This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20250603_june_3_2025 [2025/06/03 17:28] nchanove |
uc:uc20250603_june_3_2025 [2025/06/04 15:24] (current) nchanove |
||
---|---|---|---|
Line 59: | Line 59: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | The site report is pretty comprehensive. | + | The site has been incredibly dry but we got some much-needed rain last weekend even though we are not yet in the classical monsoon season. We will be keeping an eye out for seasonal telescope motion errors that may increase as the temperature warms; if that happens we may need to adjust the PID settings. |
- | ARCSAST | + | ARCSAT had some issues |
- | Will investigate KOSMOS issue. | + | |
- | ARCTIC - lost a quad, issues with ion pump control, narrowed down to a bad cable, once repaired hoping these issues will be reduced and won't have to warm instrument as much as recently. | + | |
- | Agile - failure of newly replaced TEC; no current plans to repair further; moving ahead with SoonerCam. Have camera in office! Auxillary equip not ordered yet but that project is ramping up. Working on remaplcemet for modern computer/ | + | |
- | No status update on DIS. | + | |
- | NICFPS and Spec performing fine. Undergoing some tech issues re: laser on APOLLO that we're working through. | + | |
- | If do any instrument servicing, probably outside | + | We will investigate the KOSMOS issue reported above. |
+ | |||
+ | ARCTIC recently dropped a quad, which was recovered. There were also recent issues with the ion pump control; the cause was narrowed down to a bad cable. Once this is repaired we hope these issues will be reduced and we will not have to warm the instrument as much as we have recently. | ||
+ | |||
+ | Agile experienced a failure of the newly replaced TEC, and there are no current plans to repair the instrument further. We are moving ahead with SoonerCam (we now have the new camera in hand)! Auxiliary equipment for SoonerCam has not been ordered yet but that project is ramping up. | ||
+ | |||
+ | We are working on replacements for more modern computer/ | ||
+ | |||
+ | There is no new status update for DIS. | ||
+ | |||
+ | NICFPS and TripleSpec are performing fine. | ||
+ | |||
+ | We are currently undergoing some technical issues with the laser on APOLLO that we're working through. | ||
+ | |||
+ | If we do any instrument servicing | ||
---- | ---- | ||
Line 74: | Line 83: | ||
=== 2025 Q2 3.5m scheduling === | === 2025 Q2 3.5m scheduling === | ||
- | The time in Q2 is fully allocated; no OPEN or DD slots remain. | + | The time in Q2 is fully allocated; no OPEN or DD slots remain. |
---- | ---- | ||
Line 80: | Line 89: | ||
=== 2025 Q2 0.5 scheduling === | === 2025 Q2 0.5 scheduling === | ||
- | The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). | + | The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). |
---- | ---- | ||
Line 86: | Line 95: | ||
=== 2025 Q3 3.5m scheduling === | === 2025 Q3 3.5m scheduling === | ||
- | The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. | + | The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. |
---- | ---- | ||
Line 92: | Line 101: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | A replacement high speed imager, SoonerCam, is under development. | + | A replacement high speed imager, SoonerCam, is under development. |
Line 108: | Line 117: | ||
'' | '' | ||
- | If any users have specific | + | **We really need users to complete this survey by the end of June. If anyone has specific |
Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. | Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. | ||
- | Trying | + | Regarding Ocotillo, we are trying |
---- | ---- | ||
Line 119: | Line 128: | ||
This group is still meeting and exploring various options for the future of ARCSAT. | This group is still meeting and exploring various options for the future of ARCSAT. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Annual Request to Update Publication Record === | ||
+ | |||
+ | Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, | ||
---- | ---- | ||
Line 125: | Line 140: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. | + | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. Nancy and Sarah are awaiting updated quotes from the grism vendor and then the proposal will be submitted. |
* UC reps: ask your users to complete the survey regarding needs/ | * UC reps: ask your users to complete the survey regarding needs/ | ||
New action items from this meeting: | New action items from this meeting: | ||
- | * xxx | + | * UC reps: ask your users to send Nancy the bibliographic information for any papers published in 2024-2025 that are resulting from 3.5m or ARCSAT data. |
---- | ---- | ||
Line 135: | Line 150: | ||
=== All Other Business === | === All Other Business === | ||
- | Annual Request to Update Publication Record | + | None. |
- | + | ||
- | Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, | + | |
---- | ---- |