User Tools

Site Tools


uc:uc20260113_january_13_2026

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
uc:uc20260113_january_13_2026 [2026/01/13 20:59]
nchanove
uc:uc20260113_january_13_2026 [2026/01/13 21:17] (current)
nchanove
Line 94: Line 94:
  
   * SoonerCam: See above site report and subsequent discussion.   * SoonerCam: See above site report and subsequent discussion.
-  * KOSMOS grisms: our proposal requesting funds to support the purchase of three new grisms for KOSMOS was not selected. We will move forward with the purchase of one or two grisms using ARC funds. If users have an opinion about this they should complete the following form no later than Friday January 30.+  * KOSMOS grisms: our proposal requesting funds to support the purchase of three new grisms for KOSMOS was not selected. We will move forward with the purchase of one or two grisms using ARC funds. If users have an opinion about this they should complete the following form **no later than Friday January 30**: https://forms.gle/Fr6LVu9o8Up782hW7
   * ASPEN: we have an NSF proposal pending but learned that we did receive some funds from the State of New Mexico to further advance the design. We will move forward with building the atmospheric dispersion corrector first since it can be used with ARCES. We presented a poster about ASPEN at the Jan. 2026 AAS meeting and received some positive feedback, and we submitted several papers about the instrument for the SPIE conference this summer. We still plan to hold the Preliminary Design Review in the first half of 2026, likely now in Q2.   * ASPEN: we have an NSF proposal pending but learned that we did receive some funds from the State of New Mexico to further advance the design. We will move forward with building the atmospheric dispersion corrector first since it can be used with ARCES. We presented a poster about ASPEN at the Jan. 2026 AAS meeting and received some positive feedback, and we submitted several papers about the instrument for the SPIE conference this summer. We still plan to hold the Preliminary Design Review in the first half of 2026, likely now in Q2.
   * Ocotillo: Things are progressing; we have the camera in hand and someone is working on camera characterization and software. We have the grating, some optics, and the fiber in hand. The TEG will be hiring an engineer/technician at the BS/MS level very soon; interested parties should look for the job ad on the UW hiring site shortly.   * Ocotillo: Things are progressing; we have the camera in hand and someone is working on camera characterization and software. We have the grating, some optics, and the fiber in hand. The TEG will be hiring an engineer/technician at the BS/MS level very soon; interested parties should look for the job ad on the UW hiring site shortly.
uc/uc20260113_january_13_2026.txt ยท Last modified: 2026/01/13 21:17 by nchanove