This is an old revision of the document!
Attending: Nancy Chanover (NMSU), Jamey Eriksen (APO), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Eric Bellm (UW), Anne Verbiscer (UVa), Moire Prescott (NMSU), Moire Prescott (NMSU), Russet McMillan (APO), Misty Bentz (GSU), Kevin Schlaufman (JHU), Zach BT (CU), Sarah Tuttle (UW), Joanne Hughes (Seattle U), Ben Williams (UW), Chip K (UWy)
The detailed site report is included below, followed by additional information discussed during today's meeting.
3.5-m Telescope and Instruments Highlights, 12/03/24 – 01/07/25
1) Overview
Weather wise, December was very mild in terms of both temperatures and precipitation. There were no astronomers, instrument teams or classes that visited APO in the month of December.
2) Operations
3.5m Telescope: Telescope is working as expected.
0.5m Telescope: Telescope is working as expected.
KOSMOS: nothing to report.
ARCTIC: We performed another emergency vacuum service due to the vacuum softening. The current hypothesis for the cause of this issue is that we may have gotten/installed an ion pump that had a defective/reduced lifetime; it is still struggling to maintain vacuum. We plan to replace it ASAP with minimal or no impact to the science schedule. In the meantime, we have restricted instrument rotation to prevent the ion pump from shorting out when upside down, which seems to be a pattern. Additional maintenance on the diffuser mechanism will be scheduled as well given the reports of intermittent behavior at times.
Agile: It is being worked on at the repair house to investigate the hardware that was changed and how that impacts observing modes/gain settings. APO software control was not able to configure the camera as expected when it was initially tested at APO after the repairs.
ARCES: The system is up, however, over the holiday break there was an error indicating a failure to read images, which led to the instrument control software being restarted. That restart led to additional errors when the system recovered in an unexpected way. We are investigating this further. Science was/is not affected, this only impacted daily engineering IOL data.
DIS: System is currently up and usable.
NICFPS: System is cooled and usable.
TripleSpec: System is up and usable.
APOLLO: system leaks were repaired and the system is in operation.
Nothing to add other than what was in agenda. Multi-day storm coming tonight, could include snow. KOSMOS weirdness that Zach reported has been resolved. Emergency vacuum service for ARCTIC. Ion pump was replaced this past weekend; diffuser rotator scheduled to be fixed. Agile still at repair shop. ARCES is back and usable after weirdness with daytime metrology data. ARCTIC used B half last night without issue. Russet: remove rotation restriction for ARCTIC. Check with Amanda about headers not being written for KOSMOS - a few weeks ago ZBT had issues. Diffuser - tensioned but rotation sensor is not working properly.
We have some unassigned time in Q1 next week (Jan 09B - offered to specific ppl but need to cast net broadly, but also forecast is quite poor, want someone if weather improves but might claim for engineering). Most are B halves as well as in Feb (8 is next one). Time is listed as OPEN. Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). Users can request time listed as OPEN or DD.
The 2025 Q1 ARCSAT scheduled is posted. Only had 2 requests this quarter. Continuing to struggle with frequent failure in communication with camera (“support library error”) - camera is getting old. Temporary fix is fairly quick so if observers can keep an eye on it and report errors it can be recovered pretty quickly. Early March - onsite class and other stuff going on so not available for ARCSAT.
Test tomorrow on converting site to new servers - just heard from Shane that may be rescheduled due to illness.
Still researching applications to improve password handling but it's coming.
No news on ASPEN pre-proposal from NSF. Hope to hear soon. Ocotillo CDR - evaluate subsequent report. Also applying for funding. Will come together in phased approach, bring channels on line one at a time. Start with IFU, follow up with MOS component - more costly and mechanically complicated. Hoping that this would enable supported data reduction development, troubleshooting as we go. Spaces out the cost, reduces impact on budget. End of month have report back to CDR review panel.
In the works.
Open action items from previous meetings:
Open action items from this meeting:
xxx
The next meeting will be on February 4, 2025 at 10:30 MST.