This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
uc:uc20251007_october_7_2025 [2025/10/07 16:49] nchanove |
uc:uc20251007_october_7_2025 [2025/10/14 20:55] (current) nchanove |
||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ---- | ---- | ||
| - | Attending: Nancy Chanover (NMSU), Aleksandr Mosenkov (BYU), Russet McMillan (APO), Anne Verbiscer (UVa), Adam Kowalski (CU), Misty Bentz (GSU), Ben Williams (UW), Moire Prescott (NMSU), Joanne Hughes (Seattle U), Chip Kobulnicky (UWy), Michael Hayden (OU), Eric Bellm (UW), Sarah Tuttle (UW), Bill Ketzeback (APO), Gordon MacDonald (APO) | + | Attending: Nancy Chanover (NMSU), Aleksandr Mosenkov (BYU), Russet McMillan (APO), Anne Verbiscer (UVa), Adam Kowalski (CU), Misty Bentz (GSU), Ben Williams (UW), Moire Prescott (NMSU), Joanne Hughes (Seattle U), Chip Kobulnicky (UWy), Michael Hayden (OU), Eric Bellm (UW), Sarah Tuttle (UW), Bill Ketzeback (APO), Gordon MacDonald (APO) |
| Line 9: | Line 9: | ||
| === User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
| - | * Colorado - user or two wondering about status | + | * Colorado - Several CU users were wondering about the status |
| * BYU - nothing to report | * BYU - nothing to report | ||
| * Oklahoma - nothing to report | * Oklahoma - nothing to report | ||
| * UVa - nothing to report | * UVa - nothing to report | ||
| - | * Wyoming - nothing to report | + | * Wyoming - nothing to report |
| * Georgia State - nothing to report | * Georgia State - nothing to report | ||
| * NMSU - nothing to report | * NMSU - nothing to report | ||
| - | * Washington - nothing to report | + | * Washington - nothing to report |
| * JHU - nothing to report (by email) | * JHU - nothing to report (by email) | ||
| - | * Seattle - nothing to report | + | * Seattle - nothing to report |
| * NAPG - no report | * NAPG - no report | ||
| Line 41: | Line 41: | ||
| 0.5m Telescope: Telescope is working as expected. | 0.5m Telescope: Telescope is working as expected. | ||
| - | KOSMOS: | + | KOSMOS: As discussed last month, the increase in dark current warranted opening the cryostat for inspection. Three of the four thermal connections from the liquid nitrogen can to the CCD cold block had failed, leaving only a single thin connection. Repairs were delayed by the shipping of material from Europe. We are currently searching for a vendor to assemble the parts, as we have not had success ourselves. |
| ARCTIC: The diffuser rotation mechanism is still unreliable even after a full servicing. The mechanism that moves the diffuser in and out of the optical path is still functional in the meantime. The rest of the instrument is cooled. | ARCTIC: The diffuser rotation mechanism is still unreliable even after a full servicing. The mechanism that moves the diffuser in and out of the optical path is still functional in the meantime. The rest of the instrument is cooled. | ||
| Line 61: | Line 61: | ||
| === Additional site, telescope and instruments discussion === | === Additional site, telescope and instruments discussion === | ||
| - | Highlight some of the items - APO hosting Open House this coming weekend. Giving | + | APO will be hosting |
| - | Nothing | + | The 3.5m telescope is performing as expected for this time of year. We had a failure of one of the actuators on the secondary mirror, which froze when changing between two ports. Homing of the mirror corrected the problem with no further issues; this was caught during poor weather so no science time was lost. |
| + | |||
| + | The 0.5m telescope is working as expected; Dcam-spare and UVAcam are available to users for Q4. | ||
| + | |||
| + | KOSMOS is warm and taken apart as a result of increased dark current reported by the users. At last month' | ||
| + | |||
| + | ARCES: While working on streamlining the software for calculating IOL it was discovered that the DATE-OBS keyword | ||
| + | |||
| + | ARCTIC, NICFPS, TripleSpec and APOLLO are all functioning nominally. DIS and Agile are still slated for decommissioning. | ||
| ---- | ---- | ||
| Line 69: | Line 77: | ||
| === 2025 Q4 3.5m scheduling === | === 2025 Q4 3.5m scheduling === | ||
| - | The Q4 schedule is posted. | + | The Q4 schedule is posted. There is a fair amount of OPEN/DD01 time in late October (dark time, all B halves). We hope to use some of it to pay back KOSMOS users who had to give up their time but we're not committing to that until we know when KOSMOS will be returning. Some of the scheduled KOSMOS time may need to be allocated to other users, ideally from the same institution. There is additional OPEN/DD01 time later in quarter, including a limited number of A halves or partial A halves. A huge thank you to Russet for doing such a great job with the challenging schedule for this quarter. |
