This shows you the differences between two versions of the page.
— |
uc:uc20250701_july_1_2025 [2025/06/26 20:53] (current) nchanove created |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ==== APO 3.5-m Users Committee Meeting, 07/01/2025 ==== | ||
+ | |||
+ | ---- | ||
+ | |||
+ | Attending: UPDATE EVERYTHING BELOW THIS: | ||
+ | |||
+ | Nancy Chanover (NMSU), Bill Ketzeback (APO), Anne Verbiscer (UVa), Eric Bellm (UW), Aleksandr Mosenkov (BYU), Kevin Schlaufman (JHU), Joanne Hughes (Seattle U), Moire Prescott (NMSU), Adam Kowalski (CU), Chip Kobulnicky (UWy), Ben Williams (UW), Sarah Tuttle (UW) | ||
+ | |||
+ | === User feedback and comments from institutional representatives === | ||
+ | |||
+ | * BYU - nothing to report | ||
+ | * Colorado - nothing to report | ||
+ | * Georgia State - nothing to report (by email) | ||
+ | * JHU - nothing to report | ||
+ | * NAPG - no report | ||
+ | * NMSU - There was a report from a user regarding the dark correction on KOSMOS data taken pretty recently. The dark level seems to be higher than it was historically, | ||
+ | * Oklahoma - no report | ||
+ | * Seattle - nothing to report | ||
+ | * UVa - nothing to report | ||
+ | * Washington - nothing to report | ||
+ | * Wyoming - no report | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Telescope and Instruments Report === | ||
+ | |||
+ | The detailed site report is included below, followed by additional information discussed during today' | ||
+ | |||
+ | // 3.5-m Telescope and Instruments Highlights, 5/02/25 – 06/02/25 // | ||
+ | |||
+ | 1) Overview | ||
+ | |||
+ | May was another month filled with unsettled weather but there were a few excellent nights near the end of the month with good seeing. The nights lost due to weather were mostly a result of cloud cover, high winds, elevated dust and humidity; we had very little precipitation this month. The New Mexico Governor has declared a state of emergency for the entire state due to severe drought conditions and extreme fire risk. A wildfire about 80 miles NNE of the observatory, | ||
+ | |||
+ | As a reminder, summer shutdown is scheduled to start on July 7. | ||
+ | |||
+ | 2) Operations | ||
+ | |||
+ | 3.5m Telescope: Telescope is working as expected. Seasonal motion errors have been infrequent. | ||
+ | |||
+ | 0.5m Telescope: Telescope is working as expected. | ||
+ | |||
+ | KOSMOS: System is cooled and stable. | ||
+ | |||
+ | ARCTIC: The diffuser rotation mechanism is still unreliable even after a full servicing. Troubleshooting is continuing. The mechanism that moves the diffuser in and out of the optical path is still functional in the meantime. The rest of the instrument is cooled. The CCD was experiencing a strange bias issue that appears to have gone away when we partially warmed the instrument for an ion pump change. We are continuing to monitor. | ||
+ | |||
+ | Agile: The camera is non-operational; | ||
+ | |||
+ | ARCES: System is currently up and usable. Work continues on a replacement and modern ICC. | ||
+ | |||
+ | DIS: System is cooled but in an unknown state for science. | ||
+ | |||
+ | NICFPS: System is cooled and usable. | ||
+ | |||
+ | TripleSpec: System is cooled and usable. | ||
+ | |||
+ | APOLLO: The system is currently experiencing some technical issues with the laser and thermal control at the time of this report. A portion of the system has been powered down while we wait for replacement parts. It may still be possible to energize just prior to a schedule run and still range. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Additional site, telescope and instrument discussion === | ||
+ | |||
+ | The site has been incredibly dry but we got some much-needed rain last weekend even though we are not yet in the classical monsoon season. We will be keeping an eye out for seasonal telescope motion errors that may increase as the temperature warms; if that happens we may need to adjust the PID settings. | ||
+ | |||
+ | ARCSAT had some issues last night with the camera communicating with the software but it got ironed out. | ||
+ | |||
+ | We will investigate the KOSMOS issue reported above. | ||
+ | |||
+ | ARCTIC recently dropped a quad, which was recovered. There were also recent issues with the ion pump control; the cause was narrowed down to a bad cable. Once this is repaired we hope these issues will be reduced and we will not have to warm the instrument as much as we have recently. | ||
