Log opened at Sun, Jan 29 2023 03:51:00 UTC (actual time) Current log level is Normal ACP Expert Scheduler Engine Version 9.0.4 Part of ACP Expert 9.0 Release Full license: Arne Henden 2023-01-29 03:51:00.1: REAL TIME internal clock initialized at 29-Jan-2023 03:51:00 UTC 2023-01-29 03:51:00.1: Dispatcher started at 29-Jan-2023 03:51:00 UTC 2023-01-29 03:51:00.4: Loaded Constraint plugin AirMass 2023-01-29 03:51:00.4: Loaded Constraint plugin AirmassRange 2023-01-29 03:51:00.4: Loaded Constraint plugin Horizon 2023-01-29 03:51:00.4: Loaded Constraint plugin HourAngle 2023-01-29 03:51:00.4: Loaded Constraint plugin MoonAvoid 2023-01-29 03:51:00.5: Loaded Constraint plugin MoonDown 2023-01-29 03:51:00.5: Loaded Constraint plugin SkyCondition 2023-01-29 03:51:00.5: Loaded Constraint plugin TimeRange 2023-01-29 03:51:01.4: 182 plans are now pending. 2023-01-29 03:51:01.4: Attach ACP sequencer 2023-01-29 03:51:07.6: Weather successfully connected. Wait for valid data... 2023-01-29 03:51:08.1: ==== Dispatcher is running in NORMAL (NIGHT) mode ==== 2023-01-29 03:51:08.1: Sequencer does sky flats 2023-01-29 03:51:12.6: ++ Weather Safe ++ 2023-01-29 03:51:19.0: ++ Observatory Startup ++ 2023-01-29 03:51:19.0: Weather safety is now disabled 2023-01-29 03:51:19.0: Start ACP Sequencer's StartupObs script 2023-01-29 03:52:06.3: Weather safety is re-enabled 2023-01-29 03:52:06.3: Observatory startup succeeded 2023-01-29 03:52:06.3: Periodic AF schedule reset. Interval is now 1.0 hours 2023-01-29 03:52:06.3: Last AutoFocus was completed at 22-Jan-2023 12:26:34 UTC 2023-01-29 03:52:06.3: Autofocus will be done ASAP. 2023-01-29 03:52:06.3: ++ Auto Focus ++ 2023-01-29 03:52:06.3: Doing periodic autofocus. 2023-01-29 03:52:06.3: Start special ACP AutoFocus script for scheduler 2023-01-29 03:56:02.7: Next periodic autofocus ASAP after 3600sec. 29-Jan-2023 04:55:44 UTC 2023-01-29 03:56:04.7: Plan V1674_Her has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan OI_158 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan GZ_Cnc has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan PKS_1510-089 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan HS1340+1524 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan OJ287 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan U_Leo has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan PV_Cep has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan J072816 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Plan M67 has Monitor Mode. Time to resubmit it. 2023-01-29 03:56:04.7: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-29 03:56:04.8: 301 min. remaining to meet strict constraints. 2023-01-29 03:56:04.8: 534 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.8: but only 99 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.8: deferred (rising) for 97 min, until 29-Jan-2023 05:33:28 UTC 2023-01-29 03:56:04.8: Rising plan delay enabled for Plan AO_Aur: 2023-01-29 03:56:04.8: 315 min. remaining to meet strict constraints. 2023-01-29 03:56:04.8: 543 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.8: but only 22 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.8: deferred (rising) for 21 min, until 29-Jan-2023 04:17:24 UTC 2023-01-29 03:56:04.8: Rising plan delay enabled for Plan AO_Aur: 2023-01-29 03:56:04.8: 315 min. remaining to meet strict constraints. 2023-01-29 03:56:04.8: 543 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.8: but only 22 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.8: deferred (rising) for 21 min, until 29-Jan-2023 04:17:31 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 03:56:04.9: 239 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 528 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 33 min, until 29-Jan-2023 04:29:57 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 03:56:04.9: 239 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 528 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 36 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 33 min, until 29-Jan-2023 04:29:57 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan CW_Mon: 2023-01-29 03:56:04.9: 290 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 545 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 71 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 71 min, until 29-Jan-2023 05:07:17 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan CW_Mon: 2023-01-29 03:56:04.9: 290 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 543 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 71 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 70 min, until 29-Jan-2023 05:06:30 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan FS_Aur: 2023-01-29 03:56:04.9: 309 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 540 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 20 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 19 min, until 29-Jan-2023 04:15:44 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan FS_Aur: 2023-01-29 03:56:04.9: 309 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 540 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 20 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 19 min, until 29-Jan-2023 04:15:44 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan GR_Ori: 2023-01-29 03:56:04.9: 218 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 544 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan GR_Ori: 2023-01-29 03:56:04.9: 218 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 544 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-29 03:56:04.9: 473 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 551 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 233 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 233 min, until 29-Jan-2023 07:49:48 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-29 03:56:04.9: 473 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 532 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 223 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 221 min, until 29-Jan-2023 07:37:59 UTC 2023-01-29 03:56:04.9: Rising plan delay enabled for Plan HQ_Mon: 2023-01-29 03:56:04.9: 327 min. remaining to meet strict constraints. 2023-01-29 03:56:04.9: 540 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:04.9: but only 104 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:04.9: deferred (rising) for 103 min, until 29-Jan-2023 05:39:16 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan HQ_Mon: 2023-01-29 03:56:05.0: 327 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 540 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 104 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 103 min, until 29-Jan-2023 05:39:16 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan J072816: 2023-01-29 03:56:05.0: 504 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 524 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 112 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 110 min, until 29-Jan-2023 05:46:19 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan J072816: 2023-01-29 03:56:05.0: 504 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 551 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 126 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 126 min, until 29-Jan-2023 06:02:32 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan KN_Lyn: 2023-01-29 03:56:05.0: 532 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 518 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 157 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 154 min, until 29-Jan-2023 06:30:40 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan L1022_IRS: 2023-01-29 03:56:05.0: 281 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 541 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 90 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 89 min, until 29-Jan-2023 05:25:30 UTC 2023-01-29 03:56:05.0: Rising plan delay enabled for Plan L1022_IRS: 2023-01-29 03:56:05.0: 281 min. remaining to meet strict constraints. 