| ---- | ---- | ||
| Line 75: | Line 83: | ||
| === 2025 Q4 0.5 scheduling === | === 2025 Q4 0.5 scheduling === | ||
| - | The ARCSAT Q4 schedule is posted. | + | The ARCSAT Q4 schedule is posted. It is pretty full, but there is some time available later in the quarter. The two available instruments are UVa-cam (larger FOV) and Dcam-spare (smaller FOV and less oversampled). Dcam-spare did have some frost on the window after shutdown; it is gone now but we can still see signatures of it on the detector. They flat-field out but the frames look ugly when taking data. |
| ---- | ---- | ||
| Line 81: | Line 89: | ||
| === Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
| - | * SoonerCam: | + | * SoonerCam: |
| * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | * KOSMOS grisms (no change from last month): we are still awaiting a decision on the proposal we submitted for funds to support the purchase of three new grisms for KOSMOS. | ||
| - | * ASPEN: We recently learned that a proposal we submitted for funds to support the development of the new echelle spectrograph was not selected for funding. Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review in early spring 2026. | + | * ASPEN: We recently learned that a proposal we submitted for funds to support the development of the new echelle spectrograph was not selected for funding. Work on the design of the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review in early spring 2026. We are hosting an ASPEN team meeting at APO and NMSU this week. |
| - | * Ocotillo: | + | * Ocotillo: |
| ---- | ---- | ||
| Line 102: | Line 110: | ||
| Open action items from previous meetings: | Open action items from previous meetings: | ||
| - | * Nancy: follow up with UWy KOSMOS user to determine severity of dark current issue. | + | * Nancy: follow up with UWy KOSMOS user to determine severity of dark current issue. Status: CLOSED. |
| - | * UC reps: remind your users to review the Q3 schedule and request OPEN time in September if they can make a good case for it. | + | * UC reps: remind your users to review the Q3 schedule and request OPEN time in September if they can make a good case for it. Status: CLOSED. |
| - | * UC reps: poll your users about a Jan. 2026 splinter session at the AAS for APO science highlights and networking (or other ideas!). | + | * UC reps: poll your users about a Jan. 2026 splinter session at the AAS for APO science highlights and networking (or other ideas!). Status: CLOSED. |
| New action items from this meeting: | New action items from this meeting: | ||
| - | * xxx | + | * Nancy/ |
| + | * Joanne Hughes: put the KOSMOS MOS data reduction software on the wiki. | ||
| + | * UC reps: remind your users to review the Q4 schedule and request OPEN/DD01 time if they can make a good case for it. | ||
| + | * UC reps: remind your users to ** provide Nancy with science highlights from 2025; she needs to receive them no later than Monday October 27.** | ||
| ---- | ---- | ||
| Line 113: | Line 124: | ||
| === All Other Business === | === All Other Business === | ||
| - | None. | + | We discussed the timeline of events that led to the temperature issues for KOSMOS. In January 2025 the chip temperature increased. Data taken in late winter and early spring were probably not affected, but users started to notice the issue in the mid/late spring. |
| + | |||
| + | Gordon is working on a new release for TUI (v3.2), which will be coming out soon. The new version cleaned out some old scripts and removed the option of selecting instruments that are being decommissioned. The most exciting aspect is that he is working on packaging to make the software installation process more simple for users, especially students. Although we encourage users to stay current with their TUI versions, older versions of the software will still work. | ||
| ---- | ---- | ||
| Line 119: | Line 132: | ||
| === Next meeting === | === Next meeting === | ||
| - | The next meeting is currently scheduled for Tuesday November 4, 2025. This directly conflicts with the ARC Board meeting; shall we reschedule for one week later or cancel | + | The next Users Committee |
| ---- | ---- | ||