3.5-m Telescope and Instruments Highlights, 7/5/2022 - 8/1/2022
0) Overview
APO is no longer under any staffing or indoor masking restrictions from the State of New Mexico due to COVID. The COVID vaccination policy for ARC/APO has not changed.
Weather for July has been monsoonal, with dust also contributing to occasional closures.
1) Telescope
The telescope secondary issue may be related to the galil controller resetting. A power supply board was changed out and behavior is being monitored.
2) Instruments
KOSMOS: Commissioning activities are continuing; the instrument is still being offered on a shared risk basis. A replacement shutter for the slitviewer has arrived and will be replaced during the summer shutdown. Flux was decreased for internal lamps, more tuning is needed; this will take place at the same time as the shutter work. Work is also proceeding on prototype multiobject masks at both NMSU and UW shops. Some preliminary fields were observed and lessons learned are being applied to second round of test masks.
DIS: Servicing is tentatively being planned for early October to attempt to resolve the ice droplets on the red camera.
TripleSpec: Cold, operational and performing nominally.
Agile: Cold, operational and performing nominally. There is a known issue with missing observatory and WCS cards from the headers that we are trying to track down. This problem seemed to originate about the time we converted and moved the hub35m to a new server.
Echelle: Echelle inter-order light was slowly decreasing with the warmer ambient temperatures, but increased with cooler monsoon temperatures; the ratios are still quite good.
NICFPS: The instrument is performing nominally with the occasional need to reset the controller due to corrupted images, and previous cautions about rotator angle.
ARCTIC: Cold, operational and performing nominally.
3) ARCSAT: Limited to no usage lately.
xxx
xxx
xxx
Open time
Allocations will be sent out later this week. ANY CLASS TRIPS? we need to know ASAP
The ARCSAT Q3 schedule is now published; there is still room for some more requests.
APO needs your help in updating the observatory publication record! Please send Nancy (nchanove@nmsu.edu) any references for 3.5m-related publications (refereed publications and student theses/dissertations that have been published or submitted) from Jan 1, 2021 to now. The deadline was July 31 but Nancy can take all updates through the month of August.
Open action items from previous meetings:
New action items from this meeting:
xxx
The next meeting will be on Tuesday September 6, 10:30 am MDT.