2023-01-29 03:56:05.0: 541 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.0: but only 90 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.0: deferred (rising) for 89 min, until 29-Jan-2023 05:25:30 UTC 2023-01-29 03:56:05.1: Plan M67 deferred, too early 2023-01-29 03:56:05.1: Rising plan delay enabled for Plan M67: 2023-01-29 03:56:05.1: 456 min. remaining to meet strict constraints. 2023-01-29 03:56:05.1: 551 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.1: 3123 min. remaining for the plan to fit before "must run before" time. 2023-01-29 03:56:05.1: but only 209 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.1: deferred (rising) for 209 min, until 29-Jan-2023 07:25:22 UTC 2023-01-29 03:56:05.1: Plan Melotte_111 deferred, too early 2023-01-29 03:56:05.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-29 03:56:05.1: 351 min. remaining to meet strict constraints. 2023-01-29 03:56:05.1: 494 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.1: but only 58 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.1: deferred (rising) for 52 min, until 29-Jan-2023 04:48:28 UTC 2023-01-29 03:56:05.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-29 03:56:05.1: 351 min. remaining to meet strict constraints. 2023-01-29 03:56:05.1: 518 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.1: but only 70 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.1: deferred (rising) for 67 min, until 29-Jan-2023 05:03:13 UTC 2023-01-29 03:56:05.1: Rising plan delay enabled for Plan NGC_1904: 2023-01-29 03:56:05.1: 84 min. remaining to meet strict constraints. 2023-01-29 03:56:05.1: 532 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.1: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.1: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.2: Plan NGC_7790 deferred, too early 2023-01-29 03:56:05.2: Rising plan delay enabled for Plan NQ_Gem: 2023-01-29 03:56:05.2: 404 min. remaining to meet strict constraints. 2023-01-29 03:56:05.2: 543 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.2: but only 125 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.2: deferred (rising) for 125 min, until 29-Jan-2023 06:01:10 UTC 2023-01-29 03:56:05.2: Rising plan delay enabled for Plan OI_158: 2023-01-29 03:56:05.2: 396 min. remaining to meet strict constraints. 2023-01-29 03:56:05.2: 537 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.2: but only 129 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.2: deferred (rising) for 127 min, until 29-Jan-2023 06:03:57 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan OI_158: 2023-01-29 03:56:05.3: 396 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 551 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 136 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 136 min, until 29-Jan-2023 06:12:20 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan OJ287: 2023-01-29 03:56:05.3: 478 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 533 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 203 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 201 min, until 29-Jan-2023 07:17:50 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan OJ287: 2023-01-29 03:56:05.3: 478 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 551 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 212 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 212 min, until 29-Jan-2023 07:28:49 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan QX_Pup: 2023-01-29 03:56:05.3: 295 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 539 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 133 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 132 min, until 29-Jan-2023 06:08:38 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan QZ_Aur: 2023-01-29 03:56:05.3: 298 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 521 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan QZ_Aur: 2023-01-29 03:56:05.3: 298 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 521 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan RY_Lep: 2023-01-29 03:56:05.3: 149 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 522 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 12 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 9 min, until 29-Jan-2023 04:05:18 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan S_Ori: 2023-01-29 03:56:05.3: 206 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 534 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan S5_0716+714: 2023-01-29 03:56:05.3: 485 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 547 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 117 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 117 min, until 29-Jan-2023 05:53:27 UTC 2023-01-29 03:56:05.3: [AirmassRange] Target will never be below the maximum air mass 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan SU_Lyn: 2023-01-29 03:56:05.3: 412 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 545 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 77 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 77 min, until 29-Jan-2023 05:13:25 UTC 2023-01-29 03:56:05.3: Rising plan delay enabled for Plan SU_Lyn: 2023-01-29 03:56:05.3: 412 min. remaining to meet strict constraints. 2023-01-29 03:56:05.3: 547 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.3: but only 78 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.3: deferred (rising) for 78 min, until 29-Jan-2023 05:14:30 UTC 2023-01-29 03:56:05.4: Rising plan delay enabled for Plan V1261_Ori: 2023-01-29 03:56:05.4: 184 min. remaining to meet strict constraints. 2023-01-29 03:56:05.4: 547 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.4: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.4: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.4: Rising plan delay enabled for Plan V1647_Ori: 2023-01-29 03:56:05.4: 239 min. remaining to meet strict constraints. 2023-01-29 03:56:05.4: 536 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.4: but only 17 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.4: deferred (rising) for 15 min, until 29-Jan-2023 04:11:33 UTC 2023-01-29 03:56:05.4: [AirmassRange] Target will never be below the maximum air mass 2023-01-29 03:56:05.4: [AirmassRange] Target will never be below the maximum air mass 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V582_Aur: 2023-01-29 03:56:05.5: 298 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 541 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V582_Aur: 2023-01-29 03:56:05.5: 298 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 541 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only -1 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: ending rising plan delay. Plan is now eligible. 