Log opened at Mon, Mar 05 2012 01:47:20 UTC (actual time) Scheduler version 3.4.1 Multi-user license: Arne Henden 05-Mar-2012 02:00:37.0: Simulated clock initialized at 05-Mar-2012 02:00:37 UTC 05-Mar-2012 02:00:37.0: Loaded Constraint plugin AirMass 05-Mar-2012 02:00:37.0: Loaded Constraint plugin AirmassRange 05-Mar-2012 02:00:37.0: Loaded Constraint plugin Horizon 05-Mar-2012 02:00:37.0: Loaded Constraint plugin HourAngle 05-Mar-2012 02:00:37.0: Loaded Constraint plugin MoonAvoid 05-Mar-2012 02:00:37.0: Loaded Constraint plugin MoonDown 05-Mar-2012 02:00:37.0: Loaded Constraint plugin SkyCondition 05-Mar-2012 02:00:37.0: Loaded Constraint plugin TimeRange 05-Mar-2012 02:00:37.0: Attach ACP sequencer 05-Mar-2012 02:00:37.0: Weather successfully connected. 05-Mar-2012 01:00:37.0: Simulated clock time changed to 05-Mar-2012 01:00:37 UTC 05-Mar-2012 01:00:37.0: Simulated clock time changed to 05-Mar-2012 01:00:37 UTC 05-Mar-2012 00:00:37.0: Simulated clock time changed to 05-Mar-2012 00:00:37 UTC 05-Mar-2012 00:00:37.0: Simulated clock time changed to 05-Mar-2012 00:00:37 UTC 05-Mar-2012 00:00:37.0: ACP Weather safe for 10 min or more, returning safe 05-Mar-2012 00:00:37.0: ACP Weather safe for 10 min or more, returning safe 05-Mar-2012 00:00:37.0: ACP Weather safe for 10 min or more, returning safe 05-Mar-2012 00:00:37.0: ACP Weather safe for 10 min or more, returning safe 05-Mar-2012 00:00:37.0: Simulated clock started 05-Mar-2012 00:00:37.0: Dispatcher started at 05-Mar-2012 00:00:37 UTC 05-Mar-2012 00:00:37.0: Priority: W[0]=1.00 05-Mar-2012 00:00:37.0: Transit Altitude: W[1]=0.70 05-Mar-2012 00:00:37.0: Highest Altitude: W[6]=0.00 05-Mar-2012 00:00:37.0: Lateness: W[5]=0.00 05-Mar-2012 00:00:37.0: Slew Distance: W[2]=0.30 05-Mar-2012 00:00:37.0: Retry Count: W[3]=0.20 05-Mar-2012 00:00:37.0: Meridian Crossing: W[4]=0.30 05-Mar-2012 00:00:37.0: Obs Conditions: W[7]=0.40 05-Mar-2012 00:00:37.0: Rising Plan Delay: in effect 05-Mar-2012 00:05:37.0: Weather disconnected. 05-Mar-2012 00:05:37.0: ++ Observatory Startup ++ 05-Mar-2012 00:05:37.0: Startup attempted, but no StartupObs script found 05-Mar-2012 00:05:37.0: Weather successfully connected. 05-Mar-2012 02:00:37.0: **EXCEPTION IN SCHEDULER: 05-Mar-2012 02:00:37.0: The telescope is not connected. 05-Mar-2012 02:00:37.0: Traceback: at ACP.TelescopeClass.get_SlewSettleTime() at DC3.Scheduler.ACPSequencer.get_SlewSettleTime() at DC3.Scheduler.Engine.CalculateTimeSpans(Plan P, ArrayList OList) at DC3.Scheduler.Engine.DoSchedulePass() at DC3.Scheduler.Engine.Run() 04-Mar-2012 02:00:37.0: Simulated clock time changed to 04-Mar-2012 02:00:37 UTC 05-Mar-2012 02:00:37.0: Simulated clock time changed to 05-Mar-2012 02:00:37 UTC 05-Mar-2012 02:00:37.2: Run statistics: 05-Mar-2012 02:00:37.2: Observations: 43 05-Mar-2012 02:00:37.2: Considered: 0 05-Mar-2012 02:00:37.2: Completed: 0 05-Mar-2012 02:00:37.2: Skipped: 0 05-Mar-2012 02:00:37.2: Never Eligible: 43 05-Mar-2012 02:00:37.2: Failed: 0 05-Mar-2012 02:00:37.2: Shutter-Open efficiency: 0.00% 05-Mar-2012 02:00:37.2: Overall Efficiency: 0.00% 05-Mar-2012 02:00:37.2: Release ACP sequencer 05-Mar-2012 02:00:38.6: Simulated clock stopped Log closed at Mon, Mar 05 2012 01:49:00 UTC (actual time)