uc:uc2026
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| uc:uc2026 [2026/08/06 22:38] – nchanove | uc:uc2026 [2026/08/06 22:42] (current) – nchanove | ||
|---|---|---|---|
| Line 91: | Line 91: | ||
| === 2026 Q4 3.5m scheduling === | === 2026 Q4 3.5m scheduling === | ||
| - | The Q4 institutional allocations were sent out yesterday; proposals are due on August 25. In light of the anticipated housing crunch due to the loss of the housing trailer at Sunspot, it is // | + | The Q4 institutional allocations were sent out yesterday; proposals are due on August 25. In light of the anticipated |
| === 2026 Q3 0.5 scheduling === | === 2026 Q3 0.5 scheduling === | ||
| Line 103: | Line 103: | ||
| As reported in last month' | As reported in last month' | ||
| - | Nancy reiterated the need a user group devoted to software testing (at the moment, for KOSMOS and TripleSpec users to try out these PypeIt modules). Adam K indicated that he is willing to help. UC reps: please ask your users (and/or work with your institutional schedulers to identify your KOSMOS and TripleSpec users) to help out with this testing and to have those users communicate with Jon Holtzman about their experiences. | + | Nancy reiterated the need for a user group devoted to software testing (at the moment, |
| ---- | ---- | ||
| Line 118: | Line 118: | ||
| === Pilot data archive with NOIRLab === | === Pilot data archive with NOIRLab === | ||
| - | We are moving forward with the arrangement to have ARC 3.5m data ingested into the NOIRLab data archive. We will pilot this first with a single instrument (likely ARCES), which will allow us to work out any kinks. The decision was made to have this be an OPT-OUT arrangement, | + | We are moving forward with an arrangement to have ARC 3.5m data ingested into the NOIRLab data archive. We will pilot this first with a single instrument (likely ARCES), which will allow us to work out any kinks. The decision was made to have this be an OPT-OUT arrangement, |
| + | |||
| + | ---- | ||
| === ACTION ITEMS === | === ACTION ITEMS === | ||
uc/uc2026.1786055939.txt.gz · Last modified: by nchanove
