uc:uc2026
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| uc:uc2026 [2026/06/02 17:52] – nchanove | uc:uc2026 [2026/07/06 16:32] (current) – holtz | ||
|---|---|---|---|
| Line 7: | Line 7: | ||
| * Wyoming - nothing to report | * Wyoming - nothing to report | ||
| * Williams - no report | * Williams - no report | ||
| - | * Washington - a user pointed out calendar | + | * Washington - a user pointed out that the calendars on the scheduling web page are provided in Postscript |
| * UVa - nothing to report | * UVa - nothing to report | ||
| * Oklahoma - no report | * Oklahoma - no report | ||
| Line 59: | Line 59: | ||
| === Additional site, telescope and instruments discussion === | === Additional site, telescope and instruments discussion === | ||
| - | We've experienced a mix of late spring good weather and some closures due to elevated pollen and/or dust. We had some telescope and instrument issues over the past month; see above for the specific. Nancy asked how long ARCES would be out of commission if it requires servicing before the summer shutdown. Bill replied that it would be down for 2-3 weeks. The TUI connection problem described above has been difficult to diagnose. It does not seem to be correlated with software version, computer OS, or location of observer. A new version of TUI (3.2.2) was just released. The text on the TUI downloads page on the website will be updated in the next day or two to reflect the current way for users to download TUI (through GitHub). | + | We've experienced a mix of late spring good weather and some closures due to elevated pollen and/or dust. We had some telescope and instrument issues over the past month; see above for specifics. Nancy asked how long ARCES would be out of commission if the IOL degrades quickly and it requires servicing before the summer shutdown. Bill replied that it would be down for 2-3 weeks. The TUI connection problem described above has been difficult to diagnose. It does not seem to be correlated with software version, computer OS, or location of observer. |
| + | |||
| + | A new version of TUI (3.2.2) was just released. The text on the TUI downloads page on the website will be updated in the next day or two to reflect the current way for users to download TUI (through GitHub). | ||
| + | |||
| + | The job listing for an entry-level mechanical engineering position for the 3.5m is now posted: [[https:// | ||
| ---- | ---- | ||
| Line 65: | Line 69: | ||
| === 2026 Q2 3.5m scheduling === | === 2026 Q2 3.5m scheduling === | ||
| - | The Q2 schedule is posted. There are two upcoming | + | The Q2 schedule is posted. There are two OPEN dates remaining |
| Users should submit requests for this time to the scheduling team (Amanda Townsend, Russet McMillan, Ben Williams, and Nancy Chanover), and cc their institutional scheduler. Amanda reminded anyone with an unused ToO to notify the observing staff if plans have changed. | Users should submit requests for this time to the scheduling team (Amanda Townsend, Russet McMillan, Ben Williams, and Nancy Chanover), and cc their institutional scheduler. Amanda reminded anyone with an unused ToO to notify the observing staff if plans have changed. | ||
| === 2026 Q3 3.5m scheduling === | === 2026 Q3 3.5m scheduling === | ||
| - | Amanda is working on the Q3 schedule; thanks to everyone | + | Amanda is working on the Q3 schedule; thanks to everyone |
| ---- | ---- | ||
| Line 82: | Line 86: | ||
| === Update on Sunspot Situation === | === Update on Sunspot Situation === | ||
| - | In early January there was a mercury leak at the Dunn Solar Telescope. This led the NSF to move forward with decommissioning the telescope and the entire Sunspot site. Residents received notifications that their leases were being terminated and APO was informed that our house trailer must be removed from the grounds by the end of August. The loss of three housing spots (in the trailer) plus additional pressure on the on-site housing that may be used temporarily for staff who have to relocate may have an impact on general housing availability this fall. We are in discussions with the NSF regarding additional impacts that the decommissioning will have on APO (most significantly access to water, but also keeping dust minimal when bringing down buildings, informing us of explosive | + | In early January there was a mercury leak at the Dunn Solar Telescope. This led the NSF to move forward with decommissioning the telescope and the entire Sunspot site. Residents received notifications that their leases were being terminated and APO was informed that our house trailer must be removed from the grounds by the end of August. The loss of three housing spots (in the trailer), plus additional pressure on the on-site housing that may be used temporarily for staff who have to relocate, may have an impact on general housing availability |
| ---- | ---- | ||
| - | === Call for papers/ | + | === New ARC Board Chair === |
| - | Nancy expressed an interest in collecting more information from the users concerning | + | Effective July 1, Chip Kobulnicky of the University of Wyoming will be the new Chair of the ARC Board of Governors. Congratulations, Chip! And thank you to Mike Crenshaw |
| ---- | ---- | ||
| - | === Instrument initiatives === | ||
| - | Ocotillo - parts in shop, assembling, software to control camera in work, first fiber bundle in lab, all optics in hand except | + | === Call for papers/ |
| + | |||
| + | Nancy issued her annual call for scientific papers and student theses/ | ||
| + | |||
| + | ---- | ||
| + | === New instrument initiatives === | ||
| - | https:// | + | * Ocotillo - Sarah reported progress on having the necessary parts in the shop. Assembly is underway, software to control the camera is in work, and the first fiber bundle is in progress in the lab. All optics are in hand except for one, which she expects to receive in two weeks. The orange channel is ready for mechanical |
| + | * ASPEN - Work on the Atmospheric Dispersion Corrector is proceeding as it will be used with ARCES even before ASPEN is completed. The ASPEN Preliminary Design Review is scheduled for later this month. This will be an important milestone in refining and finalizing the instrument design. | ||
| + | * SoonerCam: see site report for progress related to SoonerCam and the Agile rotator. | ||
| ---- | ---- | ||
| Line 109: | Line 119: | ||
| New action items from this meeting: | New action items from this meeting: | ||
| - | + | ||
| - | * xxxx | + | * APO: update scheduling webpage to replace Postscript calendars with PDF versions. |
| + | * APO: update text on TUI downloads page to reflect new procedure for downloading TUI. | ||
| + | * UC reps: notify your users about OPEN time available in June. | ||
| ---- | ---- | ||
| Line 116: | Line 128: | ||
| === All Other Business === | === All Other Business === | ||
| - | xxx | + | None. |
| ---- | ---- | ||
uc/uc2026.1780422768.txt.gz · Last modified: by nchanove
