This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
|
uc:uc20251202_december_2_2025 [2025/12/02 16:34] nchanove created |
uc:uc20251202_december_2_2025 [2025/12/16 17:08] (current) nchanove |
||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ---- | ---- | ||
| - | Attending: Nancy Chanover (NMSU), | + | Attending: Nancy Chanover (NMSU), |
| - | + | ||
| - | Aleksandr Mosenkov | + | |
| === User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
| - | * NMSU - nothing to report | + | * NMSU - nothing to report |
| - | * Washington - nothing to report other than general interest in the timetable for the KOSMOS | + | * Washington - nothing to report other than users are eager to hear about KOSMOS |
| - | * UVa - nothing to report | + | * UVa - nothing to report |
| - | * Colorado - | + | * Colorado - no report |
| * BYU - nothing to report | * BYU - nothing to report | ||
| * Georgia State - nothing to report | * Georgia State - nothing to report | ||
| - | * Oklahoma - nothing to report | + | * Oklahoma - nothing to report |
| - | * Wyoming - nothing to report | + | * Wyoming - no report |
| * JHU - nothing to report | * JHU - nothing to report | ||
| - | * Seattle - | + | * Seattle - nothing to report |
| * Colgate - no report | * Colgate - no report | ||
| - | * Williams - | + | * Williams - nothing to report (by email) |
| ---- | ---- | ||
| Line 37: | Line 35: | ||
| The first half of October experienced very unsettled weather, while the second half of the month through the middle of November had beautifully clear skies. The latter part of November again was nearly weathered out, and we saw our first light snowfalls of the season. | The first half of October experienced very unsettled weather, while the second half of the month through the middle of November had beautifully clear skies. The latter part of November again was nearly weathered out, and we saw our first light snowfalls of the season. | ||
| - | We had three class visits during this time period: (NMSU) mid-October, | + | We had three class visits during this time period: (NMSU) mid-October, |
| 2) Operations | 2) Operations | ||
| Line 65: | Line 63: | ||
| === Additional site, telescope and instruments discussion === | === Additional site, telescope and instruments discussion === | ||
| - | xxxx | + | We held a public Open House at APO on October 11, during which we welcomed roughly 200 visitors to APO for tours, talks and interactive exhibits. Thanks to the nearly 30 volunteers from APO, Sunspot Solar Observatory, |
| + | |||
| + | There were three class visits in Oct-Nov and another one coming up at the end of this week. Currently most of the training responsibilities have been transferred over to Russet and Amanda. | ||
| + | |||
| + | The 3.5m telescope has been working fairy well. We still have occasional (seasonal) motion errors, but we haven' | ||
| + | |||
| + | On ARCSAT, the Dcam-spare camera was cleaned to remove water spots but without much success. We are likely going to replace it with the primary DIS slitviewer. **Note added in proof: this swap was made -- Dcam-spare was replaced with Dcam.** UVa-cam is still available. We have not had much luck testing BYUCam so we may send it back to FingerLakes for repair/ | ||
| + | |||
| + | For KOSMOS, we repaired the cold strapping in a temporary sense, meaning the constrained wired cold straps were put back in place because we were unable to get braided copper straps to properly silver solder to the cold head. During engineering time last night we did some additional dark testing to verify that it's still holding up as a fix and it looks to be holding. There is some dew on the cryostat window due to a lack of purge air turned on when the instrument was put back together; the spots seem to be dried up now. During Q1 we will warm the instrument and pull the cryostat to clean the window. The spots should flat-field out in the mean time and are barely noticeable. The plan is to remake some of the parts for the cryostat separately so that the servicing time is minimized. | ||
| + | |||
| + | ARCTIC had some problems with the vacuum / cryostat ion pump and one instance where the filter wheel was unable to be commanded. We restarted the hardware controller in November. | ||
