project_status [2025/05/30 17:58] 172.59.0.80project_status [2025/10/13 20:59] (current) jasonj
Line 1: Line 1:
-===== SONG in New Mexico Status ===== +====== SONG in New Mexico Status ====== 
-(updated 5/30/2025)+(updated 10/5/2025)
  
 The SONG spectrograph is assembled and awaiting first light at Apache Point Observatory. The SONG spectrograph is assembled and awaiting first light at Apache Point Observatory.
Line 6: Line 6:
 Major upcoming milestones: Major upcoming milestones:
  
-  * Receive optical fiber and install in conduit. Expected: June 2025+  * Commissioning has begun, October 2025 ---> 
 +  * FIRST LIGHT! October 2, 2025 
 +  * Fiber installed in conduit. September 2025 
 +  * Received optical fibers. July 2025
          
  
Line 22: Line 25:
  
 [[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]] [[https://docs.google.com/document/d/121YM588cNT02rtwVfPMpzanRou6X_87ysWjweu6i8ns/edit?usp=sharing|SONG NEW MEXICO BLOG]]
 +
 +===== SONG Newsletters =====
 +  * March 2025, Vol. 0: {{ :docs:song-newsletter-vol-0.pdf |}}
  
project_status.1748627921.txt.gz · Last modified: by 172.59.0.80