This is an old revision of the document!
Attending: Jamey Eriksen (APO), Kevin Schlaufman (JHU), Aleksandr Mosenkov (BYU), Moire Prescott (NMSU), Mukremin Kilic, (OU), Ben Williams (UW), Adam Kowalski (CU), Eric Bellm (UW), Anne Verbiscer (UVa), Derek Buzasi (FGCU), Misty Bentz (GSU), Bill Ketzeback (APO)
The detailed site report is included below, followed by additional information discussed during today's meeting.
3.5-m Telescope and Instruments Highlights, 3/04/2024 – 4/02/2024
1) Overview
March has seen ping-pong type of weather at APO, ranging from snow to nice to high winds to dust. The month started out with a visit from a group of undergraduate and graduate students from CU, also a visiting team for APOLLO work at the end of the month.
2) Operations
3.5m Telescope: The telescope is working well; motion errors seem to be of the seasonal type.
0.5m Telescope: Improvements were done to some cables (took old ones out and replaced with new ones). BYUCam was tested and appears to be working better with the new cables.
KOSMOS: new slits are undergoing more tests and the new set of 1.25” slits is due to arrive from UW in mid-April
ARCTIC: the diffuser’s rotator mechanism servicing is being planned for Q2 when time permits between ARCTIC usage.
Agile: The instrument TEC controls failed. Attempted repairs have so far been unsuccessful.
Echelle: ARCES was partially warmed to try to improve the inter-order light (IOL). After cool down, the IOL is currently considered excellent. There is a slight slope indicating that the IOL is trending toward worse values, however, it is a small slope and we hope that it levels off soon.
DIS: functioning nominally, nothing to report.
No questions regarding the site report.
The recent echelle warmup was successful and seems to have mitigated the inter-order light issue. We'd like to schedule the servicing of the ARCTIC diffuser rotation mechanism soon. DIS is operating nominally, with a slight improvement in the blue. Moire asked about the current status of using dome flats with ARCTIC. Russet replied that we now have the fence in place so dome flats should be reliable, but there may be additional considerations depending on rotation.
There was some remaining OPEN time in Q1, but it has since been assigned. At the time of this writing there is no more available time in Q1.
The Q2 schedule is in the works. Note added in proof: the Q2 schedule is now posted.
Open action items from previous meetings:
Open action items from this meeting:
None.
The next meeting will be on May 7 at 10:30 MDT.