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 03:56:05.5: 304 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 477 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: 86583 min. remaining for the plan to fit before "must run before" time. 2023-01-29 03:56:05.5: but only 65 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: deferred (rising) for 57 min, until 29-Jan-2023 04:53:51 UTC 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 03:56:05.5: 304 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 465 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only 59 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: deferred (rising) for 50 min, until 29-Jan-2023 04:46:33 UTC 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 03:56:05.5: 337 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 529 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only 91 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: deferred (rising) for 88 min, until 29-Jan-2023 05:24:51 UTC 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V900_Mon: 2023-01-29 03:56:05.5: 280 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 527 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only 83 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: deferred (rising) for 80 min, until 29-Jan-2023 05:16:51 UTC 2023-01-29 03:56:05.5: Rising plan delay enabled for Plan V900_Mon: 2023-01-29 03:56:05.5: 280 min. remaining to meet strict constraints. 2023-01-29 03:56:05.5: 527 min. remaining for the plan to fit before dawn. 2023-01-29 03:56:05.5: but only 83 min till start so Plan transits mid-way in its time span. 2023-01-29 03:56:05.5: deferred (rising) for 80 min, until 29-Jan-2023 05:16:51 UTC 2023-01-29 03:56:05.8: Dispatcher cycle time: 3.0 sec. 2023-01-29 03:56:05.8: Acquire data for Observation HQ_Per... 2023-01-29 03:56:05.8: (belongs to Project AAVSO_MISC_WEL_AUTO_ver3426, Plan HQ_Per) 2023-01-29 03:56:05.8: Send Observation HQ_Per to ACP Sequencer 2023-01-29 04:08:44.6: Acquisition time: 758.8522244 sec. 2023-01-29 04:08:44.6: Data for Observation HQ_Per of Plan HQ_Per acquired successfully. 2023-01-29 04:08:44.6: Plan HQ_Per completed successfully. 2023-01-29 04:08:44.6: Image Efficiency: 50.0% 2023-01-29 04:08:44.6: Cycle Efficiency: 99.6% 2023-01-29 04:08:44.8: Rising plan delay enabled for Plan Mrk_180: 2023-01-29 04:08:44.8: 720 min. remaining to meet strict constraints. 2023-01-29 04:08:44.8: 534 min. remaining for the plan to fit before dawn. 2023-01-29 04:08:44.8: but only 359 min till start so Plan transits mid-way in its time span. 2023-01-29 04:08:44.8: deferred (rising) for 358 min, until 29-Jan-2023 10:07:19 UTC 2023-01-29 04:08:44.8: Rising plan delay enabled for Plan RY_Lep: 2023-01-29 04:08:44.8: 137 min. remaining to meet strict constraints. 2023-01-29 04:08:44.8: 510 min. remaining for the plan to fit before dawn. 2023-01-29 04:08:44.8: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 04:08:44.8: ending rising plan delay. Plan is now eligible. 2023-01-29 04:08:45.1: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:08:45.1: Acquire data for Observation V582_Aur... 2023-01-29 04:08:45.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan V582_Aur) 2023-01-29 04:08:45.1: Send Observation V582_Aur to ACP Sequencer 2023-01-29 04:19:10.0: Acquisition time: 624.9612686 sec. 2023-01-29 04:19:10.0: Data for Observation V582_Aur of Plan V582_Aur acquired successfully. 2023-01-29 04:19:10.0: Plan V582_Aur completed successfully. 2023-01-29 04:19:10.0: Image Efficiency: 67.2% 2023-01-29 04:19:10.0: Cycle Efficiency: 99.9% 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan AO_Aur: 2023-01-29 04:19:10.2: 292 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 520 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan AO_Aur: 2023-01-29 04:19:10.2: 292 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 520 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan FS_Aur: 2023-01-29 04:19:10.2: 285 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 517 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan FS_Aur: 2023-01-29 04:19:10.2: 285 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 517 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only -2 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan R_Leo: 2023-01-29 04:19:10.2: 488 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 516 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only 236 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: deferred (rising) for 234 min, until 29-Jan-2023 08:14:07 UTC 2023-01-29 04:19:10.2: Rising plan delay enabled for Plan RY_Lep: 2023-01-29 04:19:10.2: 126 min. remaining to meet strict constraints. 2023-01-29 04:19:10.2: 499 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.2: but only -10 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.3: Rising plan delay enabled for Plan V1647_Ori: 2023-01-29 04:19:10.3: 216 min. remaining to meet strict constraints. 2023-01-29 04:19:10.3: 513 min. remaining for the plan to fit before dawn. 2023-01-29 04:19:10.3: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-29 04:19:10.3: ending rising plan delay. Plan is now eligible. 2023-01-29 04:19:10.5: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:19:10.5: Acquire data for Observation V1261_Ori... 2023-01-29 04:19:10.5: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3426, Plan V1261_Ori) 2023-01-29 04:19:10.5: Send Observation V1261_Ori to ACP Sequencer 2023-01-29 04:24:15.4: Acquisition time: 304.9143103 sec. 2023-01-29 04:24:15.4: Data for Observation V1261_Ori of Plan V1261_Ori acquired successfully. 2023-01-29 04:24:15.4: Plan V1261_Ori completed successfully. 2023-01-29 04:24:15.4: Image Efficiency: 45.9% 2023-01-29 04:24:15.4: Cycle Efficiency: 99.9% 2023-01-29 04:24:15.8: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:24:15.8: Acquire data for Observation V370_And... 2023-01-29 04:24:15.8: (belongs to Project AAVSO_MISC_FGU_AUTO_ver2706, Plan V370_And) 2023-01-29 04:24:15.8: Send Observation V370_And to ACP Sequencer 2023-01-29 04:27:34.8: Acquisition time: 198.9936308 sec. 2023-01-29 04:27:34.8: Data for Observation V370_And of Plan V370_And acquired successfully. 2023-01-29 04:27:34.8: Plan V370_And completed successfully. 2023-01-29 04:27:34.8: Image Efficiency: 10.0% 2023-01-29 04:27:34.8: Cycle Efficiency: 99.8% 2023-01-29 04:27:35.2: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:27:35.2: Acquire data for Observation AX_Per... 2023-01-29 04:27:35.2: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3426, Plan AX_Per) 2023-01-29 04:27:35.2: Send Observation AX_Per to ACP Sequencer 2023-01-29 04:32:04.0: Acquisition time: 268.8121628 sec. 2023-01-29 04:32:04.0: Data for Observation AX_Per of Plan AX_Per acquired successfully. 2023-01-29 04:32:04.0: Plan AX_Per completed successfully. 2023-01-29 04:32:04.0: Image Efficiency: 55.7% 2023-01-29 04:32:04.0: Cycle Efficiency: 99.9% 2023-01-29 04:32:04.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 04:32:04.2: 203 min. remaining to meet strict constraints. 2023-01-29 04:32:04.2: 492 min. remaining for the plan to fit before dawn. 2023-01-29 04:32:04.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 04:32:04.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:32:04.2: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 04:32:04.2: 203 min. remaining to meet strict constraints. 