Attending: Nancy Chanover (NMSU)
Michael Hayden (OU), Moire Prescott (NMSU), Russet McMillan (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Kevin Schlaufman (JHU), Adam Kowalski (CU), Chip Kobulnicky (UWy), Jamey Eriksen (APO), Anne Verbiscer (UVa), Shane Thomas (APO), Sarah Tuttle (UW), Derek Buzasi (FGCU)
The detailed site report is included below, followed by additional information discussed during today's meeting.
3.5-m Telescope and Instruments Highlights, 9/03/2024 – 10/01/2024
1) Overview Weather wise, September has started to improve from the monsoonal pattern. Operations have returned relatively smoothly from the August shutdown. During the month of September we had one small class visit (UW at the end of the month); another class that had been scheduled for earlier in the month was switched to remote training. We also had the DSSI team on site for observing.
2) Operations 3.5m Telescope: The tertiary rotation system was repaired by replacing a power supply, a voltage regulator on a board, and a high resolution encoder. The telescope is experiencing position errors in azimuth direction reversals that is currently not well understood. Pointing performance is affected slightly by this error, and investigations are underway.
0.5m Telescope: Telescope is working well.
KOSMOS: nothing to report.
ARCTIC: nothing to report
Agile: The camera failure was diagnosed to be a failed TEC. A purchase order for the repair was issued, and we are now awaiting completion of the repairs so the camera can be returned.
Echelle: the instrument control computer hard drives were repaired/replaced. A power supply was also replaced with a new one of the correct size. The system is up, stable and usable. IOL measurements appear nominal and are still very good.
DIS: System is currently up and usable. Vacuum servicing may occur in Q4 but has not been scheduled yet.
NICFPS: System is cooled and usable.
TripleSpec: System is up and usable.
APOLLO: The instrument control computer had a failure of a computer motherboard/CPU/power supply. We are waiting on replacement parts to arrive as well as the spare ICC to be shipped from NASA. The system is down until the ICC is repaired.
xxx
We have one remaining unassigned half night in Q3 (Sep 14B). Users should look at the schedule and follow the usual channels for requesting this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter). [Note added in proof: there is no more unassigned time remaining in Q3.]
The Q4 ARCSAT scheduled is posted xxx
xxx any updates? xxxx
Nancy issued her annual request for science highlights (at least one from every ARC member institution and leasing partner!) for the ARC Board Meeting on November 8. Any file format is fine, but please make sure that each slide contains: researcher’s name and institution, a few bullets describing the science result and instrument used, and a graphic to complement the text. Users can send Nancy the slide directly or (preferably) UC reps can collect them and send them to her in a single packet. The deadline for submitting slides is Friday October 25. These are important for conveying to the Board members that their institution's investment in ARC and the 3.5m is worthwhile!
Open action items from previous meetings:
Open action items from this meeting:
None.
The next meeting will be on November 5 (?) at 10:30 MST.