This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
uc:uc20251202_december_2_2025 [2025/12/02 16:35] nchanove |
uc:uc20251202_december_2_2025 [2025/12/02 18:42] (current) nchanove |
||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ---- | ---- | ||
| - | Attending: Nancy Chanover (NMSU), | + | Attending: Nancy Chanover (NMSU), |
| - | Aleksandr Mosenkov (BYU), | + | Russet McMillan (APO), Anne Verbiscer (UVa), Adam Kowalski (CU), Chip Kobulnicky (UWy), Gordon MacDonald (APO) |
| === User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
| - | * NMSU - nothing to report | + | * NMSU - nothing to report; eager to hear about KOSMOS update |
| - | * Washington - nothing to report other than general interest in the timetable for the KOSMOS repair | + | * Washington - ditto |
| - | * UVa - nothing to report | + | * UVa - nothing to report |
| - | * Colorado - | + | * Colorado - no report |
| * BYU - nothing to report | * BYU - nothing to report | ||
| * Georgia State - nothing to report | * Georgia State - nothing to report | ||
| - | * Oklahoma - nothing to report | + | * Oklahoma - nothing to report; eager about KOSMOS |
| - | * Wyoming - nothing to report | + | * Wyoming - no report |
| * JHU - nothing to report | * JHU - nothing to report | ||
| - | * Seattle - | + | * Seattle - nothing to report |
| * Colgate - no report | * Colgate - no report | ||
| - | * Williams - | + | * Williams - nothing to report (by email) |
| ---- | ---- | ||
| Line 65: | Line 65: | ||
| === Additional site, telescope and instruments discussion === | === Additional site, telescope and instruments discussion === | ||
| - | xxxx | + | 3 class visits in Oct-Nov, upcoming class at end of this week, current training responsibilities transferred over to Russet and Amanda. |
| + | |||
| + | 3.5m telescope - working fairy well. Still have occasional motion error (seasonal), haven' | ||
| + | |||
| + | 0.5m Dcam-spare - cleaned to remove water spots but without much success. Likely going to replace DIS slitviewer to use in ARCSAT. UVa camera still available. Not much luck testing BYUCam - may send to Fingerlakes for repair/ | ||
| + | |||
| + | KOSMOS - repaired cold strapping in a temporary sense - constrained wired cold straps put back in place because unable to get braided copper straps to properly silver solder. Engineering last night - did some additional dark testing to make sure that it's still holding up as a fix; some dew on cryostat window due to lack of purge air turns on when put back together, They dried up. During Q1 will warm and pull cryostat to clean window. Should flat field out in the mean time and are barely noticeable. | ||
| + | |||
| + | ARCTIC had problems with vacuum / cryostat ion pump. one instance with filter wheel unable to be commanded. Restarted hardware controller in November. | ||
| + | |||
| + | Agile not taken apart yet but have received all parts for SoonerCam but will start assembling it after first of year as well as software developing. | ||
| + | |||
| + | ARCES - reminder about FITS header DATE-OBS keyword was incorrect. Also - in last week had some intermittent THAr lamp behavior - not energized. Recent echelle users should look at their cals to confirm that cal files are not blank. DOn't think it's a bulb problem, probably cabling or power supply. Still investigating. | ||
| + | |||
| + | APOLLO - had 2 sessions in last 2 months where hit all 6 retroreflectors. And tracked down some water line problems identified and repaired. | ||
| + | |||
| + | Moire question: is ARCES value offset constant or does it depend on when data were taken? BK: thinks it's constant. | ||
| + | |||
| + | KOSMOS - plan to remake some of the parts for cryostat separately so that servicing time is minimized. | ||
| ---- | ---- | ||
| Line 71: | Line 89: | ||
| === 2025 Q4 3.5m scheduling === | === 2025 Q4 3.5m scheduling === | ||
| - | The Q4 schedule is posted. There is a fair amount of OPEN/DD01 time in late October (dark time, all B halves). We hope to use some of it to pay back KOSMOS users who had to give up their time but we're not committing to that until we know when KOSMOS will be returning. Some of the scheduled KOSMOS time may need to be allocated to other users, ideally from the same institution. There is additional OPEN/DD01 time later in quarter, including a limited number of A halves or partial A halves. A huge thank you to Russet for doing such a great job with the challenging schedule for this quarter. | + | The Q4 schedule is posted. |
| + | |||
| + | There is a fair amount of OPEN/DD01 time in late October (dark time, all B halves). We hope to use some of it to pay back KOSMOS users who had to give up their time but we're not committing to that until we know when KOSMOS will be returning. Some of the scheduled KOSMOS time may need to be allocated to other users, ideally from the same institution. There is additional OPEN/DD01 time later in quarter, including a limited number of A halves or partial A halves. A huge thank you to Russet for doing such a great job with the challenging schedule for this quarter. | ||
| ---- | ---- | ||
| Line 77: | Line 97: | ||
| === 2026 Q1 3.5m scheduling === | === 2026 Q1 3.5m scheduling === | ||
| - | The Q1 schedule is in the works. | + | All requests in. The Q1 schedule is in the works. Working out conflicts. Should have something around 12/10. ARCSAT call comes out late next week. |
| ---- | ---- | ||
| Line 83: | Line 103: | ||
| === 2025 Q4 0.5 scheduling === | === 2025 Q4 0.5 scheduling === | ||
| - | The ARCSAT Q4 schedule is posted. | + | The ARCSAT Q4 schedule is posted. |
| ---- | ---- | ||
| Line 92: | Line 112: | ||
| * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | ||
| * ASPEN: We recently learned that a proposal we submitted for funds to support the development of the new echelle spectrograph was not selected for funding. Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review in early spring 2026. We are hosting an ASPEN team meeting at APO and NMSU this week. | * ASPEN: We recently learned that a proposal we submitted for funds to support the development of the new echelle spectrograph was not selected for funding. Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review in early spring 2026. We are hosting an ASPEN team meeting at APO and NMSU this week. | ||
| - | * Ocotillo: | + | * Ocotillo: |
| ---- | ---- | ||
| Line 98: | Line 118: | ||
| === Website update === | === Website update === | ||
| - | xxx | + | Tentative launch date of Jan 13. working on staff access for login portion. |
| + | Anne V : will old site still be accessible? | ||
| ---- | ---- | ||
| Line 116: | Line 137: | ||
| === Data archiving discussion === | === Data archiving discussion === | ||
| - | xxx | + | MH - extremely useful; one of most valuabe stellar spectroscopy databases in world; if go this route, get pipeline |
| + | EB - great idea, archive is table stakes in today' | ||
| ---- | ---- | ||
| Line 125: | Line 147: | ||
| Open action items from previous meetings: | Open action items from previous meetings: | ||
| * Nancy/ | * Nancy/ | ||
| - | | + | |
| + | open on git hub - tutorials are not fully vetted - not locked down - open to editing | ||
| + | |||
| + | | ||
| + | * | ||
| * UC reps: remind your users to review the Q4 schedule and request OPEN/DD01 time if they can make a good case for it. | * UC reps: remind your users to review the Q4 schedule and request OPEN/DD01 time if they can make a good case for it. | ||