2023-01-29 04:32:04.2: 492 min. remaining for the plan to fit before dawn. 2023-01-29 04:32:04.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 04:32:04.2: ending rising plan delay. Plan is now eligible. 2023-01-29 04:32:04.4: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:32:04.4: Acquire data for Observation B0133+47... 2023-01-29 04:32:04.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan B0133+47) 2023-01-29 04:32:04.4: Send Observation B0133+47 to ACP Sequencer 2023-01-29 04:43:45.0: Acquisition time: 700.5462053 sec. 2023-01-29 04:43:45.0: Data for Observation B0133+47 of Plan B0133+47 acquired successfully. 2023-01-29 04:43:45.0: Plan B0133+47 completed successfully. 2023-01-29 04:43:45.0: Image Efficiency: 77.0% 2023-01-29 04:43:45.0: Cycle Efficiency: 100.0% 2023-01-29 04:43:45.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 04:43:45.1: 191 min. remaining to meet strict constraints. 2023-01-29 04:43:45.1: 481 min. remaining for the plan to fit before dawn. 2023-01-29 04:43:45.1: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-29 04:43:45.1: ending rising plan delay. Plan is now eligible. 2023-01-29 04:43:45.1: Rising plan delay enabled for Plan CSS091110:060919-064155: 2023-01-29 04:43:45.1: 191 min. remaining to meet strict constraints. 2023-01-29 04:43:45.1: 481 min. remaining for the plan to fit before dawn. 2023-01-29 04:43:45.1: but only -11 min till start so Plan transits mid-way in its time span. 2023-01-29 04:43:45.1: ending rising plan delay. Plan is now eligible. 2023-01-29 04:43:45.4: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:43:45.4: Acquire data for Observation YZ_Aur... 2023-01-29 04:43:45.4: (belongs to Project AAVSO_DCEP_HQA_AUTO_ver3426, Plan YZ_Aur) 2023-01-29 04:43:45.4: Send Observation YZ_Aur to ACP Sequencer 2023-01-29 04:52:08.5: Acquisition time: 503.1297621 sec. 2023-01-29 04:52:08.5: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2023-01-29 04:52:08.5: Plan YZ_Aur completed successfully. 2023-01-29 04:52:08.5: Image Efficiency: 23.6% 2023-01-29 04:52:08.5: Cycle Efficiency: 99.9% 2023-01-29 04:52:08.7: Rising plan delay enabled for Plan MP_Gem: 2023-01-29 04:52:08.7: 295 min. remaining to meet strict constraints. 2023-01-29 04:52:08.7: 438 min. remaining for the plan to fit before dawn. 2023-01-29 04:52:08.7: but only 2 min till start so Plan transits mid-way in its time span. 2023-01-29 04:52:08.7: ending rising plan delay. Plan is now eligible. 2023-01-29 04:52:08.8: Rising plan delay enabled for Plan U_Leo: 2023-01-29 04:52:08.8: 497 min. remaining to meet strict constraints. 2023-01-29 04:52:08.8: 495 min. remaining for the plan to fit before dawn. 2023-01-29 04:52:08.8: but only 245 min till start so Plan transits mid-way in its time span. 2023-01-29 04:52:08.8: deferred (rising) for 245 min, until 29-Jan-2023 08:57:49 UTC 2023-01-29 04:52:08.8: Rising plan delay enabled for Plan U_Leo: 2023-01-29 04:52:08.8: 497 min. remaining to meet strict constraints. 2023-01-29 04:52:08.8: 486 min. remaining for the plan to fit before dawn. 2023-01-29 04:52:08.8: but only 240 min till start so Plan transits mid-way in its time span. 2023-01-29 04:52:08.8: deferred (rising) for 239 min, until 29-Jan-2023 08:52:06 UTC 2023-01-29 04:52:08.8: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 04:52:08.8: 248 min. remaining to meet strict constraints. 2023-01-29 04:52:08.8: 409 min. remaining for the plan to fit before dawn. 2023-01-29 04:52:08.8: but only 3 min till start so Plan transits mid-way in its time span. 2023-01-29 04:52:08.8: ending rising plan delay. Plan is now eligible. 2023-01-29 04:52:09.0: Dispatcher cycle time: 0.3 sec. 2023-01-29 04:52:09.0: Acquire data for Observation CSS091110:060919-064155... 2023-01-29 04:52:09.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan CSS091110:060919-064155) 2023-01-29 04:52:09.0: Send Observation CSS091110:060919-064155 to ACP Sequencer 2023-01-29 05:15:06.5: Acquisition time: 1377.5425621 sec. 2023-01-29 05:15:06.5: Data for Observation CSS091110:060919-064155 of Plan CSS091110:060919-064155 acquired successfully. 2023-01-29 05:15:06.5: Plan CSS091110:060919-064155 completed successfully. 2023-01-29 05:15:06.5: Image Efficiency: 69.7% 2023-01-29 05:15:06.5: Cycle Efficiency: 100.0% 2023-01-29 05:15:06.6: ++ Auto Focus ++ 2023-01-29 05:15:06.6: Doing periodic autofocus. 2023-01-29 05:15:06.6: Start special ACP AutoFocus script for scheduler 2023-01-29 05:18:38.0: Next periodic autofocus ASAP after 7200sec. 29-Jan-2023 07:18:19 UTC 2023-01-29 05:18:38.1: Rising plan delay enabled for Plan BX_Pup: 2023-01-29 05:18:38.1: 153 min. remaining to meet strict constraints. 2023-01-29 05:18:38.1: 458 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.1: but only 64 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.1: deferred (rising) for 63 min, until 29-Jan-2023 06:21:51 UTC 2023-01-29 05:18:38.1: Rising plan delay enabled for Plan BX_Pup: 2023-01-29 05:18:38.1: 153 min. remaining to meet strict constraints. 2023-01-29 05:18:38.1: 458 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.1: but only 64 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.1: deferred (rising) for 63 min, until 29-Jan-2023 06:21:51 UTC 2023-01-29 05:18:38.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-29 05:18:38.1: 269 min. remaining to meet strict constraints. 2023-01-29 05:18:38.1: 411 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.1: but only -24 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.1: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.1: Rising plan delay enabled for Plan MP_Gem: 2023-01-29 05:18:38.1: 269 min. remaining to meet strict constraints. 2023-01-29 05:18:38.1: 436 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.1: but only -12 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.1: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.2: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 05:18:38.2: 221 min. remaining to meet strict constraints. 2023-01-29 05:18:38.2: 382 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.2: but only -23 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.2: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.2: Rising plan delay enabled for Plan V838_Mon: 2023-01-29 05:18:38.2: 221 min. remaining to meet strict constraints. 2023-01-29 05:18:38.2: 394 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.2: 86501 min. remaining for the plan to fit before "must run before" time. 2023-01-29 05:18:38.2: but only -17 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.2: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.2: Rising plan delay enabled for Plan V900_Mon: 2023-01-29 05:18:38.2: 198 min. remaining to meet strict constraints. 2023-01-29 05:18:38.2: 444 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.2: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.2: Rising plan delay enabled for Plan V900_Mon: 2023-01-29 05:18:38.2: 198 min. remaining to meet strict constraints. 2023-01-29 05:18:38.2: 444 min. remaining for the plan to fit before dawn. 2023-01-29 05:18:38.2: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 05:18:38.2: ending rising plan delay. Plan is now eligible. 