This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
uc:uc20250805_august_5_2025 [2025/08/26 21:45] nchanove |
uc:uc20250805_august_5_2025 [2025/08/26 21:48] (current) nchanove |
||
---|---|---|---|
Line 90: | Line 90: | ||
=== 2025 Q4 3.5m scheduling === | === 2025 Q4 3.5m scheduling === | ||
- | All allocations for Q4 have been sent to the institutional schedulers; proposals are due on August 25. Note that in the allocation emails | + | All allocations for Q4 have been sent to the institutional schedulers; proposals are due on August 25. Note that the allocation emails |
---- | ---- |