This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
uc:uc20250401_april_1_2025 [2025/04/01 17:27] nchanove |
uc:uc20250401_april_1_2025 [2025/04/01 17:30] (current) nchanove |
||
---|---|---|---|
Line 75: | Line 75: | ||
=== 2025 Q2 3.5m scheduling === | === 2025 Q2 3.5m scheduling === | ||
- | The Q2 3.5m schedule is out; it started today. There is no DD time this quarter, and very little OPEN time due to the scheduling inefficiencies associated with several programs that required short time slots. There are a few bright B half slots in April starting on April 17, along with a few ToO payback slots towards end of quarter that will be rescheduled if the ToOs don't get called in. Users are encouraged to review the schedule and request any OPEN time that they could use. | + | The Q2 3.5m schedule is out; it started today. There is no DD time this quarter, and very little OPEN time due to the scheduling inefficiencies associated with several programs that required short time slots. There are a few bright B half slots in April starting on April 17, along with a few ToO payback slots towards end of quarter that will be rescheduled if the ToOs don't get called in. Users are encouraged to review the schedule and request any OPEN time that they can use. |
---- | ---- | ||
Line 87: | Line 87: | ||
=== Status of new instrument initiatives === | === Status of new instrument initiatives === | ||
- | Early discussions regarding the development of a replacement high speed imager, SoonerCam, are ongoing. We expect to be able to share an information/ | + | Early discussions regarding the development of a replacement high speed imager, SoonerCam, are ongoing. We expect to be able to share an information/ |
Our preliminary proposal to the NSF for a replacement echelle was not invited for a full proposal. Work on the instrument continues with the goal of completing the Preliminary Design Review this calendar year, and additional sources of funds are being investigated. | Our preliminary proposal to the NSF for a replacement echelle was not invited for a full proposal. Work on the instrument continues with the goal of completing the Preliminary Design Review this calendar year, and additional sources of funds are being investigated. | ||
Line 104: | Line 104: | ||
=== Future of ARCSAT Working Group === | === Future of ARCSAT Working Group === | ||
- | A new working group was recently formed: the Future of ARCSAT Working Group (FAWG, or " | + | A new working group was recently formed: the Future of ARCSAT Working Group (FAWG, or " |
---- | ---- |