2023-01-29 05:18:38.3: Dispatcher cycle time: 0.3 sec. 2023-01-29 05:18:38.3: Acquire data for Observation RY_Lep... 2023-01-29 05:18:38.3: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3426, Plan RY_Lep) 2023-01-29 05:18:38.3: Send Observation RY_Lep to ACP Sequencer 2023-01-29 05:38:43.6: Acquisition time: 1205.2333013 sec. 2023-01-29 05:38:43.6: Data for Observation RY_Lep of Plan RY_Lep acquired successfully. 2023-01-29 05:38:43.6: Plan RY_Lep completed successfully. 2023-01-29 05:38:43.6: Image Efficiency: 5.7% 2023-01-29 05:38:43.6: Cycle Efficiency: 100.0% 2023-01-29 05:38:43.7: Rising plan delay enabled for Plan 2MASS_J07092139-1029344: 2023-01-29 05:38:43.7: 198 min. remaining to meet strict constraints. 2023-01-29 05:38:43.7: 432 min. remaining for the plan to fit before dawn. 2023-01-29 05:38:43.7: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 05:38:43.7: ending rising plan delay. Plan is now eligible. 2023-01-29 05:38:43.8: Rising plan delay enabled for Plan IU_Leo: 2023-01-29 05:38:43.8: 473 min. remaining to meet strict constraints. 2023-01-29 05:38:43.8: 435 min. remaining for the plan to fit before dawn. 2023-01-29 05:38:43.8: but only 225 min till start so Plan transits mid-way in its time span. 2023-01-29 05:38:43.8: deferred (rising) for 224 min, until 29-Jan-2023 09:23:14 UTC 2023-01-29 05:38:43.8: Rising plan delay enabled for Plan IU_Leo: 2023-01-29 05:38:43.8: 473 min. remaining to meet strict constraints. 2023-01-29 05:38:43.8: 435 min. remaining for the plan to fit before dawn. 2023-01-29 05:38:43.8: but only 225 min till start so Plan transits mid-way in its time span. 2023-01-29 05:38:43.8: deferred (rising) for 224 min, until 29-Jan-2023 09:23:14 UTC 2023-01-29 05:38:44.1: Dispatcher cycle time: 0.3 sec. 2023-01-29 05:38:44.1: Acquire data for Observation TV_Cam... 2023-01-29 05:38:44.1: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan TV_Cam) 2023-01-29 05:38:44.1: Send Observation TV_Cam to ACP Sequencer 2023-01-29 05:44:12.2: ACP data acquisition failed for Observation TV_Cam. 2023-01-29 05:44:12.2: (Observation TV_Cam interrupted by acquisition process failure.) 2023-01-29 05:44:12.4: Rising plan delay enabled for Plan HQ_Mon: 2023-01-29 05:44:12.4: 219 min. remaining to meet strict constraints. 2023-01-29 05:44:12.4: 432 min. remaining for the plan to fit before dawn. 2023-01-29 05:44:12.4: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 05:44:12.4: ending rising plan delay. Plan is now eligible. 2023-01-29 05:44:12.4: Rising plan delay enabled for Plan HQ_Mon: 2023-01-29 05:44:12.4: 219 min. remaining to meet strict constraints. 2023-01-29 05:44:12.4: 432 min. remaining for the plan to fit before dawn. 2023-01-29 05:44:12.4: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 05:44:12.4: ending rising plan delay. Plan is now eligible. 2023-01-29 05:44:12.7: Dispatcher cycle time: 0.3 sec. 2023-01-29 05:44:12.7: Acquire data for Observation HQ_Mon... 2023-01-29 05:44:12.7: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan HQ_Mon) 2023-01-29 05:44:12.7: Send Observation HQ_Mon to ACP Sequencer 2023-01-29 05:57:09.2: Acquisition time: 776.5838355 sec. 2023-01-29 05:57:09.2: Data for Observation HQ_Mon of Plan HQ_Mon acquired successfully. 2023-01-29 05:57:09.3: Plan HQ_Mon completed successfully. 2023-01-29 05:57:09.3: Image Efficiency: 69.5% 2023-01-29 05:57:09.3: Cycle Efficiency: 100.0% 2023-01-29 05:57:09.4: Rising plan delay enabled for Plan J072816: 2023-01-29 05:57:09.4: 383 min. remaining to meet strict constraints. 2023-01-29 05:57:09.4: 403 min. remaining for the plan to fit before dawn. 2023-01-29 05:57:09.4: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-29 05:57:09.4: ending rising plan delay. Plan is now eligible. 2023-01-29 05:57:09.7: Dispatcher cycle time: 0.3 sec. 2023-01-29 05:57:09.7: Acquire data for Observation CSS091110:060919-064155... 2023-01-29 05:57:09.7: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan CSS091110:060919-064155) 2023-01-29 05:57:09.7: Send Observation CSS091110:060919-064155 to ACP Sequencer 2023-01-29 06:19:08.4: Acquisition time: 1318.6468616 sec. 2023-01-29 06:19:08.4: Data for Observation CSS091110:060919-064155 of Plan CSS091110:060919-064155 acquired successfully. 2023-01-29 06:19:08.4: Plan CSS091110:060919-064155 completed successfully. 2023-01-29 06:19:08.4: Image Efficiency: 72.8% 2023-01-29 06:19:08.4: Cycle Efficiency: 100.0% 2023-01-29 06:19:08.9: Dispatcher cycle time: 0.4 sec. 2023-01-29 06:19:08.9: Acquire data for Observation SU_Lyn... 2023-01-29 06:19:08.9: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3426, Plan SU_Lyn) 2023-01-29 06:19:08.9: Send Observation SU_Lyn to ACP Sequencer 2023-01-29 06:27:42.4: Acquisition time: 513.520855 sec. 2023-01-29 06:27:42.4: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2023-01-29 06:27:42.4: Plan SU_Lyn completed successfully. 2023-01-29 06:27:42.4: Image Efficiency: 41.8% 2023-01-29 06:27:42.4: Cycle Efficiency: 99.9% 2023-01-29 06:27:42.6: Rising plan delay enabled for Plan BX_Pup: 2023-01-29 06:27:42.6: 84 min. remaining to meet strict constraints. 2023-01-29 06:27:42.6: 389 min. remaining for the plan to fit before dawn. 2023-01-29 06:27:42.6: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-29 06:27:42.6: ending rising plan delay. Plan is now eligible. 2023-01-29 06:27:42.6: Rising plan delay enabled for Plan BX_Pup: 2023-01-29 06:27:42.6: 84 min. remaining to meet strict constraints. 2023-01-29 06:27:42.6: 389 min. remaining for the plan to fit before dawn. 2023-01-29 06:27:42.6: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-29 06:27:42.6: ending rising plan delay. Plan is now eligible. 2023-01-29 06:27:42.9: Dispatcher cycle time: 0.4 sec. 2023-01-29 06:27:42.9: Acquire data for Observation BX_Pup... 2023-01-29 06:27:42.9: (belongs to Project AAVSO_ZCAM_HQA_AUTO_ver2706, Plan BX_Pup) 2023-01-29 06:27:42.9: Send Observation BX_Pup to ACP Sequencer 2023-01-29 06:40:17.5: Acquisition time: 754.6082033 sec. 2023-01-29 06:40:17.5: Data for Observation BX_Pup of Plan BX_Pup acquired successfully. 2023-01-29 06:40:17.5: Plan BX_Pup completed successfully. 2023-01-29 06:40:17.5: Image Efficiency: 71.5% 2023-01-29 06:40:17.5: Cycle Efficiency: 99.9% 2023-01-29 06:40:17.7: Rising plan delay enabled for Plan KN_Lyn: 2023-01-29 06:40:17.7: 368 min. remaining to meet strict constraints. 2023-01-29 06:40:17.7: 354 min. remaining for the plan to fit before dawn. 2023-01-29 06:40:17.7: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-29 06:40:17.7: ending rising plan delay. Plan is now eligible. 2023-01-29 06:40:17.7: Rising plan delay enabled for Plan PKS_1222+216: 2023-01-29 06:40:17.7: 526 min. remaining to meet strict constraints. 2023-01-29 06:40:17.7: 380 min. remaining for the plan to fit before dawn. 2023-01-29 06:40:17.7: but only 254 min till start so Plan transits mid-way in its time span. 2023-01-29 06:40:17.7: deferred (rising) for 253 min, until 29-Jan-2023 10:54:09 UTC 2023-01-29 06:40:17.7: Rising plan delay enabled for Plan RZ_Leo: 2023-01-29 06:40:17.7: 431 min. remaining to meet strict constraints. 2023-01-29 06:40:17.7: 373 min. remaining for the plan to fit before dawn. 2023-01-29 06:40:17.7: but only 203 min till start so Plan transits mid-way in its time span. 2023-01-29 06:40:17.7: deferred (rising) for 202 min, until 29-Jan-2023 10:02:33 UTC 2023-01-29 06:40:18.0: Dispatcher cycle time: 0.3 sec. 2023-01-29 06:40:18.0: Acquire data for Observation V1647_Ori... 2023-01-29 06:40:18.0: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan V1647_Ori) 2023-01-29 06:40:18.0: Send Observation V1647_Ori to ACP Sequencer 2023-01-29 06:42:14.1: ACP data acquisition failed for Observation V1647_Ori. 2023-01-29 06:42:14.1: (Observation V1647_Ori interrupted by acquisition process failure.) 