This is an old revision of the document!
Attending: 14 ppl: Nancy Chanover (NMSU), Jamey Eriksen (APO), Gordon MacDonald (APO), Joanne Hughes (Seattle U), Aleksandr Mosenkov (BYU), Eric Bellm (UW), Anne Verbiscer (UVa), Misty Bentz (GSU), Ben Williams (UW), Kevin Schlaufman (JHU), Misty Bentz (GSU), Eric Nielsen (NMSU), Chip (UWy), Russet McMillan (APO)
The detailed site report is included below, followed by additional information discussed during today's meeting.
3.5-m Telescope and Instruments Highlights, 5/1/2023 – 6/5/2023
1) Overview
APO weather for May was variable; we had some thunderstorms, and some very nice clear skies.
May was the quiet month before the June rush arrives. In May we had one class visit and one visiting instrument team on site. June will be a very busy month at APO with three different class visits and two visits from instrument teams.
2) Operations
3.5m telescope: operated nominally over the past month.
0.5m telescope: issues with camera control and instrument drivers are being worked on.
KOSMOS: upgrades were implemented for the umbilical hose to further limit any issues from the LN2 vent.
ARCTIC: the diffuser rotator service had to be postponed; it will be rescheduled for a later date.
Agile: the timing board was swapped, but the sync issue is still being investigated as the board swap did not eliminate the issue.
Echelle: the inter-order light ratios (measure of scattered light in the instrument) are still quite good but are declining again with the warmer weather.
DIS: scattered light is improving slowly as expected, however, the blue channel is still considered by the APO staff to be poor and the red is considered borderline usable.
3) Other
The mirror support system to hold our 3.5m mirror in the LDT coating chamber is being manufactured at APO. Plans are continuing for the scheduled August recoating at Lowell.
Repairs and maintenance are ongoing for various site metrology units (dewpoint and dust sensors).
June busy, DIS: red is kinda usable, looking better, throughput is half as good as it was last month, blue is still painful standard star, planetary nebula to look at broadening of emission lines, and SN in M101 to get as many instruments
Shutdown will start on July 26 and the anticipated return to science is August 22 (although that could slip by several days if the weather during engineering recovery is poor). if coating fails push by ~ 3 days
visit from NMSU administration others
Investigating scattered light concern
There is some unassigned time at end of June: 1 unencumbered dark B half (21 June) and 1 grey partial A half (23 June) adjacent to sunset APOLLO observations. Users are encouraged to request this time if they can make use of it (particularly those who have been weathered out recently). As a reminder, users should include Ben, Russet, Amanda, Nancy and their institutional scheduler on all schedule related emails.
schedule in progress, should be able to publish in a few days, very little open time in Q3, if difficulties with shutdown / recovery might have less open time 1 class visit in July 1 visiting instrument run VENUS
Open June 25-July 1 - not schedulable due to visiting instrument on 3.5m
when Q3 schedule comes out we will put out call for ARCSAT rpoposas not operating during summer shutdown
BYUCam is having some issues - encouraging ppl to use FlareCam, include more info in call for proposals - tell users to look closely at call for proposals for more details
Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2022 to now). The deadline is July 31. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, instrument concepts, etc., thus we need your help in updating our publication record! We are now participating in a cross-observatory analysis of scientific impact of ground-based telescopes, so it is especially important that we capture all publications resulting from APO observations. Any publications resulting from ARCSAT data are also requested. The listing should include refereed publications and student theses and dissertations (not conference abstracts unless they are peer reviewed) that made use of data acquired with the 3.5m and/or ARCSAT, published from 2022 to the present. If a paper has been submitted to a journal but has not yet completely gone through the review process, please include that as well, with the name of the journal and “submitted.”
Open action items from previous meetings:
New action items from this meeting:
xxx
xxx
The next meeting will be on Tuesday June 27, 10:30 am MDT. This is one week earlier than our regular schedule of the first Tuesday of July to avoid Independence Day. By having the meeting in late June this will give people an opportunity to provide feedback on the summer schedule, open time, instruments, etc. before July. The August meeting, which would be scheduled for August 1, will be canceled as it will be in the middle of summer shutdown. The September meeting, on September 5, will be used to discuss our return to operations after summer shutdown.