| + | |||
| + | Agile has not yet been taken apart but we have received all of the parts for SoonerCam and we will start assembling it and working on software development in January. | ||
| + | |||
| + | As a reminder, the ARCES FITS headers had a DATE-OBS keyword that was incorrect for some period of time starting on August 27, 2024. The reported value is about 45 minutes ahead of the true value. Users who require precise timing information should contact the observing staff for more details. Last week we had some intermittent ThAr lamp behavior where it was not being energized. Recent ARCES should look at their calibration files to confirm that they are not blank. We do not think it's a bulb problem; it is probably a cabling or power supply issue but we are still investigating this. | ||
| + | |||
| + | APOLLO had two sessions in last two months where we hit all 6 retroreflectors, | ||
| + | |||
| + | Question from UC member: is the ARCES time offset value constant or does it depend on when data were taken? Bill thinks it's constant. | ||
| ---- | ---- | ||
| Line 71: | Line 87: | ||
| === 2025 Q4 3.5m scheduling === | === 2025 Q4 3.5m scheduling === | ||
| - | The Q4 schedule is posted. There is a fair amount of OPEN/DD01 time in late October (dark time, all B halves). We hope to use some of it to pay back KOSMOS users who had to give up their time but we're not committing to that until we know when KOSMOS will be returning. Some of the scheduled KOSMOS | + | The Q4 schedule is posted. There is some OPEN time available on Dec 23A (short slot) and on New Year's Eve (note added in proof: the 12/31 time is now spoken for). Users interested in the Dec 23A time should send a request |
| ---- | ---- | ||
| Line 77: | Line 93: | ||
| === 2026 Q1 3.5m scheduling === | === 2026 Q1 3.5m scheduling === | ||
| - | The Q1 schedule is in the works. | + | All requests are in and the Q1 schedule is in the works, we should have the schedule published around 12/10. The ARCSAT call should come out late next week. Note added in proof: the Q1 2026 schedule is now published and the ARCSAT call for proposals for Q1 was sent out on Dec 15; proposals are due by Dec 22. |
| ---- | ---- | ||
| Line 83: | Line 99: | ||
| === 2025 Q4 0.5 scheduling === | === 2025 Q4 0.5 scheduling === | ||
| - | The ARCSAT Q4 schedule is posted. | + | The ARCSAT Q4 schedule is posted. |
| ---- | ---- | ||
| Line 89: | Line 105: | ||
| === Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
| - | * SoonerCam: | + | * SoonerCam: |
| * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | ||
| - | * ASPEN: | + | * ASPEN: Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review in spring 2026. We hosted a productive |
| - | * Ocotillo: The vibration stabilization bench and optical table have been delivered, along with the enclosure. We are starting to get optical mounting parts and a student | + | * Ocotillo: The TEG team is working on optics mounting. We have the disperser |
| - | + | ||
| - | ---- | + | |
| - | + | ||
| - | === Status of new instrument initiatives === | + | |
| - | + | ||
| - | * SoonerCam: Parts have been trickling | + | |
| - | * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | + | |
| - | * ASPEN: We recently learned that a proposal we submitted for funds to support the development of the new echelle spectrograph was not selected for funding. Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review | + | |
| - | * Ocotillo: The vibration stabilization bench and optical table have been delivered, along with the enclosure. We are starting | + | |
| ---- | ---- | ||
| Line 107: | Line 114: | ||
| === Website update === | === Website update === | ||
| - | xxx | + | We are tentatively planning to launch the new website on January 13, 2026. We are currently working on updating the procedure for staff access for the portion of the website that will be behind a login. The old website will still be accessible, at least for some TBD time period, but the goal is for all users to migrate to the new site and let us know if there is critical information that they can no longer find. |
| ---- | ---- | ||
| Line 113: | Line 120: | ||