2023-01-29 06:42:14.3: Rising plan delay enabled for Plan KN_Lyn: 2023-01-29 06:42:14.3: 366 min. remaining to meet strict constraints. 2023-01-29 06:42:14.3: 352 min. remaining for the plan to fit before dawn. 2023-01-29 06:42:14.3: but only -8 min till start so Plan transits mid-way in its time span. 2023-01-29 06:42:14.3: ending rising plan delay. Plan is now eligible. 2023-01-29 06:42:14.6: Dispatcher cycle time: 0.3 sec. 2023-01-29 06:42:14.6: Acquire data for Observation YZ_Aur... 2023-01-29 06:42:14.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan YZ_Aur) 2023-01-29 06:42:14.6: Send Observation YZ_Aur to ACP Sequencer 2023-01-29 06:51:35.6: Acquisition time: 560.9956811 sec. 2023-01-29 06:51:35.6: Data for Observation YZ_Aur of Plan YZ_Aur acquired successfully. 2023-01-29 06:51:35.6: Plan YZ_Aur completed successfully. 2023-01-29 06:51:35.6: Image Efficiency: 31.0% 2023-01-29 06:51:35.6: Cycle Efficiency: 99.9% 2023-01-29 06:51:35.7: Rising plan delay enabled for Plan IR_Com: 2023-01-29 06:51:35.7: 529 min. remaining to meet strict constraints. 2023-01-29 06:51:35.7: 362 min. remaining for the plan to fit before dawn. 2023-01-29 06:51:35.7: but only 254 min till start so Plan transits mid-way in its time span. 2023-01-29 06:51:35.7: deferred (rising) for 252 min, until 29-Jan-2023 11:04:33 UTC 2023-01-29 06:51:35.7: Rising plan delay enabled for Plan IR_Com: 2023-01-29 06:51:35.7: 529 min. remaining to meet strict constraints. 2023-01-29 06:51:35.7: 362 min. remaining for the plan to fit before dawn. 2023-01-29 06:51:35.7: but only 254 min till start so Plan transits mid-way in its time span. 2023-01-29 06:51:35.7: deferred (rising) for 252 min, until 29-Jan-2023 11:04:33 UTC 2023-01-29 06:51:36.0: Dispatcher cycle time: 0.3 sec. 2023-01-29 06:51:36.0: Acquire data for Observation CW_Mon... 2023-01-29 06:51:36.0: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3426, Plan CW_Mon) 2023-01-29 06:51:36.0: Send Observation CW_Mon to ACP Sequencer 2023-01-29 07:00:35.2: Acquisition time: 539.190633 sec. 2023-01-29 07:00:35.2: Data for Observation CW_Mon of Plan CW_Mon acquired successfully. 2023-01-29 07:00:35.2: Plan CW_Mon completed successfully. 2023-01-29 07:00:35.2: Image Efficiency: 66.7% 2023-01-29 07:00:35.2: Cycle Efficiency: 99.9% 2023-01-29 07:00:35.6: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:00:35.6: Acquire data for Observation GR_Ori... 2023-01-29 07:00:35.6: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan GR_Ori) 2023-01-29 07:00:35.7: Send Observation GR_Ori to ACP Sequencer 2023-01-29 07:08:59.5: Acquisition time: 503.8428146 sec. 2023-01-29 07:08:59.5: Data for Observation GR_Ori of Plan GR_Ori acquired successfully. 2023-01-29 07:08:59.5: Plan GR_Ori completed successfully. 2023-01-29 07:08:59.5: Image Efficiency: 53.6% 2023-01-29 07:08:59.5: Cycle Efficiency: 99.9% 2023-01-29 07:08:59.9: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:08:59.9: Acquire data for Observation QZ_Aur... 2023-01-29 07:08:59.9: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan QZ_Aur) 2023-01-29 07:08:59.9: Send Observation QZ_Aur to ACP Sequencer 2023-01-29 07:22:52.6: ACP data acquisition failed for Observation QZ_Aur. 2023-01-29 07:22:52.6: (Observation QZ_Aur interrupted by acquisition process failure.) 2023-01-29 07:22:52.7: ++ Auto Focus ++ 2023-01-29 07:22:52.7: Doing periodic autofocus. 2023-01-29 07:22:52.7: Start special ACP AutoFocus script for scheduler 2023-01-29 07:26:53.4: Next periodic autofocus ASAP after 7200sec. 29-Jan-2023 09:26:34 UTC 2023-01-29 07:26:53.5: Rising plan delay enabled for Plan OJ287: 2023-01-29 07:26:53.5: 267 min. remaining to meet strict constraints. 2023-01-29 07:26:53.5: 322 min. remaining for the plan to fit before dawn. 2023-01-29 07:26:53.5: but only -7 min till start so Plan transits mid-way in its time span. 2023-01-29 07:26:53.5: ending rising plan delay. Plan is now eligible. 2023-01-29 07:26:53.8: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:26:53.8: Acquire data for Observation FS_Aur... 2023-01-29 07:26:53.8: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan FS_Aur) 2023-01-29 07:26:53.8: Send Observation FS_Aur to ACP Sequencer 2023-01-29 07:38:38.9: Acquisition time: 705.1186922 sec. 2023-01-29 07:38:38.9: Data for Observation FS_Aur of Plan FS_Aur acquired successfully. 2023-01-29 07:38:38.9: Plan FS_Aur completed successfully. 2023-01-29 07:38:38.9: Image Efficiency: 76.5% 2023-01-29 07:38:38.9: Cycle Efficiency: 100.0% 2023-01-29 07:38:39.0: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-29 07:38:39.0: 251 min. remaining to meet strict constraints. 2023-01-29 07:38:39.0: 309 min. remaining for the plan to fit before dawn. 2023-01-29 07:38:39.0: but only 1 min till start so Plan transits mid-way in its time span. 2023-01-29 07:38:39.0: ending rising plan delay. Plan is now eligible. 2023-01-29 07:38:39.1: Rising plan delay enabled for Plan M3-V154: 2023-01-29 07:38:39.1: 559 min. remaining to meet strict constraints. 2023-01-29 07:38:39.1: 324 min. remaining for the plan to fit before dawn. 2023-01-29 07:38:39.1: but only 274 min till start so Plan transits mid-way in its time span. 2023-01-29 07:38:39.1: deferred (rising) for 274 min, until 29-Jan-2023 12:12:53 UTC 2023-01-29 07:38:39.3: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:38:39.3: Acquire data for Observation OJ287... 2023-01-29 07:38:39.3: (belongs to Project AAVSO_MISC_PYG_AUTO_ver3260, Plan OJ287) 2023-01-29 07:38:39.3: Send Observation OJ287 to ACP Sequencer 2023-01-29 07:40:47.3: ACP data acquisition failed for Observation OJ287. 2023-01-29 07:40:47.3: (Observation OJ287 interrupted by acquisition process failure.) 2023-01-29 07:40:47.4: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-29 07:40:47.4: 249 min. remaining to meet strict constraints. 2023-01-29 07:40:47.4: 307 min. remaining for the plan to fit before dawn. 2023-01-29 07:40:47.4: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 07:40:47.4: ending rising plan delay. Plan is now eligible. 2023-01-29 07:40:47.7: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:40:47.7: Acquire data for Observation TV_Cam... 2023-01-29 07:40:47.7: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3426, Plan TV_Cam) 2023-01-29 07:40:47.7: Send Observation TV_Cam to ACP Sequencer 2023-01-29 07:46:24.7: ACP data acquisition failed for Observation TV_Cam. 2023-01-29 07:46:24.7: (Observation TV_Cam interrupted by acquisition process failure.) 2023-01-29 07:46:24.8: Rising plan delay enabled for Plan GZ_Cnc: 2023-01-29 07:46:24.8: 243 min. remaining to meet strict constraints. 2023-01-29 07:46:24.8: 301 min. remaining for the plan to fit before dawn. 2023-01-29 07:46:24.8: but only -6 min till start so Plan transits mid-way in its time span. 2023-01-29 07:46:24.8: ending rising plan delay. Plan is now eligible. 2023-01-29 07:46:25.1: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:46:25.1: Acquire data for Observation QZ_Aur... 2023-01-29 07:46:25.1: (belongs to Project AAVSO_MISC_HQA_AUTO_ver3426, Plan QZ_Aur) 2023-01-29 07:46:25.1: Send Observation QZ_Aur to ACP Sequencer 2023-01-29 07:51:15.2: ACP data acquisition failed for Observation QZ_Aur. 2023-01-29 07:51:15.2: (Observation QZ_Aur interrupted by acquisition process failure.) 