:10 UTC 07-Nov-2012 02:08:52.4: Rising plan delay enabled: 07-Nov-2012 02:08:52.4: TimeSpan: 264 sec. 07-Nov-2012 02:08:52.4: Centroid: ra=20.71 dec=00.28 07-Nov-2012 02:08:52.4: LST: 22.19 07-Nov-2012 02:08:52.4: HA: 22.53 07-Nov-2012 02:08:52.4: Obs SA112_810 in Plan SA112_810 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 04:18:37 UTC 07-Nov-2012 02:08:52.4: Obs SA116_180 in Plan SA116_180 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 06:57:24 UTC 07-Nov-2012 02:08:52.4: Obs SA124_970 in Plan SA124_970 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 08:53:52 UTC 07-Nov-2012 02:08:52.4: Obs SA132 in Plan SA132 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 16:50:11 UTC 07-Nov-2012 02:08:52.4: Obs SA44_28 in Plan SA44_28 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.4: AirmassRange estimates ready after 07-Nov-2012 09:14:57 UTC 07-Nov-2012 02:08:52.5: Rising plan delay enabled: 07-Nov-2012 02:08:52.5: TimeSpan: 2559 sec. 07-Nov-2012 02:08:52.5: Centroid: ra=00.49 dec=30.38 07-Nov-2012 02:08:52.5: LST: 22.51 07-Nov-2012 02:08:52.5: HA: 01.98 07-Nov-2012 02:08:52.5: Plan SA44_28 is rising, with 349 min. remaining to meet strict constraints. 07-Nov-2012 02:08:52.5: only 118 min till transit 07-Nov-2012 02:08:52.5: deferred (rising) for 118 min, until 07-Nov-2012 04:07:44 UTC 07-Nov-2012 02:08:52.5: Obs SA52_56 in Plan SA52_56 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 07:03:18 UTC 07-Nov-2012 02:08:52.5: Obs SA52_56 in Plan SA52_56 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 09:00:58 UTC 07-Nov-2012 02:08:52.5: Rising plan delay enabled: 07-Nov-2012 02:08:52.5: TimeSpan: 299 sec. 07-Nov-2012 02:08:52.5: Centroid: ra=17.04 dec=29.76 07-Nov-2012 02:08:52.5: LST: 22.19 07-Nov-2012 02:08:52.5: HA: 18.85 07-Nov-2012 02:08:52.5: Obs SA61 in Plan SA61 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 17:30:20 UTC 07-Nov-2012 02:08:52.5: Rising plan delay enabled: 07-Nov-2012 02:08:52.5: TimeSpan: 264 sec. 07-Nov-2012 02:08:52.5: Centroid: ra=00.30 dec=15.85 07-Nov-2012 02:08:52.5: LST: 22.19 07-Nov-2012 02:08:52.5: HA: 02.12 07-Nov-2012 02:08:52.5: Plan SA68_216 is rising, with 311 min. remaining to meet strict constraints. 07-Nov-2012 02:08:52.5: only 127 min till transit 07-Nov-2012 02:08:52.5: deferred (rising) for 127 min, until 07-Nov-2012 04:15:53 UTC 07-Nov-2012 02:08:52.5: Obs SA68_216 in Plan SA68_216 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 08:34:13 UTC 07-Nov-2012 02:08:52.5: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 15:20:32 UTC 07-Nov-2012 02:08:52.5: Obs SA84 in Plan SA84 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 17:14:04 UTC 07-Nov-2012 02:08:52.5: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 03:41:16 UTC 07-Nov-2012 02:08:52.5: STRICT VETO: 07-Nov-2012 02:08:52.5: Obs SA93_317 in Plan SA93_317 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 09:30:54 UTC 07-Nov-2012 02:08:52.5: Obs SA96_171 in Plan SA96_171 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 06:41:31 UTC 07-Nov-2012 02:08:52.5: Obs SA96_171 in Plan SA96_171 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 04:34:31 UTC 07-Nov-2012 02:08:52.5: Obs SA98 in Plan SA98 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 08:43:21 UTC 07-Nov-2012 02:08:52.5: Obs SA98 in Plan SA98 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 06:35:52 UTC 07-Nov-2012 02:08:52.5: Obs SA99_438 in Plan SA99_438 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 09:46:11 UTC 07-Nov-2012 02:08:52.5: Obs SA99_438 in Plan SA99_438 was vetoed by AirmassRange constraint. 07-Nov-2012 02:08:52.5: AirmassRange estimates ready after 07-Nov-2012 07:38:55 UTC 07-Nov-2012 02:08:52.5: Obs SDSS_J075507 in Plan SDSS_J075507 was vetoed by AirMass constraint. 07-Nov-2012 02:08:52.5: AirMass estimates ready after 07-Nov-2012 07:39:44 UTC 07-Nov-2012 02:08:52.6: **EXCEPTION IN SCHEDULER: 07-Nov-2012 02:08:52.6: Object reference not set to an instance of an object. 07-Nov-2012 02:08:52.6: Traceback: at DC3.Scheduler.Engine.SelectAvailablePlans() at DC3.Scheduler.Engine.DoSchedulePass() at DC3.Scheduler.Engine.Run() 07-Nov-2012 02:08:52.6: Release ACP sequencer Log closed at Wed, Nov 07 2012 02:08:54 UTC (actual time)