Attending: Nancy Chanover (NMSU), Bill Ketzeback (APO), Anne Verbiscer (UVa), Eric Bellm (UW), Aleksandr Mosenkov (BYU), Kevin Schlaufman (JHU), Joanne Hughes (Seattle U), Moire Prescott (NMSU), Adam Kowalski (CU), Chip Kobulnicky (UWy), Ben Williams (UW), Sarah Tuttle (UW) | Attending: Nancy Chanover (NMSU), Bill Ketzeback (APO), Anne Verbiscer (UVa), Eric Bellm (UW), Aleksandr Mosenkov (BYU), Kevin Schlaufman (JHU), Joanne Hughes (Seattle U), Moire Prescott (NMSU), Adam Kowalski (CU), Chip Kobulnicky (UWy), Ben Williams (UW), Sarah Tuttle (UW) | ||
- | |||
- | |||
- | Russet McMillan (APO), | ||
- | Misty Bentz (GSU) | ||
=== User feedback and comments from institutional representatives === | === User feedback and comments from institutional representatives === | ||
Line 20: | Line 16: | ||
* Colorado - nothing to report | * Colorado - nothing to report | ||
* JHU - nothing to report | * JHU - nothing to report | ||
- | * NMSU - report from user - dark correction on KOSMOS data taken pretty recently | + | * NMSU - There was a report from a user regarding the dark correction on KOSMOS data taken pretty recently. The dark level seems to be higher than it was historically, |
* Washington - nothing to report | * Washington - nothing to report | ||
Line 63: | Line 59: | ||
=== Additional site, telescope and instrument discussion === | === Additional site, telescope and instrument discussion === | ||
- | Report is pretty comprehensive (above) - got rain last weekend | + | The site has been incredibly dry but we got some much-needed |
+ | |||
+ | ARCSAT had some issues last night with the camera communicating with the software | ||
+ | |||
+ | We will investigate the KOSMOS issue reported above. | ||
+ | |||
+ | ARCTIC recently dropped a quad, which was recovered. There were also recent issues with the ion pump control; the cause was narrowed down to a bad cable. Once this is repaired we hope these issues will be reduced and we will not have to warm the instrument as much as we have recently. | ||
+ | |||
+ | Agile experienced a failure of the newly replaced TEC, and there are no current plans to repair the instrument further. We are moving ahead with SoonerCam (we now have the new camera in hand)! Auxiliary equipment for SoonerCam has not been ordered yet but that project is ramping up. | ||
+ | |||
+ | We are working on replacements for more modern computer/ | ||
+ | |||
+ | There is no new status update for DIS. | ||
+ | |||
+ | NICFPS and TripleSpec are performing fine. | ||
+ | |||
+ | We are currently undergoing some technical issues with the laser on APOLLO that we're working through. | ||
+ | |||
+ | If we do any instrument servicing this summer it will probably take place outside of the summer shutdown window. Most likely it would only be KOSMOS, since ARCES, NICFPS, and TripleSpec don't need vacuum servicing, and KOSMOS generally only requires a 2-3 day turnaround. This could be accomplished during a period when the instrument is not scheduled for science. | ||
---- | ---- | ||
Line 69: | Line 83: | ||
=== 2025 Q2 3.5m scheduling === | === 2025 Q2 3.5m scheduling === | ||
- | The time in Q2 is fully allocated; no OPEN or DD slots remain. | + | The time in Q2 is fully allocated; no OPEN or DD slots remain. There are a couple of ToO paybacks slots that have not been called in yet. |
---- | ---- | ||
Line 75: | Line 89: | ||
=== 2025 Q2 0.5 scheduling === | === 2025 Q2 0.5 scheduling === | ||
- | The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). | + | The Q2 ARCSAT schedule has one week of OPEN time remaining (June 12-19). |
---- | ---- | ||
Line 81: | Line 95: | ||
=== 2025 Q3 3.5m scheduling === | === 2025 Q3 3.5m scheduling === | ||
- | The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. | + | The 3.5m summer shutdown is scheduled for 7-17 July, inclusive. |
---- | ---- | ||
Line 87: | Line 101: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | A replacement high speed imager, SoonerCam, is under development. | + | A replacement high speed imager, SoonerCam, is under development. |
Line 102: | Line 116: | ||
'' | '' | ||
'' | '' | ||
+ | |||
+ | **We really need users to complete this survey by the end of June. If anyone has specific requests or suggestions regarding desired capabilities for SoonerCam, that should be noted in the final question of the survey.** | ||
Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. | Work on the new optical echelle spectrograph continues with the goal of completing the Preliminary Design Review this calendar year. Another grant proposal is in the works. | ||
- | We have no updates concerning | + | Regarding |
---- | ---- | ||
Line 112: | Line 128: | ||
This group is still meeting and exploring various options for the future of ARCSAT. | This group is still meeting and exploring various options for the future of ARCSAT. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | === Annual Request to Update Publication Record === | ||
+ | |||
+ | Please send Nancy any references for 3.5m-related publications (anything published from Jan 1 2024 to now). The deadline is June 30. Understanding the scientific usage and impact of the telescope is critical for evaluating future projects, initiatives, | ||
---- | ---- | ||
Line 118: | Line 140: | ||
Open action items from previous meetings: | Open action items from previous meetings: | ||
- | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. | + | * Nancy: get Mt. Cuba Foundation proposal for new KOSMOS grisms submitted. STATUS: OPEN. Nancy and Sarah are awaiting updated quotes from the grism vendor and then the proposal will be submitted. |
* UC reps: ask your users to complete the survey regarding needs/ | * UC reps: ask your users to complete the survey regarding needs/ | ||
New action items from this meeting: | New action items from this meeting: | ||
- | * xxx | + | * UC reps: ask your users to send Nancy the bibliographic information for any papers published in 2024-2025 that are resulting from 3.5m or ARCSAT data. |
---- | ---- | ||
Line 128: | Line 150: | ||
=== All Other Business === | === All Other Business === | ||
- | Annual Request to Update Publication Record | + | None. |
- | + | ||