2023-01-29 07:51:15.6: Dispatcher cycle time: 0.3 sec. 2023-01-29 07:51:15.6: Acquire data for Observation V838_Mon... 2023-01-29 07:51:15.6: (belongs to Project AAVSO_P304_SPP_AUTO_ver3413, Plan V838_Mon) 2023-01-29 07:51:15.6: Doing 4 sets 2023-01-29 07:51:15.6: Send Observation V838_Mon to ACP Sequencer 2023-01-29 08:11:43.7: Send Observation V838_Mon to ACP Sequencer 2023-01-29 08:30:13.0: Send Observation V838_Mon to ACP Sequencer 2023-01-29 08:48:39.8: ***Running Plan V838_Mon (best efforts) completed early: 2023-01-29 08:48:39.8: Obs V838_Mon would not meet strict constraints 2023-01-29 08:48:39.8: Acquisition time: 3444.1956184 sec. 2023-01-29 08:48:39.8: Data for Observation V838_Mon of Plan V838_Mon acquired successfully. 2023-01-29 08:48:39.8: Plan V838_Mon completed successfully. 2023-01-29 08:48:39.8: Image Efficiency: 65.3% 2023-01-29 08:48:39.8: Cycle Efficiency: 100.0% 2023-01-29 08:48:40.0: Rising plan delay enabled for Plan 3C_279: 2023-01-29 08:48:40.0: 356 min. remaining to meet strict constraints. 2023-01-29 08:48:40.0: 252 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.0: but only 157 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.0: deferred (rising) for 156 min, until 29-Jan-2023 11:25:21 UTC 2023-01-29 08:48:40.0: Rising plan delay enabled for Plan AG_Dra: 2023-01-29 08:48:40.0: 601 min. remaining to meet strict constraints. 2023-01-29 08:48:40.0: 253 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.0: deferred (rising) for 253 min, until 29-Jan-2023 13:02:05 UTC 2023-01-29 08:48:40.0: Rising plan delay enabled for Plan AG_Dra: 2023-01-29 08:48:40.0: 601 min. remaining to meet strict constraints. 2023-01-29 08:48:40.0: 253 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.0: deferred (rising) for 253 min, until 29-Jan-2023 13:02:05 UTC 2023-01-29 08:48:40.0: Rising plan delay enabled for Plan HS1340+1524: 2023-01-29 08:48:40.0: 462 min. remaining to meet strict constraints. 2023-01-29 08:48:40.0: 259 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.0: but only 207 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.0: deferred (rising) for 207 min, until 29-Jan-2023 12:16:36 UTC 2023-01-29 08:48:40.0: Rising plan delay enabled for Plan HS1340+1524: 2023-01-29 08:48:40.0: 462 min. remaining to meet strict constraints. 2023-01-29 08:48:40.0: 251 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.0: but only 203 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.0: deferred (rising) for 203 min, until 29-Jan-2023 12:11:50 UTC 2023-01-29 08:48:40.1: Rising plan delay enabled for Plan NSV-6690: 2023-01-29 08:48:40.1: 526 min. remaining to meet strict constraints. 2023-01-29 08:48:40.1: 224 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.1: deferred (rising) for 221 min, until 29-Jan-2023 12:29:49 UTC 2023-01-29 08:48:40.1: Rising plan delay enabled for Plan PG_1424+240: 2023-01-29 08:48:40.1: 524 min. remaining to meet strict constraints. 2023-01-29 08:48:40.1: 254 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.1: but only 249 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.1: deferred (rising) for 248 min, until 29-Jan-2023 12:57:25 UTC 2023-01-29 08:48:40.1: Rising plan delay enabled for Plan X_Boo: 2023-01-29 08:48:40.1: 506 min. remaining to meet strict constraints. 2023-01-29 08:48:40.1: 253 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.1: but only 245 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.1: deferred (rising) for 245 min, until 29-Jan-2023 12:54:05 UTC 2023-01-29 08:48:40.1: Rising plan delay enabled for Plan X_Boo: 2023-01-29 08:48:40.1: 506 min. remaining to meet strict constraints. 2023-01-29 08:48:40.1: 253 min. remaining for the plan to fit before dawn. 2023-01-29 08:48:40.1: but only 245 min till start so Plan transits mid-way in its time span. 2023-01-29 08:48:40.1: deferred (rising) for 245 min, until 29-Jan-2023 12:54:05 UTC 2023-01-29 08:48:40.2: Dispatcher cycle time: 0.3 sec. 2023-01-29 08:48:40.2: Acquire data for Observation MP_Gem... 2023-01-29 08:48:40.2: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3426, Plan MP_Gem) 2023-01-29 08:48:40.2: Send Observation MP_Gem to ACP Sequencer 2023-01-29 08:52:52.9: ACP data acquisition failed for Observation MP_Gem. 2023-01-29 08:52:52.9: (Observation MP_Gem interrupted by acquisition process failure.) 2023-01-29 08:52:53.1: Rising plan delay enabled for Plan U_Leo: 2023-01-29 08:52:53.1: 257 min. remaining to meet strict constraints. 2023-01-29 08:52:53.1: 245 min. remaining for the plan to fit before dawn. 2023-01-29 08:52:53.1: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 08:52:53.1: ending rising plan delay. Plan is now eligible. 2023-01-29 08:52:53.2: Dispatcher cycle time: 0.2 sec. 2023-01-29 08:52:53.2: Acquire data for Observation J072816... 2023-01-29 08:52:53.2: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan J072816) 2023-01-29 08:52:53.2: Send Observation J072816 to ACP Sequencer 2023-01-29 08:57:31.2: ACP data acquisition failed for Observation J072816. 2023-01-29 08:57:31.2: (Observation J072816 interrupted by acquisition process failure.) 2023-01-29 08:57:31.4: Rising plan delay enabled for Plan U_Leo: 2023-01-29 08:57:31.4: 252 min. remaining to meet strict constraints. 2023-01-29 08:57:31.4: 240 min. remaining for the plan to fit before dawn. 2023-01-29 08:57:31.4: but only -4 min till start so Plan transits mid-way in its time span. 2023-01-29 08:57:31.4: ending rising plan delay. Plan is now eligible. 2023-01-29 08:57:31.5: Dispatcher cycle time: 0.2 sec. 2023-01-29 08:57:31.5: Acquire data for Observation SU_Lyn... 2023-01-29 08:57:31.5: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan SU_Lyn) 2023-01-29 08:57:31.5: Send Observation SU_Lyn to ACP Sequencer 2023-01-29 09:03:21.2: Acquisition time: 349.7216267 sec. 2023-01-29 09:03:21.2: Data for Observation SU_Lyn of Plan SU_Lyn acquired successfully. 2023-01-29 09:03:21.2: Plan SU_Lyn completed successfully. 2023-01-29 09:03:21.2: Image Efficiency: 30.3% 2023-01-29 09:03:21.2: Cycle Efficiency: 100.0% 2023-01-29 09:03:21.4: Dispatcher cycle time: 0.1 sec. 2023-01-29 09:03:21.4: Acquire data for Observation U_Leo... 2023-01-29 09:03:21.4: (belongs to Project AAVSO_MISC_SFY_AUTO_ver2706, Plan U_Leo) 2023-01-29 09:03:21.5: Send Observation U_Leo to ACP Sequencer 2023-01-29 09:15:24.8: Acquisition time: 723.392906 sec. 2023-01-29 09:15:24.8: Data for Observation U_Leo of Plan U_Leo acquired successfully. 2023-01-29 09:15:24.9: Plan U_Leo completed successfully. 2023-01-29 09:15:24.9: Image Efficiency: 66.3% 2023-01-29 09:15:24.9: Cycle Efficiency: 100.0% 2023-01-29 09:15:25.1: Dispatcher cycle time: 0.1 sec. 2023-01-29 09:15:25.1: Acquire data for Observation OI_158... 2023-01-29 09:15:25.1: (belongs to Project AAVSO_MISC_GCO_AUTO_ver2706, Plan OI_158) 2023-01-29 09:15:25.1: Send Observation OI_158 to ACP Sequencer 2023-01-29 09:30:44.3: Acquisition time: 919.1540905 sec. 2023-01-29 09:30:44.3: Data for Observation OI_158 of Plan OI_158 acquired successfully. 2023-01-29 09:30:44.3: Plan OI_158 completed successfully. 2023-01-29 09:30:44.3: Image Efficiency: 78.3% 2023-01-29 09:30:44.3: Cycle Efficiency: 100.0% 2023-01-29 09:30:44.4: ++ Auto Focus ++ 2023-01-29 09:30:44.4: Doing periodic autofocus. 