uc:uc20240604_june_4_2024

This is an old revision of the document!


APO 3.5-m Users Committee Meeting, 6/04/2024


Attending: Nancy Chanover (NMSU), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Bill Ketzeback (APO), Jamey Eriksen (APO), Yuta Notsu (CU), Eric Nielsen (NMSU), Anne Verbiscer (UVa), Kevin Schlaufman (JHU), Sarah Tuttle (UW), Mukremin Kilic (OU), Eric Bellm (UW), Shane Thomas, Chip Kobulnicky (UWy), Misty Bentz (GSU), Ben Williams (UW), Gordon MacDonald (APO)

User feedback and comments from institutional representatives

  • NMSU - nothing to report
  • UVa - nothing to report
  • JHU - nothing to report
  • Washington - nothing to report
  • Georgia State - nothing to report
  • Wyoming - nothing to report
  • Oklahoma - nothing to report
  • Colorado - nothing to report
  • BYU - nothing to report
  • NAPG - no report
  • FGCU - no report
  • Seattle - nothing to report -want to talk about grisms, masks

Telescope and Instruments Report

The detailed site report is included below, followed by additional information discussed during today's meeting.

3.5-m Telescope and Instruments Highlights, 5/07/2024 – 6/04/2024

1) Overview

We had improved weather at APO during the month of May. Although we have not seen much in the way of monsoonal weather patterns yet, we have had a few nights when observing was impacted by high winds and dust. The telescope has continued to work well even as nighttime temperatures have increased.

In May we hosted a team from UVa with the DSSI visiting instrument, but there were no class visits.

The brush/forest fire near Timberon that we reported on last month was contained and put out relatively quickly. Recently, there was also a brush/forest fire 4 miles east of Cloudcroft that was quickly contained with no impact to APO. Lastly, there is a much larger fire near Ruidoso (~45 miles as the crow flies from APO) that is currently 7500 acres in size and producing lots of smoke; it is 5% contained. If the winds shift so that they are coming from the north/northeast that could cause the smoke to impact observing at APO.

2) Operations

3.5m Telescope: The telescope is working well, with motion errors that seem to be primarily of the seasonal type. There was one recently that was attributed to an instrument mounting error.

0.5m Telescope: The telescope and cameras are working well.

KOSMOS: A new set of 1.25” slits arrived from UW and were tested on an engineering night. The preliminary reports suggest that they are acceptable; the new mounting/flattening screws are near the edge of the field of view.

ARCTIC: The diffuser rotator was serviced and the rotation mechanism has been used for one set of science observations so far. There are some software bugs in the reporting status of the rotator mechanism that still need to be addressed.

Agile: The instrument TEC controls failed. Further investigations are currently underway by Cary and Bill.

ARCES: The inter-order light has continued to exhibit a slow decline in the blue though the red is holding steady. The instrument is still considered excellent for use, with scattered light not being a major issue.

All other instruments are performing nominally.


Additional telescope and instrument discussion

May had improving weather (but storms forecasted for later this week). Dust and winds have been issue. Tempincrease handled fine. DSSI visit in May. Fire near Timberon put out/contained. Fire near Cloudcroft handled. Biggest one is Ruidiso -7500 acres → 8000 acres. Containment ~ 50% - huge smoke plume but going away from us. Other happenings - hosting science talks - encourage visiting scientists to give them when come to site (visitors, NMSU ppl). Cool tour group from Air Force reliability lab. Cool northern lights viewing last month from all sky camera.


2024 Q2 3.5m scheduling

We have a some unassigned time (OPEN or DD01) remaining in Q2, specifically June 13A, June 15B, 16B, 18B and 23B. Some of the available slots are short, while others are complete half-nights. Users should follow the usual channels for requesting any of this time (i.e. email Russet, Amanda, Ben, Nancy and their institutional scheduler when submitting requests, and provide a proposal cover page if you don't already have a program scheduled for the current quarter).


2024 Q3 3.5m scheduling

xxx


2024 Q2 0.5 scheduling

xxx


Annual Request to Update Publication Record

Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2023 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, instrument concepts, etc., thus we need your help in updating our publication record! We are now participating in a cross-observatory analysis of scientific impact of ground-based telescopes, so it is especially important that we capture all publications resulting from APO observations. Any publications resulting from ARCSAT data are also requested. The listing should include refereed publications and student theses and dissertations (not conference abstracts unless they are peer reviewed) that made use of data acquired with the 3.5m and/or ARCSAT, published from 2023 to the present. If a paper has been submitted to a journal but has not yet completely gone through the review process, please include that as well, with the name of the journal and “submitted.”


Website Modernization Effort

Ben Williams provided an update regarding work being done to develop a new APO web site. Shane has created a whole separate web site with a more modern front end and database-driven apps on the back end. It has been time consuming to port all of the existing web site content over, which was the first step, and then evaluating how to improve the user experience and remove redundant or unnecessary information. We are getting close to the point where we will be ready to seek broader feedback on the new web site from the user community; we are aiming to provide the link to new site at the next Users Committee meeting so people can check it out and provide feedback.

xxx


ACTION ITEMS

Open action items from previous meetings:

  • Nancy: get ROM costs for new KOSMOS grisms. UPDATE: We are in the process of putting together some quotes and working with vendors, and will make decisions from there. We will use examples that had been requested by users previously in order to get quotes so we have some idea of what will be possible. STATUS: OPEN.
  • UC reps: remind your users to review the Q2 schedule and request OPEN/DD time if they can make a good case for it.
  • UC reps: publication record

Open action items from this meeting:

  • UC reps: web site

All Other Business


Next meeting

The next meeting will be on July 2 at 10:30 MDT.


uc/uc20240604_june_4_2024.1717519128.txt.gz · Last modified: 2024/06/04 16:38 by nchanove