+ | |||
+ | Agile experienced a failure of the newly replaced TEC, and there are no current plans to repair the instrument further. We are moving ahead with SoonerCam (we now have the new camera in hand)! Auxiliary equipment for SoonerCam has not been ordered yet but that project is ramping up. | ||
+ | |||
+ | We are working on replacements for more modern computer/ | ||
+ | |||
+ | There is no new status update for DIS. | ||
+ | |||
+ | NICFPS and TripleSpec are performing fine. | ||
+ | |||
+ | We are currently undergoing some technical issues with the laser on APOLLO that we're working through. | ||
+ | |||
+ | If we do any instrument servicing this summer it will probably take place outside of the summer shutdown window. Most likely it would only be KOSMOS, since ARCES, NICFPS, and TripleSpec don't need vacuum servicing, and KOSMOS generally only requires a 2-3 day turnaround. This could be accomplished during a period when the instrument is not scheduled for science. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === 2025 Q2 3.5m scheduling === | ||
+ | |||
+ | The time in Q2 is fully allocated; no OPEN or DD slots remain. There are a couple of ToO paybacks slots that have not been called in yet. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === 2025 Q2 0.5 scheduling === | ||
+ | |||
+ | The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). The long-standing policy for filter requests and changes is now published on the ARCSAT webpage in an effort to make it more visible. **Users who are asking for filter changes must make the request at least 72 hours prior to the scheduled observing night when the new filters are needed. The APO staff cannot support filter changes on weekends and holidays.** | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === 2025 Q3 3.5m scheduling === | ||
+ | |||
+ | The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. We have received all requests for Q3 (thanks to everyone for getting them in on time or close to it!). So far we are not aware of any major conflicts. The schedule is currently being built and we hope to have a version to distribute next week. Once the Q3 schedule for the 3.5m is published we will issue a call for ARCSAT Q3 requests. ARCSAT will have the same shutdown schedule as the 3.5m so there will be less time available in Q3. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Status of new instrument initiatives === | ||
+ | |||
+ | A replacement high speed imager, SoonerCam, is under development. A survey of all past/ | ||
+ | |||
+ | |||
+ | '' | ||
+ | |||
+ | We are purchasing a new qCMOS high-speed camera, **SoonerCam**, | ||
+ | |||
+ | '' | ||
+ | |||
+ | '' | ||
+ | [[https:// | ||
+ | |||
+ | '' | ||
+ | '' | ||
+ | '' | ||
+ | |||
+ | **We really need users to complete this survey by the end of June. If anyone has specific requests or suggestions regarding desired capabilities for SoonerCam, that should be noted in the final question of the survey.** | ||
+ | |||
+ | Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. | ||
+ | |||
+ | Regarding Ocotillo, we are trying to get final quotes so that we can start purchasing materials and optics to assemble the first channel. Some vendors are slow in responsiveness these days. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Future of ARCSAT Working Group === | ||
+ | |||
+ | This group is still meeting and exploring various options for the future of ARCSAT. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Annual Request to Update Publication Record === | ||
+ | |||
+ | Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === ACTION ITEMS === | ||
+ | |||
+ | Open action items from previous meetings: | ||
+ | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. Nancy and Sarah are awaiting updated quotes from the grism vendor and then the proposal will be submitted. | ||
+ | * UC reps: ask your users to complete the survey regarding needs/ | ||
+ | |||
+ | New action items from this meeting: | ||
+ | * UC reps: ask your users to send Nancy the bibliographic information for any papers published in 2024-2025 that are resulting from 3.5m or ARCSAT data. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === All Other Business === | ||
+ | |||
+ | None. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Next meeting === | ||
+ | |||
+ | The next meeting will be on July 1, 2025 at 10:30 MDT. | ||
+ | |||
+ | ---- | ||