project_status [2025/10/05 23:04] – [SONG in New Mexico Status] 172.59.1.110project_status [2026/03/06 20:40] (current) jasonj
Line 1: Line 1:
-===== SONG in New Mexico Status ===== +====== SONG in New Mexico Status ====== 
-(updated 5/30/2025)+(updated 3/2026)
  
-The SONG spectrograph is assembled and awaiting first light at Apache Point Observatory.+The SONG spectrograph is assembled and carrying out science observations at Apache Point Observatory.
  
-Major upcoming milestones:+Major milestones:
  
 +  * Integration with SONG network, January 2026
 +  * Commissioning has begun, October 2025 --->
   * FIRST LIGHT! October 2, 2025   * FIRST LIGHT! October 2, 2025
   * Fiber installed in conduit. September 2025   * Fiber installed in conduit. September 2025
Line 23: Line 25:
  
  
-[[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]]+/* [[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]] */ 
 + 
 +===== SONG Newsletters ===== 
 +  * March 2026, Vol. 1: {{ :docs:song-newsletter-vol-1.pdf |}} 
 +  * March 2025, Vol. 0: {{ :docs:song-newsletter-vol-0.pdf |}}
  