2023-01-29 09:30:44.4: Start special ACP AutoFocus script for scheduler 2023-01-29 09:34:39.7: Next periodic autofocus ASAP after 7200sec. 29-Jan-2023 11:34:22 UTC 2023-01-29 09:34:39.9: Dispatcher cycle time: 0.1 sec. 2023-01-29 09:34:39.9: Acquire data for Observation NQ_Gem... 2023-01-29 09:34:39.9: (belongs to Project AAVSO_MISC_SBL_AUTO_ver3426, Plan NQ_Gem) 2023-01-29 09:34:39.9: Send Observation NQ_Gem to ACP Sequencer 2023-01-29 09:42:09.8: Acquisition time: 449.941193 sec. 2023-01-29 09:42:09.8: Data for Observation NQ_Gem of Plan NQ_Gem acquired successfully. 2023-01-29 09:42:09.8: Plan NQ_Gem completed successfully. 2023-01-29 09:42:09.8: Image Efficiency: 30.0% 2023-01-29 09:42:09.8: Cycle Efficiency: 100.0% 2023-01-29 09:42:10.0: Dispatcher cycle time: 0.1 sec. 2023-01-29 09:42:10.0: Acquire data for Observation J072816... 2023-01-29 09:42:10.0: (belongs to Project AAVSO_MISC_WLP_AUTO_ver2706, Plan J072816) 2023-01-29 09:42:10.0: Send Observation J072816 to ACP Sequencer 2023-01-29 10:07:17.8: Acquisition time: 1507.7123195 sec. 2023-01-29 10:07:17.8: Data for Observation J072816 of Plan J072816 acquired successfully. 2023-01-29 10:07:17.8: Plan J072816 completed successfully. 2023-01-29 10:07:17.8: Image Efficiency: 75.6% 2023-01-29 10:07:17.8: Cycle Efficiency: 100.0% 2023-01-29 10:07:17.9: Rising plan delay enabled for Plan NGC_5634: 2023-01-29 10:07:17.9: 369 min. remaining to meet strict constraints. 2023-01-29 10:07:17.9: 148 min. remaining for the plan to fit before dawn. 2023-01-29 10:07:17.9: deferred (rising) for 145 min, until 29-Jan-2023 12:32:39 UTC 2023-01-29 10:07:17.9: Rising plan delay enabled for Plan RZ_Leo: 2023-01-29 10:07:17.9: 224 min. remaining to meet strict constraints. 2023-01-29 10:07:17.9: 166 min. remaining for the plan to fit before dawn. 2023-01-29 10:07:17.9: but only -3 min till start so Plan transits mid-way in its time span. 2023-01-29 10:07:17.9: ending rising plan delay. Plan is now eligible. 2023-01-29 10:07:18.0: Dispatcher cycle time: 0.1 sec. 2023-01-29 10:07:18.0: Acquire data for Observation GZ_Cnc... 2023-01-29 10:07:18.0: (belongs to Project AAVSO_MISC_MZK_AUTO_ver2706, Plan GZ_Cnc) 2023-01-29 10:07:18.0: Send Observation GZ_Cnc to ACP Sequencer 2023-01-29 10:20:23.0: ACP data acquisition failed for Observation GZ_Cnc. 2023-01-29 10:20:23.0: (Observation GZ_Cnc interrupted by acquisition process failure.) 2023-01-29 10:20:23.2: Rising plan delay enabled for Plan M5-V42: 2023-01-29 10:20:23.2: 432 min. remaining to meet strict constraints. 2023-01-29 10:20:23.2: 162 min. remaining for the plan to fit before dawn. 2023-01-29 10:20:23.2: deferred (rising) for 162 min, until 29-Jan-2023 13:02:31 UTC 2023-01-29 10:20:23.2: Rising plan delay enabled for Plan M5-V84: 2023-01-29 10:20:23.2: 432 min. remaining to meet strict constraints. 2023-01-29 10:20:23.2: 162 min. remaining for the plan to fit before dawn. 2023-01-29 10:20:23.2: deferred (rising) for 161 min, until 29-Jan-2023 13:02:10 UTC 2023-01-29 10:20:23.2: Rising plan delay enabled for Plan Pal_5: 2023-01-29 10:20:23.2: 423 min. remaining to meet strict constraints. 2023-01-29 10:20:23.2: 143 min. remaining for the plan to fit before dawn. 2023-01-29 10:20:23.2: deferred (rising) for 141 min, until 29-Jan-2023 12:41:49 UTC 2023-01-29 10:20:23.3: Dispatcher cycle time: 0.1 sec. 2023-01-29 10:20:23.3: Acquire data for Observation M67... 2023-01-29 10:20:23.3: (belongs to Project AAVSO_Transform_Std_Fields_AUTO_ver3422, Plan M67) 2023-01-29 10:20:23.3: Send Observation M67 to ACP Sequencer 2023-01-29 10:44:01.5: Acquisition time: 1418.1912753 sec. 2023-01-29 10:44:01.5: Data for Observation M67 of Plan M67 acquired successfully. 2023-01-29 10:44:01.5: Plan M67 completed successfully. 2023-01-29 10:44:01.5: Image Efficiency: 64.9% 2023-01-29 10:44:01.5: Cycle Efficiency: 100.0% 2023-01-29 10:44:01.6: Rising plan delay enabled for Plan PG_1553+113: 2023-01-29 10:44:01.6: 470 min. remaining to meet strict constraints. 2023-01-29 10:44:01.6: 140 min. remaining for the plan to fit before dawn. 2023-01-29 10:44:01.6: deferred (rising) for 139 min, until 29-Jan-2023 13:04:00 UTC 2023-01-29 10:44:01.6: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-29 10:44:01.6: 364 min. remaining to meet strict constraints. 2023-01-29 10:44:01.6: 134 min. remaining for the plan to fit before dawn. 2023-01-29 10:44:01.6: deferred (rising) for 133 min, until 29-Jan-2023 12:57:24 UTC 2023-01-29 10:44:01.6: Rising plan delay enabled for Plan PKS_1510-089: 2023-01-29 10:44:01.6: 364 min. remaining to meet strict constraints. 2023-01-29 10:44:01.6: 143 min. remaining for the plan to fit before dawn. 2023-01-29 10:44:01.6: deferred (rising) for 143 min, until 29-Jan-2023 13:07:49 UTC 2023-01-29 10:44:01.7: Dispatcher cycle time: 0.1 sec. 2023-01-29 10:44:01.7: Acquire data for Observation GZ_Cnc... 2023-01-29 10:44:01.7: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan GZ_Cnc) 2023-01-29 10:44:01.7: Send Observation GZ_Cnc to ACP Sequencer 2023-01-29 11:06:46.1: Acquisition time: 1364.4054852 sec. 2023-01-29 11:06:46.1: Data for Observation GZ_Cnc of Plan GZ_Cnc acquired successfully. 2023-01-29 11:06:46.1: Plan GZ_Cnc completed successfully. 2023-01-29 11:06:46.1: Image Efficiency: 70.4% 2023-01-29 11:06:46.1: Cycle Efficiency: 100.0% 2023-01-29 11:06:46.3: Rising plan delay enabled for Plan IR_Com: 2023-01-29 11:06:46.3: 274 min. remaining to meet strict constraints. 2023-01-29 11:06:46.3: 107 min. remaining for the plan to fit before dawn. 2023-01-29 11:06:46.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 11:06:46.3: ending rising plan delay. Plan is now eligible. 2023-01-29 11:06:46.3: Rising plan delay enabled for Plan IR_Com: 2023-01-29 11:06:46.3: 274 min. remaining to meet strict constraints. 2023-01-29 11:06:46.3: 107 min. remaining for the plan to fit before dawn. 2023-01-29 11:06:46.3: but only 0 min till start so Plan transits mid-way in its time span. 2023-01-29 11:06:46.3: ending rising plan delay. Plan is now eligible. 2023-01-29 11:06:46.3: Rising plan delay enabled for Plan IX_Dra: 2023-01-29 11:06:46.3: 463 min. remaining to meet strict constraints. 2023-01-29 11:06:46.3: 98 min. remaining for the plan to fit before dawn. 2023-01-29 11:06:46.3: deferred (rising) for 96 min, until 29-Jan-2023 12:43:12 UTC 2023-01-29 11:06:46.4: Dispatcher cycle time: 0.1 sec. 2023-01-29 11:06:46.4: Acquire data for Observation Mrk_180... 2023-01-29 11:06:46.4: (belongs to Project AAVSO_survey_HQ_AUTO_ver3426, Plan Mrk_180) 2023-01-29 11:06:46.4: Send Observation Mrk_180 to ACP Sequencer 2023-01-29 11:10:54.6: **DISPATCHER INTERRUPT LEVEL 1 RECEIVED** 2023-01-29 11:11:02.0: ** ACP script "AcquireScheduler" failed: 2023-01-29 11:11:02.0: **Script Error** Source: ACP Message: The script was aborted. Location: line 1501 column 13. 2023-01-29 11:11:02.0: RUN FAILED: Scheduler was stopped during run 2023-01-29 11:11:02.0: ACP data acquisition failed for Observation Mrk_180. 2023-01-29 11:11:02.0: (Observation Mrk_180 interrupted by operator or system.) 2023-01-29 16:51:33.9: -- Weather Unsafe -- 2023-01-29 17:12:36.3: ++ Weather Safe ++ 2023-01-29 18:42:15.1: -- Weather Unsafe -- 2023-01-29 19:10:59.5: ++ Weather Safe ++ 2023-01-30 01:02:55.9: Run statistics: 2023-01-30 01:02:55.9: Observations: 273 2023-01-30 01:02:55.9: Considered: 15 2023-01-30 01:02:55.9: Completed: 1 2023-01-30 01:02:55.9: Skipped: 0 2023-01-30 01:02:55.9: Never Eligible: 258 2023-01-30 01:02:55.9: Failed: 14 Log closed at Mon, Jan 30 2023 01:02:55 UTC (actual time)