User Tools

Site Tools


uc:uc20250603_june_3_2025

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
uc:uc20250603_june_3_2025 [2025/06/04 15:18]
nchanove
uc:uc20250603_june_3_2025 [2025/06/04 15:24] (current)
nchanove
Line 89: Line 89:
 === 2025 Q2 0.5 scheduling === === 2025 Q2 0.5 scheduling ===
  
-The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). The long-standing policy for filter requests and changes is now published on the ARCSAT webpage in an effort to make it more visible. **Users who are asking for filter changes must make the request at least 72 hours prior to observing night when the new filters are needed. The APO staff cannot support filter changes on weekends and holidays.**+The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). The long-standing policy for filter requests and changes is now published on the ARCSAT webpage in an effort to make it more visible. **Users who are asking for filter changes must make the request at least 72 hours prior to the scheduled observing night when the new filters are needed. The APO staff cannot support filter changes on weekends and holidays.**
  
 ---- ----
Line 95: Line 95:
 === 2025 Q3 3.5m scheduling === === 2025 Q3 3.5m scheduling ===
  
-The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. We have received all requests for Q3 (thanks to everyone for getting them in on time or close to it!). So farwe are not aware of any major conflicts. The schedule is currently being built and we hope to have a version to distribute next week. Once the Q3 schedule for the 3.5m is published we will issue a call for ARCSAT Q3 requests. ARCSAT will have the same shutdown schedule as the 3.5m so there will be less time available in Q3.+The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. We have received all requests for Q3 (thanks to everyone for getting them in on time or close to it!). So far we are not aware of any major conflicts. The schedule is currently being built and we hope to have a version to distribute next week. Once the Q3 schedule for the 3.5m is published we will issue a call for ARCSAT Q3 requests. ARCSAT will have the same shutdown schedule as the 3.5m so there will be less time available in Q3.
  
 ---- ----
Line 117: Line 117:
 ''-Muk'' ''-Muk''
  
-If any users have specific requests or suggestions regarding desired capabilities for SoonerCam, that should be noted in the final question of the survey.+**We really need users to complete this survey by the end of June. If anyone has specific requests or suggestions regarding desired capabilities for SoonerCam, that should be noted in the final question of the survey.**
  
 Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works.
Line 128: Line 128:
  
 This group is still meeting and exploring various options for the future of ARCSAT. This group is still meeting and exploring various options for the future of ARCSAT.
 +
 +----
 +
 +=== Annual Request to Update Publication Record ===
 +
 +Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, instrument concepts, etc., thus we need your help in updating our publication record! We are now participating in a cross-observatory analysis of scientific impact of ground-based telescopes, so it is especially important that we capture all publications resulting from APO observations. Any publications resulting from ARCSAT data are also requested. The listing should include refereed publications and student theses and dissertations (not conference abstracts unless they are peer reviewed) that made use of data acquired with the 3.5m and/or ARCSAT, published from 2024 to the present. If a paper has been submitted to a journal but has not yet completely gone through the review process, please include that as well, with the name of the journal and “submitted.”
  
 ---- ----
Line 144: Line 150:
 === All Other Business === === All Other Business ===
  
-Annual Request to Update Publication Record +None.
- +
-Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, instrument concepts, etc., thus we need your help in updating our publication record! We are now participating in a cross-observatory analysis of scientific impact of ground-based telescopes, so it is especially important that we capture all publications resulting from APO observations. Any publications resulting from ARCSAT data are also requested. The listing should include refereed publications and student theses and dissertations (not conference abstracts unless they are peer reviewed) that made use of data acquired with the 3.5m and/or ARCSAT, published from 2024 to the present. If a paper has been submitted to a journal but has not yet completely gone through the review process, please include that as well, with the name of the journal and “submitted.”+
  
 ---- ----
uc/uc20250603_june_3_2025.1749050313.txt.gz · Last modified: 2025/06/04 15:18 by nchanove