| === Recap from ARC Board of Governors meeting === | === Recap from ARC Board of Governors meeting === | ||
| - | xxx | + | Nancy presented a subset of slides from her presentations to the ARC Board of Governors meeting in early November to provide the UC reps with a summary of the 2025 operations, science achievements, |
| ---- | ---- | ||
| Line 119: | Line 126: | ||
| === Plans for Jan. 2026 AAS meeting === | === Plans for Jan. 2026 AAS meeting === | ||
| - | xxx | + | We will have a joint APO-SDSS-SciServer booth at the January 2026 AAS meeting in Phoenix. We'd love to connect with faculty, staff, postdoc and student users of APO while at the meeting. Please stop by the booth, and please let us know if any of your department members are planning to present results derived from APO data so we can showcase them! |
| ---- | ---- | ||
| Line 125: | Line 132: | ||
| === Data archiving discussion === | === Data archiving discussion === | ||
| - | xxx | + | Nancy discussed the fact that we are exploring the possibility of working with an existing data archive to enable us to archive APO 3.5m data. In polling the UC reps, it seemed that there is broad support for this initiative. People agreed that this would enhance the scientific impact of APO over time, and no one seemed alarmed that the data would become public (after some proprietary period), particularly if there were a way for a user to opt-out. Nancy will provide more updates as they become available. |
| ---- | ---- | ||
| - | |||
| === ACTION ITEMS === | === ACTION ITEMS === | ||
| Open action items from previous meetings: | Open action items from previous meetings: | ||
| - | * Nancy/ | + | * Nancy/ |
| - | * Joanne Hughes: put the KOSMOS MOS data reduction software on the wiki. | + | * Joanne Hughes: put the KOSMOS MOS data reduction software on the wiki. Joanne is waiting for an update from her colleagues at the College of Idaho. Status: OPEN. |
| - | * UC reps: remind your users to review the Q4 schedule and request OPEN/DD01 time if they can make a good case for it. | + | * UC reps: remind your users to review the Q4 schedule and request OPEN/DD01 time if they can make a good case for it. Status: OPEN. |
| New action items from this meeting: | New action items from this meeting: | ||
| - | * xxxx | + | * UC reps: alert your users that if they plan to attend the Jan. 2026 AAS meeting and present results derived from APO data they should notify Nancy. |
| + | * UC reps: please discuss the idea of archiving our 3.5m data with your users and report back with any reactions, either positive (e.g., advantages that they see to having a data archive) or negative (e.g., potential issues or concerns). | ||
| ---- | ---- | ||
| Line 144: | Line 151: | ||
| === All Other Business === | === All Other Business === | ||
| - | We discussed the timeline of events that led to the temperature issues for KOSMOS. In January 2025 the chip temperature increased. Data taken in late winter and early spring were probably not affected, but users started to notice the issue in the mid/late spring. | + | None. |
| - | + | ||
| - | Gordon is working on a new release for TUI (v3.2), which will be coming out soon. The new version cleaned out some old scripts and removed the option of selecting instruments that are being decommissioned. The most exciting aspect is that he is working on packaging to make the software installation process more simple for users, especially students. Although we encourage users to stay current with their TUI versions, older versions of the software will still work. | + | |
| ---- | ---- | ||
| Line 152: | Line 157: | ||
| === Proposed meeting schedule for 2026 === | === Proposed meeting schedule for 2026 === | ||
| - | Propose | + | There was no objection to maintaining the same meeting schedule in 2026, i.e. the first Tuesday of the month at 10:30 am MT. The only exception will be in January, since the first Tuesday conflicts with the AAS meeting |
| - | Jan 13 | + | |
| - | Feb 03 | + | |
| - | Mar 03 | + | |
| - | Apr 07 | + | |
| - | May 05 | + | |
| - | Jun 02 | + | |
| - | Jul 07 | + | |
| - | Aug 04 | + | |
| - | Sep 01 | + | |
| - | Oct 06 | + | |
| - | Nov 03 | + | |
| - | Dec 01 | + | |
| - | + | ||
| ---- | ---- | ||